CN210888320U - Dedicated cement prefabricated component of engineering service - Google Patents

Dedicated cement prefabricated component of engineering service Download PDF

Info

Publication number
CN210888320U
CN210888320U CN201921688701.3U CN201921688701U CN210888320U CN 210888320 U CN210888320 U CN 210888320U CN 201921688701 U CN201921688701 U CN 201921688701U CN 210888320 U CN210888320 U CN 210888320U
Authority
CN
China
Prior art keywords
fixedly connected
cement prefabricated
water receiving
receiving tank
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921688701.3U
Other languages
Chinese (zh)
Inventor
翁奕鸿
翁奕加
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Jiannengtong Construction Engineering Co ltd
Original Assignee
Foshan Jiannengtong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Jiannengtong Construction Engineering Co ltd filed Critical Foshan Jiannengtong Construction Engineering Co ltd
Priority to CN201921688701.3U priority Critical patent/CN210888320U/en
Application granted granted Critical
Publication of CN210888320U publication Critical patent/CN210888320U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to a cement prefabricated component technical field just discloses a dedicated cement prefabricated component of engineering service, including two cement prefabricated posts, two the equal fixedly connected with mounting panel of lateral wall of cement prefabricated post one side in opposite directions, the mounting panel is kept away from one side upper end of cement prefabricated post and has been seted up scarce groove, it has the dead lever, two to lack the inslot joint the many railings of even fixedly connected with between the lateral wall of dead lever one side in opposite directions, the upper end fixedly connected with water receiving tank of cement prefabricated post, the front side fixedly connected with water storage box of cement prefabricated post, fixed intercommunication has same water service pipe between the lower extreme front side of water receiving tank and the upper end of water storage box. The utility model discloses only need to demolish the bolt and can take off whole fence and maintain convenient to maintain and use when needs are maintained the fence.

Description

Dedicated cement prefabricated component of engineering service
Technical Field
The utility model relates to a cement prefabricated component technical field especially relates to a dedicated cement prefabricated component of engineering service.
Background
The rail can be made with cement prefabricated component to the use among the building engineering's the actual service process and relevant isolation protection is carried out, and cement prefabricated component carries out the fixed to the fence as the support column at present, but is integrative fixed mostly between fence and the cement prefabricated column, and this makes the inconvenience of fence very when needs are maintained, can not carry out quick effectual change maintenance, is not convenient for use.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art cement prefabricated component and carrying out the fixed to the fence as the support column, nevertheless be integrative fixed mostly between fence and the cement prefabricated column, this makes the inconvenience that the fence is very when needs are maintained, can not carry out quick effectual change and maintain, the problem of not being convenient for to use, and the dedicated cement prefabricated component of engineering service who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a cement prefabricated component special for engineering service comprises two cement prefabricated columns, wherein the side walls of the opposite sides of the two cement prefabricated columns are fixedly connected with mounting plates, the upper end of one side of the mounting plate, which is far away from the cement prefabricated column, is provided with a notch, a fixed rod is clamped in the notch, a plurality of handrails are uniformly and fixedly connected between the side walls of the opposite sides of the two fixed rods, the upper end of the cement prefabricated column is fixedly connected with a water receiving tank, the front side of the cement prefabricated column is fixedly connected with a water storage box, the front side of the lower end of the water receiving tank and the upper end of the water storage box are fixedly communicated with a same water pipe, the front side of the lower end of the water storage box is fixedly communicated with a water tap, the inner wall of the upper end of the water receiving tank is fixedly connected with an annular supporting plate, the annular supporting plate upper support is connected with a fixing frame, a filter screen is fixedly connected in the fixing frame, and the side wall of the water receiving box is fixedly clamped with the fixing frame through a clamping mechanism.
Preferably, one side fixedly connected with of mounting panel is close to the prefabricated post of cement is many to fix a position and is inserted the post, the post is inserted in the location and is kept away from the one end of mounting panel and peg graft in the prefabricated post of cement.
Preferably, a plurality of positioning screw holes are uniformly formed in the surfaces of the fixing rod and the mounting plate and are fixedly connected through positioning bolts.
Preferably, the upper end of the fixed rod is fixedly connected with a clamping plate, and the surface of the clamping plate and the upper end of the mounting plate are symmetrically provided with limiting screw holes and are fixedly connected through limiting bolts.
Preferably, the clamping mechanism comprises a clamping rod movably inserted into the side wall of the water receiving tank through a jack formed in the side wall of the water receiving tank, the side wall of the fixing frame is provided with a clamping groove correspondingly inserted with the clamping rod, the clamping rod is located at one end outside the water receiving tank and fixedly connected with a pulling plate, and a reset spring sleeved outside the clamping rod is fixedly connected between the pulling plate and the side wall of the opposite side of the water receiving tank and fixedly connected with the same sleeve.
Compared with the prior art, the utility model provides a dedicated cement prefabricated component of engineering service possesses following beneficial effect:
1. this dedicated cement prefabricated component of engineering service, through the prefabricated post of cement that is equipped with, insert the post through the location and just inject the prefabricated post of cement in the prefabricated post shaping of cement, can make firm the linking together between mounting panel and the prefabricated post of cement, when the fence is installed, it makes dead lever and mounting panel link together relatively to insert the joint of groove through the dead lever, the effect of rethread spacing bolt and positioning bolt makes dead lever and mounting panel detachable link together firmly, railing that fixed connection has between the dead lever can form the fence fast and use, only need demolish the bolt and can take off whole fence and maintain when needs are maintained the fence, and convenient for maintain and use.
2. This dedicated cement prefabricated component of engineering service, through the water receiving case that is equipped with, the water receiving case can be collected in carrying the rainwater to the retaining box through the water service pipe in rainy time, tap can control taking of rainwater, and the energy can be saved, and can avoid the impurity of rainwater to lead to the fact water pollution and the problem of pipe blockage in water receiving case and the retaining box through the filter screen that is equipped with, reset spring pull-back arm-tie, can realize the spacing fixed to the filter screen in advancing the draw-in groove with the kelly, can realize the quick assembly disassembly to the filter screen, and convenient to use.
And the part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses only need demolish the bolt and can take off whole fence and maintain, be convenient for maintain the use when needs are maintained the fence.
Drawings
Fig. 1 is a schematic structural diagram of a cement prefabricated component dedicated for engineering services according to the present invention;
fig. 2 is a schematic structural diagram of a part a of a cement prefabricated component dedicated for engineering services.
In the figure: 1 prefabricated post of cement, 2 mounting panels, 3 scarce groove, 4 dead levers, 5 railings, 6 water receiving tank, 7 retaining box, 8 water service pipes, 9 taps, 10 annular layer boards, 11 fixed frames, 12 filter screens, 13 screens mechanism, 131 kellies, 132 draw-in groove, 133 arm-tie, 134 reset spring, 14 location insert post, 15 cardboard.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, a cement prefabricated component special for engineering service comprises two cement prefabricated columns 1, wherein the side walls of the opposite sides of the two cement prefabricated columns 1 are fixedly connected with a mounting plate 2, the upper end of one side of the mounting plate 2, which is far away from the cement prefabricated column 1, is provided with a notch 3, a fixing rod 4 is clamped in the notch 3, a plurality of railings 5 are uniformly and fixedly connected between the side walls of the opposite sides of the two fixing rods 4, the upper end of the cement prefabricated column 1 is fixedly connected with a water receiving box 6, the front side of the cement prefabricated column 1 is fixedly connected with a water storage box 7, the same water pipe 8 is fixedly communicated between the front side of the lower end of the water receiving box 6 and the upper end of the water storage box 7, the front side of the lower end of the water storage box 7 is fixedly communicated with a faucet 9, the inner wall of the upper end of the water receiving box 6 is, the side wall of the water receiving box 6 is positioned and clamped with the fixing frame 11 through the clamping mechanism 13.
The post 14 is inserted in many location of one side fixedly connected with of mounting panel 2 near prefabricated post 1 of cement, and the post 14 is inserted in the location and the one end of keeping away from mounting panel 2 is pegged graft in prefabricated post 1 of cement.
A plurality of positioning screw holes are uniformly formed in the surfaces of the fixing rod 4 and the mounting plate 2 and are fixedly connected through positioning bolts.
The upper end fixedly connected with cardboard 15 of dead lever 4, spacing screw and through spacing bolt fixed connection have been seted up to the upper end symmetry of the surface of cardboard 15 and mounting panel 2.
The clamping mechanism 13 comprises a clamping rod 131 movably inserted into the side wall of the water receiving tank 6 through a jack formed in the side wall of the water receiving tank 6, a clamping groove 132 correspondingly inserted with the clamping rod 131 is formed in the side wall of the fixing frame 11, the clamping rod 131 is located at one end of the water receiving tank 6 and fixedly connected with a pull plate 133, and a reset spring 134 which is sleeved on the clamping rod 131 is fixedly connected between the pull plate 133 and the side wall of the water receiving tank 6 opposite to the pull plate 133.
In the utility model, when in use, the mounting plate 2 and the cement prefabricated column 1 are firmly connected together by inserting the positioning insertion column 14 into the cement prefabricated column 1 when the cement prefabricated column 1 is formed, when the fence is mounted, the fixing rod 4 and the mounting plate 2 are relatively connected together by clamping the fixing rod 4 and the notch 3, the fixing rod 4 and the mounting plate 2 are detachably and firmly connected together by the action of the limiting bolt and the positioning bolt, the fence can be quickly formed for use by fixedly connecting the railing 5 between the fixing rods 4, when the fence is required to be maintained, the whole fence can be taken down for maintenance by only dismounting the bolt, the maintenance and the use are convenient, through the water receiving tank 6, when raining, the water receiving tank 6 can convey rainwater into the water storage box 7 through the water pipe 8 for collection, tap 9 can control taking of rainwater, the energy can be saved, and impurity through the filter screen 12 that is equipped with can avoid the rainwater causes the problem of water pollution and pipe blockage in carrying out water receiving tank 6 and water storage box 7, and reset spring 134 pull-back plate 133 can realize the spacing fixed to filter screen 12 in advancing draw-in groove 132 with kelly 131, can realize the quick assembly disassembly to filter screen 12, convenient to use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The special cement prefabricated part for engineering service comprises two cement prefabricated columns (1) and is characterized in that the two cement prefabricated columns (1) are fixedly connected with a mounting plate (2) on the side wall of one opposite side, a slot (3) is formed in the upper end of one side, away from the cement prefabricated columns (1), of the mounting plate (2), fixing rods (4) are clamped in the slot (3), a plurality of handrails (5) are uniformly and fixedly connected between the side walls of the opposite sides of the fixing rods (4), a water receiving tank (6) is fixedly connected to the upper end of each cement prefabricated column (1), a water receiving box (7) is fixedly connected to the front side of each cement prefabricated column (1), the same water pipe (8) is fixedly communicated between the front side of the lower end of the water receiving box (6) and the upper end of the water receiving box (7), and a faucet (9) is fixedly communicated with the front side of the lower end of the water receiving, the upper end inner wall fixedly connected with annular layer board (10) of water receiving tank (6), annular layer board (10) pop-up connects fixed frame (11), fixedly connected with filter screen (12) in fixed frame (11), the fixed frame (11) of screens of lateral wall through screens mechanism (13) location joint of water receiving tank (6).
2. The special cement prefabricated component for engineering service according to claim 1, wherein a plurality of positioning insertion columns (14) are fixedly connected to one side of the mounting plate (2) close to the cement prefabricated column (1), and one ends of the positioning insertion columns (14) far away from the mounting plate (2) are inserted into the cement prefabricated column (1).
3. The special cement prefabricated part for engineering service as claimed in claim 1, wherein a plurality of positioning screw holes are uniformly formed on the surface of the fixing rod (4) and the surface of the mounting plate (2) and are fixedly connected through positioning bolts.
4. The special cement prefabricated part for engineering service as claimed in claim 1, wherein a clamping plate (15) is fixedly connected to the upper end of the fixing rod (4), and the surface of the clamping plate (15) and the upper end of the mounting plate (2) are symmetrically provided with limiting screw holes and are fixedly connected through limiting bolts.
5. The special cement prefabricated part for engineering service according to claim 1, wherein the clamping mechanism (13) comprises a clamping rod (131) movably inserted into the side wall of the water receiving tank (6) through a jack formed in the side wall of the water receiving tank (6), a clamping groove (132) correspondingly inserted into the clamping rod (131) is formed in the side wall of the fixing frame (11), a pulling plate (133) is fixedly connected to one end, located outside the water receiving tank (6), of the clamping rod (131), and a same return spring (134) sleeved outside the clamping rod (131) is fixedly connected between the pulling plate (133) and the side wall, opposite to the water receiving tank (6), of the clamping rod.
CN201921688701.3U 2019-10-10 2019-10-10 Dedicated cement prefabricated component of engineering service Expired - Fee Related CN210888320U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921688701.3U CN210888320U (en) 2019-10-10 2019-10-10 Dedicated cement prefabricated component of engineering service

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921688701.3U CN210888320U (en) 2019-10-10 2019-10-10 Dedicated cement prefabricated component of engineering service

Publications (1)

Publication Number Publication Date
CN210888320U true CN210888320U (en) 2020-06-30

Family

ID=71318357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921688701.3U Expired - Fee Related CN210888320U (en) 2019-10-10 2019-10-10 Dedicated cement prefabricated component of engineering service

Country Status (1)

Country Link
CN (1) CN210888320U (en)

Similar Documents

Publication Publication Date Title
CN210888320U (en) Dedicated cement prefabricated component of engineering service
CN113374245B (en) Construction method for temporary support of post-cast strip of beam plate
CN210421379U (en) Assembled structure room
CN214739361U (en) High-efficient rainwater drainage structures
CN212956980U (en) Movable house capable of being quickly disassembled and assembled
CN214658047U (en) Steel structure concrete building house
CN113216615B (en) Underground garage formwork supporting system
CN210463622U (en) Support of balcony type solar water heater
CN220953952U (en) Hall canopy structure column of external wall insulation integrated board structure
CN214227669U (en) Line support for municipal works
CN215484534U (en) Window platform erects strutting arrangement for construction
CN218989906U (en) General type assembled pier steel form construction operation platform and rail
CN210292381U (en) Combined solar water heater
CN214653222U (en) Anti-climbing device for tower crane
CN214091302U (en) Welding-free easy-to-dismount fence
CN214834737U (en) Plug-in type board primary and secondary keel fast-assembling early-dismantling ear-shaped connecting piece
CN218633793U (en) Civilian photovoltaic power generation board base support of simple and convenient loading and unloading
CN216690323U (en) Novel wall connecting piece device
CN218757967U (en) Hanging type modular building structure
CN218375533U (en) Prefabricated floor bearing structure
CN214246712U (en) Reinforced interim frame of ancient and old building
CN220036080U (en) Wall connecting piece device for connecting scaffold and waterproof shear wall
CN219826253U (en) Aluminum mould beam side plate matched with detachable edge protection at stairway opening
CN220100839U (en) Stable assembled steel construction factory building
CN214696541U (en) Stair railing fixing base and stair guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200630

Termination date: 20211010