CN210768083U - Guide rail tool for vertical trial assembly of iron tower - Google Patents

Guide rail tool for vertical trial assembly of iron tower Download PDF

Info

Publication number
CN210768083U
CN210768083U CN201920663920.XU CN201920663920U CN210768083U CN 210768083 U CN210768083 U CN 210768083U CN 201920663920 U CN201920663920 U CN 201920663920U CN 210768083 U CN210768083 U CN 210768083U
Authority
CN
China
Prior art keywords
guide rail
fixed
plate
iron tower
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920663920.XU
Other languages
Chinese (zh)
Inventor
孙长升
刘文龙
孙杰
孙长东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Huajian Steel Structure Co ltd
Original Assignee
青岛繁昌电力设备厂有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 青岛繁昌电力设备厂有限公司 filed Critical 青岛繁昌电力设备厂有限公司
Priority to CN201920663920.XU priority Critical patent/CN210768083U/en
Application granted granted Critical
Publication of CN210768083U publication Critical patent/CN210768083U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a guide rail tool for vertical trial assembly of an iron tower, which belongs to the technical field of iron tower assembly devices, and comprises a fixed seat, wherein the fixed seat is fixed with an external ground anchor, a guide rail plate is in a horizontal state by adjusting a horizontal adjusting device, a workpiece of the iron tower is fixed on the upper surface of a movable plate, a turnbuckle is adjusted, the distance between the fixed plates at the two ends of the turnbuckle is increased, a spring is compressed, the clamping plate is separated from the limit of the fixed plate, the sliding of a sliding block in a sliding groove is realized, and the lower end of the sliding block is rotatably provided with a gear, so that the gear rolls on a gear strip in the sliding process of the sliding block, the sliding stability is increased, when the sliding block slides to a required position, the distance between the fixed plates at the two ends of the turnbuckle is reduced by adjusting the turnbuckle, the spring is stretched, and, realize spacing to the cardboard, avoid removing the removal of seat, convenient operation.

Description

Guide rail tool for vertical trial assembly of iron tower
Technical Field
The utility model relates to a guide rail frock for vertical examination equipment of iron tower belongs to iron tower equipment technical field.
Background
The vertical trial assembly of the iron tower is a process of assembling the iron tower or bolt structure parts which are well lofted and processed according to a design drawing or a corrected processing drawing and checking the problem of influence on the installation of the parts according to the structural form, wherein a guide rail workpiece is required to be used in the vertical trial assembly process, and the requirement on the flatness of a site is higher in the trial assembly process;
however, the existing guide rail part has the problem that the balance degree cannot be adjusted, and the existing guide rail part has the problems that the sliding is not stable and the position cannot be limited when the guide rail part slides to a certain position, so that great inconvenience is brought when the guide rail part is used.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model overcomes current defect, provides a guide rail frock for vertical examination equipment of iron tower, can effectively solve in the background art when sliding not steady and slide a certain position and can't carry out spacing problem.
In order to solve the technical problem, the utility model provides a following technical scheme:
a guide rail tool for vertical trial assembly of an iron tower comprises a fixed seat, wherein a fixed platform is fixedly arranged on the upper surface of the fixed seat, horizontal adjusting devices are fixedly arranged at four corners of the upper surface of the fixed platform, a guide rail plate is fixedly arranged on the upper surface of each horizontal adjusting device, a sliding groove is transversely formed in the middle position of the upper surface of the guide rail plate, a gear strip is fixedly arranged on the upper surface inside the sliding groove, a sliding block is slidably clamped in the sliding groove, a groove is formed in the middle position of the lower surface of the sliding block, a gear is rotatably arranged in the groove, a clamping plate is fixedly arranged on the upper surface of the sliding block, and a moving seat is fixedly arranged on the upper surface;
the utility model discloses a guide rail plate's upper surface intermediate position fixed mounting has fixed frame, the equal fixed mounting in both sides of fixed frame inside has the spring, the equal fixed mounting of the other end of spring has the fixed plate, fixed mounting has the turn buckle between the fixed plate, the upper surface of guide rail plate is close to the equal fixed mounting in both sides of fixed frame has the spirit level.
Further, the front view of the fixing seat is an L-shaped structure, and the lower end of the fixing seat is provided with a fixing hole.
Further, the gear is engaged with the gear rack.
Furthermore, first clamping teeth are formed in two sides of the clamping plate, second clamping teeth are formed in one side of the fixing plate, and the first clamping teeth are clamped with the second clamping teeth.
Further, the type of the level adjustment device is preferably: GN 350.2-NI.
Further, the level is a bubble level, and a top view of an upper surface of the level is a cross structure.
The utility model discloses beneficial effect: the utility model has the advantages that the gear teeth and the gear strips are arranged to support the sliding block, so that the friction force of the sliding block is reduced in the sliding process of the sliding block in the sliding groove, the smoothness of the sliding block in the sliding groove is improved, and the blocking phenomenon is reduced; the utility model is provided with the clamping plate and the fixed plate, when the fixing plate slides to a certain position, the fixed plate can be clamped on the clamping plate by adjusting the turnbuckle, thereby realizing the limiting function of the clamping plate; the utility model discloses a be equipped with guide rail plate and level (l) ing device, make the utility model discloses a remove the seat and can carry out the level (l) ing, make the utility model discloses can use in the region of unevenness in ground, increase the utility model discloses an application range, the utility model discloses novel structure, convenient operation, convenient to use has effectually solved the current inconvenient problem of guide rail use.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
Fig. 1 is a front view of the present invention.
Fig. 2 is a cross-sectional view of the present invention.
Fig. 3 is a partial enlarged view of the position a of the present invention.
Fig. 4 is a front sectional view of the guide rail plate of the present invention.
Fig. 5 is a schematic view of the slider structure of the present invention.
Reference numbers in the figures: 1. a fixed seat; 2. a fixed platform; 3. a leveling device; 4. a guide rail plate; 5. a chute; 6. a gear rack; 7. a slider; 8. a groove; 9. a gear; 10. clamping a plate; 11. a movable seat; 12. a fixing frame; 13. a spring; 14. a fixing plate; 15. a turn buckle; 16. a level gauge.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
As shown in fig. 1-5, a guide rail frock for vertical trial assembly of iron tower, including fixing base 1, the elevation view of fixing base 1 is L type structure, and the lower extreme of fixing base 1 has seted up the fixed orifices, and the last fixed surface of fixing base 1 installs fixed platform 2, and the equal fixed mounting in upper surface four corners of fixed platform 2 has level adjusting device 3, and level adjusting device 3's model is preferred: GN350.2-NI, a guide rail plate 4 is fixedly arranged on the upper surface of a horizontal adjusting device 3, a sliding groove 5 is transversely formed in the middle of the upper surface of the guide rail plate 4, a gear bar 6 is fixedly arranged on the inner upper surface of the sliding groove 5, a sliding block 7 is slidably clamped in the sliding groove 5, a groove 8 is formed in the middle of the lower surface of the sliding block 7, a gear 9 is rotatably arranged in the groove 8, the gear 9 is meshed with the gear bar 6, a clamping plate 10 is fixedly arranged on the upper surface of the sliding block 7, first clamping teeth are formed in two sides of the clamping plate 10, a second clamping tooth is formed in one side of a fixing plate 14, the first clamping teeth are clamped with the second clamping teeth, and a moving seat 11 is fixedly arranged;
fixed frame 12 is fixed to the upper surface intermediate position fixed mounting of guide rail plate 4, the equal fixed mounting in both sides of fixed frame 12 has spring 13, the equal fixed mounting of the other end of spring 13 has fixed plate 14, fixed mounting has turn buckle 15 between the fixed plate 14, the equal fixed mounting in both sides that the upper surface of guide rail plate 4 is close to fixed frame 12 has spirit level 16, spirit level 16 is the bubble spirit level, and the upper surface plan view of spirit level 16 is cross structure.
The utility model discloses the theory of operation: when the utility model is used, the fixed seat 1 is fixed with the ground anchor on the external ground, so that the utility model is fixed on the ground anchor to prevent movement when the utility model is used, the guide rail plate 4 is in a horizontal state by adjusting the horizontal adjusting device 3, the upper surface of the guide rail plate 4 is provided with the bubble level gauge 16 with a cross structure, when the bubble is adjusted to be positioned at the middle position of the level gauge 16, namely the guide rail plate 4 is in a horizontal state, the workpiece of the iron tower is fixed on the upper surface of the movable seat 11, the basket bolts 15 are adjusted to extend out two ends of the basket bolts 15, so that the distance between the fixed plates 14 at two ends of the basket bolts 15 is increased, the springs 13 at two sides of the fixed plates 14 are compressed, the clamping plate 10 is separated from the limit of the fixed plates 14, the sliding of the sliding block 7 in the sliding groove 5 is realized, the lower end of the sliding block 7 is rotatably provided with the gear 9, the upper surface inside the, gear rack 6 meshes with gear 9 mutually, make at slider 7 slip in-process, gear 9 rolls on gear rack 6, increase gliding stationarity, and gear 9 when rolling on gear rack 6, play the supporting role to slider 7, frictional force between slider 7 and spout 5 has been reduced, avoid slider 7 at 5 inside calorie pause phenomenon that appear in spout, when sliding to required position, through adjusting basket of flowers bolt 15, make the screw rod shrink at basket of flowers bolt 15 both ends, realize the distance reduction between the fixed plate 14 at basket of flowers bolt 15 both ends, and make spring 13 stretch, and then make cardboard 10 joint between fixed plate 14, realize spacing to cardboard 10, avoid removing the removal of seat 11, convenient operation.
The above is the preferred embodiment of the present invention, and the technical personnel in the field of the present invention can also change and modify the above embodiment, therefore, the present invention is not limited to the above specific embodiment, and any obvious improvement, replacement or modification made by the technical personnel in the field on the basis of the present invention all belong to the protection scope of the present invention.

Claims (6)

1. The utility model provides a guide rail frock for vertical trial assembly of iron tower, includes fixing base (1), its characterized in that: a fixed platform (2) is fixedly arranged on the upper surface of the fixed seat (1), horizontal adjusting devices (3) are fixedly arranged at four corners of the upper surface of the fixed platform (2), a guide rail plate (4) is fixedly arranged on the upper surface of the horizontal adjusting devices (3), a sliding groove (5) is transversely formed in the middle position of the upper surface of the guide rail plate (4), a gear strip (6) is fixedly arranged on the inner upper surface of the sliding groove (5), a sliding block (7) is slidably clamped in the sliding groove (5), a groove (8) is formed in the middle position of the lower surface of the sliding block (7), a gear (9) is rotatably arranged in the groove (8), a clamping plate (10) is fixedly arranged on the upper surface of the sliding block (7), and a movable seat (11) is fixedly arranged on the upper surface of the clamping plate (;
the upper surface intermediate position fixed mounting of guide rail plate (4) has fixed frame (12), the equal fixed mounting in both sides of fixed frame (12) inside has spring (13), the equal fixed mounting of the other end of spring (13) has fixed plate (14), fixed mounting has turn buckle (15) between fixed plate (14), the upper surface of guide rail plate (4) is close to the equal fixed mounting in both sides of fixed frame (12) has spirit level (16).
2. The guide rail tool for vertical trial assembly of the iron tower, according to claim 1, is characterized in that: the front view of the fixed seat (1) is of an L-shaped structure, and the lower end of the fixed seat (1) is provided with a fixed hole.
3. The guide rail tool for vertical trial assembly of the iron tower, according to claim 1, is characterized in that: the gear (9) is meshed with the gear rack (6).
4. The guide rail tool for vertical trial assembly of the iron tower, according to claim 1, is characterized in that: first clamping teeth are arranged on two sides of the clamping plate (10), second clamping teeth are arranged on one side of the fixing plate (14), and the first clamping teeth are clamped with the second clamping teeth.
5. The guide rail tool for vertical trial assembly of the iron tower, according to claim 1, is characterized in that: the type of the horizontal adjusting device (3) is selected as follows: GN 350.2-NI.
6. The guide rail tool for vertical trial assembly of the iron tower, according to claim 1, is characterized in that: the level gauge (16) is a bubble level gauge, and the top view of the upper surface of the level gauge (16) is a cross structure.
CN201920663920.XU 2019-05-10 2019-05-10 Guide rail tool for vertical trial assembly of iron tower Expired - Fee Related CN210768083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920663920.XU CN210768083U (en) 2019-05-10 2019-05-10 Guide rail tool for vertical trial assembly of iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920663920.XU CN210768083U (en) 2019-05-10 2019-05-10 Guide rail tool for vertical trial assembly of iron tower

Publications (1)

Publication Number Publication Date
CN210768083U true CN210768083U (en) 2020-06-16

Family

ID=71064875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920663920.XU Expired - Fee Related CN210768083U (en) 2019-05-10 2019-05-10 Guide rail tool for vertical trial assembly of iron tower

Country Status (1)

Country Link
CN (1) CN210768083U (en)

Similar Documents

Publication Publication Date Title
CN208819575U (en) A kind of child-parent education display board
CN210706677U (en) Surface pattern pressing equipment for aluminum profile machining
CN107830326A (en) A kind of electronic color visual field identifier
CN210768083U (en) Guide rail tool for vertical trial assembly of iron tower
CN210491422U (en) But height-adjusting rack base
JPS6427718A (en) Method and facility for correcting metallic strip
CN211613964U (en) Stamping device is used in production of piston rod double elbows
CN209099189U (en) A kind of steel structure supporting column
CN209407234U (en) A kind of multi-panel punching die device of part
CN207163940U (en) A kind of ESEM of good fixing effect
CN207248222U (en) A kind of registration calibrated analog platform being moved easily
CN208163774U (en) A kind of bracket buckle cutting machine stabilising arrangement
CN203556644U (en) Mounting and dismounting all-in-one machine for roller bearing supports
CN214155537U (en) Landscape plant molding device
CN211367712U (en) Adjustable supporting equipment for ion sputtering instrument
CN218009136U (en) Display device
CN214535499U (en) Shock attenuation base
CN216201697U (en) Auxiliary measuring device of monitoring equipment
CN220502579U (en) Hydraulic lifting device for building construction
CN214158479U (en) Basketball stand for physical education
CN213271643U (en) Patent information display device applied to patent transaction
CN218905322U (en) Fireproof door assembly workbench
CN209660856U (en) It is a kind of to place stable intensive plate shelf
CN215318575U (en) Assembly platform for electric tricycle
CN216103262U (en) Vertical transfer tool for bogie auxiliary framework

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200609

Address after: 266000 the second industrial park, Jiaoxi Town, Jiaozhou City, Qingdao City, Shandong Province

Patentee after: Qingdao Huajian Steel Structure Co.,Ltd.

Address before: No.1, zhumai Road, Jiaolai Town, Jiaozhou City, Qingdao City, Shandong Province

Patentee before: WUXI BOJIN PRECISION MACHINERY MANUFACTURING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200616

Termination date: 20210510