CN210779921U - Cable bridge convenient to cable arrangement - Google Patents
Cable bridge convenient to cable arrangement Download PDFInfo
- Publication number
- CN210779921U CN210779921U CN201922218399.1U CN201922218399U CN210779921U CN 210779921 U CN210779921 U CN 210779921U CN 201922218399 U CN201922218399 U CN 201922218399U CN 210779921 U CN210779921 U CN 210779921U
- Authority
- CN
- China
- Prior art keywords
- concatenation
- splicing
- wire casing
- cable
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a cable crane span structure convenient to cable arrangement, including wire casing and concatenation hole, wire casing externally mounted pivot, pivot one side sets up the slab cap, and the wire casing both sides are equipped with second concatenation piece, and wherein, the concatenation hole sets up on the second concatenation piece, and concatenation hole installation second concatenation screw, the both sides of keeping away from the wire casing of second concatenation piece set up first concatenation piece, installs first concatenation screw on the first concatenation piece, and the wire casing one end of keeping away from the pivot is equipped with the fixed screw, and the wire casing inboard sets up the main shaft, main shaft one end installation connecting rod. This cable crane span structure convenient to cable arrangement is provided with first concatenation piece, sets up the concatenation hole on the first concatenation piece, through installing first concatenation screw, assembles fixedly to the wire casing, and first concatenation piece and wire casing are structure as an organic whole, and two horizontal concatenation pieces are not on same water flat line, can carry out seamless concatenation fixedly, have saved part and concatenation step.
Description
Technical Field
The utility model relates to a cable crane span structure technical field specifically is a cable crane span structure convenient to cable arrangement.
Background
The cable bridge is divided into structures of a groove type, a tray type, a ladder type, a grid type and the like, and comprises a support, a supporting arm, an installation accessory and the like. The inner bridge frame of the building can be independently erected and can also be attached to various buildings and pipe gallery supports, the characteristics of simple structure, attractive appearance, flexible configuration, convenience in maintenance and the like are reflected, all parts need to be galvanized, and the inner bridge frame is installed outside the building in the open air.
Cable bridge in market is when the concatenation, and is loaded down with trivial details because of the too many process that leads to of part, to a great extent waste time, under the condition that cable is in large quantity, can't arrange in order the inside mixed and disorderly cable of crane span structure, and can't fix the cable. Improvements are therefore needed in the art for cable trays that facilitate cable management.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cable crane span structure convenient to cable arrangement to solve the cable crane span structure in the existing market that above-mentioned background art provided when the concatenation, because of the part is too many, lead to the process loaded down with trivial details, to a great extent waste time, under the condition that cable is in large quantity, can't arrange in order the inside mixed and disorderly cable of crane span structure, and can't carry out the problem of fixing to the cable.
In order to achieve the above object, the utility model provides a following technical scheme: including wire casing and concatenation hole, the pivot is installed in the wire casing outside, and pivot one side sets up the board lid, and the wire casing both sides are equipped with the second concatenation piece. The splicing holes are formed in the second splicing sheet, second splicing screws are installed in the splicing holes, first splicing sheets are arranged on two sides of the wire groove far away from the second splicing sheets, first splicing screws are installed on the first splicing sheets, and fixing screws are arranged at one ends of the wire grooves far away from the rotating shaft. The wire casing inboard sets up the main shaft, and main shaft one end installation connecting rod keeps away from main shaft connecting rod one side and sets up the connecting axle, is equipped with the telescopic link on the connecting axle, keeps away from one side of the wire casing of main shaft and is fixed with fixed the support, sets up the fixed orifices on the fixed support, sets up the screw rod on the fixed orifices.
Preferably, a rotating structure is formed between the plate cover and the wire groove through a rotating shaft, and the rotating range of the plate cover is 0-180 degrees.
Preferably, the second splicing pieces are provided with 4 splicing holes, the second splicing pieces are symmetrically fixed on two sides of the wire slot respectively, and the second splicing pieces are provided with 2 splicing holes respectively.
Preferably, the number of the first splicing pieces is 4, the first splicing pieces are respectively provided with 1 splicing hole, and the first splicing pieces at the upper position and the lower position are not on the same horizontal line.
Preferably, constitute revolution mechanic through the main shaft between connecting rod and the wire casing, be provided with 3 telescopic links on the connecting axle, fixed the support and fix horizontal telescopic link, 3 corresponding fixed orificess have been seted up respectively to the wire casing inboard.
This cable crane span structure convenient to cable arrangement compares with prior art, the beneficial effects of the utility model are that:
the wire groove splicing structure has the beneficial effects that the first splicing pieces are arranged, the splicing holes are formed in the first splicing pieces, the wire groove is assembled and fixed by installing the first splicing screws, the first splicing pieces and the wire groove are of an integral structure, the two transverse splicing pieces are not on the same horizontal line, seamless splicing and fixing can be carried out, and parts and splicing steps are saved.
The wire groove splicing structure has the beneficial effects that the second splicing pieces are arranged, the splicing holes are formed in the second splicing pieces, and the wire groove is assembled and fixed by mounting second splicing screws, so that splicing in different directions can be performed.
Beneficial effect 3 is provided with the telescopic link, fixes the telescopic link through the screw rod, then reaches the fixed purpose of putting in order the cable, can fold telescopic link and connecting rod through main shaft and connecting axle, laminates at the wire duct inner wall.
Beneficial effect 4 is provided with the board lid, can arrange mixed and disorderly cable in the wire casing in order, and the auxiliary telescopic link carries out the fixed action.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic side sectional view of the present invention;
FIG. 3 is a schematic top view of the present invention;
fig. 4 is an enlarged schematic view of part a of the present invention.
In the figure: 1. a wire slot; 2. a rotating shaft; 3. a plate cover; 4. a second splice tab; 5. splicing holes; 6. a second splicing screw; 7. a first splice tab; 8. a first splicing screw; 9. fixing screws; 10. a main shaft; 11. a connecting rod; 12. a connecting shaft; 13. a telescopic rod; 14. fixing the support; 15. a fixing hole; 16. a screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the cable bridge convenient for cable arrangement includes a cable slot 1, a rotating shaft 2, a plate cover 3, a second splicing sheet 4, a splicing hole 5, a second splicing screw 6, a first splicing sheet 7, a first splicing screw 8, a fixing screw 9, a main shaft 10, a connecting rod 11, a connecting shaft 12, a telescopic rod 13, a fixing support 14, a fixing hole 15 and a screw 16, the rotating shaft 2 is installed outside the cable slot 1, the plate cover 3 is arranged on one side of the rotating shaft 2, the second splicing sheets 4 are arranged on two sides of the cable slot 1, a rotating structure is formed between the plate cover 3 and the cable slot 1 through the rotating shaft 2, the rotating range of the plate cover 3 is 0-180 degrees, the number of the second splicing sheets 4 is four, and the second splicing sheets 4 are symmetrically fixed on two sides of.
The splicing holes 5 are arranged on the second splicing sheet 4, the splicing holes 5 are provided with second splicing screws 6, the second splicing sheet 4 is provided with splicing holes 5, the slot 1 is assembled and fixed by installing the second splicing screws 6, 2 splicing holes 5 are arranged on the splicing second splicing sheet 4 which can be spliced in different directions, four second splicing sheets 4 are arranged, the second splicing sheets 4 are respectively and symmetrically fixed at two sides of the slot 1, 2 splicing holes 5 are arranged on the second splicing sheet 4, the slot 1 is assembled and fixed by installing the second splicing screws 6, splicing in different directions can be carried out, the first splicing sheets 7 are arranged at two sides of the slot 1 far away from the second splicing sheet 4, the first splicing sheets 7 are provided with first splicing screws 8, one end of the slot 1 far away from the rotating shaft 2 is provided with fixing screws 9, the first splicing sheets 7 are provided with four splicing holes 7, the first splicing sheets 7 are respectively provided with 1 splicing hole 5, the first splicing piece 7 of upper and lower position is not at same water flat line, through installing first concatenation screw 8, assembles fixedly to wire casing 1, and first splicing piece 7 and wire casing 1 are a body structure, and 2 horizontal splicing pieces are not at same water flat line, can carry out seamless concatenation fixedly, have saved part and concatenation step.
The inboard main shaft 10 that sets up of wire casing 1, main shaft 10 one end erection joint pole 11, connecting rod 11 one side of keeping away from main shaft 10 sets up connecting axle 12, be equipped with telescopic link 13 on connecting axle 12, one side of keeping away from main shaft 10's wire casing 1 is fixed with fixed support 14, set up fixed orifices 15 on the fixed support 14, set up screw rod 16 on the fixed orifices 15, constitute revolution mechanic through main shaft 10 between connecting rod 11 and the wire casing 1, be provided with 3 telescopic link 13 on the connecting axle 12, fixed support 14 fixes horizontal telescopic link 13, 3 fixed orifices 15 that correspond are seted up respectively to wire casing 1 inboard, fix telescopic link 13 through screw rod 16, then reach and arrange in order fixed purpose to the cable, can fold telescopic link 13 and connecting rod 11 through main shaft 10 and connecting axle 12, the laminating is at wire casing 1 inner wall.
This theory of operation of cable crane span structure convenient to cable arrangement: firstly during using this cable crane span structure convenient to cable arrangement, at first laminate a plurality of wire casing 1 through second concatenation piece 4 or first concatenation piece 7, then rotatory second concatenation screw 6 or first concatenation screw 8 are fixed two wire casings 1, open plate cover 3 through rotatory pivot 2 after that, later drive connecting rod 11 through rotatory main shaft 10 and open telescopic link 13, pass through screw rod 16 and fixed orifices 15 with 3 telescopic links 13 and fix at wire casing 1 inner wall, put into wire casing 1 with the cable at last, the mouth of opening through plate cover 3 can arrange in order the cable. Those not described in detail in this specification are within the skill of the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (5)
1. The utility model provides a cable crane span structure convenient to cable arrangement, includes wire casing (1) and concatenation hole (5), its characterized in that: a rotating shaft (2) is arranged outside the wire slot (1), a plate cover (3) is arranged on one side of the rotating shaft (2), and second splicing pieces (4) are arranged on two sides of the wire slot (1);
the splicing holes (5) are formed in the second splicing sheet (4), second splicing screws (6) are installed in the splicing holes (5), first splicing sheets (7) are arranged on two sides, far away from the second splicing sheet (4), of the wire groove (1), first splicing screws (8) are installed on the first splicing sheets (7), and fixing screws (9) are arranged at one end, far away from the rotating shaft (2), of the wire groove (1);
the utility model discloses a wire casing (10) is fixed to wire casing (1) inboard, main shaft (10) one end erection joint pole (11), keep away from main shaft (10) connecting rod (11) one side sets up connecting axle (12), be equipped with telescopic link (13) on connecting axle (12), keep away from main shaft (10) one side of wire casing (1) is fixed with fixed support (14), set up fixed orifices (15) on fixed support (14), set up screw rod (16) on fixed orifices (15).
2. A cable tray for facilitating cable management as claimed in claim 1, wherein: a rotating structure is formed between the plate cover (3) and the wire groove (1) through a rotating shaft (2), and the rotating range of the plate cover (3) is 0-180 degrees.
3. A cable tray for facilitating cable management as claimed in claim 1, wherein: second concatenation piece (4) are provided with four, second concatenation piece (4) are the symmetric fixation respectively in wire casing (1) both sides, install 2 concatenation holes (5) on second concatenation piece (4).
4. A cable tray for facilitating cable management as claimed in claim 1, wherein: first concatenation piece (7) are provided with four, 1 concatenation hole (5) have been seted up respectively on first concatenation piece (7), and first concatenation piece (7) of upper and lower position are not at same horizontal line.
5. A cable tray for facilitating cable management as claimed in claim 1, wherein: constitute revolution mechanic through main shaft (10) between connecting rod (11) and wire casing (1), be provided with 3 telescopic link (13) on connecting axle (12), fixed support (14) are fixed horizontal telescopic link (13), wire casing (1) inboard is seted up 3 fixed orificess (15) that correspond respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922218399.1U CN210779921U (en) | 2019-12-10 | 2019-12-10 | Cable bridge convenient to cable arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922218399.1U CN210779921U (en) | 2019-12-10 | 2019-12-10 | Cable bridge convenient to cable arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210779921U true CN210779921U (en) | 2020-06-16 |
Family
ID=71040519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922218399.1U Expired - Fee Related CN210779921U (en) | 2019-12-10 | 2019-12-10 | Cable bridge convenient to cable arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210779921U (en) |
-
2019
- 2019-12-10 CN CN201922218399.1U patent/CN210779921U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210779921U (en) | Cable bridge convenient to cable arrangement | |
CN212378271U (en) | Spliced solar panel convenient to install | |
CN210380118U (en) | Novel cable bridge for photovoltaic power generation | |
CN215009421U (en) | Cable bridge for electric power erection | |
CN213989959U (en) | Cable bridge convenient to fix | |
CN210326810U (en) | Carbon fiber crane span structure convenient to installation | |
CN210573081U (en) | Platform device for detecting quality of display screen panel | |
CN211018136U (en) | Support is used in installation of cable testing bridge | |
CN210867057U (en) | Cable bridge with adjustable wiring assembly | |
CN210430814U (en) | Bracket arm for cable bridge | |
CN210111501U (en) | Assembling structure of ladder type cable bridge | |
CN213959630U (en) | Cable aluminum bridge group | |
CN215419452U (en) | Quick splicing assembly for groove type bridge | |
CN216162325U (en) | Maintenance-free steel-plastic co-extrusion cable bridge | |
CN217984360U (en) | Combined groove type bridge frame | |
CN219283137U (en) | Photovoltaic view illumination lamp house that weather proof is effectual | |
CN216699416U (en) | Cable bridge with waterproof function | |
CN220325189U (en) | Partition type cable bridge | |
CN218976227U (en) | Flexible radiating cable bridge | |
CN218678921U (en) | Solar distributed power supply | |
CN211925202U (en) | A building electrical construction installation device for side position installation | |
CN218070880U (en) | Anti-oxidation and anti-corrosion cable bridge | |
CN211114264U (en) | Assembled photovoltaic curtain wall | |
CN216530433U (en) | Outdoor bus bridge with good waterproof effect | |
CN215681612U (en) | High-temperature-resistant hot-dip galvanizing bridge profile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200616 Termination date: 20211210 |