CN210819287U - Building pipeline installation butt joint adjusting equipment - Google Patents
Building pipeline installation butt joint adjusting equipment Download PDFInfo
- Publication number
- CN210819287U CN210819287U CN201921988820.0U CN201921988820U CN210819287U CN 210819287 U CN210819287 U CN 210819287U CN 201921988820 U CN201921988820 U CN 201921988820U CN 210819287 U CN210819287 U CN 210819287U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- shaped frame
- fixing frame
- threaded
- threaded rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a building pipeline installation butt joint adjusting device, which belongs to the field of building construction devices and comprises a base, wherein the upper end of the base is fixedly connected with a fixing frame, the upper end of the base is fixedly connected with a slide rail, the slide rail is in sliding connection with a sliding table, the sliding table is fixedly connected with a pair of electric push rods, the telescopic end of each electric push rod is fixedly connected with a U-shaped frame, threaded holes are uniformly drilled on the fixing frame and the U-shaped frame, a first threaded rod is in threaded hole connection, one end of the first threaded rod is rotationally connected with a clamping plate, second sliding grooves matched with the clamping plate are uniformly drilled on the inner walls of the fixing frame and the U-shaped frame, the other end of the first threaded rod is fixedly connected with an adjusting knob, one end of the fixing frame close to the U-shaped frame is fixedly connected with a pair of positioning rods, the push type switch is connected in the clamping groove, so that the butt joint of pipelines with the same caliber is facilitated, and the butt joint and the positioning of the pipelines are easy to be accurate.
Description
Technical Field
The utility model relates to a building construction equipment field, more specifically say, relate to a building piping erection butt joint adjusting equipment.
Background
The pipeline is a device for conveying gas, liquid or fluid with solid particles, which is formed by connecting pipes, pipe connectors, valves and the like, generally, the fluid flows from a high-pressure part to a low-pressure part of the pipeline after being pressurized by a blower, a compressor, a pump, a boiler and the like, and can also be conveyed by utilizing the pressure or gravity of the fluid, the pipeline has wide application range, and is mainly used for water supply, drainage, heat supply, gas supply, long-distance petroleum and natural gas conveying, agricultural irrigation, hydraulic engineering and various industrial devices.
In the construction process of installing the building pipeline, two adjacent pipelines with the same caliber need to be butted, at the moment, the pipelines to be butted need to be supported at the same height, and the end parts of the pipelines to be butted are aligned with the end parts of the basic pipelines, so that the butting quality of the two pipelines can be ensured.
At present, the alignment of the pipeline is mostly manually adjusted, the labor intensity is high, fine adjustment is difficult to carry out, the positioning effect is fixed, and the working efficiency is low.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a building piping erection butt joint adjusting equipment, it can realize making things convenient for the butt joint of the same bore pipeline, easily makes the pipeline butt joint location accurate.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A building pipeline installation butt joint adjusting device comprises a base, wherein a fixing frame is fixedly connected to the upper end of the base, a sliding rail is fixedly connected to the upper end of the base, a sliding table is connected to the sliding rail in a sliding mode, a pair of electric push rods are fixedly connected to the sliding table, a U-shaped frame is fixedly connected to the telescopic end of each electric push rod, threaded holes are formed in the fixing frame and the U-shaped frame in a chiseled mode, a first threaded rod is connected to one end of the threaded hole in a threaded mode, a clamping plate is connected to one end of the first threaded rod in a rotating mode, second sliding grooves matched with the clamping plate are formed in the inner walls of the fixing frame and the U-shaped frame in a chiseled mode, an adjusting knob is fixedly connected to the other end of the first threaded rod, a pair of positioning rods is fixedly connected to one end, close to the, the push type switch is connected in the clamping groove and electrically connected with the electric push rod, so that the butt joint of pipelines with the same caliber is facilitated, and the butt joint and the positioning of the pipelines are easy to be accurate.
U-shaped through holes are drilled in the fixing frame and the U-shaped frame, the vertical inner wall of the fixing frame and the vertical inner wall of the U-shaped frame are located on the same vertical plane, and therefore the pipeline located in the fixing frame and the U-shaped frame can be located accurately easily.
The utility model discloses a pipeline fine adjustment device, including splint, push pedal, the lower extreme of push pedal is connected with the first threaded rod, the splint go up the chisel have with push pedal assorted third spout, the push pedal has been placed in the second spout, the lower extreme of push pedal rotates and is connected with the second threaded rod, second threaded rod and electric putter threaded connection conveniently carry out vertical direction's fine adjustment to the pipeline.
Fixedly connected with and slip table assorted motor on the base, fixedly connected with lead screw on the power take off of motor, slip table and lead screw threaded connection, fixedly connected with locating lever in the slide rail, the slip table is gone up to chisel has with locating lever assorted through-hole, makes things convenient for the slip of slip table.
Further, fixedly connected with rubber buffer layer on the splint, it has anti-skidding line to cut on the rubber buffer layer, makes splint press from both sides the pipeline tightly firm.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) this scheme makes arm and sliding rail connection firm, makes things convenient for the dismouting of arm.
(2) The fixing frame and the U-shaped frame are both provided with U-shaped through holes, the vertical inner wall of the fixing frame and the vertical inner wall of the U-shaped frame are positioned on the same vertical plane, and the pipeline positioned in the fixing frame and the U-shaped frame can be positioned accurately easily.
(3) The splint are provided with a third sliding groove matched with the pushing plate in a chiseling mode, the pushing plate is placed in the second sliding groove, the lower end of the pushing plate is connected with a second threaded rod in a rotating mode, the second threaded rod is in threaded connection with the electric push rod, and the vertical direction micro-adjustment is conveniently carried out on the pipeline.
(4) Fixedly connected with and slip table assorted motor on the base, fixedly connected with lead screw on the power take off of motor, slip table and lead screw threaded connection, fixedly connected with locating lever in the slide rail, the chisel on the slip table have with locating lever assorted through-hole, make things convenient for the slip of slip table.
(5) Fixedly connected with rubber buffer layer on the splint, it has anti-skidding line to cut on the rubber buffer layer, makes splint press from both sides the pipeline tight firmly.
Drawings
Fig. 1 is a cross-sectional view of the present invention;
FIG. 2 is a cross-sectional view of the U-shaped frame of the present invention;
fig. 3 is a front view of the fixing frame of the present invention;
fig. 4 is a cross-sectional view of the splint of the present invention.
The reference numbers in the figures illustrate:
the device comprises a support 1, a fixing frame 2, a sliding table 3, an electric push rod 4, a U-shaped frame 5, a first threaded rod 6, a clamping plate 7, a positioning rod 8, a push switch 9, a motor 10, a lead screw 101, a push plate 11 and a second threaded rod 12.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1:
referring to fig. 1-2, a building pipeline installation butt joint adjusting device comprises a base 1, a fixed mount 2 is fixedly connected to the upper end of the base 1, a slide rail is fixedly connected to the upper end of the base 1, a sliding table 3 is slidably connected to the slide rail, a motor 10 matched with the sliding table 3 is fixedly connected to the base 1, a lead screw 101 is fixedly connected to the power output end of the motor 10, the sliding table 3 is in threaded connection with the lead screw 101, a positioning rod is fixedly connected to the inside of the slide rail, a through hole matched with the positioning rod is chiseled on the sliding table 3 to facilitate the sliding of the sliding table 3, a pair of electric push rods 4 is fixedly connected to the sliding table 3, the electric push rods 4 are electrically connected to an external power supply, and are installed by a person skilled in the art by using a suitable electric push rod 4, such as ANT-32, a U-shaped frame 5 is fixedly connected to the, one end of the fixing frame 2 close to the U-shaped frame 5 is fixedly connected with a pair of positioning rods 8, one end of each positioning rod 8 is fixedly connected with the base 1, so that each positioning rod 8 is L-shaped, the top end of the U-shaped frame 5 is provided with a clamping groove matched with the corresponding positioning rod 8, a pressing switch 9 is connected in the clamping groove, the pressing switch 9 is electrically connected with the electric push rod 4, the fixing frame 2 and the U-shaped frame 5 are respectively provided with a U-shaped through hole, the vertical inner wall of the fixing frame 2 and the vertical inner wall of the U-shaped frame 5 are positioned on the same vertical surface, so that the pipelines fixed in the fixing frame 2 and the U-shaped frame 5 are tangent to the same vertical surface, the positioning is accurate when the pipelines are, the plane of the bottom end of the inner wall of the fixing frame 2 coincides with the plane of the bottom end of the inner wall of the U-shaped frame 5, so that the pipelines in the fixing frame 2 and the U-shaped frame 5 are tangent to the same horizontal plane.
Referring to fig. 2-4, threaded holes are drilled in the fixing frame 2 and the U-shaped frame 5, a first threaded rod 6 is connected to the threaded holes in an inner threaded manner, one end of the first threaded rod 6 is connected with a clamping plate 7 in a rotating manner, a rubber buffer layer is fixedly connected to the clamping plate 7, anti-skid lines are drilled on the rubber buffer layer, the clamping plate 7 firmly clamps the pipeline, second sliding grooves matched with the clamping plate 7 are drilled in the inner walls of the fixing frame 2 and the U-shaped frame 5, an adjusting knob is fixedly connected to the other end of the first threaded rod 6, a push plate 11 is arranged in the second sliding grooves, a third sliding groove matched with the push plate 11 is drilled in the clamping plate 7, a second threaded rod 12 is connected to the lower end of the push plate 11 in a rotating manner, the second threaded rod 12 is in threaded connection with the electric push rod 4, vertical micro-adjustment of the pipeline.
When the pipeline clamp is used, a technician places a pipeline in the fixing frame 2 and rotates the first threaded rod 6 to enable the clamping plate 7 and the fixing frame 2 to clamp the pipeline tightly, then places another pipeline in the U-shaped frame 5, rotates the first threaded rod 6 on the U-shaped frame 5 to enable the clamping plate 7 and the U-shaped frame 5 to clamp the pipeline tightly, then controls the electric push rod 4 to work to enable the U-shaped frame 5 to drive the pipeline to ascend until the positioning rod 8 on the fixing frame 2 enters the clamping groove on the U-shaped frame 5 to enable the positioning rod 8 to press the push switch 9, the electric push rod 4 stops moving, at the moment, the two pipelines are tangent to the same vertical plane and horizontal plane, then the user can control the motor 10 to work to enable the motor 10 to drive the screw rod 101 to rotate, so that the fixing frame 2 moves along the length direction of the base 1 to enable the two pipelines to be jointed, at the moment, the, the second threaded rod 12 pushes the pipeline in the U-shaped frame 5 to ascend, so that the position of the butt joint pipe is finely adjusted.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.
Claims (5)
1. The utility model provides a building piping erection butt joint adjusting equipment, includes base (1), its characterized in that: the upper end of the base (1) is fixedly connected with a fixing frame (2), the upper end of the base (1) is fixedly connected with a sliding rail, the sliding rail is internally connected with a sliding table (3), the sliding table (3) is fixedly connected with a pair of electric push rods (4), the telescopic end of each electric push rod (4) is fixedly connected with a U-shaped frame (5), threaded holes are drilled in the fixing frame (2) and the U-shaped frame (5), a first threaded rod (6) is connected in the threaded holes in a threaded manner, one end of the first threaded rod (6) is rotatably connected with a clamping plate (7), second sliding grooves matched with the clamping plate (7) are drilled in the inner walls of the fixing frame (2) and the U-shaped frame (5), the other end of the first threaded rod (6) is fixedly connected with an adjusting knob, one end of the fixing frame (2) close to the U-shaped frame (5) is fixedly connected, one end of the positioning rod (8) is fixedly connected with the base (1), a clamping groove matched with the positioning rod (8) is formed in the top end of the U-shaped frame (5), a pressing switch (9) is connected in the clamping groove, and the pressing switch (9) is electrically connected with the electric push rod (4).
2. A building plumbing installation docking conditioning apparatus according to claim 1, wherein: u-shaped through holes are drilled in the fixing frame (2) and the U-shaped frame (5), and the vertical inner wall of the fixing frame (2) and the vertical inner wall of the U-shaped frame (5) are located on the same vertical plane.
3. A building plumbing installation docking conditioning apparatus according to claim 1, wherein: the utility model discloses a push plate, including splint (7), division chisel on splint (7) have with push pedal (11) assorted third spout, push pedal (11) have been placed in the second spout, the lower extreme of push pedal (11) is rotated and is connected with second threaded rod (12), second threaded rod (12) and electric putter (4) threaded connection.
4. A building plumbing installation docking conditioning apparatus according to claim 1, wherein: fixedly connected with and slip table (3) assorted motor (10) on base (1), fixedly connected with lead screw (101) on the power take off of motor (10), slip table (3) and lead screw (101) threaded connection, fixedly connected with locating lever in the slide rail, the chisel has with locating lever assorted through-hole on slip table (3).
5. A building plumbing installation docking conditioning apparatus according to claim 1, wherein: fixedly connected with rubber buffer layer on splint (7), it has anti-skidding line to cut on the rubber buffer layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921988820.0U CN210819287U (en) | 2019-11-18 | 2019-11-18 | Building pipeline installation butt joint adjusting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921988820.0U CN210819287U (en) | 2019-11-18 | 2019-11-18 | Building pipeline installation butt joint adjusting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210819287U true CN210819287U (en) | 2020-06-23 |
Family
ID=71277648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921988820.0U Expired - Fee Related CN210819287U (en) | 2019-11-18 | 2019-11-18 | Building pipeline installation butt joint adjusting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210819287U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113977240A (en) * | 2021-11-26 | 2022-01-28 | 夏敬明 | Self-calibration type docking assembly equipment based on hydraulic cylinder driving |
-
2019
- 2019-11-18 CN CN201921988820.0U patent/CN210819287U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113977240A (en) * | 2021-11-26 | 2022-01-28 | 夏敬明 | Self-calibration type docking assembly equipment based on hydraulic cylinder driving |
CN113977240B (en) * | 2021-11-26 | 2024-04-05 | 安徽众嘉液压科技有限公司 | Self-calibration type butt joint assembly equipment based on hydraulic cylinder driving |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210819287U (en) | Building pipeline installation butt joint adjusting equipment | |
CN210587293U (en) | Drilling equipment is used in pipeline processing | |
CN213629200U (en) | Be used for pipeline construction support | |
CN215357064U (en) | Supporting and positioning clamp for pipeline welding | |
CN109227654A (en) | A kind of band saw device of multi-angle cutting plastic pipe | |
CN112944069B (en) | Connecting equipment for fastening and connecting pipe fittings in direct sliding-in mode | |
CN218016860U (en) | Positioning device for welding pressure pipeline | |
CN211361602U (en) | Lathe that water pump shaft was used of beating eyes convenient to adjust | |
CN215635410U (en) | Pipeline laying auxiliary device for water conservancy construction | |
CN211638397U (en) | Pipeline drilling device | |
CN220838755U (en) | Auxiliary butt joint platform for pipeline welding | |
CN111112404A (en) | Machine tool | |
CN218051139U (en) | Nested pipeline inner tube positioner | |
CN216643282U (en) | Municipal administration water supply and drainage pipeline stop device | |
CN117948065B (en) | Large-drift-diameter fracturing wellhead device convenient to install and fix and auxiliary butt joint device thereof | |
CN214291098U (en) | Cutting device is used in metal pipeline production | |
CN218696371U (en) | Automatic change processing tubular product tool for location | |
CN209970528U (en) | Water supply and drainage pipeline butt joint supporting and adjusting device | |
CN219493303U (en) | Pipeline supporting device for hydraulic engineering | |
CN215145973U (en) | Movable pipeline multi-angle pre-assembled mould platform | |
CN220389222U (en) | Pipeline positioning device for municipal engineering | |
CN220659382U (en) | Pipeline cutting equipment | |
CN212977300U (en) | Novel pipeline construction welding manipulator is connected device | |
CN220523900U (en) | Stray current monitoring device for steel oil-gas pipeline | |
CN219082462U (en) | Novel pipeline support and hanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200623 Termination date: 20201118 |