CN210771146U - Install stable gas acquisition controller - Google Patents

Install stable gas acquisition controller Download PDF

Info

Publication number
CN210771146U
CN210771146U CN201921851881.2U CN201921851881U CN210771146U CN 210771146 U CN210771146 U CN 210771146U CN 201921851881 U CN201921851881 U CN 201921851881U CN 210771146 U CN210771146 U CN 210771146U
Authority
CN
China
Prior art keywords
fixedly connected
acquisition controller
slider
gaseous
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921851881.2U
Other languages
Chinese (zh)
Inventor
张玲
尹志军
刘燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Langdi Lola Power Technology Co ltd
Original Assignee
Nanjing Langdi Lola Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Langdi Lola Power Technology Co ltd filed Critical Nanjing Langdi Lola Power Technology Co ltd
Priority to CN201921851881.2U priority Critical patent/CN210771146U/en
Application granted granted Critical
Publication of CN210771146U publication Critical patent/CN210771146U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Valve Housings (AREA)

Abstract

The utility model relates to a gaseous acquisition controller technical field just discloses a gaseous acquisition controller of stable installation, the slider comprises a slider, the gaseous acquisition controller body of right side fixedly connected with of slider, the left side movable mounting of gaseous acquisition controller body has the mounting panel, the right side fixedly connected with and slider sliding connection's of mounting panel slide rail, the right side fixedly connected with of mounting panel is located the backup pad of slide rail bottom. This install stable gas acquisition controller, through aim at the slide rail with the slider, then the pulling pull rod, drive the top kelly and remove to the right side, thereby make the spring compressed, the left side place plane of top kelly lies in the right side of mounting panel, then move down in gas acquisition controller body slips the slider into the slide rail, make in the bottom inserted bar inserts first through-hole, the quick installation of gas acquisition controller body has been realized, the installation effectiveness has been improved, thereby make whole device use more convenient.

Description

Install stable gas acquisition controller
Technical Field
The utility model relates to a gaseous acquisition controller technical field specifically is a gaseous acquisition controller of installation stability.
Background
Gas is one of four basic material states, gas can be composed of single atoms, single substance molecules composed of one element, compound molecules composed of multiple elements and the like, gas mixture can comprise multiple gas materials, such as air, the gas is greatly separated from liquid and solid, namely, the gas particles are separated, the separation is difficult for human eyes to detect colorless gas, the gas is fluid like liquid, can flow and deform, and can be compressed unlike liquid, and if the gas is not limited, the gas can diffuse, the volume of the gas is not limited, the gas is not fixed, and atoms or molecules of the gaseous materials can freely move relative to each other.
Gaseous need use gaseous collection controller when gathering, but current gaseous collection controller all is with bolt snap-on when the installation, though the installation is stable, nevertheless needs relevant instrument to install and dismantle, inconvenient user's dismouting, and troublesome poeration, reduced user's work efficiency, the event provides the stable gaseous collection controller of installation in order to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a stable gas acquisition controller of installation possesses the advantage of being convenient for install and dismantle, has solved current gas acquisition controller and all uses the bolt snap-on when the installation, needs relevant instrument to install and dismantle, inconvenient user's dismouting, and troublesome poeration, has reduced user's work efficiency's problem.
(II) technical scheme
For the purpose of realizing the aforesaid installation and dismantlement of being convenient for, the utility model provides a following technical scheme: a stably-installed gas collection controller comprises a sliding block, wherein a gas collection controller body is fixedly connected to the right side of the sliding block, a mounting plate is movably installed on the left side of the gas collection controller body, a sliding rail which is connected with the right side of the mounting plate in a sliding manner is fixedly connected to the right side of the mounting plate, a supporting plate which is located at the bottom of the sliding rail is fixedly connected to the right side of the mounting plate, a bottom inserting rod is fixedly connected to the bottom of the gas collection controller body, one end of the bottom inserting rod penetrates through and extends to the bottom of the supporting plate, metal bins are fixedly connected to the front side and the back side of the gas collection controller body, fixing plates which are located on the left sides of the two metal bins are fixedly connected to the front side and the back side of the gas collection controller body respectively, pull rods are movably installed on the right sides of the two metal bins, one end of each pull rod, two the equal fixedly connected with limiting plate in left side of pull rod, two the equal fixedly connected with one end in left side of limiting plate runs through respectively and extends to the inside top kelly of two draw-in grooves, two the outside of top kelly all overlaps and is equipped with the spring that is located two metal bins inside respectively, two the equal fixedly connected with baffle of interior roof and the interior diapire of draw-in groove, the spacing groove has all been seted up in the left side of baffle, the equal fixedly connected with stopper in top and the bottom of top kelly, the left side fixedly connected with blotter of top kelly.
Preferably, the top of the supporting plate is provided with a first through hole, and the size of the first through hole is matched with that of the bottom inserted link.
Preferably, the right sides of the two metal bins are provided with second through holes, and the second through holes are respectively matched with the two pull rods.
Preferably, the left sides of the two metal bins are provided with third through holes, and the third through holes are respectively matched with the two top clamping rods.
Preferably, the right sides of the two fixing plates are provided with fourth through holes, and the fourth through holes are respectively matched with the two top clamping rods.
Preferably, the bottom and the left side of the limiting groove are located on the same horizontal plane with one side and the left side of the baffle close to the top clamping rod respectively, the width of the limiting groove is the same as that of the limiting blocks, and the distance between the two opposite sides of the limiting blocks on the back is one centimeter greater than that between the two opposite sides of the baffle in the same clamping groove.
(III) advantageous effects
Compared with the prior art, the utility model provides a stable gas acquisition controller of installation possesses following beneficial effect:
1. this install stable gas acquisition controller, through aim at the slide rail with the slider, then the pulling pull rod, drive the top kelly and remove to the right side, thereby make the spring compressed, the left side place plane of top kelly lies in the right side of mounting panel, then move down in gas acquisition controller body slips the slider into the slide rail, make in the bottom inserted bar inserts first through-hole, the quick installation of gas acquisition controller body has been realized, the installation effectiveness has been improved, thereby make whole device use more convenient.
2. The stably-installed gas acquisition controller is characterized in that after a bottom insertion rod is inserted into a first through hole, a top clamping rod corresponds to a clamping groove in position, a pull rod is loosened to enable the top clamping rod to be inserted into the clamping groove through the reason of spring tension, then the pull rod is rotated to enable a limiting block and a baffle not to be located on the same horizontal plane, the pull rod is pressed, the top clamping rod continues to move towards the left side to enable a buffering cushion to be compressed until the limiting block is located on the left side of the baffle, then the pull rod is rotated to enable the top clamping rod to rotate until the limiting block and the baffle are located on the same horizontal plane, the limiting block is in close contact with the baffle through the reason of the spring tension, the pull rod is rotated again to enable the limiting block to be located in a limiting groove, the stable installation of the gas acquisition controller body is realized, when the gas acquisition controller body needs to be disassembled, only the pull rod needs to be pressed and, then with the gas acquisition controller body through slider with slide rail sliding connection take out can, realized the quick dismantlement of gas acquisition controller body, whole device has guaranteed that the installation can be fast when stable installation and dismantlement, need not the instrument operation, make whole device use more convenient.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of A of FIG. 1 according to the present invention;
fig. 3 is a right side view of the clamping groove of the present invention.
In the figure: 1 slider, 2 gaseous collection controller body, 3 metal storehouse, 4 pull rods, 5 limiting plates, 6 springs, 7 bottom inserted bars, 8 backup pads, 9 fixed plates, 10 top kellies, 11 mounting panels, 12 slide rails, 13 draw-in grooves, 14 spacing grooves, 15 baffles, 16 stoppers, 17 blotters.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a stably installed gas collection controller comprises a slider 1, a gas collection controller body 2 is fixedly connected to the right side of the slider 1, a mounting plate 11 is movably installed on the left side of the gas collection controller body 2, a slide rail 12 slidably connected to the slider 1 is fixedly connected to the right side of the mounting plate 11, a support plate 8 located at the bottom of the slide rail 12 is fixedly connected to the right side of the mounting plate 11, a bottom insertion rod 7 having one end penetrating and extending to the bottom of the support plate 8 is fixedly connected to the bottom of the gas collection controller body 2, a first through hole is formed in the top of the support plate 8, the size of the first through hole is matched with the size of the bottom insertion rod 7, metal bins 3 are fixedly connected to the front side and the back side of the gas collection controller body 2, fixing plates 9 respectively located on the left sides of the two metal bins 3 are fixedly connected to the front, the right sides of the two metal bins 3 are movably provided with pull rods 4, one ends of the pull rods 4 respectively penetrate through and extend to the insides of the two metal bins 3, the right sides of the two metal bins 3 are respectively provided with second through holes, the two second through holes are respectively matched with the two pull rods 4, the right side of the mounting plate 11 is provided with two clamping grooves 13, the two clamping grooves are respectively positioned at the left sides of the two metal bins 3, the left sides of the two pull rods 4 are respectively and fixedly connected with limiting plates 5, the left sides of the two limiting plates 5 are respectively and fixedly connected with top clamping rods 10, one ends of the top clamping rods 10 respectively penetrate through and extend to the insides of the two clamping grooves 13, the right sides of the two fixing plates 9 are respectively provided with fourth through holes, the two fourth through holes are respectively matched with the two top clamping rods 10, the left sides of the two metal bins 3 are respectively provided with third through holes, the two third through holes are respectively matched, the slide block 1 is aligned to the slide rail 12, then the pull rod 4 is pulled to drive the top clamping rod 10 to move towards the right side, so that the spring 6 is compressed until the plane of the left side of the top clamping rod 10 is positioned at the right side of the mounting plate 11, then the gas acquisition controller body 2 is moved downwards to slide the slide block 1 into the slide rail 12, the bottom insertion rod 7 is inserted into the first through hole, the gas acquisition controller body 2 is quickly mounted, the mounting efficiency is improved, so that the whole device is more convenient to use, the inner top wall and the inner bottom wall of the two clamping grooves 13 are fixedly connected with the baffle plates 15, the two baffle plates 15 in the same clamping groove 13 are identical and mutually symmetrical, the two baffle plates 15 in the same clamping groove 13 are both arc-shaped, the left side of each baffle plate 15 is provided with the limiting groove 14, the bottom and the left side of each limiting groove 14 are respectively positioned at the same horizontal plane with one side and the left, the top and the bottom of the top clamping rod 10 are fixedly connected with limit blocks 16, the width of a limit groove 14 is the same as that of the limit blocks 16, the distance between the opposite sides of the two limit blocks 16 is one centimeter greater than the distance between the opposite sides of the two baffles 15 in the same clamping groove 13, a buffer cushion 17 is fixedly connected to the left side of the top clamping rod 10, when the bottom insertion rod 7 is inserted into the first through hole, the top clamping rod 10 corresponds to the clamping groove 13, the pull rod 4 is loosened, the top clamping rod 10 can be inserted into the clamping groove 13 through the tension of the spring 6, then the pull rod 4 is rotated, the limit blocks 16 and the baffles 15 are not located on the same horizontal plane, the pull rod 4 is pressed, the top clamping rod 10 continues to move towards the left side, the buffer cushion 17 is compressed until the limit blocks 16 are located on the left side of the baffles 15, then the pull rod 4 is rotated, the top clamping rod 10 is rotated until the limit, through blotter 17 and the tensile reason of spring 6, make stopper 16 and baffle 15 in close contact with, rotate pull rod 4 once more, make stopper 16 be located spacing groove 14, the stability of the installation of gaseous acquisition controller body 2 has been realized, when gaseous acquisition controller body 2 need be dismantled, only need press pull rod 4, then rotate, make top kelly 10 break away from draw-in groove 13 through the tensile reason of spring 6, then take gaseous acquisition controller body 2 out through slider 1 and slide rail 12 sliding connection can, the quick dismantlement of gaseous acquisition controller body 2 has been realized, whole device has ensured that the installation can be fast when stable is the installation and dismantlement, need not the tool operation, make whole device use more convenient.
In conclusion, this stable gas acquisition controller of installation, through aim at slide rail 12 with slider 1, then stimulate pull rod 4, drive top kelly 10 and remove to the right side, thereby make spring 6 compressed, the left side place plane of top kelly 10 is located the right side of mounting panel 11, then move down gas acquisition controller body 2 and slide slider 1 into slide rail 12 in, make bottom inserted bar 7 insert in the first through-hole, the quick installation of gas acquisition controller body 2 has been realized, the installation effectiveness is improved, thereby make whole device use more convenient.
And, after the bottom inserted link 7 is inserted into the first through hole, the position of the top clamping rod 10 corresponds to the position of the clamping groove 13, the pull rod 4 is loosened, the top clamping rod 10 can be inserted into the clamping groove 13 through the tension of the spring 6, then the pull rod 4 is rotated, the limiting block 16 and the baffle 15 are not positioned on the same horizontal plane, the pull rod 4 is pressed, the top clamping rod 10 continues to move to the left side, the cushion pad 17 is compressed until the limiting block 16 is positioned on the left side of the baffle 15, then the pull rod 4 is rotated, the top clamping rod 10 is rotated until the limiting block 16 and the baffle 15 are positioned on the same horizontal plane, the limiting block 16 and the baffle 15 are in tight contact through the tension of the cushion pad 17 and the spring 6, the pull rod 4 is rotated again, the limiting block 16 is positioned in the limiting groove 14, the installation stability of the gas collection controller body 2 is realized, when the gas collection controller body 2, only need press pull rod 4, then rotate, make top kelly 10 break away from draw-in groove 13 through the tensile reason of spring 6, then with gas acquisition controller body 2 take out through slider 1 and slide rail 12 sliding connection can, the quick dismantlement of gas acquisition controller body 2 has been realized, whole device has ensured that the installation is stable simultaneously can be fast installation and dismantlement, need not the instrument operation, make whole device use convenience more, it all uses bolt snap-on to have solved current gas acquisition controller in the installation, need relevant instrument to install and dismantle, inconvenient user's dismouting, and troublesome poeration, the work efficiency's of user problem has been reduced.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a stable gas acquisition controller of installation, includes slider (1), its characterized in that: gaseous collection control ware body (2) of right side fixedly connected with of slider (1), the left side movable mounting of gaseous collection control ware body (2) has mounting panel (11), the right side fixedly connected with of mounting panel (11) and slider (1) sliding connection's slide rail (12), the right side fixedly connected with of mounting panel (11) is located backup pad (8) of slide rail (12) bottom, the bottom fixedly connected with one end of gaseous collection control ware body (2) runs through and extends to bottom inserted bar (7) of backup pad (8) bottom, the front and the equal fixedly connected with metal storehouse in the back (3) of gaseous collection control ware body (2), the left front of gaseous collection control ware body (2) and the equal fixedly connected with in the back are located two left fixed plate (9) in metal storehouse (3) respectively, two the equal movable mounting in right side of metal storehouse (3) has one end to run through respectively and extend to two metal storehouses (3) respectively ) The metal bin structure comprises internal pull rods (4), the right side of the mounting plate (11) is provided with two clamping grooves (13) which are respectively positioned on the left sides of the two metal bins (3), the left sides of the two pull rods (4) are fixedly connected with limiting plates (5), the left sides of the two limiting plates (5) are fixedly connected with top clamping rods (10) one ends of which respectively penetrate through and extend into the two clamping grooves (13), springs (6) respectively positioned in the two metal bins (3) are sleeved on the outer sides of the two top clamping rods (10), and baffles (15) are respectively fixedly connected with the inner top wall and the inner bottom wall of the two clamping grooves (13), the left side of the baffle (15) is provided with a limit groove (14), the top and the bottom of the top clamping rod (10) are fixedly connected with limit blocks (16), the left side of the top clamping rod (10) is fixedly connected with a cushion pad (17).
2. A stable mounted gas collection controller according to claim 1, wherein: a first through hole is formed in the top of the supporting plate (8), and the size of the first through hole is matched with that of the bottom inserting rod (7).
3. A stable mounted gas collection controller according to claim 1, wherein: and the right sides of the two metal bins (3) are provided with second through holes, and the second through holes are respectively matched with the two pull rods (4).
4. A stable mounted gas collection controller according to claim 1, wherein: and third through holes are formed in the left sides of the two metal bins (3), and are respectively matched with the two top clamping rods (10).
5. A stable mounted gas collection controller according to claim 1, wherein: fourth through holes are formed in the right sides of the two fixing plates (9), and the fourth through holes are matched with the two top clamping rods (10) respectively.
6. A stable mounted gas collection controller according to claim 1, wherein: the bottom and the left side of spacing groove (14) are located same horizontal plane with baffle (15) one side and the left side that is close to top kelly (10) respectively, the width of spacing groove (14) is the same with the width of stopper (16), two the distance of stopper (16) one side of the back of the body mutually is greater than the distance between the relative one side of two baffles (15) in same draw-in groove (13) by one centimetre.
CN201921851881.2U 2019-10-31 2019-10-31 Install stable gas acquisition controller Expired - Fee Related CN210771146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921851881.2U CN210771146U (en) 2019-10-31 2019-10-31 Install stable gas acquisition controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921851881.2U CN210771146U (en) 2019-10-31 2019-10-31 Install stable gas acquisition controller

Publications (1)

Publication Number Publication Date
CN210771146U true CN210771146U (en) 2020-06-16

Family

ID=71036358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921851881.2U Expired - Fee Related CN210771146U (en) 2019-10-31 2019-10-31 Install stable gas acquisition controller

Country Status (1)

Country Link
CN (1) CN210771146U (en)

Similar Documents

Publication Publication Date Title
CN201585825U (en) Telescopic curtain rod
CN210771146U (en) Install stable gas acquisition controller
CN211011706U (en) Wall hanging structure of air purifying device
CN210144095U (en) Foldable table
CN212868770U (en) Novel multidirectional support of antidetonation water pipe list hanging
CN214696227U (en) Energy-conserving wall body device of building engineering
CN211608533U (en) Multifunctional teacher's desk
CN214731628U (en) Medical waste collection device for B-ultrasonic interventional room treatment vehicle
CN206499166U (en) A kind of paper apparatus for placing for saving placement space
CN212644167U (en) Display screen mounting structure of double-screen self-service operation terminal
CN209732953U (en) Separation structure for office table
CN215686399U (en) Novel culture art photo holder frame
CN215136202U (en) Inorganic cloth smoke-blocking vertical wall convenient to install
CN217368804U (en) Soybean protein powder cyclone recovery device
CN106974458B (en) Locking mechanism
CN218501542U (en) Convenient clear dust remover filter screen
CN2509959Y (en) Improved hanging apparatus
CN221123575U (en) Electronic scale protective cover for chemical test
CN214216524U (en) Prevent fire door board transfer device
CN215493489U (en) Indoor air detection device with prevent falling function
CN211044114U (en) Desktop computer mainframe box
CN212863613U (en) Storage mechanism that article graphite alkene was rolled up for environmental protection
CN219657361U (en) Pressure resistance detector for plastic pipe fitting pipe
CN218852376U (en) Wall-mounted support capable of adjusting angle
CN216640933U (en) Composite material modularization stable support assembly for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200616

Termination date: 20211031