CN210892154U - Gas boiler who can assist gas complete combustion reforms transform structure - Google Patents

Gas boiler who can assist gas complete combustion reforms transform structure Download PDF

Info

Publication number
CN210892154U
CN210892154U CN201921725800.4U CN201921725800U CN210892154U CN 210892154 U CN210892154 U CN 210892154U CN 201921725800 U CN201921725800 U CN 201921725800U CN 210892154 U CN210892154 U CN 210892154U
Authority
CN
China
Prior art keywords
gas
pipe
inner cavity
control device
lifting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921725800.4U
Other languages
Chinese (zh)
Inventor
赵历刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921725800.4U priority Critical patent/CN210892154U/en
Application granted granted Critical
Publication of CN210892154U publication Critical patent/CN210892154U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of gas boilers, in particular to a gas boiler reforming structure capable of assisting in complete combustion of gas, which comprises a water storage tank, a control device, a combustion chamber, a diffusion pipe, a heat dissipation pipe, a flow guide pipe and a gas collection box are arranged in the water storage tank, one side of the control device is connected with the combustion chamber, one end of the combustion chamber is fixedly connected with the diffusion pipe, the upper end of the control device is provided with a plurality of heat dissipation pipes which are evenly distributed in parallel, one end of each heat dissipation pipe is connected with the diffusion pipe, the other end of each heat dissipation pipe extends to the outside of the control device, the upper end of the control device is connected with the flow guide pipe, one end of the flow guide pipe is connected with the gas collection box, and the heat dissipation pipes penetrate through the gas collection box, the energy-saving performance of the whole gas boiler is improved.

Description

Gas boiler who can assist gas complete combustion reforms transform structure
Technical Field
The utility model relates to a gas boiler technical field specifically is a gas boiler who can assist gas complete combustion reforms transform structure.
Background
How to improve the secondary combustion effect of other hot gas flows is a technical problem needing improvement in the prior art, and the gas-fired boiler not only can maximize the combustion efficiency and bring economic benefits to enterprises, but also can reduce the pollution influence on the environment.
If the gas boiler has the function of automatically controlling the circulation of the gas flow, the secondary combustion of the gas flow is realized without extra energy injection, the gas combustion efficiency is improved, and the problem can be solved, so that the improved structure of the gas boiler capable of assisting the complete combustion of the gas is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a gas boiler who can assist gas complete combustion reforms transform structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a gas boiler transformation structure capable of assisting in complete combustion of gas comprises a water storage tank, wherein a control device, a combustion chamber, a diffusion pipe, radiating pipes, a flow guide pipe and a gas collection box are arranged in the water storage tank, one side of the control device is connected with the combustion chamber, one end of the combustion chamber is fixedly connected with the diffusion pipe, the upper end of the control device is provided with the radiating pipes which are uniformly distributed in parallel, one ends of the radiating pipes are connected with the diffusion pipe, the other ends of the radiating pipes extend out of the control device, the upper end of the control device is connected with the flow guide pipe, one end of the flow guide pipe is connected with the gas collection box, the radiating pipes penetrate through the gas collection box, one side of the water storage tank is connected with a gas injection pipe, one end of the gas injection pipe extends into the control device, the control device comprises a control box, an intercepting, the middle part of the inner cavity of the control box is fixedly connected with an intercepting barrel, the upper end of the intercepting barrel is provided with a lifting plate, the lifting plate is movably sleeved in the inner cavity of the control box, a corrugated pipe and a sliding rod are arranged in the inner cavity of the control box at the upper end of the lifting plate, a plurality of sliding rods which are uniformly distributed are arranged in the middle ring of the inner cavity of the corrugated pipe, a plurality of through holes which are uniformly distributed are formed in the plate body of the lifting plate, one end of each through hole of the lifting plate is communicated with the inner cavity of the corrugated.
Preferably, the check valve includes sealing ring, ball sealer and interception board, the lower extreme of sealing ring is provided with the ball sealer, and the lower extreme of ball sealer is provided with the interception board, the interception board shape is offered a plurality of evenly distributed's through-hole on plectane and the plate body, and the cambered surface inner groovy has been offered for drum and barrel bottom surface middle part down to sealed annular form, and the cambered surface inner groovy and the ball sealer of sealing ring agree with.
Preferably, the upper end of the sliding rod is fixedly connected with the bottom surface of the inner cavity of the control box, and the lower end of the sliding rod extends into a columnar groove formed in the lifting plate.
Preferably, the gas collection box is of a cuboid box shell structure, the radiating pipes penetrate through the inner cavity of the gas collection box, and a plurality of uniformly distributed through holes are annularly arranged on the side walls of the radiating pipes in the inner cavity of the gas collection box.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model realizes the purpose of fully burning the air flow by the control device, the air flow in the radiating pipe can flow back and be injected into the control box for secondary burning, and the energy-saving performance of the whole gas boiler is improved by taking the air pressure as the power;
2. the utility model discloses a stable mechanical transmission control is realized in controlling means's design, and then ensures the stable refluence that carries on of air current in the cooling tube.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the check valve in fig. 1.
In the figure: 1 water storage tank, 2 control devices, 3 combustion chambers, 4 diffusion pipes, 5 radiating pipes, 6 flow guide pipes, 7 gas collection boxes, 8 gas injection pipes, 9 one-way valves, 10 control boxes, 11 intercepting cylinders, 12 lifting plates, 13 corrugated pipes, 14 sliding rods, 15 sealing rings, 16 sealing balls and 17 intercepting plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the technical scheme in the utility model, all other embodiments that ordinary skilled person in the art obtained under the prerequisite of not making the creative work all belong to the scope of the utility model protection.
Referring to fig. 1 to 2, the present invention provides a technical solution: the utility model provides a can assist gas boiler of gas complete combustion to reform transform structure, including storage water tank 1, be provided with controlling means 2 in storage water tank 1, combustion chamber 3, the diffuser pipe 4, cooling tube 5, honeycomb duct 6 and gas collection box 7, one side of controlling means 2 is connected with combustion chamber 3, the one end fixedly connected with diffuser pipe 4 of combustion chamber 3, the upper end of controlling means 2 is provided with a plurality of even parallel distribution's cooling tube 5, the one end and the diffuser pipe 4 of cooling tube 5 are connected, the other end of cooling tube 5 extends to the outside of controlling means 2, the upper end of controlling means 2 is connected with honeycomb duct 6, the one end of honeycomb duct 6 is connected with gas collection box 7, cooling tube 5 runs through gas collection box 7, one side of storage water tank 1 is connected with gas injection pipe 8, gas injection pipe 8 one end extends to controlling means 2, controlling means 2 includes controlling means 10, intercepting section, The control box 10 is in a cylindrical shell shape, an intercepting cylinder 11 is fixedly connected to the middle of an inner cavity of the control box 10, a lifting plate 12 is arranged at the upper end of the intercepting cylinder 11, the lifting plate 12 is movably sleeved in the inner cavity of the control box 10, a corrugated pipe 13 and a sliding rod 14 are arranged in the inner cavity of the control box 10 at the upper end of the lifting plate 12, a plurality of sliding rods 14 which are uniformly distributed are arranged in the middle ring of the inner cavity of the corrugated pipe 13, a plurality of through holes which are uniformly distributed are formed in a plate body of the lifting plate 12, one end of each through hole of the lifting plate 12 is communicated with the inner cavity of the corrugated pipe 13, and a plurality.
The check valve 9 comprises a sealing ring 15, a sealing ball 16 and a blocking plate 17, the sealing ball 16 is arranged at the lower end of the sealing ring 15, the blocking plate 17 is arranged at the lower end of the sealing ball 16, the blocking plate 17 is shaped like a circular plate, a plurality of through holes are uniformly distributed in the plate body, the sealing ring 15 is shaped like a cylinder, an inner arc-surface groove is formed in the middle of the lower bottom surface of the cylinder, and the inner arc-surface groove of the sealing ring 15 is matched with the sealing ball 16.
The upper end of the sliding rod 14 is fixedly connected with the bottom surface of the inner cavity of the control box 10, and the lower end of the sliding rod 14 extends into a columnar groove formed in the lifting plate 12.
The gas collecting box 7 is a cuboid box shell structure, the heat radiating pipe 5 penetrates through the inner cavity of the gas collecting box 7, and the side wall of the heat radiating pipe 5 in the inner cavity of the gas collecting box 7 is provided with a plurality of uniformly distributed through holes in a ring mode, a one-way valve 9 in fig. 2 plays a role in guiding air flow in a one-way mode, referring to fig. 1, one end of an air injection pipe 8 extends into the inner cavity of a control box 10, the end part of the air injection pipe 8 on the gas boiler in the prior art is connected with an air injection head, the combustion chamber 3 is in a cylindrical shell shape with an opening at one end, the air injection head on the air injection pipe 8 injects gas and combustion air, an electric ignition mechanism in the prior art is arranged in the control box 10, the gas is ignited, a flame column generated by the gas mainly impacts the inner cavity of the combustion chamber 3, complete combustion in the place is.
The working principle is as follows: the gas injection pipe 8 is injected with gas, the gas is mainly combusted in the combustion chamber 3, the generated heat flows into the diffusion pipe 4 and then flows into the plurality of radiating pipes 5, the water tank 1 stores water to be heated, the water level is heated through the radiation of the pipe walls of the radiating pipes 5, the residual heat flows out of the water tank 1 through the radiating pipes 5 and flows into the collecting mechanism of the gas boiler in the prior art, a part of residual heat flows through the gas collecting box 7 and flows into the flow guide pipe 6 and then flows into the inner cavity of the corrugated pipe 13 and finally flows into the inner cavity of the control box 10 below the lifting plate 12 through the lifting plate 12, the air pressure caused by combustion rises to push the lifting plate 12, the lifting plate 12 rises, and then the air flow in the corrugated pipe 13 is extruded into the inner cavity of the control box 10 below the lifting plate 12 through the through holes on the plurality of lifting plates 12, and a part of the air flow is extruded into the flow guide pipe 6, the part of air flow can be ignored relative to the permeation of the lifting plate 12, and the flame is extinguished at one end of combustion, so that the position of the gravity lifting plate 12 is lowered, the corrugated pipe 13 is deformed and opened, the suck-back force of the air flow is generated in the flow guide pipe 6, namely, the air flow in the air collection box 7 flows into the flow guide pipe 6, the air flow in the heat dissipation pipe 5 flows into the air collection box 7, and thus, the fuel gas in the control device 2 is intermittently combusted, most of residual heat air flow in the heat dissipation pipe 5 is reinjected into the control box 10 to carry out secondary combustion, and the combustion efficiency is improved to the maximum extent.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a can assist gas boiler of gas complete combustion reforms transform structure, includes storage water tank (1), its characterized in that: the water storage tank is characterized in that a control device (2), a combustion chamber (3), a diffusion pipe (4), radiating pipes (5), a guide pipe (6) and a gas collection box (7) are arranged in the water storage tank (1), one side of the control device (2) is connected with the combustion chamber (3), one end of the combustion chamber (3) is fixedly connected with the diffusion pipe (4), the upper end of the control device (2) is provided with a plurality of radiating pipes (5) which are uniformly distributed in parallel, one end of each radiating pipe (5) is connected with the diffusion pipe (4), the other end of each radiating pipe (5) extends out of the control device (2), the upper end of the control device (2) is connected with the guide pipe (6), one end of each guide pipe (6) is connected with the gas collection box (7), each radiating pipe (5) penetrates through the gas collection box (7), one side of the water storage tank (1) is connected with a gas injection pipe (, the control device (2) comprises a control box (10), an intercepting cylinder (11), a circular plate-shaped lifting plate (12), a corrugated pipe (13) and a sliding rod (14), the control box (10) is in a cylindrical shell shape, the middle part of the inner cavity of the control box (10) is fixedly connected with an intercepting cylinder (11), the upper end of the intercepting cylinder (11) is provided with a lifting plate (12), the lifting plate (12) is movably sleeved in the inner cavity of the control box (10), a corrugated pipe (13) and a slide rod (14) are arranged in the inner cavity of the control box (10) at the upper end of the lifting plate (12), a plurality of slide rods (14) which are uniformly distributed are arranged in the middle ring of the inner cavity of the corrugated pipe (13), a plurality of through holes which are uniformly distributed are arranged on the plate body of the lifting plate (12), one end of each through hole of the lifting plate (12) is communicated with the inner cavity of the corrugated pipe (13), and a plurality of uniformly distributed one-way valves (9) are arranged in the lifting plate (12).
2. The reformed structure of a gas boiler capable of assisting complete combustion of gas, according to claim 1, wherein: check valve (9) are including sealing ring (15), ball sealer (16) and interception board (17), the lower extreme of sealing ring (15) is provided with ball sealer (16), and the lower extreme of ball sealer (16) is provided with interception board (17), interception board (17) shape is offered a plurality of evenly distributed's through-hole on plectane and the plate body, and cambered surface inner groovy has been offered for bottom surface middle part under drum and the barrel to sealing ring (15) shape, and the cambered surface inner groovy and ball sealer (16) of sealing ring (15) agree with.
3. The reformed structure of a gas boiler capable of assisting complete combustion of gas, according to claim 1, wherein: the upper end of the sliding rod (14) is fixedly connected with the bottom surface of the inner cavity of the control box (10), and the lower end of the sliding rod (14) extends into a columnar groove formed in the lifting plate (12).
4. The reformed structure of a gas boiler capable of assisting complete combustion of gas, according to claim 1, wherein: the gas collection box (7) is of a cuboid box shell structure, the radiating pipes (5) penetrate through the inner cavity of the gas collection box (7), and the side walls of the radiating pipes (5) in the inner cavity of the gas collection box (7) are provided with a plurality of uniformly distributed through holes in an annular mode.
CN201921725800.4U 2019-10-15 2019-10-15 Gas boiler who can assist gas complete combustion reforms transform structure Expired - Fee Related CN210892154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921725800.4U CN210892154U (en) 2019-10-15 2019-10-15 Gas boiler who can assist gas complete combustion reforms transform structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921725800.4U CN210892154U (en) 2019-10-15 2019-10-15 Gas boiler who can assist gas complete combustion reforms transform structure

Publications (1)

Publication Number Publication Date
CN210892154U true CN210892154U (en) 2020-06-30

Family

ID=71322240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921725800.4U Expired - Fee Related CN210892154U (en) 2019-10-15 2019-10-15 Gas boiler who can assist gas complete combustion reforms transform structure

Country Status (1)

Country Link
CN (1) CN210892154U (en)

Similar Documents

Publication Publication Date Title
CN210892154U (en) Gas boiler who can assist gas complete combustion reforms transform structure
CN107702340B (en) Method for supplying hot water and/or steam by double-layer spiral coil heating device
CN201066195Y (en) Horizontal type reverse-combusting coal-firing boiler
CN105332865B (en) Tower type solar and coal-burning boiler photothermal cogeneration system
CN203671888U (en) Multi-circulation heat absorption energy-saving boiler
CN201983311U (en) Afterheat recovering device for gas stove
CN109579292B (en) Boiler water heater with condensing heat exchanger
CN218936653U (en) Multi-channel cleaning furnace
CN201589418U (en) Combined type circulatory heating system
CN203454385U (en) Multi-section type water heating boiler
CN105167597A (en) Thermoelectric power generation kettle
CN212841499U (en) Vertical steam boiler for burning biomass particles
CN202024467U (en) Thermal superconductive pipe boiler
CN205957151U (en) Combustor of high -efficient heat conduction
CN103398467A (en) High-heat efficiency hot-water boiler with function o f multi-stage heating
CN204478509U (en) A kind of heat-absorbing structure of inner bag biomass boiler
CN210485685U (en) Water supply device for steam boiler
CN213480591U (en) Three-dimensional box type gas boiler
CN203823752U (en) Gas cooking range
CN219976420U (en) Stable combustion device of biomass thermal gasification boiler
CN117450493B (en) Marine boiler with explosion-proof protection
CN220852096U (en) Gas steam boiler
CN211781239U (en) Multifunctional energy-saving stove
CN203159555U (en) Improved energy-saving coal gasification furnace
CN218991696U (en) Combined heat and power generation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200630

Termination date: 20211015