CN210857281U - Lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure - Google Patents

Lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure Download PDF

Info

Publication number
CN210857281U
CN210857281U CN201921859764.0U CN201921859764U CN210857281U CN 210857281 U CN210857281 U CN 210857281U CN 201921859764 U CN201921859764 U CN 201921859764U CN 210857281 U CN210857281 U CN 210857281U
Authority
CN
China
Prior art keywords
layer
reinforcing
polyurea waterproof
polyurea
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921859764.0U
Other languages
Chinese (zh)
Inventor
饶胜斌
徐少平
马天昌
苏春生
何十美
汤振亚
梁朋刚
刘宏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd, Sixth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201921859764.0U priority Critical patent/CN210857281U/en
Application granted granted Critical
Publication of CN210857281U publication Critical patent/CN210857281U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a lake bottom tunnel deformation joint, male and female angle department polyurea waterproof coating structure, which comprises a reinforcing body, wherein the reinforcing body comprises a reinforcing main board and a fixed reinforcing net arranged at the top of the reinforcing main board, the bottom of the fixed reinforcing net is provided with a fixed bulge, and the fixed bulge is of a porous structure; the fixing reinforcing net is embedded in the functional layer; the reinforced main board is fixedly connected with the processing surface. The utility model discloses a setting up of reinforcement body has improved the joint strength of monolithic coating structure, has reduced the stress cracking's of polyurea waterproof layer problem through the fixed bellied setting of porous.

Description

Lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure
Technical Field
The utility model belongs to the technical field of tunnel waterproof construction, concretely relates to lake bottom tunnel movement joint, negative and positive angle department polyurea waterproof coating structure.
Background
The polyurea waterproof coating is a novel material introduced into China only in recent years, has excellent physical and chemical performance indexes, convenient construction process, integrity and environmental protection of a waterproof and anticorrosion system which cannot be achieved by any other traditional protective material and technology, and can be widely applied to industrial anticorrosion and waterproofing of high-speed railway bridges and subways once introduced. In the construction of the lake bottom tunnel, the polyurea coating is used for waterproofing, however, the polyurea waterproofing layer has the problems of low strength and easy hollowing during the construction process. Although the above problems occur, the technology for waterproofing the lake-bottom tunnel by applying the polyurea coating is not mature, and the solution for solving the above problems is not provided at present in the long-term of technology accumulation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a lake bottom tunnel movement joint, negative and positive angle department polyurea waterproof coating structure, the utility model discloses a setting up of strengthening the body has improved the joint strength of monolithic structure, has reduced the stress cracking's of polyurea waterproof layer problem through the fixed bellied setting of porous.
The utility model discloses mainly realize through following technical scheme: a lake bottom tunnel deformation joint and polyurea waterproof coating structure at a male corner and a female corner comprises a reinforcing body, wherein the reinforcing body comprises a reinforcing main board and a fixed reinforcing net arranged at the top of the reinforcing main board, the bottom of the fixed reinforcing net is provided with a fixed bulge, and the fixed bulge is of a porous structure; the fixing reinforcing net is embedded in the functional layer; the reinforced main board is fixedly connected with the processing surface.
The utility model discloses in the use, be provided with the reinforcing plate at the fixed periphery of movement joint or negative and positive angle department to fix the reinforcing mesh setting and treating construction position department. In the use process, the reinforcing plate can be fixed firstly, and then a polyurea layer is sprayed between the construction surface and the fixed reinforcing net; or spraying the initial layer of the polyurea layer, fixing the reinforcing plate, and continuously spraying the reinforcing layer of the polyurea layer; or after spraying the polyurea layer, fixing the reinforcing body on the polyurea layer; and finally, coating a functional layer on the fixed reinforcing mesh.
The reinforced main board and the construction surface can be fixedly connected through screws, the reinforced main board and the fixed reinforced net can be connected in a welding or integrated mode, and the connection mode is the prior art, so that the details are not repeated.
For better realization the utility model discloses, it is further, the bottom of polyurea waterproof layer is provided with the leveling layer, the leveling layer is mortar leveling layer or resin leveling layer. In the work progress, the concrete face of construction often has defects such as more honeycomb, pitted surface, handles honeycomb and great unevenness through the leveling layer, has reduced the condition such as trompil, fission on polyurea layer, has improved whole waterproof coating's the quality of laying, has improved life.
For better realization the utility model discloses, it is further, the bottom of polyurea waterproof layer is provided with the polymer division bar. When great gap appears in the construction face, can fill the gap through the polymer division bar, especially to the construction of movement joint, to structure movement joint department enhancement layer, after executing to make the movement joint sealed glue, set up the polymer division bar between two parties along the seam earlier, then the spraying polyurea waterproof layer makes and keeps apart between polyurea waterproof layer and the concrete foundation bed face to polyurea waterproof layer atress is destroyed when preventing that structural deformation, inhomogeneous settlement. The polymeric barrier strip may be made of PE material.
For better realization the utility model discloses, it is further, the polyurea waterproof layer includes from supreme initial layer and the enhancement layer that sets gradually down, the gross thickness of polyurea waterproof layer is 1.5mm, the height of initial layer is 0.9mm, and the thickness of enhancement layer is 0.6 mm. In the construction process, the polyurea waterproof layer can be sprayed by adopting H-XP3 type polyurea special spraying equipment, and practices prove that the secondary spraying method is favorable for reducing common quality problems of needle holes, empty drums, hanging flow and the like of the polyurea waterproof layer. Firstly, spraying polyurea for the first time according to the overall requirement, namely spraying a primary layer, wherein the thickness of the primary layer is 0.9 mm; and then after the polyurea is cured to form a film with certain strength, spraying the polyurea for the second time after about 10min after the polyurea is applied, namely spraying the reinforcing layer, wherein the thickness of the reinforcing layer is 0.6mm, and the total thickness of the polyurea layer is 1.5 mm. Practice proves that the surface of the sprayed polyurea layer has no pinholes or hollows, the physical property is good, and the service life is relatively long.
In order to realize the utility model discloses, it is further, the functional layer is concrete protection agent finish paint layer.
In order to better realize the utility model, furthermore, the outside coating of reinforcing body has the anticorrosive coating.
The utility model has the advantages that:
(1) the utility model discloses a setting up of reinforcement body has improved the joint strength of monolithic coating structure, has reduced the stress cracking's of polyurea waterproof layer problem through the fixed bellied setting of porous.
(2) The concrete face of construction often has defects such as more honeycomb, pitted surface, handles honeycomb and great unevenness through the leveling layer, has reduced the condition such as trompil, fission on polyurea layer, has improved whole waterproof coating's the quality of laying, has improved life.
(3) To the construction of movement joint, to structure movement joint department enhancement layer, after executing to make the movement joint sealed glue, set up the polymer division bar between two parties along the seam earlier, then the spraying polyurea waterproof layer makes and keeps apart between polyurea waterproof layer and the concrete foundation bed face to polyurea waterproof layer atress is destroyed when structure deformation, inhomogeneous settlement is prevented.
Drawings
FIG. 1 is a schematic construction diagram of a deformation joint;
FIG. 2 is a schematic view of a construction structure of a male and female corner;
FIG. 3 is a schematic view of the rib;
fig. 4 is a schematic structural diagram of the present invention.
Wherein: 1-reinforcing body, 2-fixed reinforcing net, 3-reinforced main board, 4-fixed bulge, 5-polyurea waterproof layer, 6-functional layer, 7-macromolecule isolating strip and 8-leveling layer.
Detailed Description
Example 1:
a lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure comprises a reinforcing body 1, as shown in figures 3 and 4, the reinforcing body 1 comprises a reinforcing main board 3 and a fixed reinforcing net 2 arranged on the top of the reinforcing main board 3, a fixed protrusion 4 is arranged at the bottom of the fixed reinforcing net 2, and the fixed protrusion 4 is of a porous structure; a polyurea waterproof layer 5 is arranged between the fixed reinforcing net 2 and the reinforcing main board 3, the fixed protrusions 4 are embedded in the polyurea waterproof layer 5, the functional layer 6 is further included, and the fixed reinforcing net 2 is embedded in the functional layer 6; the reinforcing main board 3 is fixedly connected with the processing surface.
The utility model discloses in the use, be provided with the reinforcing plate at the fixed periphery of movement joint or negative and positive angle department to fix reinforcing mesh 2 and set up and treat construction position department. In the use process, the reinforcing plate can be fixed firstly, and then a polyurea layer is sprayed between the construction surface and the fixed reinforcing net 2; or spraying the initial layer of the polyurea layer, fixing the reinforcing plate, and continuously spraying the reinforcing layer of the polyurea layer; or after spraying the polyurea layer, fixing the reinforcing body 1 on the polyurea layer; finally, the functional layer 6 is coated on the fixed reinforcing mesh 2. The reinforced main board 3 and the construction surface can be fixedly connected through screws, the reinforced main board 3 and the fixed reinforced net 2 can be connected through welding or an integrated setting mode, and the connection mode is the prior art, so that the repeated description is omitted.
Example 2:
the embodiment is optimized on the basis of embodiment 1, and as shown in fig. 1, a leveling layer 8 is arranged at the bottom of the polyurea waterproof layer 5, and the leveling layer 8 is a mortar leveling layer or a resin leveling layer. In the work progress, the concrete face of construction often has defects such as more honeycomb, pitted surface, handles honeycomb and great unevenness through leveling layer 8, has reduced the condition such as trompil, fission on polyurea layer, has improved whole waterproof coating's the quality of laying, has improved life.
As shown in fig. 2, the bottom of the polyurea waterproof layer 5 is provided with a polymer barrier rib 7. To the construction of movement joint, to structure movement joint department enhancement layer, after executing to make the movement joint sealed glue, set up polymer division bar 7 along the seam is placed in the middle earlier, then spraying polyurea waterproof layer 5 makes and keeps apart between polyurea waterproof layer 5 and the concrete foundation bed face to polyurea waterproof layer 5 atress destruction when preventing structural deformation, differential settlement. The polymeric barrier strip 7 may be made of PE material. As shown in fig. 4, the bottom of the polyurea waterproof layer 5 may be provided with one or more polymeric barrier ribs 7.
Other parts of this embodiment are the same as embodiment 1, and thus are not described again.
Example 3:
this embodiment is optimized on the basis of embodiment 1 or 2, polyurea waterproof layer 5 includes and follows supreme primary layer and the enhancement layer that sets gradually down, polyurea waterproof layer 5's gross thickness is 1.5mm, the height of primary layer is 0.9mm, and the thickness of enhancement layer is 0.6 mm.
In the construction process, the polyurea waterproof layer 5 can be sprayed by adopting H-XP3 type polyurea special spraying equipment, and practice proves that the secondary spraying method is favorable for reducing common quality problems of needle holes, empty drums, hanging flow and the like of the polyurea waterproof layer 5. Firstly, spraying polyurea for the first time according to the overall requirement, namely spraying a primary layer, wherein the thickness of the primary layer is 0.9 mm; and then after the polyurea is cured to form a film with certain strength, spraying the polyurea for the second time after about 10min after the polyurea is applied, namely spraying the reinforcing layer, wherein the thickness of the reinforcing layer is 0.6mm, and the total thickness of the polyurea layer is 1.5 mm. Practice proves that the surface of the sprayed polyurea layer has no pinholes or hollows, the physical property is good, and the service life is relatively long.
The rest of this embodiment is the same as embodiment 1 or 2, and therefore, the description thereof is omitted.
Example 4:
this embodiment is optimized based on any one of embodiments 1 to 3, and as shown in fig. 4, the functional layer 6 is a finish paint layer of a concrete protective agent. The outer side of the reinforcement body 1 is coated with an anticorrosive layer.
The utility model discloses a setting up of reinforcement 1 has improved the joint strength of monolithic coating structure, has reduced polyurea waterproof layer 5's stress cracking's problem through setting up of porous fixed arch 4.
Other parts of this embodiment are the same as any of embodiments 1 to 3, and thus are not described again.
The above is only the preferred embodiment of the present invention, not to the limitation of the present invention in any form, all the technical matters of the present invention all fall into the protection scope of the present invention to any simple modification and equivalent change of the above embodiments.

Claims (6)

1. A lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure is characterized by comprising a reinforcing body (1), wherein the reinforcing body (1) comprises a reinforcing main plate (3) and a fixed reinforcing net (2) arranged at the top of the reinforcing main plate (3), a fixed bulge (4) is arranged at the bottom of the fixed reinforcing net (2), and the fixed bulge (4) is of a porous structure; a polyurea waterproof layer (5) is arranged between the fixed reinforcing net (2) and the reinforcing main board (3), the fixed protrusions (4) are embedded in the polyurea waterproof layer (5), the reinforced composite board further comprises a functional layer (6), and the fixed reinforcing net (2) is embedded in the functional layer (6); the reinforced main board (3) is fixedly connected with the processing surface.
2. The lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure according to claim 1, wherein the polyurea waterproof layer (5) is provided with a leveling layer (8) at the bottom, and the leveling layer (8) is a mortar leveling layer or a resin leveling layer.
3. The lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure according to claim 1 or 2, wherein the bottom of the polyurea waterproof layer (5) is provided with a high molecular isolation strip (7).
4. The lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure as claimed in claim 1 or 2, wherein the polyurea waterproof layer (5) comprises a primary layer and a reinforcing layer which are sequentially arranged from bottom to top, the total thickness of the polyurea waterproof layer (5) is 1.5mm, the height of the primary layer is 0.9mm, and the thickness of the reinforcing layer is 0.6 mm.
5. The lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure as claimed in claim 1, wherein the functional layer (6) is a concrete protectant topcoat layer.
6. The lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure according to claim 1, wherein the outside of the reinforcement body (1) is coated with an anticorrosive layer.
CN201921859764.0U 2019-10-31 2019-10-31 Lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure Expired - Fee Related CN210857281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921859764.0U CN210857281U (en) 2019-10-31 2019-10-31 Lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921859764.0U CN210857281U (en) 2019-10-31 2019-10-31 Lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure

Publications (1)

Publication Number Publication Date
CN210857281U true CN210857281U (en) 2020-06-26

Family

ID=71304649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921859764.0U Expired - Fee Related CN210857281U (en) 2019-10-31 2019-10-31 Lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure

Country Status (1)

Country Link
CN (1) CN210857281U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387386A (en) * 2022-10-20 2022-11-25 中国二十冶集团有限公司 Waterproof structure and construction process of comprehensive pipe rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387386A (en) * 2022-10-20 2022-11-25 中国二十冶集团有限公司 Waterproof structure and construction process of comprehensive pipe rack

Similar Documents

Publication Publication Date Title
CN105625197A (en) Concrete beam bending reinforcing method based on steel plate-prestressed carbon fiber plate
CN108457485B (en) Repairing process for concrete floor cracking and water leakage
CN210857281U (en) Lake bottom tunnel deformation joint and male and female corner polyurea waterproof coating structure
CN207498999U (en) A kind of basement bottom board subsiding crack crack treatment node
CN203960812U (en) Hydraulic concrete structure shrinkage joint embedded water stop band repair structure
CN112901205A (en) Soft rock large-span tunnel double-layer superposed lining support removing method and structure
CN210127673U (en) Large-width carbon fiber plate for building structure reinforcement
CN104912208A (en) Anticorrosion structure and treatment method of outer bottom edge board of gas chamber
CN108894102A (en) A kind of high-bearing capacity shock isolating pedestal and its manufacturing method
CN104929254A (en) Antiseptic and processing method for margin plate at bottom outside gas chamber
CN213173843U (en) Waterproof overlap joint structure of new and old underground works roof
CN211314236U (en) Shield constructs section of jurisdiction reinforced structure
CN208884344U (en) A kind of high-bearing capacity shock isolating pedestal
CN203742001U (en) Waterproof and reinforcing structure based on high-toughness and high-strength epoxy resin
CN209818076U (en) Shield tunnel reinforced layer structure
CN110295924B (en) Shield tunnel reinforcing structure based on H-shaped steel plate and construction method
CN109057389B (en) Method for repairing reserved gap of building
CN113117998A (en) Anti-corrosion construction method based on basalt fibers
CN108277932B (en) Pipe edge water leakage repairing process
CN207048079U (en) Built-in steel mixed connection fitting water proof structure
CN216196832U (en) Repairing system for external wall leakage water
JP2009074359A (en) Concrete waterway remodeling structure and remodeling method
CN215801819U (en) Basement post-cast strip waterproof construction
CN205219889U (en) Oil gas storage tank tank deck with light cured fiber reinforcing composite sheet
CN107448001A (en) Protect the Component composition of the self-contained structural system of timber structure beam column and its apply method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200626