CN210860477U - Electric temporary supporting device for civil engineering construction - Google Patents

Electric temporary supporting device for civil engineering construction Download PDF

Info

Publication number
CN210860477U
CN210860477U CN201921649252.1U CN201921649252U CN210860477U CN 210860477 U CN210860477 U CN 210860477U CN 201921649252 U CN201921649252 U CN 201921649252U CN 210860477 U CN210860477 U CN 210860477U
Authority
CN
China
Prior art keywords
civil engineering
engineering construction
fixedly connected
bottom end
support device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921649252.1U
Other languages
Chinese (zh)
Inventor
阚景玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921649252.1U priority Critical patent/CN210860477U/en
Application granted granted Critical
Publication of CN210860477U publication Critical patent/CN210860477U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses an electric temporary support device is used in civil engineering construction, comprising a base plate, a set of recess has been seted up to bottom plate bottom both sides, and the middle part has first slider through first slide rail sliding connection in the recess, a set of diagonal bracing piece of first slider bottom fixedly connected with, bottom plate bottom middle part fixedly connected with vertical support bar, bottom plate upper end middle part is provided with the fixing base, a set of roof of branch fixedly connected with is passed through to fixing base top both sides, the spacing groove has been seted up at fixing base upper end middle part, and the spacing groove both sides are provided with a set of cavity, there is the second slider bottom middle part in the cavity through second slide rail sliding connection. The utility model discloses a set up first sharp plug, second sharp plug, first slider, first slide rail, second slider, second slide rail, fixation clamp, guiding gutter and honeycomb duct structure, have the power equipment of being convenient for and strut and carry out stable in structure's advantage to self.

Description

Electric temporary supporting device for civil engineering construction
Technical Field
The utility model relates to a civil engineering technical field specifically is a civil engineering construction uses electric temporary support device.
Background
Civil engineering is a general name of scientific technology for building various engineering facilities, and refers to applied materials, equipment and technical activities such as surveying, designing, constructing, maintaining and the like; the present invention also refers to the objects of engineering construction, i.e. various engineering facilities which are built on the ground or underground, on land or in water, and directly or indirectly serve human life, production, military and scientific research, and the electric power equipment is an essential part of civil engineering.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides an electric temporary support device is used in civil engineering construction to solve the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a temporary supporting device for electric power for civil engineering construction comprises a bottom plate, wherein a group of grooves are formed in two sides of the bottom end of the bottom plate, a first sliding block is connected to the middle portion in each groove in a sliding mode through a first sliding rail, a group of inclined supporting rods are fixedly connected to the bottom end of each first sliding block, a group of gaskets are welded to the bottom ends of the inclined supporting rods, a second pointed plug is fixedly connected to the bottom ends of the gaskets through screws, a vertical supporting rod is fixedly connected to the middle portion of the bottom end of the bottom plate, a first pointed plug is welded to the middle portion of the bottom end of the vertical supporting rod, a fixing seat is arranged in the middle of the upper end of the bottom plate, a group of top plates are fixedly connected to two sides of the top of the fixing seat through supporting rods, the middle part of the bottom end in the cavity is connected with a second sliding block through a second sliding rail in a sliding mode, and the middle part of the front end of the second sliding block is movably connected with a group of fixing clamps through a push rod.
Preferably, the center positions of the two ends of the first sliding block are connected with a group of fixed blocks in a welding mode, and two sides of the bottom end of each fixed block are connected with first fastening bolts in a threaded mode.
Preferably, the upper end of the first fastening bolt extends into the middle of the first screw hole, and the first screw holes are equidistantly arranged in the middle of the bottom end of the first slide rail.
Preferably, the second slider top central position threaded connection has the second fastening bolt, and second fastening bolt upper end middle part fixedly connected with rotates the handle.
Preferably, the bottom end of the second fastening bolt extends into the middle of the second screw hole, and the second screw holes are equidistantly arranged in the middle of the bottom end of the second slide rail.
Preferably, the middle part of the inner side of the fixing clamp is uniformly bonded with rubber blocks, and the rubber blocks are connected with power equipment in an abutting mode.
Preferably, the diversion trenches are respectively arranged at an ahertz thirty-degree angle of one hundred fifty degrees with the horizontal plane, and the diversion trenches are communicated with the middle part of the inner side of the diversion pipe.
(III) advantageous effects
The utility model provides a civil engineering construction uses electric temporary support device possesses following beneficial effect:
(1) the utility model has the advantages that the utility model has the effect of facilitating the structural fixation of the supporting device by arranging the oblique supporting rod, the first slider, the first slide rail, the vertical supporting rod, the first sharp plug and the second sharp plug, solves the problem of unstable structural fixation of the supporting device, is provided with a group of grooves at two sides of the bottom end of the bottom plate, is connected with the first slider at the bottom end of the groove by the first slide rail in a sliding way, adjusts the position of the oblique supporting rod by the sliding of the first slider at the bottom end of the first slide rail, and utilizes the threaded connection of the first fastening bolt and the first screw hole to fix the structure of the oblique supporting rod after the position adjustment, thereby facilitating the structural fixation of the oblique supporting rod in a large area or a small area, meanwhile, is provided with the second sharp plug at the bottom of the screw rod at the bottom end of the oblique supporting rod, is provided with the first sharp plug at the bottom end of the vertical supporting rod, and extends the, the supporting device structure is fixed again, and then the stability of the supporting device structure is guaranteed.
(2) The utility model has the advantages that the utility model is provided with the diversion trench, the diversion pipe, the fixing clamp, the rubber block, the second slide block and the second slide rail, which has the effect of conveniently fixing and protecting the structure of the electric power equipment on the supporting device, solves the problem of inconvenient protection of the supporting device for the electric power equipment, the middle part of the upper end of the fixing seat is provided with the limiting trench, the inner bottom end of the cavity at the two ends of the limiting trench is provided with the second slide rail, the upper end of the second slide rail is connected with the push rod through the second slide block in a sliding way, the inward force is applied to the second slide block, the electric power equipment is connected in a collision way through the fixing clamp, the second slide block after positioning is fixed in the structure through the connection of the second fastening bolt and the second screw hole, thereby realizing the structure fixation of the electric power equipment, and both sides of the upper end of the fixing seat are, carry out quick refluence to rivers, avoid rivers to get into inside the power equipment, cause the damage of power equipment.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is an enlarged schematic view of the present invention at A in FIG. 1;
FIG. 3 is a schematic top view of the fixing base of the present invention;
fig. 4 is an enlarged schematic view of the point B in fig. 3 according to the present invention.
The reference numbers in the figures are: 1. an oblique supporting rod; 2. a screw; 3. a flow guide pipe; 4. a strut; 5. a diversion trench; 6. a top plate; 7. a fixed seat; 8. a vertical support bar; 9. a first tip plug; 10. a gasket; 11. a second tip plug; 12. a base plate; 13. a fixed block; 14. a first slider; 15. a first screw hole; 16. a first fastening bolt; 17. a first slide rail; 18. a cavity; 19. a second slide rail; 20. a fixing clip; 21. a limiting groove; 22. an electrical device; 23. a rubber block; 24. a push rod; 25. a second slider; 26. rotating the handle; 27. a second fastening bolt; 28. a second screw hole; 29. and (4) a groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: an electric temporary supporting device for civil engineering construction comprises a bottom plate 12, wherein two sides of the bottom end of the bottom plate 12 are provided with a group of grooves 29, the middle part in each groove 29 is connected with a first slide block 14 in a sliding way through a first slide rail 17, the position of an inclined supporting rod 1 is adjusted through the sliding action of the first slide block 14 at the bottom end of the first slide rail 17, the supporting device is conveniently fixed in a large area or a small area through the inclined supporting rod 1, the bottom end of the first slide block 14 is fixedly connected with a group of inclined supporting rods 1, the bottom end of each inclined supporting rod 1 is connected with a group of gaskets 10 in a welding way, the bottom end of each gasket 10 is fixedly connected with a second pointed plug 11 through a screw rod 2, the screw rod 2 is conveniently led to enter the ground surface in the deep part through the second pointed plug 11, the inclined supporting rod 1 is structurally fixed, the middle part at the bottom, the vertical support rod 8 is driven to enter the deep part of the earth surface through the first sharp plug 9 to structurally fix the vertical support rod 8, the fixing seat 7 is arranged in the middle of the upper end of the bottom plate 12, a group of top plates 6 are fixedly connected to two sides of the top of the fixing seat 7 through supporting rods 4, guide grooves 5 are equidistantly arranged at the upper ends of the top plates 6, a group of guide pipes 3 are fixedly connected to two ends of each top plate 6, water flows are rapidly flowed back through the guide grooves 5 to be discharged through the guide pipes 3, the limiting grooves 21 are arranged in the middle of the upper end of the fixing seat 7, a group of cavities 18 are arranged on two sides of each limiting groove 21, the middle of the bottom end in each cavity 18 is slidably connected with a second slide block 25 through a second slide rail 19, a group of fixing clamps 20 are movably connected to the middle of the front end of each second slide block 25 through a push rod 24, the structural fixation of the power equipment 22 is realized.
Further, a set of fixing blocks 13 are welded and connected to the central positions of the two ends of the first sliding block 14, first fastening bolts 16 are connected to the two sides of the bottom end of each fixing block 13 in a threaded mode, and the first fastening bolts 16 are connected through the fixing blocks 13 in a threaded mode.
Further, the upper end of the first fastening bolt 16 extends into the middle of the inside of the first screw hole 15, the first screw holes 15 are equidistantly arranged in the middle of the bottom end of the first slide rail 17, and the first slide block 14 after being adjusted is fixed in position through the connection of the first fastening bolt 16 and the first screw holes 15.
Further, a second fastening bolt 27 is connected to the top center of the second slider 25 through a screw, and a rotating handle 26 is fixedly connected to the middle of the upper end of the second fastening bolt 27, so that the second fastening bolt 27 can be rotated conveniently through the rotating handle 26.
Further, the bottom end of the second fastening bolt 27 extends into the middle of the second screw hole 28, and the second screw holes 28 are equidistantly formed in the middle of the bottom end of the second slide rail 19, so that the second slide block 25 after being adjusted is fixed by the connection between the second fastening bolt 27 and the second screw hole 28.
Further, the inboard middle part of fixation clamp 20 evenly bonds and is connected with block rubber 23, and the conflict is connected with power equipment 22 between block rubber 23, utilizes block rubber 23 to increase the frictional force between power equipment 22 and the fixation clamp 20, carries out further fixed to power equipment 22's structure.
Further, guiding gutter 5 is personally submitted one hundred fifty degrees angle ahh thirty degrees angle settings with the horizontal respectively, and guiding gutter 5 and 3 inboard middle parts of honeycomb duct intercommunication settings, through personally submitting certain angle settings with guiding gutter 5 and horizontal, is convenient for carry out quick refluence to rivers to carry out quick discharge by honeycomb duct 3.
The working principle is as follows: when the device is used, the first sliding block 14 slides at the corresponding position at the bottom end of the first sliding rail 17, when the first sliding block 14 slides to a specified position, the first fastening bolt 16 is connected with the first screw hole 15, the first sliding block 14 after the position is adjusted is fixed, the screw rod 2 and the vertical supporting rod 8 are applied with downward force, the first pointed plug 9 and the second pointed plug 11 enter the deep part of the ground surface, at the moment, the power equipment 22 is placed in the limiting groove 21, the second sliding block 25 is applied with inward force, the second sliding block 25 drives the push rod 24 to slide inwards at the upper end of the second sliding rail 19, the push rod 24 pushes the fixing clamp 20 to butt and connect the power equipment 22, the rubber block 23 is bonded and connected to the middle part of the inner side of the fixing clamp 20, the friction force between the power equipment 22 and the fixing clamp 20 is increased, at the moment, the second fastening bolt 27 is connected with the second screw hole 28, and the second sliding block 25 after the position is adjusted is structurally fixed, the diversion trench 5 conducts rapid diversion on water flow, the water flow is discharged through the diversion pipe 3, and temporary support of the power equipment 22 is completed.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an electric temporary support device for civil engineering construction, includes bottom plate (12), its characterized in that: a group of grooves (29) are formed in two sides of the bottom end of the bottom plate (12), a first sliding block (14) is connected to the middle of the inner portion of each groove (29) in a sliding mode through a first sliding rail (17), a group of inclined supporting rods (1) are fixedly connected to the bottom end of each first sliding block (14), a group of gaskets (10) are welded to the bottom ends of the inclined supporting rods (1), a second sharp plug (11) is fixedly connected to the bottom ends of the gaskets (10) through a screw rod (2), a vertical supporting rod (8) is fixedly connected to the middle of the bottom end of the bottom plate (12), a first sharp plug (9) is welded to the middle of the bottom end of the vertical supporting rod (8), a fixing seat (7) is arranged in the middle of the upper end of the bottom plate (12), a group of top plates (6) are fixedly connected to, and roof (6) both ends fixedly connected with a set of honeycomb duct (3), spacing groove (21) have been seted up at fixing base (7) upper end middle part, and spacing groove (21) both sides are provided with a set of cavity (18), there is second slider (25) bottom end middle part in cavity (18) through second slide rail (19) sliding connection, and there is a set of fixation clamp (20) in second slider (25) front end middle part through push rod (24) swing joint.
2. The electric temporary support device for civil engineering construction according to claim 1, characterized in that: the middle positions of the two ends of the first sliding block (14) are connected with a group of fixing blocks (13) in a welding mode, and two sides of the bottom end of each fixing block (13) are connected with first fastening bolts (16) in a threaded mode.
3. The electric temporary support device for civil engineering construction according to claim 2, characterized in that: the upper end of the first fastening bolt (16) extends into the middle of the inside of the first screw hole (15), and the first screw holes (15) are equidistantly arranged in the middle of the bottom end of the first sliding rail (17).
4. The electric temporary support device for civil engineering construction according to claim 1, characterized in that: the top center of the second sliding block (25) is in threaded connection with a second fastening bolt (27), and the middle of the upper end of the second fastening bolt (27) is fixedly connected with a rotating handle (26).
5. The electric temporary support device for civil engineering construction according to claim 4, wherein: the bottom end of the second fastening bolt (27) extends into the middle of the inner bottom of the second screw hole (28), and the second screw holes (28) are equidistantly arranged in the middle of the inner bottom of the second slide rail (19).
6. The electric temporary support device for civil engineering construction according to claim 1, characterized in that: the middle part of the inner side of the fixing clamp (20) is evenly connected with rubber blocks (23) in an adhering mode, and power equipment (22) is connected between the rubber blocks (23) in an abutting mode.
7. The electric temporary support device for civil engineering construction according to claim 1, characterized in that: the diversion trench (5) is respectively arranged at an ahertz thirty-degree angle of one hundred fifty degrees with the horizontal plane, and the diversion trench (5) is communicated with the middle part of the inner side of the diversion pipe (3).
CN201921649252.1U 2019-09-29 2019-09-29 Electric temporary supporting device for civil engineering construction Expired - Fee Related CN210860477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921649252.1U CN210860477U (en) 2019-09-29 2019-09-29 Electric temporary supporting device for civil engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921649252.1U CN210860477U (en) 2019-09-29 2019-09-29 Electric temporary supporting device for civil engineering construction

Publications (1)

Publication Number Publication Date
CN210860477U true CN210860477U (en) 2020-06-26

Family

ID=71288425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921649252.1U Expired - Fee Related CN210860477U (en) 2019-09-29 2019-09-29 Electric temporary supporting device for civil engineering construction

Country Status (1)

Country Link
CN (1) CN210860477U (en)

Similar Documents

Publication Publication Date Title
CN205394052U (en) Drilling fixture of steel -structure connecting plate
CN210860477U (en) Electric temporary supporting device for civil engineering construction
CN206844320U (en) A kind of prefabricated reinforced concrete column beam-to-column joint structure
CN212480372U (en) Positioning support is used in water conservancy water and electricity pipeline installation
CN211816023U (en) Hydraulic engineering slope bearing structure
CN107489821A (en) A kind of Hydraulic and Hydro-Power Engineering pipeline fixing device
CN217620541U (en) Pipe fitting storage rack for civil engineering
CN213110583U (en) Civil engineering pipe fitting placing equipment
CN210917759U (en) Construction locking device for building steel structure
CN212103875U (en) Hydraulic engineering construction safety device
CN211201242U (en) Ancient building repairs and uses reinforcing fixture
CN210163896U (en) Fixing device of stake for building
CN214365159U (en) Civil engineering construction is with die carrier of convenient dismouting
CN216042490U (en) Modular strutting arrangement for civil engineering construction
CN216505037U (en) Pipe fitting rack for civil engineering
CN212251589U (en) Quick drainage device for hydraulic engineering
CN216406129U (en) Tool type scaffold wall connecting piece for civil engineering
CN217204082U (en) Civil engineering pile foundation construction structures
CN217751382U (en) Pipe fitting rack for building civil engineering
CN217326477U (en) Civil engineering building templates link
CN217760046U (en) Building templates connects steelframe for civil engineering
CN217371068U (en) Steel pipe welding device for civil engineering construction
CN216158578U (en) Civil engineering antidetonation structure
CN215168103U (en) Building templates connects steelframe for civil engineering
CN214575482U (en) Civil engineering construction support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200626

Termination date: 20200929