CN210751842U - Workshop dust purification pipe device - Google Patents

Workshop dust purification pipe device Download PDF

Info

Publication number
CN210751842U
CN210751842U CN201921687923.3U CN201921687923U CN210751842U CN 210751842 U CN210751842 U CN 210751842U CN 201921687923 U CN201921687923 U CN 201921687923U CN 210751842 U CN210751842 U CN 210751842U
Authority
CN
China
Prior art keywords
pipe
dust
workshop
water
workshop main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921687923.3U
Other languages
Chinese (zh)
Inventor
王瑞珍
孙焦德
孙美功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Deruxin Purification Engineering Co ltd
Original Assignee
Qingdao Deruxin Purification Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Deruxin Purification Engineering Co ltd filed Critical Qingdao Deruxin Purification Engineering Co ltd
Priority to CN201921687923.3U priority Critical patent/CN210751842U/en
Application granted granted Critical
Publication of CN210751842U publication Critical patent/CN210751842U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model discloses a workshop dust purification pipe device, including the workshop main part, workshop main part top inner wall is equipped with dust collecting pipe, and dust collecting pipe both ends are equipped with into dirt pipe, workshop main part top is equipped with the water feeding pump, the water feeding pump is equipped with the flow pipe, dust collecting pipe with be equipped with the collector pipe between the workshop main part, the flow pipe passes the workshop main part top with the collector pipe is connected, the collector pipe is equipped with the atomizer, the atomizer extend to inside the dust collecting pipe. The utility model solves the defect that a part of dust can be left in the dust collecting pipeline and is difficult to clean; the design of the dust inlet pipe is adopted, and the filter screen is arranged at the pipe orifice, so that the purification efficiency of dust can be ensured for intercepting some large-particle impurities which are not dust; the treatment chamber is arranged under the ground, so that waste water containing dust can be treated, and the waste water is convenient to discharge and collect.

Description

Workshop dust purification pipe device
Technical Field
The utility model relates to a workshop dust purification technical field specifically is a workshop dust purification pipe device.
Background
In industrial production, there can be the dust in the air and fly in occasionally, and current enterprise generally can install dust collecting equipment on its production facility and remove dust, and common dust remover is including dust excluding hood, connecting air pipe and dust shaker.
In the prior art, in the dust treatment process, a part of dust can be left in the dust collecting pipeline and is not easy to clean, and the dust removal efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
In order to solve the defects of the prior art, the utility model provides a workshop dust purification pipe device solves the problem that proposes in the background art.
In order to achieve the above object, the utility model discloses a technical scheme be:
a workshop dust purification pipeline device comprises a workshop main body, wherein a dust collection pipeline is arranged on the inner wall of the top end of the workshop main body, dust inlet pipes are arranged at two ends of the dust collection pipeline, a water supply pump is arranged at the top end of the workshop main body and provided with a water supply pipe, a water collection pipe is arranged between the dust collection pipeline and the workshop main body and penetrates through the top end of the workshop main body to be connected with the water collection pipe, the water collection pipe is provided with an atomizing nozzle extending into the dust collection pipeline, a liquid collection tank is arranged at the bottom end of the dust collection pipeline, a liquid discharge pipe is arranged at the bottom end of the liquid collection tank and penetrates through the ground to be connected with a treatment chamber inside the liquid collection tank, a stirring motor is arranged in the workshop main body, a stirring shaft is arranged at an output point of the stirring motor and extends into the treatment chamber, stirring blades are arranged on, the dosing pipe extends to in the workshop main part, the workshop main part outside of locating is equipped with the drain pump, the drain pump with the process chamber is connected, it is equipped with the fan to advance the intraductal fan that is equipped with of dirt, advance dirt pipe one end for leak hopper-shaped and with dust collecting pipe connects.
It is right to the utility model discloses further description, it is equipped with the mouth of pipe that is used for into dirt to advance dirt socle end, the mouth of pipe is equipped with the detachable filter screen, the filter screen pass through the screw with the mouth of pipe is connected.
To the utility model discloses further description, the process chamber still is equipped with the ventilation pipe, the ventilation pipe extends to in the workshop main part, just the ventilation pipe passes workshop main part lateral wall extends to the outside.
Right the utility model discloses further description, the flow pipe is equipped with a plurality of distributive pipes, the distributive pipe passes workshop main part top with the collector tube is connected.
To the utility model discloses further description, dust inlet pipe funnel end is equipped with the baffle, baffle one end with collecting tank top edge connects.
Right the utility model discloses further description, the fluid-discharge tube still is equipped with the water valve that is used for the flow, the stirring motor still is equipped with the protective housing outward.
To the utility model discloses further description, the drain pump is equipped with the water pipe, the water pipe pass ground with the process chamber is connected.
Compared with the prior art, the utility model has the advantages that: the defect that a part of dust is left in the dust collecting pipeline and is not easy to clean is overcome; the design of the dust inlet pipe is adopted, and the filter screen is arranged at the pipe orifice, so that the purification efficiency of dust can be ensured for intercepting some large-particle impurities which are not dust; the treatment chamber is arranged under the ground, so that waste water containing dust can be treated, and the waste water is convenient to discharge and collect.
Drawings
Fig. 1 is a schematic view of the internal structure of the present invention.
Fig. 2 is a schematic diagram of the external structure of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings, and it is to be understood that the described embodiments are only some embodiments, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Example 1, as shown in fig. 1 to 2:
a workshop dust purification pipeline device comprises a workshop main body 1, a dust collecting pipeline 3 is arranged on the inner wall of the top end of the workshop main body 1, dust inlet pipes 4 are arranged at two ends of the dust collecting pipeline 3, a water feeding pump 10 is arranged at the top end of the workshop main body 1, the water feeding pump 10 is provided with a water feeding pipe 9, a water collecting pipe 2 is arranged between the dust collecting pipeline 3 and the workshop main body 1, the water feeding pipe 9 penetrates through the top end of the workshop main body 1 to be connected with the water collecting pipe 2, the water collecting pipe 2 is provided with an atomizing nozzle 12, the atomizing nozzle 12 extends into the dust collecting pipeline 3, a liquid collecting tank 301 is arranged at the bottom end of the dust collecting pipeline 3, a liquid discharge pipe 14 is arranged at the bottom end of the liquid collecting tank 301, the liquid discharge pipe 14 penetrates through the ground to be connected with a treatment chamber 8 inside the liquid collecting pipe, a stirring motor 17 is arranged in the workshop main body 1, a stirring, the dosing pipe 20 extends into the workshop main body 1, a drainage pump 22 is arranged outside the workshop main body 1, the drainage pump 22 is connected with the processing chamber 8, a fan 401 is arranged in the dust inlet pipe 4, and one end of the dust inlet pipe 4 is funnel-shaped and is connected with the dust collecting pipeline 3.
According to the preferable technical scheme, the bottom end of the dust inlet pipe 4 is provided with a pipe opening 5 for dust inlet, the pipe opening 5 is provided with a detachable filter screen 6, and the filter screen 6 is connected with the pipe opening 5 through a screw.
In a preferred embodiment of the present invention, the processing chamber 8 is further provided with a ventilation pipe 7, the ventilation pipe 7 extends into the main body 1 of the plant, and the ventilation pipe 7 extends to the outside through the side wall of the main body 1 of the plant.
According to the preferable technical scheme of the embodiment, the water supply pipe 9 is provided with a plurality of water distribution pipes 11, and the water distribution pipes 11 penetrate through the top end of the workshop main body 1 and are connected with the water collection pipe 2.
According to a preferable technical scheme of the embodiment, a guide plate 13 is arranged at the funnel end of the dust inlet pipe 4, and one end of the guide plate 13 is connected with the edge of the top end of the liquid collecting tank 301.
In a preferred technical solution of this embodiment, the drainage pipe 14 is further provided with a water valve 15 for flow rate, and the stirring motor 17 is further provided with a protective shell 16.
In a preferred embodiment of the present embodiment, the drainage pump 22 is provided with a water pipe 21, and the water pipe 21 is connected to the treatment chamber 8 through the ground.
In the present embodiment, all the components are general standard components or components known to those skilled in the art, and the structure and principle thereof can be known to those skilled in the art through technical manuals or through routine experiments.
Start fan 401 in the dust inlet pipe 4, the dust gets into through mouth of pipe 5, simultaneously filter screen 6 on the mouth of pipe 5 can carry out prefilter, when filter screen 6 needs to wash, it can to make the two separation to pull down the screw, the dust gets into in the collection dirt pipeline 3, water pump 10 sends the water source into in the collector pipe 2 through flow pipe 9, spout by atomizer 12 again, combine with the dust and fall into the collecting tank 301 in, because the existence of baffle 13, rivers can flow into the collecting tank 301 through baffle 13, then discharge into subaerial process chamber 8 through fluid-discharge tube 14, then drop into medicament (flocculating agent) through dosing pipe 20, agitator motor 17 drives (mixing) shaft 18 and stirring leaf 19 and rotates, make the waste water that contains the dust and medicament intensive mixing, then deposit, discharge pump 22 discharges through the drain pump at last, process chamber 8 and outside air circulation have been guaranteed to ventilation pipe 7.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, a first feature "above," "over," and "on" a second feature includes that the first feature is directly above and obliquely above the second feature, or merely means that the first feature is at a higher level than the second feature, and a first feature "below," "under," and "under" the second feature includes that the first feature is directly above and obliquely above the second feature, or merely means that the first feature is at a lower level than the first feature.
In the description of the present specification, reference to the description of the terms "one embodiment," "some embodiments," "an example," "a specific example" or "some examples" or the like means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention, and schematic representations of the terms in the specification do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Although embodiments of the present invention have been shown and described, it is to be understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that those skilled in the art can make changes, modifications, substitutions and alterations to the above embodiments without departing from the spirit and scope of the present invention.

Claims (7)

1. The workshop dust purification pipeline device comprises a workshop main body (1), wherein a dust collection pipeline (3) is arranged on the inner wall of the top end of the workshop main body (1), dust inlet pipes (4) are arranged at two ends of the dust collection pipeline (3), and is characterized in that a water feeding pump (10) is arranged at the top end of the workshop main body (1), the water feeding pump (10) is provided with a water feeding pipe (9), a water collecting pipe (2) is arranged between the dust collection pipeline (3) and the workshop main body (1), the water feeding pipe (9) penetrates through the top end of the workshop main body (1) to be connected with the water collecting pipe (2), the water collecting pipe (2) is provided with an atomizing nozzle (12), the atomizing nozzle (12) extends into the dust collection pipeline (3), the bottom end of the dust collection pipeline (3) is provided with a liquid collecting tank (301), the bottom end of the liquid collecting tank (301) is provided with a liquid discharge pipe (14), and the liquid discharge pipe (, be equipped with agitator motor (17) in workshop main part (1), agitator motor (17) delivery point is equipped with (mixing) shaft (18), (mixing) shaft (18) extend to in treatment chamber (8), and the part that is located treatment chamber (8) is equipped with stirring leaf (19), treatment chamber (8) are equipped with pencil (20), pencil (20) extend to in workshop main part (1), workshop main part (1) outside of locating is equipped with drain pump (22), drain pump (22) with treatment chamber (8) are connected, be equipped with fan (401) in dust inlet pipe (4), dust inlet pipe (4) one end for leak hopper-shaped and with dust collecting pipeline (3) are connected.
2. The workshop dust purification pipeline device according to claim 1, wherein a pipe orifice (5) for dust inlet is arranged at the bottom end of the dust inlet pipe (4), the pipe orifice (5) is provided with a detachable filter screen (6), and the filter screen (6) is connected with the pipe orifice (5) through a screw.
3. A plant dust cleaning pipe arrangement according to claim 1, characterized in that the process chamber (8) is further provided with a ventilation pipe (7), the ventilation pipe (7) extends into the plant body (1), and the ventilation pipe (7) extends to the outside through the side wall of the plant body (1).
4. The workshop dust purification piping arrangement according to claim 1, wherein the water supply pipe (9) is provided with a plurality of water distribution pipes (11), and the water distribution pipes (11) penetrate through the top end of the workshop body (1) and are connected with the water collection pipe (2).
5. A workshop dust cleaning pipe arrangement according to claim 1, characterized in that the funnel end of the dust inlet pipe (4) is provided with a guide plate (13), and one end of the guide plate (13) is connected with the top edge of the liquid collecting tank (301).
6. A workshop dust purification pipe device according to claim 1, wherein the drain pipe (14) is further provided with a water valve (15) for flow, and the stirring motor (17) is further provided with a protective shell (16).
7. The dust cleaning piping device for plant according to claim 1, wherein the drain pump (22) is provided with a water pipe (21), and the water pipe (21) is connected to the process chamber (8) through the ground.
CN201921687923.3U 2019-10-10 2019-10-10 Workshop dust purification pipe device Expired - Fee Related CN210751842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921687923.3U CN210751842U (en) 2019-10-10 2019-10-10 Workshop dust purification pipe device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921687923.3U CN210751842U (en) 2019-10-10 2019-10-10 Workshop dust purification pipe device

Publications (1)

Publication Number Publication Date
CN210751842U true CN210751842U (en) 2020-06-16

Family

ID=71055051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921687923.3U Expired - Fee Related CN210751842U (en) 2019-10-10 2019-10-10 Workshop dust purification pipe device

Country Status (1)

Country Link
CN (1) CN210751842U (en)

Similar Documents

Publication Publication Date Title
CN107511022A (en) A kind of disintegrating machine high-efficiency energy-saving dust-removing equipment
CN207493407U (en) A kind of dust pelletizing system of printing machine
CN211513928U (en) Waste gas processor
CN106110822B (en) Remove the cleaner of solid particle in air
CN213467277U (en) Cleaning device for boiler slag extractor
CN210751842U (en) Workshop dust purification pipe device
CN108654265A (en) A kind of workshop disordered exhaust gas collection device
CN205925278U (en) High -efficient air dust remover
CN107997723A (en) The structure that eliminates the unusual smell and dish-washing machine
CN205340454U (en) Grid casting flue gas dust removal device
CN209985144U (en) House building dust collector
CN208582363U (en) The structure that eliminates the unusual smell and dish-washing machine
CN214097324U (en) Agricultural product surface pesticide residue detection device
CN210796042U (en) Wash a pigment waste water impurity filter equipment
CN209704862U (en) A kind of novel and multifunctional dredge pump
CN202290699U (en) Dust removing device for material mixing workshop
CN209020057U (en) A kind of dust-extraction unit of automobile filter
CN212888362U (en) Banbury mixer dust collecting device for producing halogen-free polyolefin
CN215996114U (en) High-efficient single cycle ultralow dust collector
CN221319349U (en) Sewage treatment device with self-cleaning function
CN216323734U (en) Raw materials belt cleaning device is used in rice wine processing
CN214600790U (en) A dust collection device for engineering construction
CN220331034U (en) Sweeps collecting mechanism of polishing machine
CN209065565U (en) A kind of metalwork waste liquid disposal machine
CN211419808U (en) Self-purification filter device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200616