CN210762396U - Garbage can - Google Patents

Garbage can Download PDF

Info

Publication number
CN210762396U
CN210762396U CN202020726609.8U CN202020726609U CN210762396U CN 210762396 U CN210762396 U CN 210762396U CN 202020726609 U CN202020726609 U CN 202020726609U CN 210762396 U CN210762396 U CN 210762396U
Authority
CN
China
Prior art keywords
box body
outlet
bin
sewage
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020726609.8U
Other languages
Chinese (zh)
Inventor
杨学超
王成玉
林成红
张振海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Haorui Intelligent Technology Co ltd
Yantai Haide Special Vehicle Co Ltd
Original Assignee
Shandong Haorui Intelligent Technology Co ltd
Yantai Haide Special Vehicle Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Haorui Intelligent Technology Co ltd, Yantai Haide Special Vehicle Co Ltd filed Critical Shandong Haorui Intelligent Technology Co ltd
Priority to CN202020726609.8U priority Critical patent/CN210762396U/en
Application granted granted Critical
Publication of CN210762396U publication Critical patent/CN210762396U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/10Waste collection, transportation, transfer or storage, e.g. segregated refuse collecting, electric or hybrid propulsion

Abstract

The utility model provides a garbage can belongs to rubbish storage device technical field. It includes preceding box, back box and sewage box, the top intercommunication of preceding box has the one end of preceding box air outlet pipe way, sealed frame before the other end fixedly connected with of preceding box air outlet pipe way, the advancing pipe is installed to the inner wall bottom one side of preceding box, the top intercommunication of advancing pipe has the takeover that advances, box drain before the inner wall bottom opposite side of preceding box has been seted up, the top of preceding box drain is provided with first filter screen, box discharge port before one side of preceding box has been seted up, box closing plate before one side of box discharge port was installed before the preceding box was seted up, make the dustbin have with last, the lower box becomes the effect that a big or small box comes to carry out classified storage and carry out sewage and article separation to different types of rubbish.

Description

Garbage can
Technical Field
The utility model relates to a rubbish storage device technical field particularly, relates to a rubbish box.
Background
Along with the abundance of the country, the living standard of people is higher and higher, and the garbage disposal becomes an important subject. For garbage disposal, the most important is garbage classification. Present motor sweeper, its dustbin body are mostly single-box structure, can not carry out the categorised storage of rubbish. The patent of the Chinese utility model patent garbage can (CN 108978555A) can realize garbage classification even though the garbage can is layered. However, due to the limitation of upper and lower layers, the upper and lower cases cannot be changed into one large and small case for classified storage of different kinds of garbage, and sewage and articles cannot be separated.
Disclosure of Invention
In order to compensate the above deficiency, the utility model provides a garbage can makes the improvement through the structure with the dustbin, has changed the machine garbage can and can not store different types of rubbish and can not carry out the problem of separating to sewage and article with upper and lower box becoming a big or small box.
The utility model adopts the technical proposal that:
a garbage can comprises a front can body, a rear can body and a sewage can body;
the top of the front box body is communicated with one end of a front box body air outlet pipeline, the other end of the front box body air outlet pipeline is fixedly connected with a front sealing frame, a front inlet pipe is arranged on one side of the bottom of the inner wall of the front box body, the top of the front inlet pipe is communicated with a front inlet connecting pipe, a front flow guide cover is arranged on the top of the inner wall of the front box body, a front box body sewage outlet is arranged on the other side of the bottom of the inner wall of the front box body, a first filter screen is arranged on the top of the front box body sewage outlet, a front box body outlet is arranged on one side of the front box body, a front box body sealing plate is arranged on one side of the front box body provided with the front box body outlet, a front box body outlet sealing strip is arranged between the front box body outlet and the front, the front box body sealing plate can open and close the front box body outlet;
the top of the rear box body is communicated with one end of a rear box body air outlet pipeline, the other end of the rear box body air outlet pipeline is fixedly connected with a rear sealing frame, a rear inlet pipe is arranged on one side of the bottom of the inner wall of the rear box body, a rear connecting pipe is communicated with the top of the rear inlet pipe, a rear flow guide cover is arranged on the top of the inner wall of the rear box body, a rear box body sewage outlet is arranged on the other side of the bottom of the inner wall of the rear box body, a second filter screen is arranged on the top of the rear box body sewage outlet, a rear box body outlet is arranged on one side of the rear box body, a rear box body sealing plate is arranged on one side of the rear box body provided with the rear box body outlet, a rear box body outlet sealing strip is arranged between the rear box body outlet and the rear box, the rear box body sealing plate can open and close a rear box body outlet, and the rear box body is arranged on one side of the front box body;
the sewage box body is used for collecting sewage carried by the front box body and the rear box body; the sewage tank comprises a front tank body and a rear tank body, wherein the front tank body is arranged at the front end of the front tank body, the rear tank body is arranged at the rear end of the rear tank body, and the sewage tank body is arranged at the bottom of the front tank body and the rear tank body.
Furthermore, the one end of preceding box outlet duct link up the top of preceding box, preceding box outlet duct link up filter screen before the one end fixedly connected with of preceding box.
Furthermore, the advance pipe link up the sewage box with the bottom of preceding box, the quantity of advance pipe is any one in one or two, and when the quantity of advance pipe is one, the central axis of advance pipe with the median plane coincidence of preceding box, when the quantity of advance pipe is two the advance pipe with the median plane of preceding box is the symmetry axis mirror image setting.
Furthermore, one end of the rear box body air outlet pipeline is communicated with the top of the rear box body, and the rear box body air outlet pipeline is communicated with the rear filter screen fixedly connected with one end of the rear box body.
Furthermore, the rear inlet pipe penetrates through the sewage tank body and the bottom of the rear tank body, and the central axis of the rear inlet pipe coincides with the middle plane of the rear tank body.
Furthermore, the height of the left side of the bottom of the front box body is higher than that of the right side of the bottom of the front box body, and a sewage discharge outlet of the front box body is formed in the right side of the bottom of the front box body.
Furthermore, the height of the left side of the bottom of the rear box body is higher than that of the right side of the bottom of the rear box body, and a sewage discharge outlet of the rear box body is formed in the right side of the bottom of the rear box body.
Furthermore, the shape and the size of the top of the sewage tank body are respectively matched with the shape and the size of the bottom of the front tank body and the shape and the size of the bottom of the rear tank body, the shape and the size of the first sewage port are matched with the shape and the size of the sewage outlet of the front tank body, and the shape and the size of the second sewage port are matched with the shape and the size of the sewage outlet of the rear tank body.
Furthermore, the front air guide sleeve is arranged right above the forward connecting pipe, and the rear air guide sleeve is arranged right above the rear connecting pipe.
Furthermore, one side of the rear box body is designed to be an opening, the opening faces the front box body, and the volume of the front box body is smaller than that of the rear box body.
The utility model has the advantages that: the utility model discloses a rubbish box that obtains through above-mentioned design, the top shape of sewage box and the bottom shape looks adaptation with the front box respectively, the shape and the size of first sewage mouth looks adaptation with the shape and the size of front box drain, the shape and the size of second sewage mouth looks adaptation with the shape and the size of back box drain, the left height of bottom of back box is higher than the height on right side, back box drain sets up the bottom right side at the back box, front box drain sets up the bottom right side at the front box, sewage in front box and the back box collects front box drain and back box drain respectively and flows into the sewage box, one side design of back box is the opening, and this opening is towards the front box, back box is installed one side of front box, the volume of front box is less than the volume of back box, the bottom of the front box body and the bottom of the rear box body are respectively provided with a front inlet pipe and a rear inlet pipe, so that the garbage box body has the effect of changing the upper box body and the lower box body into a large box body to carry out classified storage on different types of garbage and separate sewage from articles.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural diagram of a garbage can according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a front box body according to an embodiment of the present invention;
fig. 3 is a schematic side view of the front box according to the embodiment of the present invention;
fig. 4 is a schematic structural view of a rear box body provided in an embodiment of the present invention;
fig. 5 is a schematic side view of the rear box according to the embodiment of the present invention;
fig. 6 is a schematic view of a sectional structure of a sewage tank according to an embodiment of the present invention.
In the figure: 1-front sealing frame; 2-rear box body air outlet pipeline; 3-rear sealing frame; 4-front box body air outlet pipeline; 5-front box body; 6-forward connecting pipe; 7-advancing pipe; 8-front air deflector; 9-front filter screen; 10-a sewage draining outlet of the front box body; 11-a first screen; 12-front box sealing plate; 13-sealing strip of outlet of front box; 14-front box body discharge port; 15-rear box body; 16-rear dome; 17-a post-filter screen; 18-a rear inlet pipe; 19-rear connection pipe; 20-a sewage tank body; 21-rear box sealing plate; 22-sealing strip of outlet of rear box body; 23-a rear box body discharge port; 24-a first sewage port; 25-a second sewage port; 26-a sewage tank drain outlet; 27-a drain outlet of the rear box body; 28-second screen.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-6, the present invention provides a technical solution: a garbage can body comprises a front can body 5, a rear can body 15 and a sewage can body 20.
Referring to fig. 1-5, the top of the front box 5 is communicated with one end of a front box outlet pipe 4, the other end of the front box outlet pipe 4 is fixedly connected with a front sealing frame 1, the outlet pipe 4 is used for communicating with a first fan, the front sealing frame 1 is used for sealing the joint of the air pipe 4 and the fan inlet to prevent air leakage, one end of the front box outlet pipe 4 penetrates through the top of the front box 5, one end of the front box outlet pipe 4 penetrating through the front box 5 is fixedly connected with a front filter screen 9 for preventing large-particle garbage materials from entering the front box outlet pipe 4 to enter the first fan to damage the first fan, a front inlet pipe 7 is installed on one side of the bottom of the inner wall of the front box 5, the front inlet pipe 7 is used for sucking garbage into the front box 5, the front inlet pipe 7 penetrates through the bottom of the sewage box 20 and the front box 5, the number of the front pipe 7 is one, when the number of the front inlet pipes 7 is one, the central axis of each front inlet pipe 7 is superposed with the median plane of the front box body 5, when the number of the front inlet pipes 7 is two, the front inlet pipes 7 are arranged by taking the median plane of the front box body 5 as a mirror image of a symmetry axis, the top of each front inlet pipe 7 is communicated with a front connecting pipe 6, the top of the inner wall of each front box body 5 is provided with a front flow guide cover 8, the front flow guide cover 8 is arranged right above the front connecting pipe 6, when the garbage sucked by the front inlet pipes 7 passes through the front connecting pipes 6, the large-particle garbage impacts the front filter screen 9 and the inner wall of the front box body 5 when the garbage is discharged, the other side of the bottom of the inner wall of the front box body 5 is provided with a front box body sewage discharge outlet 10, the top of the front box body sewage outlet 10 is provided with a first filter screen 11, the first filter screen 11 separates the garbage from the water, the, the sewage in the front box body 5 is collected towards the right side and enters the sewage box body 20 through the front box body sewage discharge outlet 10, one side of the front box body 5 is provided with a front box body discharge outlet 14, one side of the front box body 5 provided with the front box body discharge outlet 14 is provided with a front box body sealing plate 12, a front box body discharge outlet sealing strip 13 is arranged between the front box body discharge outlet 14 and the front box body sealing plate 12, the front box body discharge outlet sealing strip 13 is fixedly connected to the periphery of the front box body discharge outlet 14 to wrap the front box body discharge outlet 14 in the front box body, the front box body discharge outlet 14 is sealed by the front box body sealing plate 12 through the front box body discharge outlet sealing strip 13, the front box body discharge outlet 14 can be opened and closed by the front box body 5, the garbage stored in the front box body is emptied through the front box body discharge outlet 14, the top, the air outlet pipeline 2 is used for connecting a second fan, the wind power of the first fan is smaller than that of the second fan, one end of the rear box air outlet pipeline 2 penetrates through the top of the rear box body 15, one end of the rear box air outlet pipeline 2 penetrating through the rear box body 15 is fixedly connected with a rear filter screen 17 and used for preventing large-particle garbage materials from entering the rear box air outlet pipeline 2 and entering the second fan to damage the second fan, a rear inlet pipe 18 is installed on one side of the bottom of the inner wall of the rear box body 15, the rear inlet pipe 18 penetrates through the bottom of the sewage box body 20 and the bottom of the rear box body 15, the central axis of the rear inlet pipe 18 is superposed with the middle position surface of the box body of the rear box body 15, the top of the rear inlet pipe 18 is communicated with a rear connecting pipe 19, a rear flow guide cover 16 is installed on the top of the inner wall of the rear box body 15, the rear flow guide cover 16 is installed right above the rear connecting pipe 19 and used for preventing large-, the other side of the bottom of the inner wall of the rear box body 15 is provided with a rear box body sewage discharge port 27, the top of the rear box body sewage discharge port 27 is provided with a second filter screen 28, the left side of the bottom of the rear box body 15 is higher than the right side, the rear box body sewage discharge port 27 is arranged on the right side of the bottom of the rear box body 15, sewage in the rear box body 15 is collected towards the right side and enters the sewage box body 20 through the rear box body sewage discharge port 27, one side of the rear box body 15 is provided with a rear box body discharge port 23, one side of the rear box body 15 provided with the rear box body discharge port 23 is provided with a rear box body sealing plate 21, a rear box body discharge port sealing strip 22 is arranged between the rear box body discharge port 23 and the rear box body sealing plate 21, the rear box body discharge port sealing strip 21 seals the, the rear box body sealing plate 21 can open and close the rear box body outlet 23, the rear box body 15 is arranged at one side of the front box body 5, one side of the rear box body 15 is designed to be an opening, the opening faces the front box body 5, the volume of the front box body 5 is smaller than that of the rear box body 15, when the front box body sealing plate 12 and the rear box body sealing plate 21 are closed, the front box body 5 and the rear box body 15 are mutually sealed independent box bodies, a first fan connected with the front box body air outlet pipeline 4 has smaller wind force than a second fan connected with the rear box body air outlet pipeline 2, the suction force of the front advancing pipe 7 is smaller than that of the rear advancing pipe 18, the front advancing pipe 7 sucks garbage with light weight into the front box body 5, the rear advancing pipe 18 sucks the garbage with heavy weight into the rear box body 15, after the front box body 5 is filled with the garbage, the front box body sealing plate 12 and the rear box body sealing plate 21 are, after the rear box body 15 is filled with garbage, the rear box body sealing plate 21 is opened to discharge the garbage to a recycling treatment center through the rear box body discharge port 23, the front box body sealing plate 12 is opened when only the same type of garbage needs to be treated, the front box body 5 is communicated with the rear box body 15 to form a large box body, the garbage can be effectively used, and therefore the garbage box body has the effect that the upper box body and the lower box body are changed into the large box body to store different types of garbage in a classified mode.
Referring to fig. 1 and 6, the sewage tank 20 is used for collecting sewage carried by the front tank 5 and the rear tank 15;
wherein, the top of the sewage tank 20 has been seted up first sewage mouth 24 and second sewage mouth 25 from left to right, back box drain 27 has been seted up to bottom one side of sewage tank 20, sewage tank 20 installs in the bottom of preceding box 5 and back box 15, the top shape of sewage tank 20 and respectively with the bottom shape of preceding box 5 and the bottom shape looks adaptation of back box 15, the shape and the size of first sewage mouth 24 and the shape and the size of preceding box drain 10 look like the adaptation, the shape and the size of second sewage mouth 25 and the shape and the size looks adaptation of back box drain 27, the inside sewage of preceding box 5 can enter into the inside of sewage tank 20 through preceding box drain 10 and store, the inside sewage of back box 15 can enter into the inside of sewage tank 20 through back box drain 27 and store, thereby make the dustbin have had the effect of separating sewage and article.
Specifically, this garbage bin's theory of operation: one end of a front box body air outlet pipeline 4 penetrates through the top of a front box body 5, one end of the front box body air outlet pipeline 4 penetrating through the front box body 5 is fixedly connected with a front filter screen 9, the other end of the front box body air outlet pipeline 4 is communicated with a first fan, a front inlet pipe 7 is installed on one side of the bottom of the inner wall of the front box body 5, a front flow guide hood 8 is installed on the top of the inner wall of the front box body 5, the front flow guide hood 8 is installed right above a front inlet pipe 6, one side of the front box body 5 is provided with a front box body outlet 14, one side of a rear box body 15 is designed to be an opening, the opening faces the front box body 5, the other side of the rear box body 15 is provided with a rear box body outlet 23, one end of a rear box body air outlet pipeline 2 penetrating through the top of the rear box body 15, one end of the rear box body air outlet pipeline 2 penetrating through, the top of the inner wall of the rear box body 15 is provided with a rear air guide sleeve 16, the rear air guide sleeve 16 is arranged right above a rear connecting pipe 19, the wind power of a first fan is smaller than that of a second fan, the suction force of a front advancing pipe 7 is smaller than that of a rear advancing pipe 18, the front advancing pipe 7 sucks light garbage into the front box body 5, the rear advancing pipe 18 sucks heavy garbage into the rear box body 15, the volume of the front box body 5 is smaller than that of the rear box body 15, when the same type of garbage is only required to be treated, a front box body sealing plate 12 is opened, the front box body 5 is communicated with the rear box body 15 to form a large box body, the garbage box can be effectively used, the height of the left side of the bottom of the front box body 5 is higher than that of the right side, a front box body sewage discharge outlet 10 is arranged on the right side of the bottom of the front box body 5, sewage in the front box body 5 is collected towards the right side and enters, the rear box body sewage outlet 27 is formed in the right side of the bottom of the rear box body 15, sewage in the rear box body 15 is collected towards the right side and enters the sewage box body 20 through the rear box body sewage outlet 27, and therefore the garbage box body has the effect that the upper box body and the lower box body are changed into a large box body to carry out classified storage on different types of garbage and separate the sewage from articles.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A garbage can body comprises a front can body (5), a rear can body (15) and a sewage can body (20), and is characterized in that the top of the front can body (5) is communicated with one end of a front can body air outlet pipeline (4), the other end of the front can body air outlet pipeline (4) is fixedly connected with a front sealing frame (1), a front inlet pipe (7) is installed on one side of the bottom of the inner wall of the front can body (5), a front inlet pipe (7) is communicated with the top of the front inlet pipe (7) and is provided with a front inlet pipe (6), a front flow guide cover (8) is installed on the top of the inner wall of the front can body (5), a front can body sewage outlet (10) is formed in the other side of the bottom of the inner wall of the front can body (5), a first filter screen (11) is arranged on the top of the front can body sewage outlet (10), a front can body outlet (14) is formed in one side of the front can body (5, a front box body outlet sealing strip (13) is arranged between the front box body outlet (14) and the front box body sealing plate (12), the front box body outlet sealing strip (13) is fixedly connected to the periphery of the front box body outlet (14) to wrap the front box body outlet (14) in the front box body outlet, and the front box body outlet (14) can be opened and closed by the front box body sealing plate (12);
the rear box body is characterized in that the top of the rear box body (15) is communicated with one end of a rear box body air outlet pipeline (2), the other end of the rear box body air outlet pipeline (2) is fixedly connected with a rear sealing frame (3), a rear inlet pipe (18) is installed on one side of the bottom of the inner wall of the rear box body (15), the top of the rear inlet pipe (18) is communicated with a rear inlet pipe (19), a rear flow guide cover (16) is installed on the top of the inner wall of the rear box body (15), a rear box body sewage discharge port (27) is formed in the other side of the bottom of the inner wall of the rear box body (15), a second filter screen (28) is arranged on the top of the rear box body sewage discharge port (27), a rear box body discharge port (23) is formed in one side of the rear box body (15), a rear box body sealing plate (21) is installed on one side of the rear box body discharge port (23), and a rear box body, the rear box body outlet sealing strip (22) is fixedly connected to the periphery of the rear box body outlet (23) to wrap the rear box body outlet (23) inside, the rear box body sealing plate (21) can open and close the rear box body outlet (23), and the rear box body (15) is installed on one side of the front box body (5);
the sewage tank body (20) is used for collecting sewage carried by the front tank body (5) and the rear tank body (15);
the sewage tank is characterized in that a first sewage port (24) and a second sewage port (25) are formed in the top of the sewage tank body (20) from left to right, a rear tank body sewage outlet (27) is formed in one side of the bottom of the sewage tank body (20), and the sewage tank body (20) is installed at the bottom of the front tank body (5) and the bottom of the rear tank body (15).
2. A garbage bin according to claim 1, wherein one end of the front bin outlet pipe (4) penetrates the top of the front bin (5), and one end of the front bin outlet pipe (4) penetrating the front bin (5) is fixedly connected with a front filter screen (9).
3. A garbage can according to claim 1, wherein the advancing pipe (7) penetrates the bottom of the sewage can (20) and the front can (5), the number of the advancing pipe (7) is one or two, when the number of the advancing pipe (7) is one, the central axis of the advancing pipe (7) coincides with the middle plane of the can of the front can (5), and when the number of the advancing pipe (7) is two, the advancing pipe (7) is arranged in a mirror image mode by taking the middle plane of the can of the front can (5) as a symmetry axis.
4. A garbage can according to claim 1, characterized in that one end of the rear can outlet pipe (2) penetrates the top of the rear can (15), and one end of the rear can outlet pipe (2) penetrating the rear can (15) is fixedly connected with a rear filter screen (17).
5. A waste bin according to claim 1, wherein the backward pipe (18) penetrates the bottom of the waste bin (20) and the bottom of the rear bin (15), and the central axis of the backward pipe (18) coincides with the median plane of the rear bin (15).
6. A waste bin according to claim 1, characterised in that the height of the left side of the bottom of the front bin (5) is higher than the height of the right side, and that the front bin discharge outlet (10) is provided at the right side of the bottom of the front bin (5).
7. A waste bin according to claim 1, characterised in that the rear bin (15) has a lower left side than a right side, the rear bin discharge outlet (27) being provided at the lower right side of the rear bin (15).
8. A waste bin according to claim 1, wherein the top of the waste bin (20) is shaped to fit the bottom of the front bin (5) and the bottom of the rear bin (15), respectively, the first waste outlet (24) is shaped and sized to fit the shape and size of the front bin waste outlet (10), and the second waste outlet (25) is shaped and sized to fit the shape and size of the rear bin waste outlet (27).
9. A waste bin according to claim 1, wherein the front fairing (8) is mounted directly above the forward nozzle (6) and the rear fairing (16) is mounted directly above the rear nozzle (19).
10. A waste bin according to claim 1, characterised in that one side of the rear bin (15) is designed as an opening facing the front bin (5), the volume of the front bin (5) being smaller than the volume of the rear bin (15).
CN202020726609.8U 2020-05-07 2020-05-07 Garbage can Active CN210762396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020726609.8U CN210762396U (en) 2020-05-07 2020-05-07 Garbage can

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020726609.8U CN210762396U (en) 2020-05-07 2020-05-07 Garbage can

Publications (1)

Publication Number Publication Date
CN210762396U true CN210762396U (en) 2020-06-16

Family

ID=71044389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020726609.8U Active CN210762396U (en) 2020-05-07 2020-05-07 Garbage can

Country Status (1)

Country Link
CN (1) CN210762396U (en)

Similar Documents

Publication Publication Date Title
CN209095803U (en) A kind of technics of reclaim of plastic waste processing unit
CN109203303A (en) Environmentally friendly depositing dust type waste old is crushed recyclable device
CN210762396U (en) Garbage can
CN206142242U (en) Nested formula environmental protection garbage truck of interior outer container
CN217346851U (en) Dry-wet separating device for solid waste pretreatment material
CN209480027U (en) Feed intake storehouse dust collection recyclable device
CN216637661U (en) Garbage disposal equipment for recycling waste
CN108545907A (en) A kind of municipal sludge collection pre-processing device
CN208022205U (en) A kind of domestic waste collection is cleared and processing equipment
CN217773370U (en) Impurity removing equipment for vacuum drainage system
CN219238096U (en) Garbage collection classification box suitable for garbage classification demonstration area
CN208327570U (en) A kind of construction sewage-treatment plant
CN214877397U (en) Dustbin of sewage separation
CN216778451U (en) Deodorizing device for intelligent classification equipment
CN218429202U (en) Concrete slurry collecting and utilizing device
CN213965638U (en) Dust collector is used in pig feed processing production
CN218752715U (en) Domestic garbage water filtering tank
CN215232487U (en) Energy recycling mechanism
CN208262990U (en) Punch die garbage collection filter device
CN216402623U (en) Garbage classification room with sewage treatment mechanism at bottom
CN217616060U (en) Raw material pretreatment device for flexible sealing material production
CN215624324U (en) Construction site classification garbage pool with dust suppression function
CN213934545U (en) Clean powder-adding selenium drum
CN215462343U (en) Prevent blockking up circulating oil pump
CN219296269U (en) Dustbin for garbage transfer station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant