CN210797418U - Template for hydraulic engineering - Google Patents
Template for hydraulic engineering Download PDFInfo
- Publication number
- CN210797418U CN210797418U CN201920912698.2U CN201920912698U CN210797418U CN 210797418 U CN210797418 U CN 210797418U CN 201920912698 U CN201920912698 U CN 201920912698U CN 210797418 U CN210797418 U CN 210797418U
- Authority
- CN
- China
- Prior art keywords
- template
- hydraulic engineering
- slider
- plate
- fixed band
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a template for hydraulic engineering, which comprises a top plate, first spout has been seted up to the bottom of roof, the inside sliding connection has first slider and second slider in proper order of first spout, the bottom of first slider has bolted first template, the bottom of second slider has bolted the second template, the bottom of first template is provided with the bottom plate, the second spout has been seted up to the inside of bottom plate, the inside of second spout has third slider and fourth slider in proper order sliding connection. The utility model discloses a roof, first spout, first slider, second slider, first template, second template, bottom plate, second spout, third slider, fourth slider, connecting plate, standing groove and limit structure's setting makes template for hydraulic engineering have easy to assemble's advantage, has reduced staff's intensity of labour, has solved the problem of the inconvenient installation of current template for hydraulic engineering simultaneously.
Description
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a template for hydraulic engineering.
Background
The project (including new construction, extension, reconstruction, reinforcement and restoration) such as flood control, waterlogging removal, irrigation, power generation, water supply, reclamation, water resource protection and the like, and the overall name of the matched and attached projects thereof are used for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting the building, also called water project, and the construction template for the water project at the present stage is complex in operation steps and more in parts when being installed mutually, so that the workload of workers is increased and the working efficiency of the workers is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a template for hydraulic engineering possesses easy to assemble's advantage, has solved the problem of the inconvenient installation of current template for hydraulic engineering.
In order to achieve the above object, the utility model provides a following technical scheme: a template for hydraulic engineering comprises a top plate, wherein the bottom of the top plate is provided with a first sliding chute, a first sliding block and a second sliding block are sequentially connected inside the first sliding chute in a sliding manner, the bottom of the first slide block is in bolted connection with a first template, the bottom of the second slide block is in bolted connection with a second template, the bottom of the first template is provided with a bottom plate, a second sliding groove is arranged inside the bottom plate, a third sliding block and a fourth sliding block are sequentially connected inside the second sliding groove in a sliding manner, the top of the third slide block is bolted with the bottom of the first template, the top of the fourth slide block is bolted with the bottom of the second template, the left side integrated into one piece of first template has the connecting plate, the quantity of connecting plate is three, the standing groove that uses with the connecting plate cooperation is seted up on the right side of second template, the front welding of second template has the limit structure who is used for fixed connection board.
Preferably, limit structure includes spacing case, the quantity of spacing case is three, the inside of spacing case is equipped with the pull rod, the outside that spacing case and extend to spacing case is run through in the front of pull rod, the back welding of pull rod has the limiting plate, the surface cover of pull rod is equipped with the spring, the back welding of limiting plate has the gag lever post, the spacing groove has been seted up to the inside of connecting plate, the back of gag lever post runs through the second template and extends to the inside of spacing groove.
Preferably, the limiting groove is square or polygonal prism-shaped, and the cross section of the limiting rod is square or polygonal prism-shaped.
Preferably, the front side of the limiting rod is welded with a force application block, and the force application block is circular.
Preferably, the both sides of roof bottom all are bolted connection to have first fixed band, the bottom cover of first fixed band is equipped with first fixture block, the both sides at bottom plate top all are bolted connection to have the second fixed band, the top cover of second fixed band is equipped with the second fixture block, the surface of second fixture block and the inside joint of first fixture block.
Preferably, the first fixing band and the second fixing band are both made of elastic fiber, and the first fixing band and the second fixing band are bolted to the front sides of the first template and the second template.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a roof, first spout, first slider, second slider, first template, second template, bottom plate, second spout, third slider, fourth slider, connecting plate, standing groove and limit structure's setting makes template for hydraulic engineering have easy to assemble's advantage, has reduced staff's intensity of labour, has solved the problem of the inconvenient installation of current template for hydraulic engineering simultaneously.
2. The utility model discloses a cooperation of spacing case, pull rod, limiting plate, spring, gag lever post and spacing groove is used, can carry on spacingly to the connecting plate, through the use of application of force piece, makes things convenient for the staff to stretch the pull rod, uses through the cooperation of first fixed band, first fixture block, second fixed band and second fixture block, can fix roof and bottom plate, strengthens the stability of first template and second template.
Drawings
FIG. 1 is a schematic sectional view of the structure of the present invention;
FIG. 2 is a schematic sectional view of the partial structure of the present invention;
FIG. 3 is a schematic top sectional view of the structure of the present invention;
fig. 4 is a partially enlarged view of a portion a in fig. 3 according to the present invention.
In the figure: 1. a top plate; 2. a first chute; 3. a first slider; 4. a second slider; 5. a first template; 6. a second template; 7. a base plate; 8. a second chute; 9. a third slider; 10. a fourth slider; 11. a connecting plate; 12. a placement groove; 13. a limiting structure; 131. a limiting box; 132. a pull rod; 133. a limiting plate; 134. a spring; 135. a limiting rod; 136. a limiting groove; 14. a force application block; 15. a first securing strap; 16. a first clamping block; 17. a second securing strap; 18. and a second clamping block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a template for hydraulic engineering comprises a top plate 1, a first chute 2 is formed at the bottom of the top plate 1, a first slide block 3 and a second slide block 4 are sequentially and slidably connected inside the first chute 2, a first template 5 is bolted at the bottom of the first slide block 3, a second template 6 is bolted at the bottom of the second slide block 4, a bottom plate 7 is arranged at the bottom of the first template 5, a second chute 8 is formed inside the bottom plate 7, a third slide block 9 and a fourth slide block 10 are sequentially and slidably connected inside the second chute 8, the top of the third slide block 9 is bolted at the bottom of the first template 5, the top of the fourth slide block 10 is bolted at the bottom of the second template 6, connecting plates 11 are integrally formed at the left side of the first template 5, the number of the connecting plates 11 is three, a placing groove 12 matched with the connecting plates 11 is formed at the right side of the second template 6, a limiting structure 13 for fixing the connecting plates 11 is welded at the front side of the second template 6, the limiting structure 13 comprises three limiting boxes 131, a pull rod 132 is arranged inside the limiting boxes 131, the front surface of the pull rod 132 penetrates through the limiting boxes 131 and extends to the outside of the limiting boxes 131, a limiting plate 133 is welded on the back surface of the pull rod 132, a spring 134 is sleeved on the surface of the pull rod 132, a limiting rod 135 is welded on the back surface of the limiting plate 133, a limiting groove 136 is formed inside the connecting plate 11, the back surface of the limiting rod 135 penetrates through the second template 6 and extends to the inside of the limiting groove 136, the limiting groove 136 is square or polygonal prism, the cross section of the limiting rod 135 is square or polygonal prism, a force application block 14 is welded on the front surface of the limiting rod 135, the force application block 14 is circular, first fixing belts 15 are bolted on two sides of the bottom of the top plate 1, first clamping blocks 16 are sleeved on the bottom of the first fixing belts 15, second fixing belts 17 are bolted on two sides of the top of the bottom plate 7, and second, the surface of the second fixture block 18 is clamped with the inside of the first fixture block 16, the first fixing band 15 and the second fixing band 17 are both made of elastic fibers, the positions of the first fixing band 15 and the second fixing band 17 are both bolted to the front sides of the first template 5 and the second template 6, the connecting plate 11 can be limited by using the limiting box 131, the pull rod 132, the limiting plate 133, the spring 134, the limiting rod 135 and the limiting groove 136 in a matched manner, the pull rod 132 can be conveniently stretched by a worker by using the force application block 14, the top plate 1 and the bottom plate 7 can be fixed by using the first fixing band 15, the first fixture block 16, the second fixing band 17 and the second fixture block 18 in a matched manner, the stability of the first template 5 and the second template 6 is enhanced, and the top plate 1, the first chute 2, the first sliding block 3, the second sliding block 4, the first template 5, the second template 6, the bottom plate 7, the second chute 8, the second chute 6 and the top plate, Third slider 9, fourth slider 10, connecting plate 11, standing groove 12 and limit structure 13's setting make template for hydraulic engineering have easy to assemble's advantage, have reduced staff's intensity of labour, have solved the inconvenient problem of installing of current template for hydraulic engineering simultaneously.
During the use, fill in first template 5 and second template 6 from one side of roof 1 and bottom plate 7, tensile application of force piece 14 afterwards, the removal of application of force piece 14 drives pull rod 132 and removes, the removal of pull rod 132 drives limiting plate 133 and extrudees spring 134, spacing rod 135 shifts out standing groove 12 afterwards, remove first template 5 afterwards, first template 5 drives first slider 3 and third slider 9 and removes, fill in standing groove 12 with connecting plate 11 afterwards, loosen application of force piece 14, and rotate application of force piece 14, make spacing rod 135 insert in spacing groove 136, fix connecting plate 11, fill in first fixture block 16 with second fixture block 18 afterwards, stretch fixedly top plate 1 and bottom plate 7, fix first template 5 and second template 6.
In summary, the following steps: this template for hydraulic engineering uses through roof 1, first spout 2, first slider 3, second slider 4, first template 5, second template 6, bottom plate 7, second spout 8, third slider 9, fourth slider 10, connecting plate 11, standing groove 12 and limit structure 13's cooperation, has solved the problem of the inconvenient installation of current template for hydraulic engineering.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a template for hydraulic engineering, includes roof (1), its characterized in that: the bottom of the top plate (1) is provided with a first sliding groove (2), the inside of the first sliding groove (2) is sequentially connected with a first sliding block (3) and a second sliding block (4) in a sliding manner, the bottom of the first sliding block (3) is connected with a first template (5) in a bolting manner, the bottom of the second sliding block (4) is connected with a second template (6) in a bolting manner, the bottom of the first template (5) is provided with a bottom plate (7), the inside of the bottom plate (7) is provided with a second sliding groove (8), the inside of the second sliding groove (8) is sequentially connected with a third sliding block (9) and a fourth sliding block (10) in a sliding manner, the top of the third sliding block (9) is connected with the bottom of the first template (5) in a bolting manner, the top of the fourth sliding block (10) is connected with the bottom of the second template (6) in a bolting manner, the left side of the first template (5) is integrally formed with three connecting plates (11, the right side of the second template (6) is provided with a placing groove (12) matched with the connecting plate (11) for use, and the front side of the second template (6) is welded with a limiting structure (13) for fixing the connecting plate (11).
2. The template for hydraulic engineering according to claim 1, characterized in that: limit structure (13) include spacing case (131), the quantity of spacing case (131) is three, the inside of spacing case (131) is equipped with pull rod (132), the outside that spacing case (131) and extending to spacing case (131) are run through in the front of pull rod (132), the back welding of pull rod (132) has limiting plate (133), the surface cover of pull rod (132) is equipped with spring (134), the back welding of limiting plate (133) has gag lever post (135), spacing groove (136) have been seted up to the inside of connecting plate (11), the back of gag lever post (135) runs through second template (6) and extends to the inside of spacing groove (136).
3. The template for hydraulic engineering according to claim 2, characterized in that: the limiting groove (136) is square or polygonal prismatic, and the cross section of the limiting rod (135) is square or polygonal prismatic.
4. The template for hydraulic engineering according to claim 2, characterized in that: the front side of the limiting rod (135) is welded with a force application block (14), and the force application block (14) is circular.
5. The template for hydraulic engineering according to claim 1, characterized in that: first fixed band (15) have all been bolted on the both sides of roof (1) bottom, the bottom cover of first fixed band (15) is equipped with first fixture block (16), second fixed band (17) have all been bolted on the both sides at bottom plate (7) top, the top cover of second fixed band (17) is equipped with second fixture block (18), the surface of second fixture block (18) and the inside joint of first fixture block (16).
6. The template for hydraulic engineering according to claim 5, characterized in that: first fixed band (15) and second fixed band (17) are elastic fiber, the position of first fixed band (15) and second fixed band (17) all is pegged graft in the front side of first template (5) and second template (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920912698.2U CN210797418U (en) | 2019-06-18 | 2019-06-18 | Template for hydraulic engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920912698.2U CN210797418U (en) | 2019-06-18 | 2019-06-18 | Template for hydraulic engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210797418U true CN210797418U (en) | 2020-06-19 |
Family
ID=71231142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920912698.2U Expired - Fee Related CN210797418U (en) | 2019-06-18 | 2019-06-18 | Template for hydraulic engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210797418U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854804A (en) * | 2021-01-12 | 2021-05-28 | 闫全义 | Existing reinforced concrete column head structure and manufacturing method thereof |
-
2019
- 2019-06-18 CN CN201920912698.2U patent/CN210797418U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854804A (en) * | 2021-01-12 | 2021-05-28 | 闫全义 | Existing reinforced concrete column head structure and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210797418U (en) | Template for hydraulic engineering | |
CN205615777U (en) | Full -automatic reinforcing steel bar binding machine | |
CN205610537U (en) | A photovoltaic plate holder piece for various steel tile roofing | |
CN210216319U (en) | Slope protection net for water conservancy | |
CN209012974U (en) | A kind of detachable lamps and lanterns | |
CN209114839U (en) | A kind of room is built with simple scaffold | |
CN103762525A (en) | Auxiliary tool for manufacturing cable head | |
CN205615991U (en) | Stifled pull throughs of funnel card | |
CN203457834U (en) | Novel electrician clothes | |
CN212773597U (en) | A face limit protector for building site is last | |
CN205591357U (en) | Telescopic is connecting device for construction | |
CN213654309U (en) | Scaffold frame protection network mounting structure | |
CN211008251U (en) | UHPC apron of convenient concatenation | |
CN211172282U (en) | Concrete escape canal is with portable instrument of looking for a slope | |
CN215520369U (en) | Building guardrail for civil engineering | |
CN211662016U (en) | Multipurpose magnet sleeve | |
CN205977071U (en) | Multifunctional ladder | |
CN218669070U (en) | Building door plant convenient to installation | |
CN210368832U (en) | Flood prevention case of hydraulic engineering installation of being convenient for | |
CN211395896U (en) | Drainage pipe for hydraulic engineering | |
CN216463769U (en) | Edging assembly quality is used in PVC hose production | |
CN214530582U (en) | Riverway water body prosthetic devices | |
CN219931016U (en) | Slope protection structure | |
CN213944726U (en) | Steel wire rope triangular ring eyelet clamp | |
CN213360042U (en) | Novel twist drill rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200619 Termination date: 20210618 |