CN210819521U CN201921680610.5U CN201921680610U CN210819521U CN 210819521 U CN210819521 U CN 210819521U CN 201921680610 U CN201921680610 U CN 201921680610U CN 210819521 U CN210819521 U CN 210819521U
Authority
CN
China
Prior art keywords
steel wire
fixation clamp
drill rod
line
drilling rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921680610.5U
Other languages
Chinese (zh)
Inventor
袁鸿
袁翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Hong Xiang Technologies Co ltd
Original Assignee
Tianjin Hong Xiang Technologies Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Hong Xiang Technologies Co ltd filed Critical Tianjin Hong Xiang Technologies Co ltd
Priority to CN201921680610.5U priority Critical patent/CN210819521U/en
Application granted granted Critical
Publication of CN210819521U publication Critical patent/CN210819521U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model discloses a device is used to quick setting-out of drilling rod belongs to drilling rod setting-out equipment technical field, and its technical scheme main points are including being used for the setting-out device to the drilling rod setting-out, and the setting-out device includes first fixation clamp, steel wire and second fixation clamp, and first fixation clamp can be dismantled with the one end of drilling rod and be connected, and the second fixation clamp can be dismantled with the other end of drilling rod and be connected, and the one end and the first fixation clamp of steel wire are fixed and are connected, are provided with tightening means between the other end and the second fixation clamp, reach the effect that improves work efficiency.

Description

Device for quickly drawing line on drill rod
Technical Field
The utility model relates to a drilling rod setting-out equipment field, in particular to device is used in quick setting-out of drilling rod.
Background
The drilling rod includes the outer pole usually, a plurality of telescopic link has been cup jointed in proper order in the outer pole, be equipped with the retaining member between the adjacent telescopic link, the retaining member includes the locking long slab of fixed connection on the telescopic link inner wall, the locking groove has been seted up on the locking long slab, fixedly connected with lockplate on the outer wall of telescopic link, the lockplate card is established and has been realized the locking between the adjacent telescopic link in the locking groove, when the locking plate roll-out locking groove, fixedly connected with locking plate's telescopic link is in the unblock state, can stretch out from the outer pole, the length of extension drilling rod.
The telescopic sliding between the telescopic rods is generally realized by welding an outer key strip parallel to the axis of the telescopic rod on the outer peripheral surface of the telescopic rod and welding an inner key strip parallel to the axis of the telescopic rod on the inner wall of the telescopic rod. The inner key strip of the outer telescopic rod is matched with the inner key strip of the inner telescopic rod, so that telescopic sliding between the telescopic rods is realized.
When welding the key bar to the telescopic link, in order to guarantee the smooth and easy nature when the telescopic link is flexible, the straightness accuracy requirement of the key bar of welding is higher. The highest point of the telescopic rod is generally required to be measured at two ends of the telescopic rod, then the highest point of the position is required to be measured every other meter in the axial direction of the telescopic rod, finally all the highest points are connected together to draw a line, and a key strip is welded at the position where the line is drawn.
However, the telescopic rod is generally dozens of meters long, workers need to find the highest point of the telescopic rod every other meter, dozens of highest points need to be measured on each telescopic rod, the operation is quite complicated for the workers, and the working efficiency is low.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a device is used to quick setting-out of drilling rod reaches the effect that improves work efficiency.
The above technical purpose of the present invention can be achieved by the following technical solutions:
the utility model provides a quick setting-out of drilling rod is with device which characterized in that: including being used for the setting-out device to the drilling rod setting-out, the setting-out device includes first fixation clamp, steel wire and second fixation clamp, and the one end of first fixation clamp and drilling rod can be dismantled and be connected, and the other end of second fixation clamp and drilling rod can be dismantled and be connected, and the one end and the first fixation clamp of steel wire are fixed and are connected, are provided with tightening means between the other end and the second fixation clamp.
By adopting the technical scheme, firstly, the highest points at two ends of the drill rod are searched through measurement and marked. And then, fixedly connecting the first fixing clamp with one end of the drill rod, and enabling the steel wire to be superposed with the highest point of the marked position. And then, fixedly connecting the second fixing clamp with one end of the drill rod, which is far away from the first fixing clamp, and then tightening the steel wire through a tightening device to straighten the steel wire and enable the steel wire to be superposed with the marks at the highest positions of the two ends of the drill rod. At this time, the steel wire is abutted to the outer peripheral surface of the drill rod, and the position where the steel wire is abutted to the drill rod is the position where the line needs to be drawn. And finally, drawing a line along the position of the steel wire. In the line drawing process, the highest points are only needed to be measured at the two ends of the drill rod, and one highest point does not need to be measured every other meter, so that the line drawing device is simple and convenient to operate, the workload of workers is reduced, and the working efficiency is improved.
The utility model discloses further set up to, tightening means includes wind-up roll and baffle, and the both ends and the second fixation clamp of wind-up roll rotate to be connected, and the steel wire winding is on the wind-up roll, baffle and wind-up roll axis direction's both ends fixed connection in order to shelter from the steel wire.
Through adopting above-mentioned technical scheme, with the one end fixed connection back of first fixed plate and drilling rod, again with the other end fixed connection of second fixation clamp and drilling rod. After the highest points at the two ends of the steel wire and the drill rod are overlapped, the winding roller is rotated to wind the steel wire on the winding roller, so that the steel wire is tightened. At the moment, the position where the steel wire is located is the position needing drawing the line, and the worker only needs to draw the line along the position of the steel wire. The baffle shelters from the steel wire of winding on the wind-up roll, avoids the steel wire to drop from the both ends of wind-up roll, makes the steel wire pine to influence the degree of accuracy of staff's setting-out.
The utility model discloses further set up to, be provided with the retaining member between baffle and the second fixed plate, the retaining member is locking bolt, and first fixation clamp is passed with the inseparable butt of baffle, locking bolt and first fixation clamp threaded connection to locking bolt's one end.
By adopting the technical scheme, after the steel wire is tightened, the locking bolt is rotated to enable the locking bolt to be tightly abutted to the baffle plate, so that the wind-up roll is prevented from rotating, a worker does not need to hold the wind-up roll by hands, and the workload of the worker is further reduced. And simultaneously, the labor can be saved.
This practicality further sets up to, the rotatory handle of one end fixedly connected with of wind-up roll.
Through adopting above-mentioned technical scheme, handheld rotatory handle rotates the wind-up roll, and easy operation, convenience when improving the in-service use to further improve work efficiency.
The utility model discloses further set up to, first fixation clamp includes first splint, second splint and connecting plate, leaves the embedding distance that is used for embedding drilling rod thickness between first splint and the second splint, the both ends of connecting plate respectively with first splint and second splint fixed connection.
Through adopting above-mentioned technical scheme, leave the distance that supplies the one end wall thickness embedding of drilling rod between first splint and the second splint, then through first splint and second splint with first fixation clamp in the one end of drilling rod to it is fixed with first fixation clamp and drilling rod. So that the steel wire can be straightened when the steel wire is wound by the winding roller, and the line can be drawn on the drill rod quickly.
The utility model discloses further set up to, threaded connection has first bolt on the first splint, the inseparable butt of one end and drilling rod of first bolt.
Through adopting above-mentioned technical scheme, first bolt passes behind the first splint closely the butt with the drilling rod, then further increases the stability of being connected of first fixation clamp and drilling rod, prevents that first fixation clamp from producing and rocking, improves the stability of first fixation clamp to improve the degree of accuracy of setting-out.
The utility model discloses further set up to, be equipped with the setting-out subassembly on the steel wire, the setting-out subassembly includes the lantern ring and setting-out pen, and the lantern ring cover is established on the steel wire with steel wire sliding connection, the setting-out pen is connected with the fixed surface of lantern ring axis direction, the outer peripheral face butt of setting-out pen and drilling rod.
Through adopting above-mentioned technical scheme, with the steel wire stretch-straight back, handheld lantern ring makes the lantern ring slide along the steel wire to make the setting-out pen slide along the steel wire, easy operation and setting-out precision are high.
The utility model discloses further set up to, fixedly connected with prevents lantern ring pivoted bracing piece on the outer peripheral face of the lantern ring, and the bracing piece is equipped with two to axis symmetry about the lantern ring, the bottom and the drilling rod butt of bracing piece.
Through adopting above-mentioned technical scheme, the bottom and the drilling rod outer peripheral face butt of bracing piece, then when the lantern ring slided along the steel wire, can prevent that the lantern ring from taking place to rotate, further improve the degree of accuracy of setting-out to can improve the smooth and easy nature of setting-out, improve work efficiency.
To sum up, the utility model discloses following beneficial effect has:
1. through setting up the setting-out device, fix first fixation clamp and second fixation clamp at the both ends of drilling rod respectively, make the steel wire with the peak coincidence at drilling rod both ends after tighten up the steel wire through tightening means, then follow the steel wire setting-out again can. The highest point does not need to be measured on the peripheral surface of the drill rod every other meter, so that the working process is simplified, the workload of workers is reduced, and the working efficiency can be improved;
2. further fix first fixation clamp and drilling rod through first bolt, further increase the stability of first fixation clamp to can improve the setting-out degree of accuracy.
3. Set up the setting-out subassembly, further simplify the working process, only need the handheld lantern ring of staff to slide along the steel wire and can accomplish the setting-out work, easy operation, setting-out precision are high, can improve work efficiency simultaneously.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of the first mounting clip for clarity;
FIG. 3 is a schematic view of the second mounting clip for clarity;
figure 4 is a schematic view of a portion of the construction intended to clearly show the line marking assembly.
Reference numerals: 1. a line drawing device; 11. a first fixing clip; 111. a first splint; 1111. a first bolt; 112. a second splint; 113. a connecting plate; 12. a steel wire; 13. a second fixing clip; 131. a fixing plate; 1311. a second bolt; 1312. a U-shaped groove; 132. fixing the rod; 2. a tightening device; 21. a wind-up roll; 211. rotating the handle; 22. a baffle plate; 221. locking the bolt; 3. a line drawing assembly; 31. a collar; 311. a support bar; 32. a line drawing pen; 4. and (5) drilling a rod.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
A device for quickly drawing a line on a drill rod is shown in figure 1 and comprises a line drawing device 1 for drawing a line on a drill rod 4, wherein the line drawing device 1 comprises a first fixing clamp 11, a steel wire 12 and a second fixing clamp 13, the first fixing clamp 11 is fixedly connected with one end of the drill rod 4, and the second fixing clamp 13 is fixedly connected with the other end of the drill rod 4. One end of the steel wire 12 is highly connected with the first fixing clamp 11, and a tightening device 2 is connected between the other end of the steel wire and the second fixing clamp 13.
Marking the highest point at the two ends of the drill rod 4, and then fixedly connecting the first fixing clamp 11 with one end of the drill rod 4. Afterwards, the second fixing clamp 13 and one end of the drill rod 4, which is far away from the first fixing clamp 11, are fixedly connected, after the steel wire 12 is overlapped with the highest points of the two ends of the drill rod 4, the steel wire 12 is tightened through the tightening device 2, and the position where the steel wire 12 is abutted to the drill rod 4 is the position where the line needs to be drawn, so that the operation is simple and fast, and the working efficiency can be improved.
As shown in fig. 2, the first fixing clip 11 includes a first clamping plate 111, a second clamping plate 112 and a connecting plate 113, the first clamping plate 111 and the second clamping plate 112 are each in a rectangular plate-shaped structure, and the length of the first clamping plate 111 is greater than that of the second clamping plate 112. The first clamping plate 111 is horizontally arranged, and the second clamping plate 112 is horizontally arranged on the top surface of the first clamping plate 111 and is spaced from the first clamping plate 111. One end of the first clamping plate 111 is flush with one end of the second clamping plate 112. A connecting plate 113 is vertically positioned between the first clamping plate 111 and the second clamping plate 112, and the height of the connecting plate 113 is greater than the thickness of the drill rod 4. The top end of the connecting plate 113 is fixedly connected with the second clamping plate 112, and the bottom end is fixedly connected with the first clamping plate 111. One end of the steel wire 12 is fixedly connected with one end of the first clamping plate 111 far away from the second clamping plate 112. First splint 111 is gone up threaded connection and has first bolt 1111, and first bolt 1111 passes behind the first splint 111 from the one side that second splint 112 was kept away from to first splint 111 closely to butt with drilling rod 4 to with first fixation clamp 11 and drilling rod 4 fixed connection.
As shown in fig. 3, the second fixing clip 13 includes a fixing plate 131 and a fixing rod 132, the fixing plate 131 is horizontally disposed, the fixing rod 132 is in an inverted L shape, and a bottom end of the fixing rod 132 is fixedly connected to a top surface of the fixing plate 131. The surface of the other end of the fixing rod 132 is flush with the surface of one end of the fixing plate 131 in the length direction. The fixing levers 132 are provided in two, and the two fixing levers 132 are symmetrically disposed about the center line of the fixing plate 131. A second bolt 1311 is screwed on the fixing plate 131, and the second bolt 1311 penetrates through the fixing plate 131 and then tightly abuts against the drill rod 4, so that the second fixing clamp 13 is fixedly connected with the drill rod 4. One end of the fixing plate 131 far from the fixing rod 132 is provided with a U-shaped groove 1312, and the tightening device 2 is located in the U-shaped groove 1312 and connected with the fixing plate 131.
As shown in fig. 3, tightening device 2 includes a take-up roll 21 and a baffle 22, where take-up roll 21 is located in U-shaped groove 1312, and both ends of take-up roll 21 are rotatably connected to the side walls of U-shaped groove 1312. Two baffles 22 are arranged and are respectively positioned at two ends of the wind-up roll 21 and fixedly connected with the wind-up roll 21. The steel wire 12 is wound on the take-up roll 21. The baffle 22 is in a circular plate-shaped structure, and the axis of the baffle 22 is overlapped with the axis of the winding roller 21. One end of the wind-up roll 21 is fixedly connected with a rotating handle 211. The retaining member for locking the winding roller 21 is connected to the retaining plate 22, the retaining member is a retaining bolt 221, and the retaining bolt 221 is located on one side of the fixing plate 131 far away from the rotating handle 211. One end of the locking bolt 221 penetrates through the fixing plate 131 and then tightly abuts against the baffle 22, and the locking bolt 221 is in threaded connection with the fixing plate 131.
Firstly, finding and marking the highest points at two ends of the drill rod 4; then, the first fixing clip 11 is clamped at one end of the drill rod 4 through the first clamping plate 111 and the second clamping plate 112, and similarly, the second fixing clip 13 is clamped at the other end of the drill rod 4 through the fixing plate 131 and the fixing rod 132, and the positions of the first fixing clip 11 and the second fixing clip 13 are adjusted, so that the steel wire 12 coincides with the highest point of the two ends of the drill rod 4; then, first bolt 1111 is rotated to bring first bolt 1111 into close contact with drill rod 4, first fixing clip 11 is fixedly connected to drill rod 4, and second fixing clip 13 is fixedly connected to drill rod 4 by second bolt 1311; finally, the handle 211 is rotated by holding the rotating handle, the winding roll 21 is rotated, the steel wire 12 is tightened, and after the steel wire 12 is straightened, the locking bolt 221 is rotated, so that the locking bolt 221 is tightly abutted to the baffle 22, and the winding roll 21 is prevented from rotating. At this time, the position of the steel wire 12 is the position where the drawing is required.
Referring to fig. 1 and 4, a line drawing assembly 3 is arranged on the steel wire 12, the line drawing assembly 3 comprises a lantern ring 31 and a line drawing pen 32, the lantern ring 31 is of a circular ring structure, and the lantern ring 31 is sleeved on the outer circumferential surface of the steel wire 12 and is in sliding connection with the steel wire 12. The outer peripheral surface of the collar 31 abuts against the outer peripheral surface of the drill rod 4. The line drawing pen 32 is in a cylindrical structure, the line drawing pen 32 is fixedly connected with the surface of one side of the collar 31 in the axial direction, and the axis of the line drawing pen 32 is perpendicular to the axis of the collar 31. The line drawing end of the line drawing pen 32 is in an arc-shaped structure which is overlapped with the center of the lantern ring 31. The line end of the line drawing pen 32 abuts against the outer peripheral surface of the drill rod 4. The outer peripheral surface of the lantern ring 31 is provided with two support rods 311, and the number of the support rods 311 is two. The two support rods 311 are symmetrical about the axis of the line drawing pen 32. The top end of the support rod 311 is fixedly connected with the outer peripheral surface of the lantern ring 31, and the bottom end of the support rod is abutted against the outer peripheral surface of the drill rod 4.
After the steel wire 12 is straightened, the supporting rod 311 is abutted against the outer peripheral surface of the drill rod 4 by holding the lantern ring 31. At this time, the line end of the line drawing pen 32 abuts against the outer peripheral surface of the drill rod 4. The collar 31 is then slid along the length of the wire 12 to complete the line drawing operation of the drill rod 4.
The utility model discloses a use as follows:
when the line needs to be drawn on the drill rod 4, firstly, measuring the highest points of the two end positions of the drill rod 4, marking, clamping a first fixing clamp 11 at one end of the drill rod 4 by one person, and clamping a second fixing clamp 13 at the other end of the drill rod 4 by the other person; then, the winding roller 21 is rotated, the steel wire 12 is wound on the winding roller 21, and the steel wire 12 is tightened; then, adjusting the position of the first fixing clamp 11 and the position of the second fixing clamp 13 to enable the steel wire 12 to coincide with the highest point at the two ends of the drill rod 4, and then fixedly connecting the first fixing clamp 11 and the drill rod 4 through a first bolt 1111 and fixedly connecting the second fixing clamp 13 and the drill rod 4 through a second bolt 1311; finally, when the winding roller 21 continues to rotate, the steel wire 12 is further straightened, the lantern ring 31 is held by a hand, the line drawing pen 32 and the supporting rod 311 are both abutted to the outer peripheral surface of the drill rod 4, the lantern ring 31 slides along the steel wire 12, line drawing operation on the drill rod 4 is achieved, operation is simple and fast, and working efficiency is improved.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides a quick setting-out of drilling rod is with device which characterized in that: including being used for setting out device (1) to drilling rod (4) setting out, setting out device (1) includes first fixation clamp (11), steel wire (12) and second fixation clamp (13), and first fixation clamp (11) can be dismantled with the one end of drilling rod (4) and be connected, and second fixation clamp (13) can be dismantled with the other end of drilling rod (4) and be connected, the one end and first fixation clamp (11) fixed connection of steel wire (12), is provided with tightening means (2) between the other end and second fixation clamp (13).
2. The device for quickly drawing the line on the drill rod according to claim 1, wherein: tightening means (2) include wind-up roll (21) and baffle (22), and the both ends and second fixation clamp (13) of wind-up roll (21) rotate to be connected, and steel wire (12) winding is on wind-up roll (21), and baffle (22) and wind-up roll (21) axis direction's both ends fixed connection are in order to shelter from steel wire (12).
3. The device for quickly drawing the line on the drill rod according to claim 2, wherein: be provided with the retaining member between baffle (22) and second fixed plate (131), the retaining member is locking bolt (221), and first fixation clamp (11) is passed to the one end of locking bolt (221) and baffle (22) closely butt, locking bolt (221) and first fixation clamp (11) threaded connection.
4. The device for quickly drawing the line on the drill rod according to claim 2, wherein: one end of the winding roller (21) is fixedly connected with a rotating handle (211).
5. The device for quickly drawing the line on the drill rod according to claim 1, wherein: first fixation clamp (11) include first splint (111), second splint (112) and connecting plate (113), leave the embedding distance that is used for embedding drilling rod (4) thickness between first splint (111) and second splint (112), the both ends of connecting plate (113) respectively with first splint (111) and second splint (112) fixed connection.
6. The device for quickly drawing the line on the drill rod according to claim 5, wherein: a first bolt (1111) is connected to the first clamping plate (111) in a threaded mode, and one end of the first bolt (1111) is tightly abutted to the drill rod (4).
7. The device for quickly drawing the line on the drill rod according to claim 1, wherein: be equipped with setting out subassembly (3) on steel wire (12), setting out subassembly (3) are including lantern ring (31) and setting out pen (32), and lantern ring (31) cover is established on steel wire (12) and is connected with steel wire (12) sliding connection, and surface fixed connection of setting out pen (32) and lantern ring (31) axis direction, the peripheral face butt of setting out pen (32) and drilling rod (4).
8. The device for quickly drawing the line on the drill rod according to claim 7, wherein: the outer peripheral surface of the lantern ring (31) is fixedly connected with two supporting rods (311) for preventing the lantern ring (31) from rotating, the two supporting rods (311) are symmetrical about the axis of the lantern ring (31), and the bottom end of each supporting rod (311) is abutted to the drill rod (4).
CN201921680610.5U 2019-10-09 2019-10-09 Device for quickly drawing line on drill rod Expired - Fee Related CN210819521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921680610.5U CN210819521U (en) 2019-10-09 2019-10-09 Device for quickly drawing line on drill rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921680610.5U CN210819521U (en) 2019-10-09 2019-10-09 Device for quickly drawing line on drill rod

Publications (1)

Publication Number Publication Date
CN210819521U true CN210819521U (en) 2020-06-23

Family

ID=71254385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921680610.5U Expired - Fee Related CN210819521U (en) 2019-10-09 2019-10-09 Device for quickly drawing line on drill rod

Country Status (1)

Country Link
CN (1) CN210819521U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114211135A (en) * 2021-12-28 2022-03-22 浙江明牌珠宝科技有限公司 Line drawing device of diamond laser cutting machine and diamond laser cutting machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114211135A (en) * 2021-12-28 2022-03-22 浙江明牌珠宝科技有限公司 Line drawing device of diamond laser cutting machine and diamond laser cutting machine
CN114211135B (en) * 2021-12-28 2024-05-14 浙江明牌珠宝科技有限公司 Line drawing device of diamond laser cutting machine and diamond laser cutting machine

Similar Documents

Publication Publication Date Title
CN210819521U (en) Device for quickly drawing line on drill rod
CN104827456A (en) Scribing combined tool for pasting strain gage of fuel assembly
CN112577397A (en) Angle detection guiding ruler for flange pipe
CN205426163U (en) Indoor decoration design is with measuring pay -off
CN210396185U (en) Novel pay-off fixture
CN213952996U (en) Template anchor clamps convenient to adjust
CN206353013U (en) A kind of car condenser row pitch checking tool
CN213391157U (en) Fastener type scaffold upright rod positioning fixture
CN212843421U (en) Anchor rod tensioning displacement self-indicating device
CN208687122U (en) A kind of reusable pipe sleeve fixes device with one heart
CN102865860B (en) A kind of steel column surveying setting-out device and measuring method thereof
CN109579655B (en) Stiffening steel pipe plane center positioning device and application method thereof
CN218926055U (en) Bridge worker's reinforcing bar bending device
CN214951009U (en) Shield constructs section of jurisdiction size measurement device
CN207963822U (en) A kind of prefabricated components lateral bending auxiliary detection device
CN207123253U (en) A kind of steel pipe end surface detection tool for detecting verticality of bicylindrical positioning
CN212988183U (en) Positioning ruler convenient for cost consultation work
CN218411203U (en) Portable integrated template verticality measuring tool
CN111174672A (en) Concrete slab reinforcing steel bar spacing marking device
CN221173378U (en) Guiding ruler is measured to aluminium template location and straightness that hangs down
CN214792926U (en) Radian measuring device for steel structural member
CN212513042U (en) Measure unwrapping wire positioner
CN214639828U (en) Angle adjusting device for reinforcing steel bar
CN215405475U (en) A central line positioner for road engineering
CN215331593U (en) Adjustable construction steel bar interval drawing point device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee