CN210798997U - Shield constructs quick-witted slip casting pipeline convenient to wash - Google Patents

Shield constructs quick-witted slip casting pipeline convenient to wash Download PDF

Info

Publication number
CN210798997U
CN210798997U CN201921858483.3U CN201921858483U CN210798997U CN 210798997 U CN210798997 U CN 210798997U CN 201921858483 U CN201921858483 U CN 201921858483U CN 210798997 U CN210798997 U CN 210798997U
Authority
CN
China
Prior art keywords
branch pipe
pipe
slip casting
shutoff
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921858483.3U
Other languages
Chinese (zh)
Inventor
张晓勇
石志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tunnel Engineering Co Ltd
Original Assignee
CCCC Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tunnel Engineering Co Ltd filed Critical CCCC Tunnel Engineering Co Ltd
Priority to CN201921858483.3U priority Critical patent/CN210798997U/en
Application granted granted Critical
Publication of CN210798997U publication Critical patent/CN210798997U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of tunnel engineering devices, and discloses a shield constructs quick-witted slip casting pipeline convenient to wash, including the slip casting pipe, the position slope that is close to the entrance point on the slip casting pipe is equipped with branch pipe one, and the position slope that is close to the exit end on the slip casting pipe is equipped with branch pipe two, and branch pipe one intussuseption is filled with the foam ball, and the inner wall sliding connection of branch pipe one is used for impelling the foam ball in the branch pipe one to the piston rod in the slip casting pipe, and branch pipe two is gone up the detachable shutoff piece that is carried out the shutoff to branch pipe two; the utility model provides a pair of shield constructs quick-witted slip casting pipeline convenient to wash can effectually realize avoiding slip casting pipe to block up to slip casting pipe clearance, and convenient operation is swift, obviously improves work efficiency, guarantees the work progress of shield structure construction.

Description

Shield constructs quick-witted slip casting pipeline convenient to wash
Technical Field
The utility model relates to a tunnel engineering technical field, concretely relates to shield constructs quick-witted slip casting pipeline convenient to wash.
Background
In the shield construction process, grouting operation needs to be carried out synchronously, and in the extremely short time of formation of a shield tail gap, grouting materials need to be filled, so that surrounding rock and soil bodies are supported timely, ground surface settlement can be controlled, rock and soil collapse is guaranteed, and deformation and leakage prevention after shield tunnel construction are guaranteed.
In the grouting process, the solidification time of the grout is generally 3-10 hours, and if the grouting pipe is not cleaned in time after the grouting is finished, the grouting pipe is easy to block, so that the next grouting construction is influenced, and the shield construction is also influenced. The mode that the slip casting pipe was washd with the water pipe after adopting the segmentation to unpack apart the slip casting pipe to the tradition, and the operation is not walked complicacy, wastes time and energy, and the scavenging period of every time all needs more than 6 hours, influences work efficiency, also causes the loss of shutting down for the shield structure construction.
SUMMERY OF THE UTILITY MODEL
To the problem that exists among the above-mentioned prior art, the utility model provides a shield constructs quick-witted slip casting pipeline convenient to wash can effectually realize avoiding the slip casting pipe to block up to slip casting pipe clearance, and convenient operation is swift, obviously improves work efficiency, guarantees the job schedule that the shield constructs the construction.
The utility model discloses the technical scheme who adopts does:
the utility model provides a shield constructs quick-witted slip casting pipeline convenient to wash, includes the slip casting pipe, the position slope that is close to the entrance point on the slip casting pipe is equipped with branch pipe one, the position slope that is close to the exit end on the slip casting pipe is equipped with branch pipe two, the intussuseption of branch pipe is filled with the foam ball, the inner wall sliding connection of branch pipe one has and is used for advancing the foam ball in the branch pipe one to the intraductal piston rod of slip casting, detachable being connected with carries out the shutoff to branch pipe two on the branch pipe two.
The first branch pipe is arranged at a position, close to the inlet end of the grouting pipe, on the grouting pipe, the piston rod is arranged in the first branch pipe, a foam ball filled in the first branch pipe can be pushed into the grouting pipe from the first branch pipe under a proper condition, after grouting is completed by the grouting pipe, the foam ball can be pushed into the grouting pipe while high-pressure water is introduced into the pipe, the foam ball enters the grouting pipe to realize isolation of high-pressure water and slurry, the high-pressure water continuously enters the grouting pipe to push the foam ball to move towards the outlet end of the grouting pipe, and the pressure of the slurry is higher as the pressure of the slurry is closer to the outlet end when the foam ball enters the grouting pipe, so that the second branch pipe close to the outlet end of the grouting pipe becomes the outlet of the foam ball when the high-pressure water continuously impacts the grouting pipe.
For the sake of more clear description, the area of the inside of the grouting pipe behind the lower port of the second branch pipe is a grouting end area, and in the grouting process, in order to avoid the overflow of the grout from the second branch pipe, therefore, during grouting, the blocking piece blocks the second branch pipe, when the grout is gradually pushed to the grouting end area by the foam ball, the blocking piece can be opened, the foam ball can float upwards under the impact of high-pressure water, and overflows from the second branch pipe, so that the recovery of the foam ball is realized.
The foam ball has the characteristics of light weight and easy deformation, can smoothly pass through under the condition that the grouting pipe has a curve, can gradually move along the inner wall of the grouting pipe under the impact of high-pressure water, can achieve the better cleaning effect on the inner wall of the grouting pipe, is more thorough in cleaning, and avoids the trouble that the traditional grouting pipe needs to be cleaned in a segmented manner. This project organization, it is intraductal directly to adopt when suitable to push the slip casting with the foam ball, and the in-process that the foam ball was advanced to the water under high pressure removes has just played fine clearance effect to the inner wall of slip casting pipe, and the foam ball can be retrieved through branch pipe two. This slip casting pipeline can effectually realize avoiding the slip casting pipe to block up the slip casting pipe clearance, and convenient operation is swift, obviously improves work efficiency, guarantees the job schedule of shield structure construction.
Furthermore, the foam balls filled in the first branch pipe are divided into scattered foam balls and furled foam balls wrapped by the string bag, the scattered foam balls are far away from the piston rod, and the furled foam balls are close to the piston rod.
The foam ball adopts two kinds of modes, one kind is that the foam ball of direct scattering form is filled at the lower extreme of branch pipe one, another kind is that adopt the string bag to wrap up a plurality of foam balls, avoid the foam ball comparatively scattered under the impact of high pressure water, can not reach the better effect of clearing up with the inner wall of slip casting pipe, the string bag wraps up draws in the form foam ball and fills in the upper end of branch pipe two, at the in-process that the piston rod impels downwards, the foam ball that advances the scattering form in the slip casting pipe advances in proper order, the form foam ball that draws in that the back income slip casting pipe is then located the rear end of the foam ball of scattering form, also be, high pressure water directly strikes drawing in the form foam ball, can guarantee the whole propulsion effect of foam ball at the in-process that impels the foam ball gradually, thereby reach better clearance effect.
Certainly, because drawing in the form foam ball is overall structure, also be at the whole propulsive in-process of foam ball, drawing in the form foam ball and keeping apart the foam ball of high pressure water and form that scatters, it erodees the foam ball of form that scatters to thick liquid one side also to have reduced high pressure water as far as possible, certainly because the design of branch pipe two, can guarantee the timely discharge of foam ball, it needs to explain that because under the effect of high pressure water, probably have a small amount of foam ball to enter into the thick liquid, a small amount of foam ball can not exert an influence to the slip casting construction, can ignore.
Furthermore, for the convenience of propelling and discharging the foam balls, an included angle between the first branch pipe and the inlet end of the grouting pipe is an acute angle, and an included angle between the second branch pipe and the outlet end of the grouting pipe is an acute angle.
Further, the shutoff piece includes the shutoff pole and is used for realizing carrying out the shutoff dish that compresses tightly to the shutoff pole, the lower extreme of shutoff pole is equipped with the shutoff board that is used for the lower port of shutoff branch pipe two, be equipped with the bell mouth in the branch pipe two, the aperture of bell mouth reduces gradually towards the last port of branch pipe two, the upper end of bell mouth is a platform, be equipped with the limiting plate on the shutoff pole, the limiting plate supports and leans on a platform, the shutoff dish including the pressure platform that is used for compressing tightly the limiting plate and with the fixed disk of the detachable fixed connection of branch pipe two, the middle part of pressing the platform is equipped with the through-hole of being convenient for to pass with the shutoff pole.
It should be noted that the lower end face of the plugging plate is flush with the lower port of the second branch pipe, slurry does not enter the second branch pipe at all in the plugging state, the tapered hole is designed mainly to support the limiting plate on the plugging rod in the process of installing the plugging rod when the second branch pipe needs to be plugged under the condition that the discharge of foam balls is not influenced, namely, the limiting of the plugging rod is realized through the matching of the pressing table and the supporting table, the fixing effect of the plugging rod is realized through installing the fixed disc, and the plugging of the second branch pipe is realized.
The fixed disk only needs to be dismantled in the dismantlement process, then the shutoff pole alright wholly shift out, realize opening branch pipe two, the foam ball alright follow branch pipe two and discharge.
Further, press the platform to be located branch pipe two, the lower extreme of pressing the platform compresses tightly the limiting plate on a platform.
Furthermore, in order to realize the fixed installation of the fixed disk, the fixed disk is fixed on the second branch pipe through screws.
Furthermore, a high-pressure air pipe is arranged on the position, close to the outlet end of the grouting pipe, and an air inlet of the high-pressure air pipe inclines towards the outlet end of the grouting pipe.
The high-pressure air pipe is designed to further clean the grouting end region after the foam ball is discharged.
The utility model has the advantages that: the first branch pipe is arranged at a position, close to the inlet end of the grouting pipe, on the grouting pipe, the piston rod is arranged in the first branch pipe, a foam ball filled in the first branch pipe can be pushed into the grouting pipe from the first branch pipe under a proper condition, after grouting is completed by the grouting pipe, the foam ball can be pushed into the grouting pipe while high-pressure water is introduced into the pipe, the foam ball enters the grouting pipe to realize isolation of high-pressure water and slurry, the high-pressure water continuously enters the grouting pipe to push the foam ball to move towards the outlet end of the grouting pipe, and the pressure of the slurry is higher as the pressure of the slurry is closer to the outlet end when the foam ball enters the grouting pipe, so that the second branch pipe close to the outlet end of the grouting pipe becomes the outlet of the foam ball when the high-pressure water continuously impacts the grouting pipe.
For the sake of more clear description, the area of the inside of the grouting pipe behind the lower port of the second branch pipe is a grouting end area, and in the grouting process, in order to avoid the overflow of the grout from the second branch pipe, therefore, during grouting, the blocking piece blocks the second branch pipe, when the grout is gradually pushed to the grouting end area by the foam ball, the blocking piece can be opened, the foam ball can float upwards under the impact of high-pressure water, and overflows from the second branch pipe, so that the recovery of the foam ball is realized.
The foam ball has the characteristics of light weight and easy deformation, can smoothly pass through under the condition that the grouting pipe has a curve, can gradually move along the inner wall of the grouting pipe under the impact of high-pressure water, can achieve the better cleaning effect on the inner wall of the grouting pipe, is more thorough in cleaning, and avoids the trouble that the traditional grouting pipe needs to be cleaned in a segmented manner. This project organization, it is intraductal directly to adopt when suitable to push the slip casting with the foam ball, and the in-process that the foam ball was advanced to the water under high pressure removes has just played fine clearance effect to the inner wall of slip casting pipe, and the foam ball can be retrieved through branch pipe two. This slip casting pipeline can effectually realize avoiding the slip casting pipe to block up the slip casting pipe clearance, and convenient operation is swift, obviously improves work efficiency, guarantees the job schedule of shield structure construction.
Drawings
Fig. 1 is a schematic structural diagram of state one of the present invention;
FIG. 2 is a schematic structural diagram of state two of the present invention;
fig. 3 is a schematic structural diagram of state three of the present invention;
fig. 4 is a schematic structural diagram of state four of the present invention.
In the figure: a grouting pipe 1; a first branch pipe 2; a second branch pipe 3; a foam ball 4; 4.1 of dispersed foam balls; 4.2 of furled foam balls; a piston rod 5; a grouting end zone 6; a net bag 7; a plugging rod 8; a plugging disc 9; a pressing table 9.1; fixing a disc 9.2; a through hole 9.3; a plugging plate 10; a tapered hole 11; a support table 12; a position limiting plate 13; a slurry 14; high-pressure water 15; a high pressure gas pipe 16.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
The present invention will be further described with reference to the accompanying drawings and specific embodiments.
Example 1:
as shown in fig. 1-4, this embodiment provides a shield constructs quick-witted slip casting pipeline convenient to wash, including slip casting pipe 1, the position slope that is close to the entrance point on slip casting pipe 1 is equipped with branch pipe one 2, the position slope that is close to the exit end on slip casting pipe 1 is equipped with branch pipe two 3, branch pipe one 2 intussuseption is filled with foam ball 4, the inner wall sliding connection of branch pipe one 2 has and is used for advancing the foam ball 4 in branch pipe one 2 to the piston rod 5 in slip casting pipe 1, detachable being connected with on branch pipe two 3 carries out the shutoff piece of shutoff to branch pipe two 3.
According to the grouting pipeline, the branch pipe I2 is arranged on the grouting pipe 1 and close to the inlet end of the grouting pipe 1, the piston rod 5 is arranged in the branch pipe I2, the foam balls 4 filled in the branch pipe I2 can be pushed into the grouting pipe 1 from the branch pipe I2 under a proper condition, after grouting of the grouting pipe 1 is completed, the foam ball 4 can be pushed into the grouting pipe 1 while the high-pressure water 15 is introduced into the pipeline, the foam ball 4 enters the grouting pipe 1 to realize the isolation of the high-pressure water 15 and the grout 14, the high-pressure water 15 continuously enters to push the foam ball 4 to move towards the outlet end of the grouting pipe 1, since the pressure of the slurry 14 is greater the further to the rear end of the slurry injection pipe 1, that is, the closer to the outlet end, and therefore, during the process that the high-pressure water 15 continuously impacts the inside of the grouting pipe 1, the branch pipe two 3 which is arranged close to the outlet end of the grouting pipe 1 becomes the outlet of the foam ball 4.
For the sake of more clear description, the area inside the grouting pipe 1 behind the lower port of the second branch pipe 3 is the grouting end area 6, and in the grouting process, in order to prevent the grout 14 from overflowing from the second branch pipe 3, therefore, during grouting, the blocking piece blocks the second branch pipe 3, when the grout 14 is gradually pushed to the grouting end area 6 by the foam ball 4, the blocking piece can be opened, the foam ball 4 can float upwards under the impact of high-pressure water 15, and overflows from the second branch pipe 3, and the foam ball 4 is recovered.
Foam ball 4 has the light, yielding peculiarity, under the circumstances that slip casting pipe 1 has the bend, also can pass through smoothly, under high pressure water 15's impact, foam ball 4 removes along the inner wall of slip casting pipe 1 gradually, can reach the better clearance effect to the inner wall of slip casting pipe 1, and the clearance is more thorough, has avoided traditional slip casting pipe 1 to need the abluent trouble of segmentation. This project organization directly adopts in pushing into slip casting pipe 1 with foam ball 4 when being suitable, and the in-process that high pressure water 15 pushed foam ball 4 and removed has just played fine clearance effect to the inner wall of slip casting pipe 1, and foam ball 4 can be retrieved through two 3 of branch pipes. This slip casting pipeline can effectual realization avoid slip casting pipe 1 to block up slip casting pipe 1, and convenient operation is swift, obviously improves work efficiency, guarantees the job schedule of shield structure construction.
Example 2:
this embodiment is defined by optimization based on embodiment 1 described above.
The foam balls 4 filled in the branch pipes I2 are divided into scattered foam balls 4.1 and furled foam balls 4.2 which wrap the foam balls 4 by a string bag 7, the scattered foam balls 4.1 are far away from the piston rod 5, and the furled foam balls 4.2 are close to the piston rod 5.
Foam ball 4 adopts two kinds of modes, one kind is that directly the form foam ball 4.1 that scatters fills the lower extreme at branch pipe 2, another kind is that adopt string bag 7 to wrap up a plurality of foam balls 4, it is comparatively scattered to avoid foam ball 4 under the impact of high pressure water 15, can not reach better and the effect of clearing up with the inner wall of slip casting pipe 1, the form foam ball 4.2 that gathers in that string bag 7 wrapped up packs up fills the upper end at branch pipe two 3, in the in-process that piston rod 5 impels downwards, the form foam ball 4.1 that scatters that gets into in slip casting pipe 1 earlier impels in proper order, the form foam ball 4.2 that gathers in that the back gets into in slip casting pipe 1 then is located the rear end of form foam ball 4.1 that scatters, also gather in, high pressure water 15 directly strikes form foam ball 4.2, can guarantee foam ball 4's the whole propulsive effect gradually in-process, thereby reach better clearance effect.
Certainly, because the furled foam balls 4.2 are of an integral structure, namely in the integral propelling process of the foam balls 4, the furled foam balls 4.2 isolate the high-pressure water 15 from the scattered foam balls 4.1, and the washing of the scattered foam balls 4.1 by the high-pressure water 15 to one side of the slurry 14 is also reduced as much as possible, the foam balls 4 can be discharged in time due to the design of the branch pipe two 3. It should be noted that, because a small amount of foam balls 4 may enter into the slurry 14 under the action of the high-pressure water 15, the small amount of foam balls 4 will not affect the grouting construction, and can be ignored.
Example 3:
this embodiment is defined by optimization based on embodiment 1 described above.
In order to facilitate the propelling and discharging of the foam ball 4, an included angle between the first branch pipe 2 and the inlet end of the grouting pipe 1 is an acute angle, and an included angle between the second branch pipe 3 and the outlet end of the grouting pipe 1 is an acute angle.
Example 4:
this embodiment is defined by optimization based on embodiment 1 described above.
The shutoff piece is including shutoff pole 8 and the shutoff dish 9 that is used for realizing compressing tightly shutoff pole 8, the lower extreme of shutoff pole 8 is equipped with the shutoff board 10 that is used for the lower port of two 3 of shutoff branch pipes, be equipped with bell mouth 11 in the branch pipe two 3, the aperture of bell mouth 11 reduces towards the last port of two 3 of branch pipe gradually, the upper end of bell mouth 11 is a platform 12, be equipped with limiting plate 13 on the shutoff pole 8, limiting plate 13 supports and leans on a platform 12, shutoff dish 9 including the pressure platform 9.1 that is used for compressing tightly limiting plate 13 and with the detachable fixed disk 9.2 of two 3 detachable fixed connection of branch pipe, the middle part of pressure platform 9.1 is equipped with the through-hole 9.3 that is convenient for pass with shutoff pole 8.
It should be noted that the lower end face of the plugging plate 10 is flush with the lower end port of the second branch pipe 3, slurry 14 does not enter the second branch pipe 3 at all in the plugging state, the tapered hole 11 is designed mainly to support the limiting plate 13 on the plugging rod 8 in the process of installing the plugging rod 8 when the second branch pipe 3 needs to be plugged under the condition that the discharge of the foam ball 4 is not affected, that is, the limiting of the plugging rod 8 is realized by the matching of the pressing table 9.1 and the supporting table 12, the fixing effect of the plugging rod 8 is realized by installing the fixed disc 9.2, and the plugging of the second branch pipe 3 is achieved.
The fixed disk 9.2 is only needed to be disassembled in the disassembling process, the plugging rod 8 can be integrally moved out, the second branch pipe 3 is opened, and the foam balls 4 can be discharged from the second branch pipe 3.
Example 5:
this embodiment is defined by optimization based on embodiment 4 above.
The pressing platform 9.1 is positioned in the second branch pipe 3, and the limiting plate 13 is pressed on the support platform 12 by the lower end of the pressing platform 9.1.
Example 6:
this embodiment is defined by optimization based on embodiment 4 above.
In order to realize the fixed installation of the fixed disk 9.2, the fixed disk 9.2 is fixed on the second branch pipe 3 through screws.
Example 7:
this embodiment is defined by optimization based on embodiment 1 described above.
A high-pressure air pipe 16 is arranged on the grouting pipe 1 and close to the outlet end of the grouting pipe 1, and an air inlet of the high-pressure air pipe 16 inclines towards the outlet end of the grouting pipe 1.
The high pressure gas pipe 16 is designed to further clean the grouting end zone 6 after the foam ball 4 is discharged.
Example 8:
this embodiment is defined by optimization based on embodiment 2 described above.
In order to facilitate the propelling and discharging of the foam ball 4, an included angle between the first branch pipe 2 and the inlet end of the grouting pipe 1 is an acute angle, and an included angle between the second branch pipe 3 and the outlet end of the grouting pipe 1 is an acute angle.
The shutoff piece is including shutoff pole 8 and the shutoff dish 9 that is used for realizing compressing tightly shutoff pole 8, the lower extreme of shutoff pole 8 is equipped with the shutoff board 10 that is used for the lower port of two 3 of shutoff branch pipes, be equipped with bell mouth 11 in the branch pipe two 3, the aperture of bell mouth 11 reduces towards the last port of two 3 of branch pipe gradually, the upper end of bell mouth 11 is a platform 12, be equipped with limiting plate 13 on the shutoff pole 8, limiting plate 13 supports and leans on a platform 12, shutoff dish 9 including the pressure platform 9.1 that is used for compressing tightly limiting plate 13 and with the detachable fixed disk 9.2 of two 3 detachable fixed connection of branch pipe, the middle part of pressure platform 9.1 is equipped with the through-hole 9.3 that is convenient for pass with shutoff pole 8.
It should be noted that the lower end face of the plugging plate 10 is flush with the lower end port of the second branch pipe 3, slurry 14 does not enter the second branch pipe 3 at all in the plugging state, the tapered hole 11 is designed mainly to support the limiting plate 13 on the plugging rod 8 in the process of installing the plugging rod 8 when the second branch pipe 3 needs to be plugged under the condition that the discharge of the foam ball 4 is not affected, that is, the limiting of the plugging rod 8 is realized by the matching of the pressing table 9.1 and the supporting table 12, the fixing effect of the plugging rod 8 is realized by installing the fixed disc 9.2, and the plugging of the second branch pipe 3 is achieved.
The fixed disk 9.2 is only needed to be disassembled in the disassembling process, the plugging rod 8 can be integrally moved out, the second branch pipe 3 is opened, and the foam balls 4 can be discharged from the second branch pipe 3.
The pressing platform 9.1 is positioned in the second branch pipe 3, and the limiting plate 13 is pressed on the support platform 12 by the lower end of the pressing platform 9.1.
In order to realize the fixed installation of the fixed disk 9.2, the fixed disk 9.2 is fixed on the second branch pipe 3 through screws.
A high-pressure air pipe 16 is arranged on the grouting pipe 1 and close to the outlet end of the grouting pipe 1, and an air inlet of the high-pressure air pipe 16 inclines towards the outlet end of the grouting pipe 1.
The high pressure gas pipe 16 is designed to further clean the grouting end zone 6 after the foam ball 4 is discharged.
The present invention is not limited to the above-mentioned optional embodiments, and any other products in various forms can be obtained by anyone under the teaching of the present invention, and any changes in the shape or structure thereof, all the technical solutions falling within the scope of the present invention, are within the protection scope of the present invention.

Claims (7)

1. The utility model provides a shield constructs quick-witted slip casting pipeline convenient to wash which characterized in that: including the slip casting pipe, the position slope that is close to the entrance point on the slip casting pipe is equipped with branch pipe one, the position slope that is close to the exit end on the slip casting pipe is equipped with branch pipe two, the intussuseption of branch pipe one is filled with the foam ball, the inner wall sliding connection of branch pipe one has and is used for advancing the foam ball in the branch pipe one to the intraductal piston rod of slip casting, detachable the shutoff piece that carries out the shutoff to branch pipe two that is connected with on the branch pipe two.
2. The shield machine grouting pipeline convenient to clean as claimed in claim 1, characterized in that: the foam balls filled in the first branch pipe are divided into scattered foam balls and furled foam balls, the foam balls are wrapped by the aid of the net bags, the scattered foam balls are far away from the piston rod, and the furled foam balls are close to the piston rod.
3. The shield machine grouting pipeline convenient to clean as claimed in claim 1, characterized in that: the included angle between the first branch pipe and the inlet end of the grouting pipe is an acute angle, and the included angle between the second branch pipe and the outlet end of the grouting pipe is an acute angle.
4. The shield machine grouting pipeline convenient to clean as claimed in claim 1, characterized in that: the shutoff piece is including the shutoff pole and be used for realizing carrying out the shutoff dish that compresses tightly to the shutoff pole, the lower extreme of shutoff pole is equipped with the shutoff board that is used for the lower port of shutoff branch pipe two, be equipped with the bell mouth in the branch pipe two, the aperture of bell mouth reduces gradually towards the last port of branch pipe two, the upper end of bell mouth is a platform, be equipped with the limiting plate on the shutoff pole, the limiting plate supports and leans on a platform, the shutoff dish including the pressure platform that is used for compressing tightly the limiting plate and with the detachable fixed disk of two detachable fixed connection of branch pipe, the middle part of pressing the platform is equipped with the through-hole of being convenient for to pass with the shutoff pole.
5. The shield tunneling machine grouting pipeline convenient to clean as claimed in claim 4, wherein: the pressing table is located in the second branch pipe, and the limiting plate is pressed on the supporting table by the lower end of the pressing table.
6. The shield tunneling machine grouting pipeline convenient to clean as claimed in claim 4, wherein: the fixed plate is fixed on the second branch pipe through screws.
7. The shield machine grouting pipeline convenient to clean as claimed in claim 1, characterized in that: and a high-pressure air pipe is arranged on the position, close to the outlet end of the grouting pipe, and an air inlet of the high-pressure air pipe inclines towards the outlet end of the grouting pipe.
CN201921858483.3U 2019-10-31 2019-10-31 Shield constructs quick-witted slip casting pipeline convenient to wash Expired - Fee Related CN210798997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921858483.3U CN210798997U (en) 2019-10-31 2019-10-31 Shield constructs quick-witted slip casting pipeline convenient to wash

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921858483.3U CN210798997U (en) 2019-10-31 2019-10-31 Shield constructs quick-witted slip casting pipeline convenient to wash

Publications (1)

Publication Number Publication Date
CN210798997U true CN210798997U (en) 2020-06-19

Family

ID=71240804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921858483.3U Expired - Fee Related CN210798997U (en) 2019-10-31 2019-10-31 Shield constructs quick-witted slip casting pipeline convenient to wash

Country Status (1)

Country Link
CN (1) CN210798997U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112588708A (en) * 2020-11-26 2021-04-02 安徽铜都流体科技股份有限公司 Anti-blocking mud valve for shield machine
CN113294162A (en) * 2021-05-20 2021-08-24 北京建工土木工程有限公司 Shutdown pressure maintaining method of earth pressure balance shield machine
CN113685730A (en) * 2021-07-12 2021-11-23 中铁建华南建设有限公司 Air supply structure for pressure maintaining system and earth pressure balance shield machine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112588708A (en) * 2020-11-26 2021-04-02 安徽铜都流体科技股份有限公司 Anti-blocking mud valve for shield machine
CN112588708B (en) * 2020-11-26 2021-08-27 安徽铜都流体科技股份有限公司 Anti-blocking mud valve for shield machine
CN113294162A (en) * 2021-05-20 2021-08-24 北京建工土木工程有限公司 Shutdown pressure maintaining method of earth pressure balance shield machine
CN113294162B (en) * 2021-05-20 2023-11-14 北京建工土木工程有限公司 Shutdown pressure maintaining method for earth pressure balance shield machine
CN113685730A (en) * 2021-07-12 2021-11-23 中铁建华南建设有限公司 Air supply structure for pressure maintaining system and earth pressure balance shield machine

Similar Documents

Publication Publication Date Title
CN210798997U (en) Shield constructs quick-witted slip casting pipeline convenient to wash
CN109675667A (en) A kind of civil engineering stone crushing device
CN105233970A (en) Crop seed screening device
CN209509672U (en) It is a kind of suitable for urban construction construction with can depositing dust environment-friendly type enclosing
CN202238272U (en) Water wheel type sand washer
CN208857946U (en) A kind of pipe dredging device
CN108672259A (en) A kind of roller screening type quarrying case
CN208482768U (en) Roller screening type quarrying case
CN201068747Y (en) Hollow grouting anchoring-bolt
CN207332893U (en) A kind of pulp shooting machine
CN214499054U (en) Shield belt conveyor with slag receiving box and rapid discharge equipment
CN202250228U (en) Firewall
CN115121471A (en) Building environment-friendly energy-saving sand and stone screening device and using method thereof
CN209430215U (en) A kind of tunnel construction cement transportation equipment
CN210619640U (en) Colliery belt transportation lane dust device
CN206860189U (en) A kind of push pipe pollution discharge structure
CN208107438U (en) A kind of anti-blocking connecting tube of the irrigation and water conservancy of easy cleaning
CN220487670U (en) TBM finger-shaped shield falling gangue automatic collection device
CN206535802U (en) A kind of architectural engineering building stones cleaning device
CN205777547U (en) Appts. for transferring ready-mixed concrete
CN217298545U (en) Sand-free large-hole concrete rapid construction device for reconstructing and expanding new and old pavements of highway
CN216679395U (en) Slurry blanking pipeline dredging device
CN107185922A (en) Push pipe inner-wall cleaning device
CN220285339U (en) Concrete pouring equipment
CN209314757U (en) A kind of grading plant suitable for spot section shrimp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200619

Termination date: 20201031