CN210797844U - Device that steel cofferdam and pump station combine to arrange - Google Patents
Device that steel cofferdam and pump station combine to arrange Download PDFInfo
- Publication number
- CN210797844U CN210797844U CN201921684390.3U CN201921684390U CN210797844U CN 210797844 U CN210797844 U CN 210797844U CN 201921684390 U CN201921684390 U CN 201921684390U CN 210797844 U CN210797844 U CN 210797844U
- Authority
- CN
- China
- Prior art keywords
- steel
- cofferdam
- pile
- platform
- water pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/20—Controlling water pollution; Waste water treatment
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The utility model discloses a device that steel cofferdam and pump station combine to arrange belongs to hydraulic engineering facility field. The method comprises the following steps: the steel cofferdam pile comprises a steel cofferdam pile, a steel pipe pile, a profile steel platform, a 1cm thick steel plate, a water pump fixing support and a water outlet pipe; the pile of utilizing the steel cofferdam and the steel-pipe pile in the cofferdam outside are as the structure basis, and the basis top forms the steel platform with shaped steel welding together, as the mounting platform of water pump, and the water pump adopts dive through-flow pump, and the outlet pipe and the pipe connection of water pump, pipeline access river outside. The utility model solves the problems of water change and drainage of the inland river after the river channel is closed by the steel cofferdam; the installation and the removal are fast, the removal can be recycled, and waste garbage can not be generated. The pump station is combined with the steel cofferdam and arranged, so that the occupied area of the project is saved, and the construction cost is reduced.
Description
Technical Field
The utility model relates to a device that steel cofferdam and pump station combine to arrange belongs to hydraulic engineering facility field.
Background
The hydraulic engineering often needs to newly build a temporary cofferdam to close a construction site to form a dry land construction working face. For river network areas, many inland rivers participate in water circulation through external water sources to ensure the water quality of the inland rivers. A cofferdam is built at a place where an inland river and an external river are connected, an originally communicated water system is cut off after the cofferdam is built, the water quality of the inland river is easy to deteriorate, and waterlogging is easy to form in a flood season.
In order to solve the problem, drainage and water exchange are generally performed by burying a draft tube or erecting a temporary water pump on the bank. The water level difference at the two ends of the flow guide pipe in the plain river network area is very small, and water flow is difficult to flow freely, so the communication effect of the flow guide pipe in the plain area is poor. The temporary water pump usually adopts a submersible sewage pump or an axial flow pump with small single pump flow (the single pump flow is usually 0.1 m)3And less than s), the number of the water pumps is large, and the emergency drainage management is not facilitated.
To solve the above problems, the utility model provides aThe device for arranging the cofferdam and the pump station together improves the rigidity of the foundation and can meet the requirement that the maximum flow of a single pump is 1.5m3The scheme can effectively reduce the number of water pumps, improve the drainage and water exchange efficiency and ensure the water environment and water safety. The mounting platform of water pump has all adopted the steel construction, and the installation is fast with demolising, and demolishs back all materials and all recoverable recycling, has the sustainability.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a device that steel cofferdam and pump station combine to arrange.
A device for arranging a steel cofferdam and a pump station in a combined way comprises: the steel cofferdam pile, the steel-pipe pile, shaped steel platform, 1cm thick steel board, water pump fixing support, outlet pipe.
The arrangement form utilizes the steel cofferdam piles and the steel pipe piles outside the cofferdam as a structural foundation, and the structural steel platform is installed on the foundation. The section steel platform is formed by welding section steel; and the section steel platform is respectively welded with the steel cofferdam pile foundation and the steel pipe pile foundation through steel plates.
And a water pump is arranged on the profile steel platform to form a temporary pumping station. The water pump adopts a submersible tubular pump; the water pump is fixed by welding a water pump fixing support on the pump shell with the profile steel platform or by utilizing a bolt connection mode. And a water outlet pipe of the water pump is connected with a pipeline, and the water pump discharges water into a foreign river through the pipeline.
The steel pipe piles and the steel cofferdam piles are welded with each other through the section steel platforms to form an integral frame;
the integral frame is fixed on the periphery of the cofferdam along with the steel pipe piles and the cofferdam piles;
the steel plate with the thickness of 1cm is welded between the steel cofferdam pile and the section steel platform;
the steel plate with the thickness of 1cm is welded between the steel pipe pile and the section steel platform;
the wall thickness of the steel pipe pile and the steel pipe cofferdam pile is not less than 8 mm;
the water pump is fixed on the profile steel platform through a water pump fixing support, and the fixing support is welded on the profile steel platform;
the outlet pipe is interconnected with a pipe leading to the downstream.
Welding a section steel platform on the steel plate which is welded and blocked, wherein the section steel platform is an upright channel steel platform, and the section number of the channel steel is not less than 14 b;
the water pump adopts a submersible tubular pump.
Compare with current arrangement form, the utility model has the advantages of:
1. the rigidity of the water pump mounting platform is high, and the requirement that the flow of a single pump is 1.5m can be met3And the water pumps are mounted in the/s mode, so that the number of the water pumps in the drainage pump station can be reduced, and the management is convenient.
2. Mounting platform and basic all adopt the steel construction, and the installation is convenient with demolish, and the construction speed is fast, and can continue the practicality after demolising, can not produce abandonment rubbish.
Drawings
Fig. 1 is a schematic top view of the present invention;
fig. 2 is a schematic cross-sectional view of the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings, and the following embodiments are only used to illustrate the technical solutions of the present invention more clearly, and the protection scope of the present invention cannot be limited thereby.
As shown in fig. 1, the utility model discloses a device that steel cofferdam and pump station combine to arrange, include: the steel cofferdam pile comprises a steel cofferdam pile 1, a steel pipe pile 2, a section steel platform 3, a 1cm thick steel plate, a water pump 5, a water pump fixing support 6 and a water outlet pipe 7.
According to the arrangement form, the steel cofferdam piles 1 and the steel pipe piles 2 on the outer side of the cofferdam are used as a structural foundation, and the section steel platforms 3 are installed on the foundation. The section steel platform 3 is formed by welding section steel; and the section steel platform 3 is respectively welded with the steel cofferdam pile 1 foundation and the steel pipe pile 2 foundation through steel plates 4.
And a water pump 5 is arranged on the profile steel platform 3 to form a temporary pumping station. The water pump 5 adopts a submersible tubular pump; the water pump 5 is fixed by welding a water pump fixing support 6 on the pump shell with the section steel platform 3 or by utilizing a bolt connection mode. And a water outlet pipe 7 of the water pump 5 is connected with a pipeline, and the water pump 5 discharges water into a foreign river through the pipeline. The steel channel selected by the section steel platform is 14 b.
Claims (3)
1. The utility model provides a device that steel cofferdam and pump station combine to arrange which characterized in that: the method comprises the following steps: the steel cofferdam pile comprises a steel cofferdam pile, a steel pipe pile, a profile steel platform, a 1cm thick steel plate, a water pump fixing support and a water outlet pipe;
the steel pipe piles and the steel cofferdam piles are welded with each other through the section steel platforms to form an integral frame;
the integral frame is fixed on the periphery of the cofferdam along with the steel pipe pile and the cofferdam pile;
the 1cm thick steel plate is welded between the steel cofferdam pile and the section steel platform;
the steel plate with the thickness of 1cm is welded between the steel pipe pile and the section steel platform;
the water pump is fixed on the profile steel platform through a water pump fixing support, and the fixing support is welded on the profile steel platform;
the outlet pipe is interconnected with a pipe leading to the downstream.
2. The device for combining the steel cofferdam with the pump station according to the claim 1, characterized in that: the top of the steel cofferdam pile is welded and plugged by a 1cm thick steel plate, the top of the steel pipe pile is welded and plugged by a 1cm thick steel plate, a profile steel platform is welded on the steel plate welded and plugged, and the profile steel platform is an upright channel steel platform.
3. The device for combining the steel cofferdam with the pump station according to the claim 1, characterized in that: a water pump is arranged on the section steel platform; the water pump adopts a submersible tubular pump.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921684390.3U CN210797844U (en) | 2019-10-10 | 2019-10-10 | Device that steel cofferdam and pump station combine to arrange |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921684390.3U CN210797844U (en) | 2019-10-10 | 2019-10-10 | Device that steel cofferdam and pump station combine to arrange |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210797844U true CN210797844U (en) | 2020-06-19 |
Family
ID=71230054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921684390.3U Expired - Fee Related CN210797844U (en) | 2019-10-10 | 2019-10-10 | Device that steel cofferdam and pump station combine to arrange |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210797844U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112523304A (en) * | 2020-10-29 | 2021-03-19 | 上海市政工程设计研究总院(集团)有限公司 | Temporary water transfer pump station built in plain river network area rapidly |
CN112746623A (en) * | 2020-12-11 | 2021-05-04 | 上海建工五建集团有限公司 | Sewage suction device and method for steel pipe column underwater pile sinking construction |
-
2019
- 2019-10-10 CN CN201921684390.3U patent/CN210797844U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112523304A (en) * | 2020-10-29 | 2021-03-19 | 上海市政工程设计研究总院(集团)有限公司 | Temporary water transfer pump station built in plain river network area rapidly |
CN112746623A (en) * | 2020-12-11 | 2021-05-04 | 上海建工五建集团有限公司 | Sewage suction device and method for steel pipe column underwater pile sinking construction |
CN112746623B (en) * | 2020-12-11 | 2022-06-17 | 上海建工五建集团有限公司 | Sewage suction device and method for steel pipe column underwater pile sinking construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108130886B (en) | Power generation breakwater | |
CN210797844U (en) | Device that steel cofferdam and pump station combine to arrange | |
CN202323895U (en) | Tail water channel structure for stepped hydro-junction | |
CN211547887U (en) | Water pump mounting structure of pump station | |
CN109183851B (en) | Underwater installation method of shell type immersed tube | |
US20240218623A1 (en) | Modular precast pumped storage hydro system for power generation | |
CN215518588U (en) | Permanent face combined retaining wall structure | |
CN115288495B (en) | Treatment method for modifying landfill into combination of photovoltaic and hydroelectric power generation | |
CN212612247U (en) | Small-sized sewage intercepting box culvert for river treatment | |
CN210315445U (en) | Urban pumped storage power station | |
CN209779658U (en) | Steel-concrete combined negative pressure barrel structure | |
KR101290920B1 (en) | Turbine structure for tidal power plant | |
CN202227319U (en) | Temporary aqueduct formed by steel pipe support | |
JP2001172948A (en) | Pumped storage power plant | |
RU101461U1 (en) | HYDRAULIC POWER PLANT | |
CN206721845U (en) | A kind of diversion tunnel | |
CN211713866U (en) | Structure that river course revetment and pump station installation combine | |
CN216920398U (en) | Cofferdam structure for hydraulic construction of hydraulic and hydroelectric engineering | |
CN217758814U (en) | Underwater pier foundation construction slurry circulation construction device | |
CN216108382U (en) | Power plant factory building side wall structure used as sluice gate pier | |
CN112982333B (en) | Pressure forebay device for hydropower station | |
CN217352556U (en) | Deepwater steel cofferdam for inhibiting hydrodynamic vibration of segment construction based on splitter plate | |
CN212715291U (en) | Assembled water treatment pool and liquid storage container | |
CN219280815U (en) | Emergency mobile water taking system | |
CN220890254U (en) | Mining area drainage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200619 Termination date: 20211010 |