CN210851268U - Water circulation system device of PE pipe production line - Google Patents

Water circulation system device of PE pipe production line Download PDF

Info

Publication number
CN210851268U
CN210851268U CN201921912116.7U CN201921912116U CN210851268U CN 210851268 U CN210851268 U CN 210851268U CN 201921912116 U CN201921912116 U CN 201921912116U CN 210851268 U CN210851268 U CN 210851268U
Authority
CN
China
Prior art keywords
water
pipe
water tank
cooling box
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921912116.7U
Other languages
Chinese (zh)
Inventor
刘平
陈松龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Yulong Cable Co ltd
Original Assignee
Liuzhou Yulong Cable Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Yulong Cable Co ltd filed Critical Liuzhou Yulong Cable Co ltd
Priority to CN201921912116.7U priority Critical patent/CN210851268U/en
Application granted granted Critical
Publication of CN210851268U publication Critical patent/CN210851268U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

The utility model discloses a water circulation system device of a PE pipe production line, which comprises a cooling box and a water tank, wherein the two ends of the cooling box are respectively provided with an inlet and an outlet, the inlet and the outlet are positioned on the same horizontal line, the top end of the cooling box is provided with a support which is in a U-shaped structure, the horizontal part of the support is penetrated by a first lead screw, the first lead screw is rotationally connected with the support through a bearing, the top end of the first lead screw is provided with a turntable, the bottom of the first lead screw is rotationally connected with a threaded cylinder, when in use, a PE pipe passes through the inlet and extends to the outside of the outlet through the space between a first guide roller and a second guide roller, the turntable is rotated to rotate the first lead screw, so that the threaded cylinder moves downwards, thereby the connecting plate moves downwards to press the first guide roller on the upper surface of the PE pipe, thereby the PE pipe can be effectively prevented from upwarping upwards, and, and can adjust the distance between first guide roll and the second guide roll according to the size of PE pipe, facilitate the use.

Description

Water circulation system device of PE pipe production line
Technical Field
The utility model relates to a PE manages production technical field, specifically is a water circulating system device of PE pipe production line.
Background
At present, in the production of PE pipes, the PE pipes which are just formed are cooled and shaped mostly in a water-cooling mode, and the outer walls of the pipe bodies are continuously washed, so that the purpose of cooling is achieved.
Because current water cooling system is water circulating structure, consequently after using a period, the aquatic can adulterate a large amount of impurity, influences the quality of PE pipe, in addition, at the water-cooling in-process, if do not have guide structure, the PE pipe can rock at will to lead to the PE pipe to damage, influence product quality, consequently, technical personnel in the field provide the water circulating system device of PE pipe production line, in order to solve the problem that proposes among the above-mentioned background art.
Disclosure of Invention
An object of the utility model is to provide a water circulating system device of PE pipe production line to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a water circulation system device of a PE pipe production line comprises a cooling box and a water tank, wherein an inlet and an outlet are respectively arranged at two ends of the cooling box, the inlet and the outlet are positioned on the same horizontal line, a support is arranged at the top end of the cooling box, the support is of a U-shaped structure, a first lead screw penetrates through the horizontal position of the support, the first lead screw is rotatably connected with the support through a bearing, a rotary disc is arranged at the top end of the first lead screw, a threaded cylinder is rotatably connected to the bottom of the first lead screw, a limiting disc is arranged on the surface of the first lead screw, the diameter of the limiting disc is larger than that of the threaded cylinder, the bottom of the threaded cylinder extends to the inner cavity of the cooling box and is provided with a connecting plate, a limiting cylinder is arranged at the;
as a further aspect of the present invention: the water tank cooling device is characterized in that slide rods are arranged on two sides of the upper surface of the connecting plate, the top ends of the slide rods are slidably connected with slide cylinders, the top ends of the slide cylinders are connected with the inner wall of the top end of the cooling tank, springs are sleeved on the slide rods, the top ends of the springs are connected with the bottom of the slide cylinders, the bottom of the springs is connected with the upper surface of the connecting plate, a plurality of first guide rollers are arranged at the bottom of the connecting plate, second guide rollers which are in one-to-one correspondence with the first guide rollers are arranged on the inner wall of the bottom of the cooling tank, support frames are arranged on two sides of the bottom of the cooling tank, a support plate is arranged between;
as a further aspect of the present invention: the water tank top end is provided with a water inlet, one side of the water tank is provided with a sealing cover, the sealing cover is rotatably connected with the water tank through a hinge, the side of the inner wall of the sealing cover is provided with a sealing gasket, the inner wall of the bottom of the cooling tank is arranged into an inclined structure, the middle part of the bottom of the inner cavity of the cooling tank is provided with a water outlet, the water outlet is communicated with the water inlet, the upper surface of the water filtering plate is contacted with a scraping plate, the top end of the scraping plate is provided with a threaded sleeve, the threaded sleeve is rotatably connected with a second lead screw, one end of the second lead screw is rotatably connected with the inner wall of the water tank through;
as a further aspect of the present invention: the water tank inner wall is provided with the spout, and the scraper blade both sides correspond with the spout and are provided with the slider, slider and spout sliding connection, and the water pipe extends to the water tank outside and is provided with the water pump, water pump bottom joint support board upper surface, and water pump one side has the refrigerator through water piping connection, and the refrigerator has the shower through water piping connection, and the shower sets up in cooler bin top inner wall, and the shower bottom is provided with a plurality of evenly distributed's shower head.
Compared with the prior art, the beneficial effects of the utility model are that:
1. during the use, pass the import with the PE pipe, and run through and extend to the export outside between first guide roll and the second guide roll, rotate the carousel, make first lead screw rotate, thereby make a thread section of thick bamboo downstream, thereby make the connecting plate downstream make first guide roll press at PE pipe upper surface, thereby can prevent effectively that the PE pipe from upwards perk, and play fine guide effect to the PE pipe, and can adjust the distance between first guide roll and the second guide roll according to the size of PE pipe, and convenient to use.
2. Start water pump and refrigerator, make the water pipe refrigerate in inhaling the refrigerator with the water in the water tank, then spout PE on the pipe through the shower head that the shower set up of water after will refrigerating through the water pipe again, thereby can high efficiency cool off the design to PE pipe, simultaneously can also wash away PE pipe surface adnexed impurity, thereby the quality of PE pipe has been improved, at this moment, because the inner wall slope of cooling tank bottom sets up, consequently, the rivers can flow into in the water tank along with the incline direction, and the impurity that drops also can be washed into in the water tank, the water that flows into in the water tank is under the effect of drainage board, make impurity held back on the drainage board, and rivers are being filtered the drainage board below and are continued to be used, thereby the cleanliness of cooling water has been ensured.
3. Through opening sealed lid to the carousel rotates for the second lead screw rotates, thereby makes the scraper blade outwards remove, thereby scrapes out the accumulational impurity of drainage plate upper surface, thereby the people of being convenient for clear up the impurity in the water tank, has improved working effect.
Drawings
Fig. 1 is a schematic structural diagram of a water circulation system device of a PE pipe production line.
FIG. 2 is a schematic view of a water tank in a water circulation system device of a PE pipe production line.
FIG. 3 is a connection diagram of a water tank and a scraper in a water circulation system device of a PE pipe production line.
FIG. 4 is a partial enlarged view of A in the water circulation system apparatus of the PE pipe production line.
In the figure: 1-cooling box, 2-support frame, 3-support plate, 4-inlet, 5-outlet, 6-support, 7-first screw rod, 8-rotary table, 9-threaded cylinder, 10-limiting disc, 11-limiting cylinder, 12-connecting plate, 13-first guide roller, 14-second guide roller, 15-water tank, 16-water outlet, 17-water filtering plate, 18-water pump, 19-water absorbing cover, 20-refrigerator, 21-water pipe, 22-spray pipe, 23-water inlet, 24-sealing cover, 25-chute, 26-scraper, 27-second screw rod, 28-threaded sleeve, 29-fixing plate, 30-slide cylinder, 31-slide rod and 32-spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, in an embodiment of the present invention, a water circulation system device for a PE pipe production line includes a cooling box 1 and a water tank 15, an inlet 4 and an outlet 5 are respectively disposed at two ends of the cooling box 1, the inlet 4 and the outlet 5 are positioned on the same horizontal line, the top end of the cooling box 1 is provided with a bracket 6, the bracket 6 is of a U-shaped structure, a first screw rod 7 penetrates through the horizontal part of the bracket 6, the first screw rod 7 is rotationally connected with the bracket 6 through a bearing, and the top end of the first screw mandrel 7 is provided with a rotary table 8, the bottom of the first screw mandrel 7 is rotationally connected with a thread cylinder 9, the surface of the first screw mandrel 7 is provided with a limiting disc 10, the diameter of the limiting disc 10 is larger than that of the thread cylinder 9, the bottom of the thread cylinder 9 extends to the inner cavity of the cooling box 1 and is provided with a connecting plate 12, a limiting cylinder 11 is arranged at the joint of the cooling box 1 and the threaded cylinder 9, and the threaded cylinder 9 is in sliding connection with the limiting cylinder 11;
the two sides of the upper surface of the connecting plate 12 are provided with slide rods 31, the top ends of the slide rods 31 are slidably connected with a slide cylinder 30, the top end of the slide cylinder 30 is connected with the inner wall of the top end of the cooling box 1, the slide rods 31 are sleeved with springs 32, the top ends of the springs 32 are connected with the bottom of the slide cylinder 30, the bottom of the springs 32 is connected with the upper surface of the connecting plate 12, the bottom of the connecting plate 12 is provided with a plurality of first guide rollers 13, the inner wall of the bottom of the cooling box 1 is provided with second guide rollers 14 which are in one-to-one correspondence with the first guide rollers 13, the two sides of the bottom of the cooling box 1 are provided with support frames 2, a support plate 3 is arranged between the two support frames 2, the middle part of the upper surface;
a water inlet 23 is formed in the top end of the water tank 15, a sealing cover 24 is arranged on one side of the water tank 15, the sealing cover 24 is rotatably connected with the water tank 15 through a hinge, a sealing gasket is arranged on the side of the inner wall of the sealing cover 24, the inner wall of the bottom of the cooling tank 1 is of an inclined structure, a drain 16 is arranged in the middle of the bottom of the inner cavity of the cooling tank 1, the drain 16 is communicated with the water inlet 23, a scraping plate 26 is in contact with the upper surface of the water filtering plate 17, a threaded sleeve 28 is arranged at the top end of the scraping plate 26, the threaded sleeve 28 is rotatably connected with a second lead screw 27, one end of the second lead screw 27 is rotatably connected with the inner wall of the water tank 15 through a bearing, the other end;
the inner wall of the water tank 15 is provided with a sliding groove 25, the two sides of the scraper 26 are provided with sliding blocks corresponding to the sliding groove 25, the sliding blocks are connected with the sliding groove 25 in a sliding mode, the water pipe 21 extends to the outer side of the water tank 15 and is provided with a water pump 18, the upper surface of the supporting plate 3 is connected to the bottom of the water pump 18, one side of the water pump 18 is connected with a refrigerator 20 through the water pipe 21, the refrigerator 20 is connected with a spray pipe 22 through the water pipe 21, the spray pipe 22 is arranged on the inner wall of the top end of.
The utility model discloses a theory of operation is:
when the PE pipe cooling device is used, a PE pipe penetrates through the inlet 4 and penetrates between the first guide roller 13 and the second guide roller 14 to extend to the outer side of the outlet 5, the rotary disc 8 is rotated to enable the first screw rod 7 to rotate, the threaded cylinder 9 moves downwards, the connecting plate 12 moves downwards to enable the first guide roller 13 to be pressed on the upper surface of the PE pipe, the PE pipe can be effectively prevented from tilting upwards and has a good guiding effect on the PE pipe, the distance between the first guide roller 13 and the second guide roller 14 can be adjusted according to the size of the PE pipe, the PE pipe cooling device is convenient to use, the water pump 18 and the refrigerator 20 are started, the water pipe 21 sucks water in the water tank 15 into the refrigerator 20 for refrigeration, then the refrigerated water is sprayed onto the PE pipe through the spray header arranged on the spray pipe 22 through the water pipe 21, the PE pipe can be cooled and shaped quickly and efficiently, and impurities attached to the surface of the PE pipe can be washed away, thereby the quality of PE pipe has been improved, at this moment, because 1 bottom inner wall slope of cooler bin sets up, consequently, the rivers can flow into in the water tank 15 along with the incline direction, and the impurity that drops also can be washed into in the water tank 15, the water that flows into in the water tank 15 is under the effect of drainage board 17, make impurity by being held back on drainage board 17, and rivers are being filtered and are being continued to use below drainage board 17, thereby the cleanliness of cooling water has been ensured, through opening sealed lid 24, and rotate the carousel, make second lead screw 27 rotate, thereby make scraper blade 26 outwards remove, thereby scrape out the accumulational impurity of drainage board 17 upper surface, thereby be convenient for people clear up the impurity in the water tank 15, and the work effect is improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. A water circulation system device of a PE pipe production line comprises a cooling box (1) and a water tank (15), and is characterized in that an inlet (4) and an outlet (5) are respectively arranged at two ends of the cooling box (1), the inlet (4) and the outlet (5) are positioned on the same horizontal line, a support (6) is arranged at the top end of the cooling box (1), the support (6) is of a U-shaped structure, a first lead screw (7) penetrates through the horizontal part of the support (6), the first lead screw (7) is rotatably connected with the support (6) through a bearing, a rotary disc (8) is arranged at the top end of the first lead screw (7), a threaded cylinder (9) is rotatably connected at the bottom of the first lead screw (7), a limiting disc (10) is arranged on the surface of the first lead screw (7), the diameter of the limiting disc (10) is larger than that of the threaded cylinder (9), the bottom of the threaded cylinder (9) extends to the inner cavity of the cooling box, a plurality of first guide rollers (13) are arranged at the bottom of the connecting plate (12), second guide rollers (14) which are in one-to-one correspondence with the first guide rollers (13) are arranged on the inner wall of the bottom of the cooling box (1), support frames (2) are arranged on two sides of the bottom of the cooling box (1), a support plate (3) is arranged between the two support frames (2), a water tank (15) is arranged in the middle of the upper surface of the support plate (3), a water filtering plate (17) is arranged in the inner cavity of the water tank (15), a water absorbing cover (19) is arranged on the inner wall of the bottom of the water tank (15), a water pipe (21) is connected to the water absorbing cover (19), the water pipe (21) extends to the outer side of the water tank (15) and is provided with a water pump (18), the bottom of the water pump (18) is connected to the upper surface of the support plate (3), a refrigerator (20, the spray pipe (22) is arranged on the inner wall of the top end of the cooling box (1), and a plurality of spray heads which are uniformly distributed are arranged at the bottom of the spray pipe (22).
2. The water circulation system device of the PE pipe production line as claimed in claim 1, wherein the top end of the water tank (15) is provided with a water inlet (23), one side of the water tank (15) is provided with a sealing cover (24), the sealing cover (24) is rotatably connected with the water tank (15) through a hinge, and the side of the inner wall of the sealing cover (24) is provided with a sealing gasket.
3. The water circulation system device of the PE pipe production line according to claim 1, wherein the inner wall of the bottom of the cooling tank (1) is arranged in an inclined structure, a water outlet (16) is arranged in the middle of the bottom of the inner cavity of the cooling tank (1), and the water outlet (16) is communicated with the water inlet (23).
4. The water circulation system device of the PE pipe production line as claimed in claim 1, wherein a scraper (26) is contacted with the upper surface of the water filtering plate (17), a threaded sleeve (28) is arranged at the top end of the scraper (26), a second screw rod (27) is rotatably connected to the threaded sleeve (28), one end of the second screw rod (27) is rotatably connected with the inner wall of the water tank (15) through a bearing, the other end of the second screw rod (27) is rotatably connected with a fixing plate (29) through a bearing, the top end of the fixing plate (29) is connected with the inner wall of the top end of the water tank (15), and a turntable is arranged at the end part of the second screw rod.
5. The water circulation system device of the PE pipe production line according to claim 1 or 4, wherein a sliding groove (25) is formed in the inner wall of the water tank (15), sliding blocks are arranged on two sides of the scraping plate (26) corresponding to the sliding groove (25), and the sliding blocks are connected with the sliding groove (25) in a sliding mode.
6. The water circulation system device of the PE pipe production line as claimed in claim 1, wherein sliding rods (31) are arranged on both sides of the upper surface of the connecting plate (12), the top ends of the sliding rods (31) are slidably connected with sliding barrels (30), the top ends of the sliding barrels (30) are connected with the inner wall of the top end of the cooling box (1), springs (32) are sleeved on the sliding rods (31), the top ends of the springs (32) are connected with the bottoms of the sliding barrels (30), and the bottoms of the springs (32) are connected with the upper surface of the connecting plate (12).
7. The water circulation system device of the PE pipe production line as recited in claim 1, wherein a limiting cylinder (11) is arranged at the joint of the cooling box (1) and the threaded cylinder (9), and the threaded cylinder (9) is slidably connected with the limiting cylinder (11).
CN201921912116.7U 2019-11-07 2019-11-07 Water circulation system device of PE pipe production line Expired - Fee Related CN210851268U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921912116.7U CN210851268U (en) 2019-11-07 2019-11-07 Water circulation system device of PE pipe production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921912116.7U CN210851268U (en) 2019-11-07 2019-11-07 Water circulation system device of PE pipe production line

Publications (1)

Publication Number Publication Date
CN210851268U true CN210851268U (en) 2020-06-26

Family

ID=71306867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921912116.7U Expired - Fee Related CN210851268U (en) 2019-11-07 2019-11-07 Water circulation system device of PE pipe production line

Country Status (1)

Country Link
CN (1) CN210851268U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111923363A (en) * 2020-08-06 2020-11-13 广东顺塑塑料实业有限公司 Environment-friendly and clean pipeline extrusion production line
CN112847984A (en) * 2021-01-14 2021-05-28 广州超力管业有限公司 Cooling device for HDPE pipeline manufacturing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111923363A (en) * 2020-08-06 2020-11-13 广东顺塑塑料实业有限公司 Environment-friendly and clean pipeline extrusion production line
CN112847984A (en) * 2021-01-14 2021-05-28 广州超力管业有限公司 Cooling device for HDPE pipeline manufacturing
CN112847984B (en) * 2021-01-14 2023-09-05 广州超力管业有限公司 Cooling device for HDPE pipe manufacturing

Similar Documents

Publication Publication Date Title
CN210851268U (en) Water circulation system device of PE pipe production line
CN207170351U (en) A kind of surface of steel plate greasy dirt cleaning equipment
CN105798076B (en) The copper material extruding purging system that a kind of quick draining is dried
CN209591668U (en) A kind of cable cooling device for extrusion process
CN212516697U (en) Energy-saving cable cooling device
CN211739935U (en) Air cooler sprays heat transfer mechanism
CN210754386U (en) Continuous casting and rolling equipment for producing high-precision copper material
CN207254942U (en) A kind of blow device for the firm emulsion of cold band
CN217058144U (en) Iron block quick cooling device for hardware processing
CN215242215U (en) Cooling device is used in mould production
CN211640884U (en) Cooling water circulation device of extrusion molding pipeline
CN110560416B (en) Hot galvanizing rinsing pool with automatic circulation function
CN212349900U (en) Cold-rolled strip steel cleaning device
CN209424307U (en) A kind of novel horizontal water tank drawing machine
CN212329621U (en) Device for rapidly and uniformly cooling die
CN210552522U (en) Waterproofing membrane cooling system
CN208914351U (en) A kind of cooling device of novel and multifunctional plastic granulator
CN105728489B (en) A kind of copper material extrusion forming cools down purging system
CN219483804U (en) Practice thrift aluminium alloy processingequipment who sprays cooling water
CN221267197U (en) Mother liquor recovery device
CN213178940U (en) Steel rolling energy-saving cooling device
CN217746150U (en) Heat exchanger filter equipment
CN216506253U (en) Plastic cooling water tank
CN219423865U (en) Multistage filtering self-cleaning cold rolling cooling liquid recovery device
CN210013756U (en) Automatic washing formula automobile engine radiator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200626