CN210770652U - Municipal administration gas pipeline butt joint construction equipment - Google Patents

Municipal administration gas pipeline butt joint construction equipment Download PDF

Info

Publication number
CN210770652U
CN210770652U CN201921896170.7U CN201921896170U CN210770652U CN 210770652 U CN210770652 U CN 210770652U CN 201921896170 U CN201921896170 U CN 201921896170U CN 210770652 U CN210770652 U CN 210770652U
Authority
CN
China
Prior art keywords
ring
plate
gas pipeline
butt joint
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921896170.7U
Other languages
Chinese (zh)
Inventor
陈春妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Qing Da Industrial Group Co ltd
Original Assignee
Sichuan Qing Da Industrial Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Qing Da Industrial Group Co ltd filed Critical Sichuan Qing Da Industrial Group Co ltd
Priority to CN201921896170.7U priority Critical patent/CN210770652U/en
Application granted granted Critical
Publication of CN210770652U publication Critical patent/CN210770652U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of pipeline construction devices, in particular to a municipal gas pipeline butt joint construction device, which comprises a supporting plate, wherein the bottom surface of the supporting plate is provided with a connecting handle, the bottom surface of the connecting handle is provided with a lifting screw rod, the bottom surface of the lifting screw rod is provided with a clamping plate, the lifting screw rod is inserted into a sleeve, the top surface of the sleeve is provided with a guide ring groove, the inside of the guide ring groove is rotatably connected with a traction ring plate, the traction ring plate is connected on the bottom surface of a movable ring, and the movable ring plate is sleeved on a rod body; the beneficial effects are that: the utility model provides a municipal administration gas pipeline butt joint construction equipment can slide in underground piping laying with the way, and layer board cooperation lower part bearing structure slides to gas pipeline lifting, then the layer board slides to next tie point along gas pipeline bottom, compares in lifting device, and easy operation has saved the step of binding gas pipeline hoist and mount, and the consumption is little.

Description

Municipal administration gas pipeline butt joint construction equipment
Technical Field
The utility model relates to a pipeline construction equipment technical field that is relevant specifically is a municipal administration gas pipeline butt joint construction equipment.
Background
The natural gas pipeline transportation has the advantages of low transportation cost, small occupied area, quick construction, large oil and gas transportation amount, high safety performance, less transportation loss, no three-waste discharge, small leakage risk, small environmental pollution, small influence of severe weather, small equipment maintenance amount, convenient management, easy realization of remote centralized monitoring and the like;
in the prior art, the gas pipeline is generally buried and installed when being laid in a city, the gas pipeline is laid underground, and in the laying process, the pipeline connecting end needs to be lifted and then is convenient for installing a connecting sleeve, so that the pipeline is hoisted and spliced by using hoisting equipment during construction, the hoisting equipment is limited by the ground space, and the power consumption of the hoisting equipment is large; therefore, the utility model provides a municipal administration gas pipeline butt joint construction equipment is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a municipal administration gas pipeline butt joint construction equipment to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a municipal administration gas pipeline butt joint construction equipment, includes the layer board, the bottom surface of layer board is provided with the connection handle, the bottom surface of connection handle is provided with lifting screw, lifting screw's bottom surface is provided with the cardboard, and lifting screw pegs graft in telescopic inside, the guide ring groove has been seted up to telescopic top surface, the inside rotation of guide ring groove is connected with the tractive crown plate, the tractive crown plate is connected on the bottom surface of activity ring, the activity crown plate is established on lifting screw's the body of rod, and the surface of layer board is provided with the epitaxial wafer, the surface of epitaxial wafer is pegged graft and is had spacing post, the spiro union has the carrier ring on the body of rod of spacing post, and the bottom surface of spacing post is fixed on the base plate.
Preferably, the layer board is that the terminal surface is half annular platelike structure, and the surface embedding of layer board installs the steel ball, and the base plate is circular cylinder structure, and the cardboard is square platelike structure, and the sleeve is the cylinder structure, and telescopic inner ring is the rectangular cylinder structure, and telescopic opening part is provided with the ring of closing up, and the ring of closing up carries on spacingly to the cardboard.
Preferably, direction annular groove and tractive ring plate all are the ring structure that the section is "T" font, and the activity ring is ring structure, is provided with the internal thread on the interior anchor ring of activity ring, and the external screw thread cooperation on internal thread and the lifting screw body of rod is connected.
Preferably, the epitaxial plate be provided with the traction rod on the surface, the traction rod is fixed on the surface of layer board, and the epitaxial plate is provided with two, and two epitaxial plates are equipped with on being the lateral wall about the ring surface centre of a circle symmetric distribution of layer board and snatch the groove, snatch the groove and be ring column body structure, snatch the groove surface and be provided with a plurality of poles of snatching, snatch the pole and be circular column body structure.
Preferably, the base plate is provided with a recessed groove on the bottom surface, the guide wheel is positioned inside the recessed groove, the surface of the guide wheel is provided with a rotating rod, and the rotating rod is rotatably connected to the inner wall of the recessed groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model provides a municipal administration gas pipeline butt joint construction equipment can slide in underground piping laying same lane, and the layer board cooperates lower part bearing structure to the gas pipeline lifting, then the layer board slides to next tie point along gas pipeline bottom, compares in hoisting equipment, easy operation has saved the step of binding gas pipeline hoist and mount, and the consumption is little;
2. the utility model provides a municipal administration gas pipeline butt joint construction equipment's layer board height is adjusted through lifting screw cooperation movable ring, and adds in the layer board both sides and establishes the epitaxial wafer, and the epitaxial wafer overlap joint is on the carrier ring for the layer board atress is even.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
fig. 3 is an enlarged schematic view of the structure at B in fig. 1.
In the figure: the device comprises a supporting plate 1, a connecting handle 2, a lifting screw 3, a clamping plate 4, a sleeve 5, a guide ring groove 6, a traction ring plate 7, a movable ring 8, an extension plate 9, a limiting column 10, a bearing ring 11, a base plate 12 and a guide wheel 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, the present invention provides a technical solution: a municipal administration gas pipeline butt joint construction device comprises a supporting plate 1, a connecting handle 2 is welded on the bottom surface of the supporting plate 1, a lifting screw 3 is welded on the bottom surface of the connecting handle 2, a clamping plate 4 is welded on the bottom surface of the lifting screw 3, the lifting screw 3 is inserted in a sleeve 5, the sleeve 5 is welded on the surface of a base plate 12, the supporting plate 1 is of a semicircular plate-shaped structure, steel balls are embedded and mounted on the surface of the supporting plate 1, the base plate 12 is of a circular cylinder structure, the clamping plate 4 is of a square plate-shaped structure, the sleeve 5 is of a cylindrical structure, an inner ring of the sleeve 5 is of a rectangular cylinder structure, a closing ring is arranged at an opening of the sleeve 5 and limits the clamping plate 4, a guide ring groove 6 is formed in the top surface of the sleeve 5, a traction ring plate 7 is rotatably connected in the guide ring groove 6, the traction ring plate 7 is bonded, the guide ring groove 6 and the drawing ring plate 7 are both of circular ring structures with T-shaped sections, the movable ring 8 is of a circular ring structure, internal threads are arranged on the inner ring surface of the movable ring 8 and are matched and connected with external threads on the rod body of the lifting screw 3, a gas pipeline is placed on the supporting plate 1, then the movable ring 8 is rotated, a handle rod can be welded on the outer ring surface of the movable ring 8 or a wrench groove is formed in the outer ring surface of the movable ring 8, the movable ring 8 can rotate conveniently to the movable ring 8, the movable ring 8 is limited by the drawing ring plate 7 and can only rotate but cannot move, the movable ring 8 is in threaded connection with the lifting screw 3, the lifting screw 3 is limited by the clamping plate 4 at the bottom end and can only vertically move but cannot rotate, therefore, the movable ring 8 is rotated to drive the lifting screw 3 to vertically move along the;
the surface welding of layer board 1 has epitaxial plate 9, the surface of epitaxial plate 9 is pegged graft and is had spacing post 10, the body of rod of spacing post 10 is spiro union has carrier ring 11, be provided with the traction bar on the surface of epitaxial plate 9, the traction bar is fixed on the surface of layer board 1, epitaxial plate 9 is provided with two, two epitaxial plates 9 are around the toroidal centre of a circle symmetric distribution of layer board 1, carrier ring 11 is equipped with on the lateral wall and snatchs the groove, snatchs the groove and is the circular cylinder structure, snatch the groove surface and be provided with a plurality of snatchs the pole, snatch the pole and be the circular cylinder structure, after layer board 1 height is confirmed, it twists carrier ring 11 to hand to twist, make the top surface of carrier ring 11 contact with the bottom surface of epitaxial plate 9, carrier ring 11 supports epitaxial plate 9 at this moment, epitaxial plate 9 is connected with layer board;
the bottom surface welding of spacing post 10 is on base plate 12, the bottom surface of base plate 12 is provided with guide pulley 13, base plate 12 is the bottom surface and has seted up the depressed groove, guide pulley 13 is in the inside of depressed groove, and the surface of guide pulley 13 is provided with the bull stick, the bull stick rotates to be connected on the inner wall of depressed groove, the gas pipe connection is accomplished the back, it makes guide pulley 13 of base plate 12 bottom advance along the guide rail of laying to carry out base plate 12, at this moment, layer board 1 slides along the gas pipe, the steel ball on layer board 1 surface reduces the wearing and tearing between layer board 1 and the gas pipe, layer board 1 slides and supports to another tie point of.
The working principle is as follows: in actual work, a gas pipeline is placed on the supporting plate 1, then the movable ring 8 is rotated, the outer ring surface of the movable ring 8 can be welded with a handle rod or provided with a wrench groove, so that the movable ring 8 can rotate conveniently, the movable ring 8 is limited by the pulling ring plate 7 and can only rotate but can not move, the movable ring 8 is in threaded connection with the lifting screw 3, the lifting screw 3 is limited by the clamping plate 4 at the bottom end and can only vertically move but can not rotate, therefore, the movable ring 8 is rotated to drive the lifting screw 3 to vertically move along the sleeve 5, the height of the supporting plate 1 is adjusted, the gas pipeline is lifted, after the height of the supporting plate 1 is determined, the grabbing rod is held by a hand to upwards screw the bearing ring 11, the top surface of the bearing ring 11 is in contact with the bottom surface of the epitaxial plate 9, at the moment, the bearing ring 11 supports the epitaxial plate 9, the epitaxial plate 9 is connected with the supporting, the base plate 12 is pushed to enable the guide wheel 13 at the bottom of the base plate 12 to advance along the laid guide rail, at the moment, the supporting plate 1 slides along the gas pipeline, steel balls on the surface of the supporting plate 1 reduce abrasion between the supporting plate 1 and the gas pipeline, the supporting plate 1 slides to another connecting point of the gas pipeline to be supported, and compared with a hoisting device, the lifting device is simple in operation and small in energy consumption.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a municipal administration gas pipeline butt joint construction equipment, includes layer board (1), its characterized in that: a connecting handle (2) is arranged on the bottom surface of the supporting plate (1), a lifting screw (3) is arranged on the bottom surface of the connecting handle (2), a clamping plate (4) is arranged on the bottom surface of the lifting screw (3), the lifting screw rod (3) is inserted in the sleeve (5), the top surface of the sleeve (5) is provided with a guide ring groove (6), a traction ring plate (7) is rotatably connected inside the guide ring groove (6), the traction ring plate (7) is connected on the bottom surface of the movable ring (8), the movable ring (8) is sleeved on the rod body of the lifting screw rod (3), the surface of the supporting plate (1) is provided with an extension plate (9), the surface of the epitaxial plate (9) is inserted with a limiting column (10), a rod body of the limiting column (10) is connected with a bearing ring (11) in a threaded mode, the bottom surface of the limiting column (10) is fixed on a base plate (12), and a guide wheel (13) is arranged on the bottom surface of the base plate (12).
2. The municipal gas pipeline butt joint construction device according to claim 1, wherein: the support plate is characterized in that the support plate (1) is of a semicircular plate-shaped structure, a steel ball is installed on the surface of the support plate (1) in an embedded mode, the base plate (12) is of a circular cylinder structure, the clamping plate (4) is of a square plate-shaped structure, the sleeve (5) is of a cylindrical structure, the inner ring of the sleeve (5) is of a rectangular cylinder structure, the opening of the sleeve (5) is provided with a closing ring, and the closing ring limits the clamping plate (4).
3. The municipal gas pipeline butt joint construction device according to claim 1, wherein: guide ring groove (6) and tractive ring plate (7) all are the ring structure that the section is "T" font, and activity ring (8) are ring annular structure, are provided with the internal thread on the interior anchor ring of activity ring (8), and the external screw thread cooperation on internal thread and the lifting screw (3) body of rod is connected.
4. The municipal gas pipeline butt joint construction device according to claim 1, wherein: the utility model discloses a supporting plate, including epitaxial plate (9), carrier ring (11), bearing ring (11) are the lateral wall, the outer board (9) of extending is provided with the traction rod on the surface, and the traction rod is fixed on the surface of layer board (1), and epitaxial plate (9) are provided with two, and two epitaxial plate (9) are about the torus centre of a circle symmetric distribution of layer board (1), have seted up on being the lateral wall and have snatched the groove, snatch the groove and be ring shape cylinder structure, snatch the groove surface and be provided with.
5. The municipal gas pipeline butt joint construction device according to claim 1, wherein: the base plate (12) is characterized in that a concave groove is formed in the bottom surface, the guide wheel (13) is located inside the concave groove, a rotating rod is arranged on the surface of the guide wheel (13), and the rotating rod is rotatably connected to the inner wall of the concave groove.
CN201921896170.7U 2019-11-06 2019-11-06 Municipal administration gas pipeline butt joint construction equipment Expired - Fee Related CN210770652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921896170.7U CN210770652U (en) 2019-11-06 2019-11-06 Municipal administration gas pipeline butt joint construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921896170.7U CN210770652U (en) 2019-11-06 2019-11-06 Municipal administration gas pipeline butt joint construction equipment

Publications (1)

Publication Number Publication Date
CN210770652U true CN210770652U (en) 2020-06-16

Family

ID=71048657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921896170.7U Expired - Fee Related CN210770652U (en) 2019-11-06 2019-11-06 Municipal administration gas pipeline butt joint construction equipment

Country Status (1)

Country Link
CN (1) CN210770652U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810711A (en) * 2020-07-20 2020-10-23 何卫统 Energy conveying pipeline connecting construction equipment
CN112157375A (en) * 2020-08-29 2021-01-01 江苏大学 Pipe automatic weld is with transmission positioner
CN113374930A (en) * 2021-06-11 2021-09-10 储士元 A pipeline is laid and is used pre-buried formula support limited support for municipal works

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810711A (en) * 2020-07-20 2020-10-23 何卫统 Energy conveying pipeline connecting construction equipment
CN111810711B (en) * 2020-07-20 2021-11-23 万泰智能电子科技(新沂)有限公司 Energy conveying pipeline connecting construction equipment
CN112157375A (en) * 2020-08-29 2021-01-01 江苏大学 Pipe automatic weld is with transmission positioner
CN113374930A (en) * 2021-06-11 2021-09-10 储士元 A pipeline is laid and is used pre-buried formula support limited support for municipal works
CN113374930B (en) * 2021-06-11 2024-02-23 山西承峻科技有限公司 A pre-buried formula support limit support for pipeline laying of municipal works

Similar Documents

Publication Publication Date Title
CN210770652U (en) Municipal administration gas pipeline butt joint construction equipment
CN205917944U (en) Floor buried sleeve positioner
CN211735384U (en) Municipal works pile device
CN204391609U (en) A kind of umbrella shape pay off rack
CN105794587A (en) Water-power-engineering big-old-tree transplanting tree-body fixing device and installing method
CN210480714U (en) Pipeline lifting device for construction
CN202032316U (en) Lift moving illuminating lighthouse
CN104563590A (en) Hydraulic lifting construction device and method for inner steel barrel of chimney
CN208034022U (en) A kind of nozzle for Large Diameter Pipeline steel pipe and nozzle docking facilities
CN208219638U (en) A kind of deep foundation pit precast stake
CN204000868U (en) The device of sand concrete free pipe is transferred in a kind of pipe well well-points dewatering
CN204615274U (en) A kind of actinobacillus device of transmission line
CN206076833U (en) A kind of wire-binding device of convenient use
CN215635728U (en) Factory high-position pipeline leak repairing device
CN105252255B (en) A kind of method that floating crane floating bearing is changed with jacking apparatus
CN210423954U (en) Movable lifting hook for hoisting pipeline in pipe gallery
CN203782575U (en) Stay cable hanging and tension construction device
CN103438273A (en) Method for installing PCCPs (prestressed concrete cylinder pipes) in deep grooves by virtue of gantry crane
CN112249876A (en) Mounting platform and mounting method for large-tonnage precast tubular pile
CN202347528U (en) Steel tube inserted foundation
CN211228793U (en) Pipeline embedding device for hydraulic engineering
CN206220624U (en) The helicopter servicing unit of extra-high voltage wine glass tower tower head
CN201395488Y (en) Portable lifting device
CN216842498U (en) Locking device for preventing piston rod of hydraulic oil cylinder from sliding downwards
CN203420280U (en) Novel foundation structure of electric transmission line tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200616