CN210766422U - Movable discharging chute for slip form construction - Google Patents

Movable discharging chute for slip form construction Download PDF

Info

Publication number
CN210766422U
CN210766422U CN201921367719.3U CN201921367719U CN210766422U CN 210766422 U CN210766422 U CN 210766422U CN 201921367719 U CN201921367719 U CN 201921367719U CN 210766422 U CN210766422 U CN 210766422U
Authority
CN
China
Prior art keywords
chute
chute body
universal fixed
movable
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921367719.3U
Other languages
Chinese (zh)
Inventor
胡康
薛飞
聂鑫磊
罗鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201921367719.3U priority Critical patent/CN210766422U/en
Application granted granted Critical
Publication of CN210766422U publication Critical patent/CN210766422U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model belongs to a movable discharge chute for slipform construction, constitute by shank of bolt and fixation nut, the cross section of the feed inlet end of the chute body is greater than the cross section of the discharge outlet end of chute body, the bottom surface of chute body is the plane, the interior bottom surface of the chute body that is located feed inlet end is equipped with the protruding cardboard that supplies the card hook board card to hold, the bottom surface lower extreme of the chute body that is located discharge outlet end is equipped with the card hook board, the bottom surface lower extreme of chute body vertically is the interval distance and is equipped with two supports longitudinal reinforcement, it is equipped with the universal fixed pipe of several to be the interval distance off-axis on two supports longitudinal reinforcement, several chute body is held the movable discharge chute who forms the head-to-tail butt joint on protruding cardboard through the card hook board. The utility model discloses can longer distance and be convenient for with the fixed movable discharge chute of pier reinforcing bar, it is fast to have simple structure, construction speed, and preparation use cost is low, and mechanicalness is high, labour saving and time saving's advantage.

Description

Movable discharging chute for slip form construction
Technical Field
The utility model belongs to a movable discharging chute for slip form construction.
Background
The high pier is relatively concentrated, and the construction section of the pier slip form pouring concrete in the mountain ridge heavy hill area can lead to the construction of the high pier facing the narrow operation space, and the mode of conveying the concrete by adopting a ground pump or an automobile pump is limited, so that the concrete pouring speed is restricted, and in order to ensure that the construction progress of the high pier is completed on schedule, the concrete conveying unloading structure with a longer distance and convenience for fixing the pier reinforcement cage is urgently needed.
Disclosure of Invention
The utility model aims at providing a movable discharging chute for slipform construction, can longer distance and be convenient for with the fixed movable discharging chute of pier reinforcing bar, it is fast to have simple structure, construction speed, and preparation use cost is low, and mechanicalness is high, labour saving and time saving's advantage.
Therefore, the utility model consists of a bolt rod and a fixing nut, and the chute body is a strip-shaped body with a trapezoidal cross section. The cross section of the feed port end of the chute body is larger than that of the discharge port end of the chute body. The bottom surface of the chute body is a plane. The inner bottom surface of the chute body positioned at the feed inlet end is provided with a convex clamping plate for clamping the hook plate. The lower end of the bottom surface of the chute body positioned at the end of the discharge port is provided with a hook plate. Two supporting longitudinal steel bars are longitudinally arranged at the lower end of the bottom surface of the chute body at intervals. And a plurality of universal fixing pipes are arranged on the two supporting longitudinal steel bars at intervals. The plurality of chute bodies are clamped on the convex clamping plate through the clamping hook plate to form a movable discharging chute in end-to-end butt joint.
The shaft is provided with a plurality of universal fixed pipes, one end of each universal fixed pipe is used for welding a bolt rod at the corresponding position of the supporting longitudinal steel bar, a screw hole is formed in the middle of each universal fixed pipe, and the other end of each bolt rod penetrates through the screw hole to be in threaded connection with a fixed nut in each universal fixed pipe. The upper end of the convex clamping plate is inclined towards the discharge port end, and the included angle between the convex clamping plate and the bottom surface of the chute body is 30-35 degrees.
Above-mentioned structural design has realized the utility model discloses a purpose.
The utility model discloses can longer distance and be convenient for with the fixed movable discharge chute of pier reinforcing bar, it is fast to have simple structure, construction speed, and preparation use cost is low, and mechanicalness is high, labour saving and time saving's advantage.
The utility model has the advantages as follows:
1. the utility model discloses be suitable for the construction of the construction site of the pier slip form concreting of the heavy hillside district, the concreting of the construction operation narrow section in space of high mound's construction. The utility model discloses can replace the transport concrete of ground pump or car pump, labour saving and time saving, construction speed is fast.
2. The utility model has the advantages of simple and reasonable design, preparation and use cost are low, adopt the old and useless steel of building site to prepare the utility model discloses.
3. The utility model discloses the longest can carry nearly hectometer of concrete, and construction cost reduces 60 ~ 70%, and the working costs is low.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the bottom structure of the present invention.
Fig. 3 is a schematic view of the structure of the section a-a of the present invention.
Detailed Description
As shown in fig. 1 to 3, a movable discharge chute for slip form construction is composed of a bolt shaft 8 and a fixing nut 9. Each chute body 3 is a bar-shaped body with a trapezoidal cross section. The chute body is formed by pressing an iron plate with the thickness of 2-3 mm, the length of each chute body is 1.5-3 m, the width of the bottom surface of each chute body is 700mm, the width of the top surface of each chute body is 800mm, and the height of each chute side is 200 mm. The cross section of the feed inlet 1 end of the chute body is larger than that of the discharge outlet 4 end of the chute body, so that the chute bodies can be sleeved into a whole. The bottom surface of the chute body is a plane.
The inner bottom surface of the chute body positioned at the feed inlet end is provided with a convex clamping plate 2 for clamping the clamping hook plate 5. The upper end of the convex clamping plate is inclined towards the discharge port end, and the included angle between the convex clamping plate and the bottom surface of the chute body is 30-35 degrees. The lower end of the bottom surface of the chute body positioned at the end of the discharge port is provided with a hook plate. The plurality of chute bodies are clamped on the convex clamping plate through the clamping hook plate to form a movable discharging chute in end-to-end butt joint.
The lower end of the bottom surface of the chute body is longitudinally provided with two supporting longitudinal steel bars 7 at intervals, the supporting longitudinal steel bars are made of steel bars with the diameter of 2.5-3.5 cm, and the supporting longitudinal steel bars and the lower end of the bottom surface of the chute body of the corresponding part are welded into a whole through welding. A plurality of universal fixed pipes 6 are arranged on the two supporting longitudinal steel bars at intervals and are steel pipes with the inner diameter of 5-7 cm and the length of 9-12 cm. The shaft is provided with a plurality of universal fixed pipes, one end of each universal fixed pipe is used for welding a bolt rod at the corresponding position of the supporting longitudinal steel bar, a screw hole is formed in the middle of each universal fixed pipe, and the other end of each bolt rod penetrates through the screw hole to be in threaded connection with a fixed nut in each universal fixed pipe.
During the use, the discharge gate end of the discharge hopper is aligned with the feed inlet of first swift current cell body, and the discharge gate of first swift current cell body is less than the feed inlet 0.5 ~ 1m of first swift current cell body, and fixed reinforcing bar passes behind the universal fixed pipe fixed as an organic whole with the pier reinforcing bar (iron wire ligature) of corresponding part, or directly puts the pier steel reinforcement cage department that does benefit to the support with supporting vertical reinforcement. The feed port end of the second chute body is sleeved at the discharge port of the first chute body from the bottom surface, and the clamping hook plate at the discharge port of the first chute body is clamped on the convex clamping plate at the feed port of the second chute body to complete the butt joint of the second chute body and the first chute body; the slope and the fixing mode of the second chute body are the same as those of the first chute body. And sequentially butting the third and fourth chute bodies until the ash falls. The slope and the fixing mode of the third chute body, the fourth chute body and the like are the same as those of the first chute body, so the description is not repeated.
In a word, the utility model discloses can longer distance and be convenient for with the fixed movable discharge chute of pier reinforcing bar, it is fast to have simple structure, construction speed, and preparation use cost is low, and mechanicalness is high, labour saving and time saving's advantage.

Claims (2)

1. The utility model provides a movable discharging chute for slip form construction, comprises shank of bolt and fixation nut, its characterized in that: the chute body is a strip-shaped body with a trapezoidal cross section, the cross section of the feeding port end of the chute body is larger than that of the discharging port end of the chute body, the bottom surface of the chute body is a plane, a convex clamping plate for clamping the clamping hook plate is arranged on the inner bottom surface of the chute body positioned at the feeding port end, the clamping hook plate is arranged at the lower end of the bottom surface of the chute body positioned at the discharging port end, two supporting longitudinal steel bars are longitudinally arranged at intervals at the lower end of the bottom surface of the chute body, a plurality of universal fixed pipes are arranged on the two supporting longitudinal steel bars in an interval mode and are in an off-axis mode, the plurality of chute bodies are clamped on the convex clamping plate through the clamping hook plate to form a movable discharging chute in end-to-end butt joint, the upper end of the.
2. A movable discharge chute for slipform construction according to claim 1 wherein: the shaft is provided with a plurality of universal fixed pipes, one end of each universal fixed pipe is used for welding a bolt rod at the corresponding position of the supporting longitudinal steel bar, a screw hole is formed in the middle of each universal fixed pipe, and the other end of each bolt rod penetrates through the screw hole to be in threaded connection with a fixed nut in each universal fixed pipe.
CN201921367719.3U 2019-08-22 2019-08-22 Movable discharging chute for slip form construction Expired - Fee Related CN210766422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921367719.3U CN210766422U (en) 2019-08-22 2019-08-22 Movable discharging chute for slip form construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921367719.3U CN210766422U (en) 2019-08-22 2019-08-22 Movable discharging chute for slip form construction

Publications (1)

Publication Number Publication Date
CN210766422U true CN210766422U (en) 2020-06-16

Family

ID=71044625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921367719.3U Expired - Fee Related CN210766422U (en) 2019-08-22 2019-08-22 Movable discharging chute for slip form construction

Country Status (1)

Country Link
CN (1) CN210766422U (en)

Similar Documents

Publication Publication Date Title
CN201581623U (en) Novel bowl-type steel tube scaffold
CN210766422U (en) Movable discharging chute for slip form construction
CN103437547B (en) A kind of aluminum alloy pattern plate
CN201786031U (en) Slip-formed concrete distributing bin device
CN202768034U (en) High-strength whole thread equal-strength resin anchor bar steel bar
CN210239159U (en) Be applicable to mountain region slope concrete conveying device
CN201644679U (en) Pile foundation reinforcement cage processing device
CN102596447A (en) Method and device for producing welded connections
CN212671168U (en) Device for reinforcing short-limb shear wall template
CN213265347U (en) Steel pipe transport collection vehicle for building site
CN209837675U (en) Bearing platform template reinforcing apparatus
CN212002269U (en) Concrete beam side form reinforcing apparatus
CN209410857U (en) A kind of " Ω " type reinforcing rib of particle material tank vehicle tank
CN201354262Y (en) Belt conveyer feeding pipe
CN202830924U (en) Steel and concrete structure for repairing drill cast-in-place pile with concrete fault
CN214740019U (en) Auxiliary device is built to jiao chi stone building
CN211250672U (en) Pipe pile feeding system using die as guide
CN210766426U (en) Reinforcing steel bar laying tool
CN2546498Y (en) Angle hollow precast pile
CN208455643U (en) Soil nailing and surface layer connection structure in pattern foundation pit supporting structure
CN202728873U (en) An adjustable support for conveying cylinders
CN207776880U (en) A kind of steel structure reinforcing bridging in tunnel culvert corner
CN105484139B (en) Brick paving machine supplies brick device
CN111455785A (en) Modular template for road construction
CN217998988U (en) Special spanner for adjusting position and angle of on-site steel bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200616