CN210862814U - Mounting bracket for flowmeter - Google Patents

Mounting bracket for flowmeter Download PDF

Info

Publication number
CN210862814U
CN210862814U CN201921920977.XU CN201921920977U CN210862814U CN 210862814 U CN210862814 U CN 210862814U CN 201921920977 U CN201921920977 U CN 201921920977U CN 210862814 U CN210862814 U CN 210862814U
Authority
CN
China
Prior art keywords
flowmeter
locking
sides
pipeline
arc splint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921920977.XU
Other languages
Chinese (zh)
Inventor
郑万生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Kchibo Instrument Technology Co ltd
Original Assignee
Tianjin Kchibo Instrument Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Kchibo Instrument Technology Co ltd filed Critical Tianjin Kchibo Instrument Technology Co ltd
Priority to CN201921920977.XU priority Critical patent/CN210862814U/en
Application granted granted Critical
Publication of CN210862814U publication Critical patent/CN210862814U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model relates to a mounting bracket for flowmeter, including flowmeter body, pipeline, support body and fixed subassembly, the support body includes storing board and coupling assembling, the storing board both sides can be dismantled respectively and be connected with fixed subassembly, fixed subassembly includes backup pad, arc splint and locking bolt, relative articulated have two arc splint in the backup pad, two arc splint middle parts respectively butt in the pipeline both sides, two arc splint upper ends are connected through locking bolt, the setting of storing board makes things convenient for the staff to place maintenance tool on it, place flowmeter body between two pipelines, the arc splint centre gripping that links to each other with the support body is in pipeline both sides, make flowmeter fix a position between two pipelines before the installation is fixed, and then connect the flange of flowmeter with the pipeline flange through fixing bolt, avoid flowmeter body because of dead weight skew mounted position in the operation process, the installation precision is ensured, the installation and maintenance operations of the flowmeter are facilitated for workers, the installation time is saved, and the working efficiency is improved.

Description

Mounting bracket for flowmeter
Technical Field
The utility model relates to a flowmeter technical field especially relates to a mounting bracket for flowmeter.
Background
The flow measurement is one of the components of the measurement science and technology, has close relation with national economy, national defense construction and scientific research, and plays an important role in ensuring the product quality, improving the production efficiency and promoting the development of the science and technology after the work is done. The flowmeter is a commonly used measuring instrument in industrial measurement and can be divided into a mass flowmeter, a rotor flowmeter, a throttling flowmeter, a slit flowmeter, a volume flowmeter, an electromagnetic flowmeter, an ultrasonic flowmeter and the like. The installation between current flowmeter and the pipeline is mostly through flange joint, at flowmeter installation, maintenance replacement in-process, need use appurtenance to be fixed in the flowmeter between two pipelines to make things convenient for the staff to screw up the bolt on the flange, make the installation between flowmeter and the pipeline all comparatively hard with the dismantlement, it is higher to installer technical level requirement itself, the operation is complicated, consume a large amount of unnecessary time, cause trouble and inconvenience in the use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that overcome exist among the prior art not enough, provide a mounting bracket for flowmeter of easy to assemble maintenance.
The utility model discloses a realize through following technical scheme:
the utility model provides a mounting bracket for flowmeter, its characterized in that, including the flowmeter body, locate the pipeline of flowmeter body both sides, locate the support body of flowmeter body below and locate the fixed subassembly between pipeline and the support body, the support body includes the storing board and is used for connecting the coupling assembling of storing board and flowmeter body, the storing board both sides are equipped with fixed subassembly respectively, fixed subassembly can be dismantled with storing board both sides and be connected, and fixed subassembly includes backup pad, arc splint and locking bolt, the backup pad upper surface articulates relatively has two arc splint, two arc splint middle part butt respectively in the pipeline both sides, and two arc splint upper ends are connected through locking bolt.
According to the technical scheme, preferably, coupling assembling includes the connecting plate, goes up movable rod and lower movable rod, the relative rigid coupling in flowmeter body below has two connecting plates, each the connecting plate both ends are articulated downwards to have an upper movable rod, it has lower movable rod to go up the movable rod lower extreme articulated, lower movable rod lower extreme articulates in storing board upper surface, be equipped with locking Assembly between storing board and the flowmeter body.
According to the above technical scheme, preferably, the locking assembly includes connecting block, locking lever and stop pin, the connecting block rigid coupling is in flowmeter body below, and both sides are opened respectively around the connecting block and are locked the groove, both sides articulate respectively around the storing board has the locking lever, locking lever tip rigid coupling has the stop pin with locking groove shape matched with.
According to the above technical scheme, preferably, the storage plate both sides respectively the rigid coupling have first adapter sleeve, the relative first adapter sleeve's of backup pad lower surface position respectively the rigid coupling have the second adapter sleeve, be equipped with the connecting rod between first adapter sleeve and the second adapter sleeve, the connecting rod both ends respectively with first adapter sleeve and second adapter sleeve threaded connection.
The utility model has the advantages that:
the setting of storing board makes things convenient for the staff to place repair tools on it, place the flowmeter body between two pipelines, the arc splint centre gripping that links to each other with the support body in the pipeline both sides, make the flowmeter be located between two pipelines before the installation is fixed, the flange of rethread fixing bolt with the flowmeter is connected with pipeline flange, avoid the flowmeter body because of the dead weight skew mounted position in operation process, ensure the installation accuracy, make things convenient for the staff to install the maintenance operation to the flowmeter, save installation time, and the work efficiency is improved.
Drawings
Fig. 1 is a schematic view of the structure of the present invention.
In the figure: 1. a pipe flange; 2. a flowmeter body; 3. a connecting flange; 4. a pipeline; 5. fixing the ear; 6. an arc-shaped splint; 7. an upper movable rod; 8. a storage plate; 9. a locking pin; 10. a locking lever; 11. a first connecting sleeve; 12. a connecting rod; 13. a second connecting sleeve; 14. a support plate; 15. a connecting plate; 16. connecting blocks; 17. a locking groove; 18. the movable rod is lowered.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the present invention will be further described in detail with reference to the accompanying drawings and preferred embodiments.
As shown in the figure, the utility model comprises a flowmeter body 2, a pipeline 4 arranged at two sides of the flowmeter body 2, a frame body arranged below the flowmeter body 2 and a fixing component arranged between the pipeline 4 and the frame body, wherein the frame body comprises a storage plate 8 and a connecting component for connecting the storage plate 8 and the flowmeter body 2, two sides of the storage plate 8 are respectively provided with the fixing component, the fixing component is detachably connected with two sides of the storage plate 8, the fixing component can be detached from two sides of the frame body after the detachment operation is completed, the fixing component comprises a support plate 14, arc-shaped clamping plates 6 and locking bolts, the upper surface of the support plate 14 is relatively articulated with two arc-shaped clamping plates 6, the middle parts of the two arc-shaped clamping plates 6 are respectively abutted against two sides of the pipeline 4, the upper end of the arc-shaped clamping plate 6 is fixedly connected with a fixing lug 5, and the locking bolt clamps the arc-shaped clamping plate 6 on two sides of the pipeline 4 by connecting the two fixing lugs 5. 2 both ends of flowmeter body are equipped with flange 3 respectively, are equipped with pipeline flange 1 on the pipeline 4, arrange flowmeter body 2 in between two pipelines 4 with the installation, link to each other flange 3 and pipeline flange 1 through fixing bolt, accomplish the installation operation to flowmeter body 2. Storage panel 8 set up and make things convenient for the staff to place maintenance tool on it, place flowmeter body 2 between two pipelines 4 in, 6 centre gripping of arc splint that link to each other with the support body in 4 both sides of pipeline, make the flowmeter fix before the installation is fixed between two pipelines 4, rethread fixing bolt is connected flowmeter's flange 3 and pipeline flange 1, avoid flowmeter body 2 because of the dead weight skew mounted position in operation process, ensure the installation accuracy, make things convenient for the staff to install the maintenance operation to the flowmeter, save installation time, and the work efficiency is improved.
According to the above embodiment, preferably, the connecting assembly includes the connecting plate 15, the upper movable rod 7 and the lower movable rod 18, two connecting plates 15 are oppositely and fixedly connected below the flowmeter body 2, two ends of each connecting plate 15 are downwards hinged with an upper movable rod 7, the lower end of the upper movable rod 7 is hinged with a lower movable rod 18, the lower end of the lower movable rod 18 is hinged on the upper surface of the storage plate 8, two ends of the lower surface of the connecting plate 15 are fixedly connected with upper connecting lugs oppositely, the upper end of the upper movable rod 7 is hinged with the connecting plate 15 at the upper connecting lugs, a lower connecting lug is arranged at the position on the storage plate 8 opposite to the upper connecting lugs, the lower end of the lower movable rod 18 is hinged with the storage plate 8 at the lower connecting lugs, be equipped with the locking subassembly between storing board 8 and the flowmeter body 2, when need not to use storing board 8, can be with storing board 8 folding back upwards through the locking subassembly locking, practice thrift the usage space.
According to the above embodiment, preferably, the locking assembly includes a connecting block 16, a locking rod 10 and a locking pin 9, the connecting block 16 is fixedly connected below the flowmeter body 2, in this example, the connecting block 15 and the connecting block 16 are fixedly connected below the flowmeter body 2 by welding, the front side and the rear side of the connecting block 16 are respectively provided with a locking groove 17, the front side and the rear side of the storage plate 8 are respectively hinged with the locking rod 10, the end of the locking rod 10 is fixedly connected with the locking pin 9 matched with the shape of the locking groove 17, in this example, the length of the locking rod 10 is smaller than the sum of the lengths of the upper movable rod 7 and the lower movable rod 18, so that after the storage plate 8 is folded, the locking rod 10 rotates upwards.
According to the above embodiment, preferably, the two sides of the storage plate 8 are respectively and fixedly connected with the first connecting sleeve 11, the positions of the lower surface of the supporting plate 14, which are opposite to the first connecting sleeve 11, are respectively and fixedly connected with the second connecting sleeve 13, the connecting rod 12 is arranged between the first connecting sleeve 11 and the second connecting sleeve 13, the two ends of the connecting rod 12 are respectively and threadedly connected with the first connecting sleeve 11 and the second connecting sleeve 13, and after the operation is finished, the fixing component is detached from the two sides of the storage plate 8 by rotating the connecting rod 12, so that the occupied space of the flowmeter in the use process is reduced.
Storage panel 8 set up and make things convenient for the staff to place maintenance tool on it, place flowmeter body 2 between two pipelines 4 in, 6 centre gripping of arc splint that link to each other with the support body in 4 both sides of pipeline, make the flowmeter fix before the installation is fixed between two pipelines 4, rethread fixing bolt is connected flowmeter's flange 3 and pipeline flange 1, avoid flowmeter body 2 because of the dead weight skew mounted position in operation process, ensure the installation accuracy, make things convenient for the staff to install the maintenance operation to the flowmeter, save installation time, and the work efficiency is improved.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (4)

1. The utility model provides a mounting bracket for flowmeter, its characterized in that, including the flowmeter body, locate the pipeline of flowmeter body both sides, locate the support body of flowmeter body below and locate the fixed subassembly between pipeline and the support body, the support body includes the storing board and is used for connecting the coupling assembling of storing board and flowmeter body, the storing board both sides are equipped with fixed subassembly respectively, fixed subassembly can be dismantled with storing board both sides and be connected, and fixed subassembly includes backup pad, arc splint and locking bolt, the backup pad upper surface articulates relatively has two arc splint, two arc splint middle part butt respectively in the pipeline both sides, and two arc splint upper ends are connected through locking bolt.
2. The mounting frame for the flowmeter as claimed in claim 1, wherein the connecting assembly comprises connecting plates, an upper movable rod and a lower movable rod, two connecting plates are fixedly connected to the lower portion of the flowmeter body, the two ends of each connecting plate are hinged to the upper movable rod in a downward mode, the lower end of the upper movable rod is hinged to the lower movable rod, the lower end of the lower movable rod is hinged to the upper surface of the storage plate, and a locking assembly is arranged between the storage plate and the flowmeter body.
3. The mounting rack of claim 2, wherein the locking assembly comprises a connecting block, a locking rod and a locking pin, the connecting block is fixedly connected below the flowmeter body, the front side and the rear side of the connecting block are respectively provided with a locking groove, the front side and the rear side of the storage plate are respectively hinged with the locking rod, and the end part of the locking rod is fixedly connected with the locking pin matched with the shape of the locking groove.
4. The mounting bracket for the flowmeter as claimed in any one of claims 1 to 3, wherein the storage plate has first connecting sleeves fixedly connected to both sides thereof, second connecting sleeves fixedly connected to the lower surface of the support plate at positions corresponding to the first connecting sleeves, respectively, a connecting rod is disposed between the first connecting sleeves and the second connecting sleeves, and both ends of the connecting rod are respectively in threaded connection with the first connecting sleeves and the second connecting sleeves.
CN201921920977.XU 2019-11-08 2019-11-08 Mounting bracket for flowmeter Active CN210862814U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921920977.XU CN210862814U (en) 2019-11-08 2019-11-08 Mounting bracket for flowmeter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921920977.XU CN210862814U (en) 2019-11-08 2019-11-08 Mounting bracket for flowmeter

Publications (1)

Publication Number Publication Date
CN210862814U true CN210862814U (en) 2020-06-26

Family

ID=71305456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921920977.XU Active CN210862814U (en) 2019-11-08 2019-11-08 Mounting bracket for flowmeter

Country Status (1)

Country Link
CN (1) CN210862814U (en)

Similar Documents

Publication Publication Date Title
CN210862814U (en) Mounting bracket for flowmeter
CN104625547A (en) Welding tool for small-diameter barrel and connecting pipe
CN102485919B (en) Method for installing dummy shaft of converter connecting rod suspension system
CN210451526U (en) Elbow pipe fitting welding tool
CN201040340Y (en) Digging machine bucket rod assembling welding fixture
CN212384915U (en) Bus duct shell welding jig device
CN214490367U (en) Portable telescopic jacking nut quick adjusting device
CN214816070U (en) Web member clamping mechanism for standard knot
CN209779868U (en) Steel pipe butt joint device in steel structure construction
CN103247981A (en) Cable head supporting method and special portable multifunctional cable head bracket
CN108974152B (en) Spare tire dismounting device
CN220814669U (en) Adjustable installation hyperboloid aluminum plate structure
CN205442372U (en) Return bend spare stone tongs
CN218965287U (en) Combined type pipeline external butt joint device
CN210171826U (en) Improved measuring equipment for dispensing machine
CN205063321U (en) Building cross fastener
CN220216535U (en) Bending machine
CN113148882B (en) Pneumatic telescopic hoisting mechanism
CN214696797U (en) Outer frame wall connecting piece structure
CN209998670U (en) Pipeline butt welding device
CN220668774U (en) Half joint convenient for disassembling and replacing sealing ring
CN212154144U (en) Building construction template for civil engineering
CN217400409U (en) Building structure preformed hole location pre-buried ware
CN219344016U (en) Light steel wood joist support frame
CN214684969U (en) Machining, clamping and positioning device for large-scale easily-deformed rail parts

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant