CN210764008U - Material conveying and lifting equipment for bridge construction of bridge engineering - Google Patents

Material conveying and lifting equipment for bridge construction of bridge engineering Download PDF

Info

Publication number
CN210764008U
CN210764008U CN201921134248.1U CN201921134248U CN210764008U CN 210764008 U CN210764008 U CN 210764008U CN 201921134248 U CN201921134248 U CN 201921134248U CN 210764008 U CN210764008 U CN 210764008U
Authority
CN
China
Prior art keywords
ball
bridge
revolving stage
gear motor
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921134248.1U
Other languages
Chinese (zh)
Inventor
吴迪
张英华
王东辉
曹贵林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Song Baokun
Original Assignee
Song Baokun
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Song Baokun filed Critical Song Baokun
Priority to CN201921134248.1U priority Critical patent/CN210764008U/en
Application granted granted Critical
Publication of CN210764008U publication Critical patent/CN210764008U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a material transports jacking equipment for bridge construction of bridge engineering, the on-line screen storage device comprises a base, the balancing weight is installed at the base top, the roating seat is installed at the balancing weight top, the inside centre of a circle department of roating seat inlays and has gear motor, the revolving stage is installed at the gear motor top, the davit is installed in revolving stage top left side, the roating seat top just is located the gear motor outside and has seted up the ball groove. The utility model discloses a it is rotatory to start gear motor and drive the revolving stage, can accomplish the removal that the hanging flower basket hoisted the back position through the revolving stage this moment, it is more convenient to make the loading and unloading of its material, and when the revolving stage was rotatory, lie in ball inslot internal rotation through the ball, and the ball top will be located the spout internal rotation, can support its revolving stage edge through the ball, thereby avoid the slope, and the rotation of ball can reduce frictional force greatly, thereby avoid frictional force great to cause the great damage that causes of gear motor load.

Description

Material conveying and lifting equipment for bridge construction of bridge engineering
Technical Field
The utility model relates to a material transports technical field, specifically is a lifting means is transported to bridge construction material of bridge engineering.
Background
The bridge engineering refers to the working process of bridge surveying, designing, constructing, maintaining, detecting and the like, and the science and engineering technology for researching the process, and is a branch of civil engineering, the development of the bridge engineering mainly depends on the requirements of transportation, and the materials of the bridge engineering need to be conveyed by lifting equipment during construction, but the existing lifting equipment for conveying the materials for bridge construction of the bridge engineering has some insufficient places, such as the engineering of the bridge engineering; the material for bridge construction of current bridge engineering transports jacking equipment and can't rotate to the discharge work of the material of not being convenient for, and produced frictional force easily causes the damage of motor when rotatory, easily blocks simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a material transports jacking equipment for bridge construction of bridge engineering, has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a lifting means is transported to bridge construction material of bridge engineering, the on-line screen storage device comprises a base, the balancing weight is installed at the base top, the roating seat is installed at the balancing weight top, the inside centre of a circle department of roating seat inlays and has gear motor, the revolving stage is installed at the gear motor top, the davit is installed in revolving stage top left side, the roating seat top just is located the gear motor outside and has seted up the ball groove, the quantity in ball groove is four groups, ball inslot movable mounting has the ball, the revolving stage bottom just is located the ball top and has seted up the spout, electric block is installed at davit left side top, the pulley is installed at davit right side top, the lifting rope is installed on the electric block right side, the.
As a preferred embodiment of the utility model, the hanging flower basket is installed to lifting rope right-hand member bottom, the rubber pad is pasted in hanging flower basket bottom four corners.
As a preferred embodiment of the present invention, lockable universal wheels are installed at four corners of the bottom of the base.
As a preferred embodiment of the present invention, the left end of the rotary seat is provided with a towing hook.
As a preferred embodiment of the utility model, the support frame is installed to the davit below, support frame bottom and revolving stage top right side fixed connection.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a bridge construction of bridge engineering transports jacking equipment with material, it is rotatory to drive the revolving stage through starting gear motor, can accomplish the removal of hanging flower basket hoist back position this moment through the revolving stage, it is more convenient to make the loading and unloading of its material, and the revolving stage is rotatory, be located ball inslot internal rotation through the ball, and the ball top will be located the spout internal rotation, can support its revolving stage edge through the ball, thereby avoid the slope, and the rotation of ball can reduce frictional force greatly, thereby avoid frictional force great cause the great damage that leads to the fact of gear motor load, the card appears when also avoiding rotatory and pauses.
2. The utility model relates to a material transports jacking equipment for bridge construction of bridge engineering can be convenient for device and trailer's connection work through the tow hook, but removes through trailer drive device, and the device can remove through the universal wheel of lockable this moment for the removal of device is more convenient laborsaving, improves the flexibility of device.
3. The utility model relates to a material transports jacking equipment for bridge construction of bridge engineering can support the davit through the support frame to avoid the davit load great to cause the damage, improve device's steadiness, and can make the hanging flower basket cushion in the twinkling of an eye that falls to the ground through the rubber pad, thereby avoid causing the damage of material, to the protection of material when ensureing to transport.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic front view of the material conveying and lifting device for bridge construction in bridge engineering of the present invention;
FIG. 2 is a schematic cross-sectional view of the rotary table and the rotary base of the material transporting and lifting apparatus for bridge construction in bridge construction according to the present invention;
FIG. 3 is a schematic view of the bottom structure of a rotary table of the lifting device for transporting bridge construction materials in bridge construction of the present invention;
fig. 4 is the utility model relates to a bridge construction of bridge engineering transports lifting devices's roating seat top structure sketch map with material.
In the figure: 1. a base; 2. a balancing weight; 3. a reduction motor; 4. a rotating table; 5. a suspension arm; 6. an electric hoist; 7. a lifting rope; 8. a support frame; 9. a pulley; 10. a hanging basket; 11. A ball bearing; 12. a lockable universal wheel; 13. towing hooks; 14. a ball groove; 15. a chute; 16. a rotating base; 17. and (7) a rubber pad.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a bridge construction of bridge engineering transports jacking equipment with material, includes base 1, balancing weight 2 is installed at 1 top of base, roating seat 16 is installed at 2 tops of balancing weight, 16 inside centre of a circle departments of roating seat inlay has gear motor 3, revolving stage 4 is installed at gear motor 3 top, davit 5 is installed in 4 top left sides of revolving stage, 16 tops of roating seat just are located the 3 outsides of gear motor and have seted up ball groove 14, the quantity of ball groove 14 is four groups, movable mounting has ball 11 in the ball groove 14, spout 15 has just been located ball 11 top to 4 bottoms of revolving stage, electric block 6 is installed at 5 left sides top of davit, pulley 9 is installed at 5 right sides top of davit, lifting rope 7 is installed to the 6 right sides of electric block, pulley 9 tops are arranged in to lifting rope 7 right-hand members.
In this embodiment (please refer to fig. 1, fig. 2, fig. 3 and fig. 4), the rotating platform 4 is driven to rotate by starting the speed reduction motor 3, at this time, the rotating platform 4 can complete the movement of the hanging basket 10 after being lifted, so that the material can be loaded and unloaded more conveniently, and when the rotating platform 4 rotates, the balls 11 are located in the ball grooves 14 to rotate, and the balls 1 will be located in the sliding grooves 15 to rotate, the edges of the rotating platform 4 can be supported by the balls 11, so as to avoid the inclination, and the friction can be greatly reduced by the rotation of the balls 11, so as to avoid the damage of the speed reduction motor 3 caused by the large load due to the large friction, and also avoid the jamming during the rotation.
Wherein, hanging flower basket 10 is installed to lifting rope 7 right-hand member bottom, rubber pad 17 is pasted at hanging flower basket 10 bottom four corners.
In this embodiment (see fig. 1), the rubber pad 17 can buffer the falling moment of the basket 10, thereby preventing the material from being damaged and ensuring the protection of the material during transportation.
And lockable universal wheels 12 are arranged at four corners of the bottom of the base 1.
In this embodiment (see fig. 1), the movement of the device is facilitated by the lockable universal wheels 12.
Wherein, the left end of the rotary seat 16 is provided with a towing hook 13.
In this embodiment (see fig. 1), the towing hook 13 can facilitate the connection between the device and the trailer.
Wherein, support frame 8 is installed to davit 5 below, 8 bottom and the 4 top right sides fixed connection of revolving stage of support frame.
In this embodiment (please refer to fig. 1), the suspension arm 5 can be supported by the support frame 8, so as to avoid the damage of the suspension arm 5 due to a large load, and improve the stability of the device.
It should be noted that the utility model relates to a material conveying and lifting device for bridge construction in bridge engineering, which comprises a base 1; 2. a balancing weight; 3. a reduction motor; 4. a rotating table; 5. a suspension arm; 6. an electric hoist; 7. a lifting rope; 8. a support frame; 9. a pulley; 10. a hanging basket; 11. a ball bearing; 12. a lockable universal wheel; 13. towing hooks; 14. a ball groove; 15. a chute; 16. a rotating base; 17. the rubber pad, the part is the general standard component or the part that the skilled person knows, its structure and principle all can be known through the technical manual or through the conventional experimental method to this skilled person, during operation, can be convenient for the device and the trailer to connect the work through the tow hook 13 at first, can the drive device move through the trailer, the device can move through the lockable universal wheel 12 at this moment, make the movement of device more convenient laborsaving, improve the flexibility of device, can drive the lifting rope 7 to stretch out and draw back through starting the electric hoist 6 during the use, the lifting rope 7 is located and moves on the pulley 9 and realizes the lifting work of hanging flower basket 10, place the material in the hanging flower basket 10 can accomplish the transportation lift of material, and can drive the revolving stage 4 to rotate through starting the gear motor 3 after the material rises, can accomplish the movement of the position after the hanging flower basket 10 lifts up through the revolving stage 4 at this moment, make the loading and unloading of its material more convenient, and revolving stage 4 when rotatory, be located ball groove 14 internal rotation through ball 11, and 1 top of ball will be located spout 15 internal rotation, can support its revolving stage 4 edge through ball 11, thereby avoid the slope, and the rotation of ball 11 can reduce frictional force greatly, thereby avoid the frictional force great gear motor 3 load great damage that causes, card pause appears when also can avoiding rotatory, and can support davit 5 through support frame 8, thereby avoid davit 5 load great damage that causes, improve the steadiness of device, and can make the one-shot buffering that hanging flower basket 10 fell to the ground through rubber pad 17, thereby avoid causing the damage of material, guarantee the protection to the material when transporting.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a lifting means is transported to bridge construction material of bridge engineering, includes base (1), its characterized in that: the automatic lifting device is characterized in that a balancing weight (2) is installed at the top of the base (1), a rotating base (16) is installed at the top of the balancing weight (2), a speed reduction motor (3) is embedded in the position of the center of a circle inside the rotating base (16), a rotating table (4) is installed at the top of the speed reduction motor (3), a lifting arm (5) is installed on the left side of the top of the rotating table (4), ball grooves (14) are formed in the top of the rotating base (16) and located on the outer side of the speed reduction motor (3), the number of the ball grooves (14) is four, balls (11) are movably installed in the ball grooves (14), a sliding groove (15) is formed in the bottom of the rotating table (4) and located above the balls (11), an electric hoist (6) is installed at the top of the left side of the lifting arm (5), pulleys (9) are installed at the top, the right end of the lifting rope (7) is arranged above the pulley (9).
2. The material conveying and lifting device for bridge construction of bridge engineering according to claim 1, characterized in that: hanging flower basket (10) are installed to lifting rope (7) right-hand member bottom, rubber pad (17) are pasted in hanging flower basket (10) bottom four corners.
3. The material conveying and lifting device for bridge construction of bridge engineering according to claim 1, characterized in that: lockable universal wheels (12) are installed at four corners of the bottom of the base (1).
4. The material conveying and lifting device for bridge construction of bridge engineering according to claim 1, characterized in that: and a towing hook (13) is arranged at the left end of the rotating seat (16).
5. The material conveying and lifting device for bridge construction of bridge engineering according to claim 2, characterized in that: support frame (8) are installed to davit (5) below, support frame (8) bottom and revolving stage (4) top right side fixed connection.
CN201921134248.1U 2019-07-19 2019-07-19 Material conveying and lifting equipment for bridge construction of bridge engineering Expired - Fee Related CN210764008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921134248.1U CN210764008U (en) 2019-07-19 2019-07-19 Material conveying and lifting equipment for bridge construction of bridge engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921134248.1U CN210764008U (en) 2019-07-19 2019-07-19 Material conveying and lifting equipment for bridge construction of bridge engineering

Publications (1)

Publication Number Publication Date
CN210764008U true CN210764008U (en) 2020-06-16

Family

ID=71061163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921134248.1U Expired - Fee Related CN210764008U (en) 2019-07-19 2019-07-19 Material conveying and lifting equipment for bridge construction of bridge engineering

Country Status (1)

Country Link
CN (1) CN210764008U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111825034A (en) * 2020-07-10 2020-10-27 马鞍山市广源法兰环件有限公司 Safe type crank arm slewer
CN116177417A (en) * 2023-03-07 2023-05-30 中国水利水电第四工程局有限公司 Generator stator bar hoisting device
CN116969355A (en) * 2023-08-28 2023-10-31 湖北辉创重型工程有限公司 Lifting mechanism of bridge inspection vehicle

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111825034A (en) * 2020-07-10 2020-10-27 马鞍山市广源法兰环件有限公司 Safe type crank arm slewer
CN116177417A (en) * 2023-03-07 2023-05-30 中国水利水电第四工程局有限公司 Generator stator bar hoisting device
CN116177417B (en) * 2023-03-07 2023-10-10 中国水利水电第四工程局有限公司 Generator stator bar hoisting device
CN116969355A (en) * 2023-08-28 2023-10-31 湖北辉创重型工程有限公司 Lifting mechanism of bridge inspection vehicle
CN116969355B (en) * 2023-08-28 2024-04-12 湖北辉创重型工程有限公司 Lifting mechanism of bridge inspection vehicle

Similar Documents

Publication Publication Date Title
CN210764008U (en) Material conveying and lifting equipment for bridge construction of bridge engineering
CN201530704U (en) Goods shelf lifter and self-discharging overturning device
CN210821972U (en) Cargo lifting structure of transport vehicle
CN102602638A (en) Self-discharging overturning device
CN108687658B (en) Workpiece machining equipment
CN210313315U (en) Hoisting device for lifting materials
CN212024665U (en) Lifting device of logistics equipment
CN216155376U (en) Lifting machine with disc type cargo carrying platform
CN107098282B (en) A kind of motor vehicle repair crane for lifting by crane different vehicle bodies
CN111204686A (en) Clamping device is fixed to fork truck
CN212425304U (en) Remove convenient mechanical transportation class material handling car
CN108100889A (en) Industrial convenient boom hoisting
CN208103770U (en) A kind of glass fibre reinforced plastic pipe lifting device using two point lifting method
CN214780362U (en) Automatic cabinet loader transporter convenient for operation in narrow space
CN210480106U (en) Mechanical movement is with handling device
CN209382052U (en) Wallboard transport vehicle with device for lifting plate
CN217264436U (en) Stable-support small-sized hoisting machine
CN216549233U (en) High-rise conveyer of construction
CN214689622U (en) Bagged feed transport vehicle
CN211495974U (en) Lubricating oil barrel transport protection device
CN217720348U (en) Transfer device for power distribution cabinet
CN212195579U (en) Safe transport vechicle is used in steel construction production
CN214653304U (en) Lifting device for building material transportation
CN221051528U (en) Combined platform truck
CN218809171U (en) Loading stacking equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200616

CF01 Termination of patent right due to non-payment of annual fee