CN210767804U - Fixing structure of scaffold gangplank hook - Google Patents

Fixing structure of scaffold gangplank hook Download PDF

Info

Publication number
CN210767804U
CN210767804U CN201920885027.1U CN201920885027U CN210767804U CN 210767804 U CN210767804 U CN 210767804U CN 201920885027 U CN201920885027 U CN 201920885027U CN 210767804 U CN210767804 U CN 210767804U
Authority
CN
China
Prior art keywords
couple
punching press
press portion
frame
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920885027.1U
Other languages
Chinese (zh)
Inventor
刘树芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xianxian Cognate Construction Equipment Co ltd
Original Assignee
Hebei Pangdajiao Scaffold Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Pangdajiao Scaffold Co ltd filed Critical Hebei Pangdajiao Scaffold Co ltd
Priority to CN201920885027.1U priority Critical patent/CN210767804U/en
Application granted granted Critical
Publication of CN210767804U publication Critical patent/CN210767804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a fixed knot of scaffold gangplank couple constructs, including two frame pipes that are located the gangplank both sides and set up in the couple at frame pipe both ends, the frame pipe is square pipe, and the both ends of frame pipe are provided with indent punching press portion respectively, the couple install in indent punching press portion, correspond between couple and the indent punching press portion and be provided with at least two sets of rivet holes, be provided with the rivet in the rivet hole, the utility model discloses a used the couple of installing in indent punching press portion and through rivet connection between couple and the indent punching press portion, this is done and is made the frame pipe no longer set up the couple on the outside both sides, become more level and smooth, can be better hug closely between the adjacent gangplank on the scaffold horizontal pole, avoid part instrument etc. to pass the clearance between the adjacent gangplank and drop; in addition, the welding process is omitted, so that the production and assembly cost of the springboard is effectively reduced, and the sale and use of the springboard are facilitated.

Description

Fixing structure of scaffold gangplank hook
Technical Field
The utility model relates to a scaffold frame springboard technical field, concretely relates to fixed knot of scaffold frame springboard couple constructs.
Background
As is well known, hooks are respectively arranged at two ends of a scaffold gangway frame, gangways can be erected on scaffold cross bars through the hooks to form a working platform, and the existing hooks are directly welded on the outer side of the frame, so that the problem is that adjacent gangways on the scaffold cross bars cannot be tightly attached to each other, large gaps always exist between the adjacent gangways due to the hooks, and parts, tools and the like easily pass through the gaps to fall off, thereby affecting safe construction; in addition, springboard and couple all can be used for the bearing, and the couple adopts the welding mode, and is higher to the requirement of welding seam quality, otherwise breaks easily, threatens personnel's safety, but high-quality welding seam means excellent welding worker, and excellent welding worker's human cost is higher, is unfavorable for reducing the manufacturing cost of scaffold springboard.
SUMMERY OF THE UTILITY MODEL
To the problem that exists among the background art, the utility model aims to provide a fixed knot of scaffold frame springboard couple constructs, and it has effectively solved the problem that exists among the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a fixed knot of scaffold frame springboard couple constructs, is including two frame pipes that are located the springboard both sides and set up in the couple at frame pipe both ends, the frame pipe is square pipe, and the both ends of frame pipe are provided with indent punching press portion respectively, the couple install in indent punching press portion corresponds between couple and the indent punching press portion and is provided with at least two sets of rivet holes, the downthehole rivet that is provided with of rivet.
Further, the wall thickness of the square tube is at least 1.5 mm.
Further, the female stamped parts are located on opposite sides of the two frame tubes.
Further, the number of the rivet holes is two.
The utility model discloses following beneficial technological effect has:
the utility model discloses in used the couple of installing in indent punching press portion and through rivet connection between couple and the indent punching press portion, this way make the frame pipe no longer set up the couple on the outside both sides, become more level and smooth, can be better between the adjacent springboard on the scaffold frame horizontal pole close, avoid part instrument etc. to pass the clearance between the adjacent springboard and drop; in addition, the welding process is omitted, so that the production and assembly cost of the springboard is effectively reduced, and the sale and use of the springboard are facilitated.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention;
fig. 2 is a schematic view of the overall structure of the embodiment of the present invention at another viewing angle;
FIG. 3 is a schematic view of a fixing structure of a hook in the prior art;
fig. 4 is a schematic structural diagram of a springboard in the prior art.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus should not be construed as limiting the present invention. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, the fixing structure of a scaffold gangplank hook according to this embodiment includes two frame tubes 1 located at two sides of a gangplank and hooks 2 disposed at two ends of the frame tubes 1, a cross brace tube 3 and a gangplank panel 4 are welded between the two frame tubes 1, the gangplank panel 4 is a steel wire mesh or a steel plate with uniformly distributed holes, the frame tubes 1 are square tubes, compared with the prior art that uses a C-shaped steel frame tube 5, the strength is higher, and the gangplank is more difficult to deform, two ends of the frame tubes 1 are respectively provided with an inward concave punching portion 6, the hooks 2 are disposed in the inward concave punching portions 6, two sets of rivet holes are correspondingly disposed between the hooks 2 and the inward concave punching portions 6, rivets 7 are disposed in the rivet holes, and the two sets of rivet holes act together, so as to effectively prevent the hooks 2 from rotating relative to the frame tubes 1, ensure the lap joint stability of the gangplank on a scaffold cross bar, further guarantee couple 2 and frame pipe 1's firm in connection, in addition, the riveting is more convenient than the welding for the construction, ordinary workman can suffice, not only reduced the production and processing cost of springboard through reducing the welder operation but also effectively guaranteed the joint strength between couple 2 and the frame pipe 1, avoid because of the low connection fracture between couple 2 and the frame pipe 1 that causes of welding seam quality, indent punching press portion 5 is located two frame pipe 1 relative both sides, make two frame pipe 1 respectively the side outwards become more level and smooth, can be better paste tightly between the adjacent springboard on the scaffold frame horizontal pole, avoid parts, the clearance that the instrument etc. passed between the adjacent springboard drops.
The wall thickness of square pipe is 1.5mm at least, to the great scaffold frame of span between the corresponding horizontal pole, should select for use the square pipe that the wall thickness is greater than 1.5mm to effectively guarantee frame pipe 1's intensity, avoid frame pipe 1 to warp and buckle.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (3)

1. The utility model provides a fixed knot of scaffold frame springboard couple constructs, its characterized in that, including two frame pipes that are located the springboard both sides and set up in the couple at frame pipe both ends, the frame pipe is square pipe, and the both ends of frame pipe are provided with indent punching press portion respectively, indent punching press portion is located two relative both sides of frame pipe, the couple install in indent punching press portion, correspond between couple and the indent punching press portion and be provided with at least two sets of rivet holes, the downthehole rivet that is provided with of rivet.
2. A scaffold jump hook fastening structure according to claim 1, wherein the wall thickness of said square tube is at least 1.5 mm.
3. A scaffold jump board hook fastening structure according to claim 1, wherein the number of the rivet holes is two.
CN201920885027.1U 2019-06-13 2019-06-13 Fixing structure of scaffold gangplank hook Active CN210767804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920885027.1U CN210767804U (en) 2019-06-13 2019-06-13 Fixing structure of scaffold gangplank hook

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920885027.1U CN210767804U (en) 2019-06-13 2019-06-13 Fixing structure of scaffold gangplank hook

Publications (1)

Publication Number Publication Date
CN210767804U true CN210767804U (en) 2020-06-16

Family

ID=71033363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920885027.1U Active CN210767804U (en) 2019-06-13 2019-06-13 Fixing structure of scaffold gangplank hook

Country Status (1)

Country Link
CN (1) CN210767804U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114260412A (en) * 2021-12-24 2022-04-01 友材科技(杭州)有限公司 Hydraulic punching and riveting device for processing springboard

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114260412A (en) * 2021-12-24 2022-04-01 友材科技(杭州)有限公司 Hydraulic punching and riveting device for processing springboard

Similar Documents

Publication Publication Date Title
CN210767804U (en) Fixing structure of scaffold gangplank hook
CN215764160U (en) Inverter fixing device and inverter assembly
CN212026845U (en) High-rise building girder steel structure
CN211736295U (en) Detachable multifunctional high-strength bolt construction platform device
CN205908008U (en) Dish knot formula scaffold external safety net coupling assembling of frame external corner and external safety net device
CN209194975U (en) Security protection mesh sheet connection structure
CN211395997U (en) Connection structure and building fixing structure with same
CN208430761U (en) Scaffold lateral connection frame
CN213318420U (en) Laser cutting machine main body frame and laser cutting machine
CN212836650U (en) Scaffold gangboard
CN206815815U (en) A kind of split sheath buckle type scaffold clasp
CN206800983U (en) A kind of building scaffold safety tread
CN205278752U (en) Outer boots connecting piece of high strength tongue and groove square tube and connection structure thereof
CN205297793U (en) Car bleed pipe component
CN205372050U (en) Boots connecting piece in high strength tongue and groove square tube and connection structure thereof
CN209924131U (en) Combined reinforced structure of color steel house
CN210947684U (en) Climb a protection network structure
CN110441134A (en) The clamping tooling and detection method of cross spot welding workpiece tensile property detection
CN212867128U (en) Assembled rail guard of dismouting of being convenient for construction
CN217759938U (en) A special lifting device for attached lift scaffold demolishs in air
CN205024890U (en) Aluminum single plate
CN212478258U (en) Assembled concrete precast slab
CN216359096U (en) Flexible anode cloth traction device, flexible anode device and wet-type electric precipitator
CN105804331A (en) Stable and high-efficiency annular fixing structure for metal roof and working method of stable and high-efficiency annular fixing structure
CN211341712U (en) Connecting and fixing structure for coupling beams of external scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220524

Address after: 061000 Huai Zhen Guo Jia Wa Cun, Xian County, Cangzhou City, Hebei Province

Patentee after: Xianxian cognate Construction Equipment Co.,Ltd.

Address before: 062255 yangjiawa village, Huai Town, Xian County, Cangzhou City, Hebei Province

Patentee before: Hebei pangdajiao scaffold Co.,Ltd.