CN210794107U - Connecting piece is used in steel bearing plate production - Google Patents

Connecting piece is used in steel bearing plate production Download PDF

Info

Publication number
CN210794107U
CN210794107U CN201921191142.5U CN201921191142U CN210794107U CN 210794107 U CN210794107 U CN 210794107U CN 201921191142 U CN201921191142 U CN 201921191142U CN 210794107 U CN210794107 U CN 210794107U
Authority
CN
China
Prior art keywords
plate
connecting piece
connecting rod
piece
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921191142.5U
Other languages
Chinese (zh)
Inventor
汤盛安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Wanji Color Steel Co ltd
Original Assignee
Nanjing Wanji Color Steel Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Wanji Color Steel Co ltd filed Critical Nanjing Wanji Color Steel Co ltd
Priority to CN201921191142.5U priority Critical patent/CN210794107U/en
Application granted granted Critical
Publication of CN210794107U publication Critical patent/CN210794107U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

The utility model discloses a connecting piece is used in steel bearing plate production relates to steel bearing plate technical field, for solving the current relatively poor and trouble problem of removal process of practicality. The rubber sponge is installed to the top of hypoplastron, the top of inlayer connecting plate is provided with the upper plate, the top of upper plate is provided with the lug, the intermediate position department of upper plate is provided with adjusting bolt, one side of first connecting piece is provided with the second connecting piece, first fixed block is installed to the one end of first connecting piece, one side of first fixed block is provided with the head rod, the second connecting rod is installed to the one end of head rod, the other end of second connecting rod is provided with first installation piece, the inside of first installation piece is provided with hexagon nut, be provided with the steel carrier plate between first connecting piece and the third connecting piece.

Description

Connecting piece is used in steel bearing plate production
Technical Field
The utility model relates to a steel holds board technical field, specifically is a connecting piece is used in steel holds board production.
Background
The steel bearing plate is firstly called a profiled steel plate, namely the steel plates are pressed and formed by a plate pressing machine, the floor bearing plate is formed by rolling and cold-bending galvanized steel plates, the cross section of the floor bearing plate is in a V shape, a U shape, a trapezoid shape or waveforms similar to the shapes of the V shape, the U shape, the trapezoid shape or the waveforms is mainly used as a permanent template, and the floor bearing plate can also be selected to be used for other purposes.
However, the connecting piece of current steel carrier plate production usefulness can not be connected fixedly according to the steel carrier plate size, often can only be to the steel carrier plate of single model specification, and the practicality is relatively poor, and the connecting piece of current steel carrier plate production usefulness only is used for fixed connection to put in addition, need pass through other apparatus assistance completions when removing or transporting, and at this in-process, the corner of steel carrier plate is impaired easily, consequently unsatisfied current demand, to this we provide a connecting piece for steel carrier plate production.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a connecting piece is used in steel bearing plate production to solve the relatively poor and trouble problem of removal process of the practicality that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a connecting piece for steel bearing plate production comprises a first connecting piece, wherein the first connecting piece consists of an outer connecting plate and an inner connecting plate, the inner connecting plate is positioned inside the outer connecting plate, a lower plate is arranged at the bottom of the outer connecting plate, rubber sponge is arranged above the lower plate, an upper plate is arranged above the inner connecting plate, a lifting lug is arranged above the upper plate, an adjusting bolt is arranged at the middle position of the upper plate, one end of the adjusting bolt penetrates through the upper plate and extends into the inner connecting plate, a clamping plate is arranged at one end of the adjusting bolt, a second connecting piece is arranged at one side of the first connecting piece, a first fixing block is arranged at one end of the first connecting piece, a first connecting rod is arranged at one side of the first fixing block, a second connecting rod is arranged at one end of the first connecting rod, and one end of the second connecting rod extends into the first connecting rod, the other end of second connecting rod is provided with first installation piece, the inside of first installation piece is provided with hexagon nut, the opposite side of first connecting piece is provided with the third connecting piece, the one end of third connecting piece is provided with the second fixed block, one side of second fixed block is provided with the third connecting rod, the fourth connecting rod is installed to the one end of third connecting rod, the one end of fourth connecting rod extends to the inside of third connecting rod, the other end of fourth connecting rod is provided with second installation piece, be provided with the steel carrier plate between first connecting piece and the third connecting piece.
Preferably, notches are formed in two sides of the inner portion of the outer connecting plate, spring pieces are arranged on two sides of the lower end of the inner connecting plate, the spring pieces are connected with the notches through clamping grooves, and the inner connecting plate is connected with the outer connecting plate in a sliding mode.
Preferably, the adjusting bolt is in threaded connection with the upper plate and is fixedly connected with the clamping plate.
Preferably, first fixed block and first connecting piece fixed connection, head rod and first fixed block fixed connection, second connecting rod and head rod sliding connection, first installation piece and second connecting rod fixed connection, hexagon nut passes through threaded connection with second connecting piece and first installation piece, second fixed block and third connecting piece fixed connection, third connecting rod and second fixed block fixed connection, fourth connecting rod and third connecting rod sliding connection, second installation piece and fourth connecting rod fixed connection.
Preferably, the lifting lug is connected with the upper plate in a welding mode.
Preferably, the rubber sponge is adhered to the lower plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a constitute the connecting piece by outer connecting plate and inner connecting plate, inner connecting plate and outer connecting plate sliding connection, when connecting the steel carrier plate, only need insert the connecting piece to the four corners of steel carrier plate, make splint and steel carrier plate fixed through adjusting bolt, because four independent erection joint of connecting piece, no matter the specification size of steel carrier plate, can both carry out the centre gripping and connect to remain stable, guarantee that the steel carrier plate can not take place the displacement.
2. The utility model discloses a be provided with first fixed block in one side of first connecting piece, the one end of first fixed block is provided with head rod and second connecting rod, the one end of second connecting rod is provided with first installation piece, head rod and second connecting rod sliding connection, length according to the steel carrier plate when connecting the steel carrier plate, the installation position of first installation piece to second connecting piece one side is stimulateeed to the installation connecting piece completion back, it is fixed to use hexagon nut, because the elasticity of connecting rod, no matter the specification size of steel carrier plate, can both install fixedly between two connecting pieces, the connecting rod is mutually supported the steel with the connecting piece and is become a whole, the top of connecting piece is provided with the lug simultaneously, make things convenient for the hoist to transport, the handling efficiency is improved.
3. The utility model discloses an install the connecting piece in the four corners of steel carrier plate to there is thickness in the connecting piece, plays certain guard action to the steel carrier plate to a certain extent, avoids the injury that produces the steel carrier plate by the collision when removing the steel carrier plate, and the bottom of outer connecting plate is provided with rubber sponge simultaneously, can play buffering absorbing effect, further protects the steel carrier plate not damaged.
Drawings
FIG. 1 is a perspective view of the connector of the present invention;
FIG. 2 is a schematic view of the overall structure of the present invention;
FIG. 3 is an overall side view of the present invention;
figure 4 position the utility model discloses a connecting plate installation structure chart.
In the figure: 1. an outer layer connecting plate; 2. an inner layer connecting plate; 3. a rubber sponge; 4. a lower plate; 5. an upper plate; 6. lifting lugs; 7. adjusting the bolt; 8. a splint; 9. a first fixed block; 10. a first connecting rod; 11. a second connecting rod; 12. a first mounting block; 13. a hexagonal nut; 14. a first connecting member; 15. a second connecting member; 16. a third connecting member; 17. a second mounting block; 18. a second fixed block; 19. a third connecting rod; 20. a fourth connecting rod; 21. a spring plate; 22. a notch; 23. a steel carrier plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: a connecting piece for steel bearing plate production comprises a first connecting piece 14, wherein the first connecting piece 14 is composed of an outer connecting plate 1 and an inner connecting plate 2, the inner connecting plate 2 is positioned inside the outer connecting plate 1, a lower plate 4 is arranged at the bottom of the outer connecting plate 1, a rubber sponge 3 is arranged above the lower plate 4, an upper plate 5 is arranged above the inner connecting plate 2, a lifting lug 6 is arranged above the upper plate 5, an adjusting bolt 7 is arranged at the middle position of the upper plate 5, one end of the adjusting bolt 7 penetrates through the upper plate 5 and extends into the inner connecting plate 2, a clamping plate 8 is arranged at one end of the adjusting bolt 7, a second connecting piece 15 is arranged at one side of the first connecting piece 14, a first fixing block 9 is arranged at one end of the first connecting piece 14, a first connecting rod 10 is arranged at one side of the first fixing block 9, and a second connecting rod 11 is arranged at, and one end of the second connecting rod 11 extends to the inside of the first connecting rod 10, the other end of the second connecting rod 11 is provided with a first mounting block 12, the inside of the first mounting block 12 is provided with a hexagon nut 13, the other side of the first connecting rod 14 is provided with a third connecting piece 16, one end of the third connecting piece 16 is provided with a second fixing block 18, one side of the second fixing block 18 is provided with a third connecting rod 19, one end of the third connecting rod 19 is provided with a fourth connecting rod 20, one end of the fourth connecting rod 20 extends to the inside of the third connecting rod 19, the other end of the fourth connecting rod 20 is provided with a second mounting block 17, and a steel bearing plate 23 is arranged between the first connecting piece 14 and the third connecting piece 16.
Further, the both sides of the inside of outer joint plate 1 are provided with notch 22, and the both sides of the 2 lower extremes of inlayer joint plate are provided with spring leaf 21, and spring leaf 21 passes through the draw-in groove with notch 22 to be connected, and inlayer joint plate 2 passes through sliding connection with outer joint plate 1, and this kind of sliding design simple structure for inlayer joint plate 2 can slide from top to bottom in outer joint plate 1.
Further, adjusting bolt 7 passes through threaded connection with upper plate 5, and adjusting bolt 7 and splint 8 fixed connection make splint 8 and steel carrier plate 23 fixed through adjusting bolt 7, because four independent erection joint of connecting piece, no matter the specification size of steel carrier plate 23, can both carry out the centre gripping and connect to remain stable, guarantee that steel carrier plate 23 can not take place the displacement.
Further, first fixed block 9 and first connecting piece 14 fixed connection, first connecting rod 10 and first fixed block 9 fixed connection, second connecting rod 11 and first connecting rod 10 sliding connection, first installation piece 12 and second connecting rod 11 fixed connection, hexagon nut 13 passes through threaded connection with second connecting piece 15 and first installation piece 12, second fixed block 18 and third connecting piece 16 fixed connection, third connecting rod 19 and second fixed block 18 fixed connection, fourth connecting rod 20 and third connecting rod 19 sliding connection, second installation piece 17 and fourth connecting rod 20 fixed connection, because the elasticity of connecting rod, no matter the specification size of steel carrier plate 23, can both install fixedly between two connecting pieces.
Further, 6 and 5 welded connection of upper plate of lug, 6 sets up of lug and makes things convenient for the hoist to carry out the handling.
Further, rubber sponge 3 pastes with hypoplastron 4, and rubber sponge 3 can play the effect of buffering shock attenuation.
The working principle is as follows: when in use, the outer connecting plate 1 is connected with the inner connecting plate 2 in a sliding manner, the connecting pieces are stretched to proper heights according to the heights of the connected steel bearing plates 23, the four connecting pieces are inserted into four corners of the steel bearing plates 23, the clamping plate 8 is fixed with the steel bearing plates 23 through the adjusting bolts 7, the four connecting pieces are independently installed and connected, clamping connection can be carried out and kept stable no matter the specifications and sizes of the steel bearing plates 23, the steel bearing plates 23 are ensured not to be displaced, after the connecting pieces are installed, the first fixing block 9 is arranged on one side of the first connecting piece 14, one end of the first fixing block 9 is provided with the first connecting rod 10 and the second connecting rod 11, one end of the second connecting rod 11 is provided with the first installing block 12, the first connecting rod 10 is connected with the second connecting rod 11 in a sliding manner, when the steel bearing plates 23 are connected, the installing parts are pulled to the installing positions on one side of the second connecting piece 15 according to the lengths of the, use hexagon nut 13 fixed, because the elasticity of connecting rod, no matter the specification size of steel carrier plate 23, can both install fixedly between two connecting pieces, the connecting rod is mutually supported the steel with the connecting piece and is held the frame and become a whole, the top of connecting piece is provided with lug 6 simultaneously, make things convenient for the hoist to transport, the handling efficiency has been improved, install simultaneously in the connecting piece in four corners and have thickness, play certain guard action to steel carrier plate 23 to a certain extent, avoid the injury that produces steel carrier plate 23 by the collision when removing steel carrier plate 23, the bottom of outer connecting plate 1 is provided with rubber sponge 3 simultaneously, can play buffering absorbing effect, further protect steel carrier plate 23 not damaged.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a connecting piece is used in production of steel bearing plate, includes first connecting piece (14), its characterized in that: the first connecting piece (14) is composed of an outer connecting plate (1) and an inner connecting plate (2), the inner connecting plate (2) is located inside the outer connecting plate (1), a lower plate (4) is arranged at the bottom of the outer connecting plate (1), a rubber sponge (3) is installed above the lower plate (4), an upper plate (5) is arranged above the inner connecting plate (2), a lifting lug (6) is arranged above the upper plate (5), an adjusting bolt (7) is arranged at the middle position of the upper plate (5), one end of the adjusting bolt (7) penetrates through the upper plate (5) and extends to the inside of the inner connecting plate (2), a clamping plate (8) is arranged at one end of the adjusting bolt (7), a second connecting piece (15) is arranged on one side of the first connecting piece (14), a first fixing block (9) is installed at one end of the first connecting piece (14), a first connecting rod (10) is arranged on one side of the first fixing block (9), a second connecting rod (11) is installed at one end of the first connecting rod (10), one end of the second connecting rod (11) extends to the inside of the first connecting rod (10), a first installation block (12) is arranged at the other end of the second connecting rod (11), a hexagon nut (13) is arranged inside the first installation block (12), a third connecting piece (16) is arranged on the other side of the first connecting piece (14), a second fixing block (18) is arranged at one end of the third connecting piece (16), a third connecting rod (19) is arranged on one side of the second fixing block (18), a fourth connecting rod (20) is installed at one end of the third connecting rod (19), one end of the fourth connecting rod (20) extends to the inside of the third connecting rod (19), and a second installation block (17) is arranged at the other end of the fourth connecting rod (20), a steel bearing plate (23) is arranged between the first connecting piece (14) and the third connecting piece (16).
2. The connecting piece for producing the steel bearing plate as claimed in claim 1, wherein: notches (22) are formed in two sides of the inner portion of the outer connecting plate (1), spring pieces (21) are arranged on two sides of the lower end of the inner connecting plate (2), the spring pieces (21) are connected with the notches (22) through clamping grooves, and the inner connecting plate (2) is connected with the outer connecting plate (1) in a sliding mode.
3. The connecting piece for producing the steel bearing plate as claimed in claim 1, wherein: the adjusting bolt (7) is in threaded connection with the upper plate (5), and the adjusting bolt (7) is fixedly connected with the clamping plate (8).
4. The connecting piece for producing the steel bearing plate as claimed in claim 1, wherein: first fixed block (9) and first connecting piece (14) fixed connection, head rod (10) and first fixed block (9) fixed connection, second connecting rod (11) and head rod (10) sliding connection, first installation piece (12) and second connecting rod (11) fixed connection, hexagon nut (13) and second connecting piece (15) and first installation piece (12) pass through threaded connection, second fixed block (18) and third connecting piece (16) fixed connection, third connecting rod (19) and second fixed block (18) fixed connection, fourth connecting rod (20) and third connecting rod (19) sliding connection, second installation piece (17) and fourth connecting rod (20) fixed connection.
5. The connecting piece for producing the steel bearing plate as claimed in claim 1, wherein: the lifting lug (6) is connected with the upper plate (5) in a welding mode.
6. The connecting piece for producing the steel bearing plate as claimed in claim 1, wherein: the rubber sponge (3) is adhered to the lower plate (4).
CN201921191142.5U 2019-07-26 2019-07-26 Connecting piece is used in steel bearing plate production Active CN210794107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921191142.5U CN210794107U (en) 2019-07-26 2019-07-26 Connecting piece is used in steel bearing plate production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921191142.5U CN210794107U (en) 2019-07-26 2019-07-26 Connecting piece is used in steel bearing plate production

Publications (1)

Publication Number Publication Date
CN210794107U true CN210794107U (en) 2020-06-19

Family

ID=71243568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921191142.5U Active CN210794107U (en) 2019-07-26 2019-07-26 Connecting piece is used in steel bearing plate production

Country Status (1)

Country Link
CN (1) CN210794107U (en)

Similar Documents

Publication Publication Date Title
CN111360477B (en) Traction and buffering composition welding tool
CN203632599U (en) Photovoltaic support system fixing assembly
CN203592419U (en) Testing jig of television screen
CN212801994U (en) Assembled steel construction building turning beam column connecting piece
CN213256487U (en) Mechanical stamping equipment convenient to adjustment
CN210794107U (en) Connecting piece is used in steel bearing plate production
CN201574500U (en) Supporting type damper for preventing batten-shaped soft steel from bending
CN2494861Y (en) Split form
CN214194117U (en) Bridge beam supports with damper
CN214393864U (en) Dedicated mechanical clamping device of hauler production
CN213256473U (en) Stamping workpiece processing apparatus for producing
CN212013221U (en) Transportation anti-deformation device of regulator cubicle
CN210577664U (en) T-shaped cable clamp convenient to mount and dismount
CN210157117U (en) Installation interlock anchor clamps for various steel tile roof photovoltaic support are exclusively used in
CN203373116U (en) Turning-over tool of steel bridge plate units
CN203481252U (en) Holder and photovoltaic module support combination adopting same holder
CN213103788U (en) Protective structure for steel rolling production
CN212957355U (en) Resistance to compression buffering type aluminium veneer
CN220621609U (en) Novel laminated glass
CN214989129U (en) Aluminum coil traction mechanism
CN218549360U (en) Pipeline supporting mechanism for weak current engineering
CN216659887U (en) High-strength light rail
CN216195442U (en) Square steel structure convenient to installation is fixed
CN203878231U (en) Placement device for anodization aluminum products
CN213379918U (en) Door frame welding processing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant