CN210740348U - But building site faces device that makes full use of construction facilities - Google Patents

But building site faces device that makes full use of construction facilities Download PDF

Info

Publication number
CN210740348U
CN210740348U CN201921903796.6U CN201921903796U CN210740348U CN 210740348 U CN210740348 U CN 210740348U CN 201921903796 U CN201921903796 U CN 201921903796U CN 210740348 U CN210740348 U CN 210740348U
Authority
CN
China
Prior art keywords
bracing piece
bottom plate
connecting block
rod
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921903796.6U
Other languages
Chinese (zh)
Inventor
宋宝来
席文喜
季云鹤
费贤贲
管冬雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Antai Traffic Safety Facilities Engineering Co ltd
Original Assignee
Suzhou Antai Traffic Safety Facilities Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Antai Traffic Safety Facilities Engineering Co ltd filed Critical Suzhou Antai Traffic Safety Facilities Engineering Co ltd
Priority to CN201921903796.6U priority Critical patent/CN210740348U/en
Application granted granted Critical
Publication of CN210740348U publication Critical patent/CN210740348U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model belongs to the technical field of the building site, especially, be a but building site faces device of building chemical plant cyclic utilization, including first bottom plate, the through-hole has been seted up on the surface of first bottom plate, the one end of first bottom plate is run through and is installed first connecting axle. Through first bracing piece and second bracing piece, connect first bottom plate and second bottom plate through first connecting axle and second connecting axle, and through-hole and bolt adaptation are connected, the installation and the demolition of lighthouse supporting mechanism have been made things convenient for, through setting up the montant of pegging graft, on the one hand can provide firm support for first bracing piece and second bracing piece, on the other hand has made things convenient for the installation, through setting up the pole of climbing in the side of first bracing piece, the material cost has been saved to the mode that sets up the cat ladder alone than the tradition, equipment occupation space has been reduced simultaneously, this device passes through the connected mode of cooperation bolt and joint between the mechanism, circulated use, the waste of building resources has been reduced.

Description

But building site faces device that makes full use of construction facilities
Technical Field
The utility model belongs to the technical field of building site, concretely relates to but building site faces built facility cyclic utilization's device.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and can also be said to be the process of changing various lines on design drawings into objects in designated places.
However, at present, the lighthouse frame that the illumination adopted mostly adopts the scaffold to set up and form or the welding installation, and the engineering finishes just once only scrapping, has except having caused serious waste to building material, inconvenient installation and dismantlement simultaneously, and in addition, current lighthouse is inconvenient along with the circulation of constructing on a large scale, and the unable cyclic utilization of lighthouse.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a but building site faces building chemical plant cyclic utilization's device has solved the unable used repeatedly's of beacon problem.
In order to achieve the above object, the utility model provides a following technical scheme: a device capable of recycling temporary building facilities in a building site comprises a first bottom plate, wherein a through hole is formed in the surface of the first bottom plate, a first connecting shaft is installed at one end of the first bottom plate in a penetrating mode, a first supporting rod is connected to the surface of the first connecting shaft, a climbing rod is connected to the interior of the first supporting rod through a bolt, a first fixing shaft is arranged at one end of the first supporting rod, a top plate is connected to the surface of the first fixing shaft, a flange plate is connected to the top of the top plate through a bolt, a threaded seat is fixedly installed at the top of the flange plate, a lifting installation rod is installed inside the threaded seat in a penetrating mode through a thread, a lamp holder is installed at the top of the lifting installation rod, a highlight lamp is arranged inside the lamp holder in a penetrating mode, a second fixing shaft is installed at one end of the top plate in a penetrating mode, and a, one side of second bracing piece is provided with first connecting block, the inside of first connecting block is run through and is provided with the montant, the sleeve pipe has been cup jointed to the bottom of montant, sheathed tube bottom fixed mounting has the board of standing foot, one side of second bracing piece is provided with the second connecting block, the bottom of roof is provided with the mounting bracket, solar cell panel is installed to the one end of mounting bracket, the one end of second bracing piece is run through and is installed the second connecting axle, the surface connection of second connecting axle has the second bottom plate.
Preferably, the through holes are internally provided with threads, and the through holes are linearly arranged on the surface of the first base plate.
Preferably, the first support rods are symmetrically arranged, and one ends of the two first support rods are connected through a first connecting shaft.
Preferably, the second support rods are symmetrical about a central axis of the top plate, and one ends of the two second support rods are connected through a second fixed shaft.
Preferably, the first connecting block and the second connecting block are respectively provided with two pairs, and the vertical rod sequentially penetrates through the first connecting block and the second connecting block.
Preferably, the solar cell panels are provided with a pair, and the two solar cell panels are respectively arranged at two ends of the mounting frame.
Compared with the prior art, the beneficial effects of the utility model are that:
through setting up first bracing piece and second bracing piece, and first bracing piece and second bracing piece are connected first bottom plate and second bottom plate through first connecting axle and second connecting axle respectively, through-hole and bolt adaptation connection, the installation and the demolition of lighthouse supporting mechanism have been made things convenient for, through setting up the montant of pegging graft, can provide firm support for first bracing piece and second bracing piece on the one hand, on the other hand has made things convenient for the installation, through setting up the pole of climbing in the side of first bracing piece, the material cost has been saved to the mode that sets up the cat ladder alone than the tradition, equipment occupation space has been reduced simultaneously, this device passes through the connected mode of cooperation bolt and joint between the mechanism, circulated use, the waste of building resources has been reduced.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a complete structural schematic diagram of the present invention;
fig. 2 is a side view of the present invention;
fig. 3 is a right side view structure diagram of the present invention.
In the figure: 1 a first base plate; 2, through holes; 3 a first connecting shaft; 4 a first support bar; 5 climbing a pole; 6 a first fixed shaft; 7 a top plate; 8, a flange plate; 9, a threaded seat; 10 lifting the mounting rod; 11 lamp holders; 12 high light; 13 a second fixed shaft; 14 a second support bar; 15 a first connecting block; 16 vertical rods; 17 a sleeve; 18 standing foot plates; 19 a second connecting block; 20, mounting a frame; 21 a solar panel; 22 a second connecting shaft; 23 second base plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: a device capable of recycling temporary building facilities in a building site comprises a first bottom plate 1, a through hole 2 is formed in the surface of the first bottom plate 1, a first connecting shaft 3 is installed at one end of the first bottom plate 1 in a penetrating mode, a first supporting rod 4 is connected to the surface of the first connecting shaft 3, a climbing rod 5 is connected to the inside of the first supporting rod 4 through a bolt, a first fixing shaft 6 is arranged at one end of the first supporting rod 4, a top plate 7 is connected to the surface of the first fixing shaft 6, a flange plate 8 is connected to the top of the top plate 7 through a bolt, a threaded seat 9 is fixedly installed at the top of the flange plate 8, a lifting installation rod 10 is installed inside the threaded seat 9 in a penetrating mode through threads, a lamp holder 11 is installed at the top of the lifting installation rod 10, a highlight lamp 12 is arranged inside the lamp holder 11 in a penetrating mode, a second fixing shaft 13 is installed at one end of the top, one side of second bracing piece 14 is provided with first connecting block 15, the inside of first connecting block 15 is run through and is provided with montant 16, sleeve pipe 17 has been cup jointed to montant 16's bottom, sleeve pipe 17's bottom fixed mounting has a board 18 of standing, one side of second bracing piece 14 is provided with second connecting block 19, the bottom of roof 7 is provided with mounting bracket 20, solar cell panel 21 is installed to the one end of mounting bracket 20, the one end of second bracing piece 14 is run through and is installed second connecting axle 22, the surface connection of second connecting axle 22 has second bottom plate 23.
In the embodiment, by arranging the lamp holder 11 and the lifting installation rod 10, the mounting height of the high-brightness lamp 12 can be adjusted through the threaded connection between the lifting installation rod 10 and the threaded seat 9, thereby improving the flexibility of the lighthouse in use, by arranging the first support rod 4 and the second support rod 14, and the first support rod 4 and the second support rod 14 are respectively connected with the first bottom plate 1 and the second bottom plate 23 through the first connecting shaft 3 and the second connecting shaft 22, and are in adaptive connection with the bolt through the through hole 2, the mounting and the dismounting of the lighthouse support mechanism are facilitated, by arranging the inserted vertical rod 16, on one hand, the stable support can be provided for the first support rod 4 and the second support rod 14, on the other hand, the mounting is facilitated, by arranging the climbing rod 5 on the side surface of the first support rod 4, the material cost is saved compared with the traditional mode of independently arranging the ladder stand, and the space occupied by the device is reduced, the device can be recycled by matching the connection mode of the bolts and the clamping between the mechanisms, and the waste of building resources is reduced.
Specifically, the inside of through-hole 2 is provided with the screw thread, and through-hole 2 sets up for linear arrangement on the surface of first bottom plate 1, sets up linear arrangement's through-hole 2 on the surface of first bottom plate 1, and through the bolt of through-hole 2 adaptation through-hole 2, further through the joint of bolt and ground, can stabilize the installation with first bottom plate 1.
Specifically, the first supporting rods 4 are symmetrically arranged, one ends of the two first supporting rods 4 are connected through the first connecting shaft 3, and the first supporting rods 4 are matched with the first fixing shaft 6 to stably support the top plate 7 through the symmetrical first supporting rods 4.
Specifically, second bracing piece 14 is symmetrical about the axis of roof 7, and the one end of two second bracing pieces 14 is passed through second fixed axle 13 and is connected, through setting up symmetrical second bracing piece 14, through the first bracing piece 4 of second bracing piece 14 cooperation, can stabilize the support to both ends about roof 7 to provide reliable fixed action for the installation and the use of 12 such as high bright.
Specifically, first connecting block 15 and second connecting block 19 are provided with two pairs respectively, and montant 16 runs through in first connecting block 15 and second connecting block 19's inside in proper order, carries out the joint through setting up montant 16 and first connecting block 15 and second connecting block 19's inside, cooperates foot board 18 and sleeve pipe 17 of standing simultaneously, can play the fixed stay effect to first bracing piece 4 and second bracing piece 14.
Specifically, solar cell panel 21 is provided with a pair ofly, and two solar cell panels 21 set up respectively in the both ends of mounting bracket 20, and through the solar cell panel 21 that sets up two symmetries, through the absorption of solar cell panel 21 to the light energy, can provide electric power for highlight lamp 12 and support.
The utility model discloses a theory of operation and use flow: after the utility model is installed, when in use, the first support rod 4 and the second support rod 14 are respectively connected with the first bottom plate 1 and the second bottom plate 23 through the first connecting shaft 3 and the second connecting shaft 22, and are connected with the bolt through the through hole 2, thereby facilitating the installation and the removal of the lighthouse support mechanism, the inserted vertical rod 16 is arranged to provide stable support for the first support rod 4 and the second support rod 14, the climbing rod 5 is arranged on the side surface of the first support rod 4, the material cost is saved compared with the traditional mode of independently arranging the ladder stand, the mounting height of the high-brightness lamp 12 can be adjusted by arranging the lamp holder 11 and the lifting mounting rod 10 and connecting the lifting mounting rod 10 with the screw thread between the screw thread seat 9, thereby improving the flexibility of the lighthouse use, and by arranging the two symmetrical solar cell panels 21, the absorption of light energy is realized by the solar cell panel 21, the high intensity lamps 12 may be powered.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a but building site faces device of building chemical plant cyclic utilization, includes first bottom plate (1), through-hole (2), its characterized in that have been seted up on the surface of first bottom plate (1): the lamp comprises a first bottom plate (1), a first connecting shaft (3) is installed at one end of the first bottom plate in a penetrating mode, a first supporting rod (4) is connected to the surface of the first connecting shaft (3), a climbing rod (5) is connected to the inside of the first supporting rod (4) through a bolt, a first fixing shaft (6) is arranged at one end of the first supporting rod (4), a top plate (7) is connected to the surface of the first fixing shaft (6), a flange plate (8) is connected to the top of the top plate (7) through a bolt, a threaded seat (9) is fixedly installed at the top of the flange plate (8), a lifting installation rod (10) is installed inside the threaded seat (9) in a penetrating mode through threads, a lamp holder (11) is installed at the top of the lifting installation rod (10), a highlight lamp (12) is installed inside the lamp holder (11) in a penetrating mode, and a second fixing shaft (13) is, the surface of second fixed axle (13) is connected with second bracing piece (14), one side of second bracing piece (14) is provided with first connecting block (15), the inside of first connecting block (15) is run through and is provided with montant (16), sleeve pipe (17) have been cup jointed to the bottom of montant (16), the bottom fixed mounting of sleeve pipe (17) has the sole of standing (18), one side of second bracing piece (14) is provided with second connecting block (19), the bottom of roof (7) is provided with mounting bracket (20), solar cell panel (21) are installed to the one end of mounting bracket (20), the one end of second bracing piece (14) is run through and is installed second connecting axle (22), the surface of second connecting axle (22) is connected with second bottom plate (23).
2. The apparatus of claim 1, wherein the apparatus comprises: the screw threads are arranged in the through holes (2), and the through holes (2) are linearly arranged on the surface of the first base plate (1).
3. The apparatus of claim 1, wherein the apparatus comprises: the first supporting rods (4) are symmetrically arranged, and one ends of the two first supporting rods (4) are connected through a first connecting shaft (3).
4. The apparatus of claim 1, wherein the apparatus comprises: the second support rods (14) are symmetrical about the central axis of the top plate (7), and one ends of the two second support rods (14) are connected through a second fixed shaft (13).
5. The apparatus of claim 1, wherein the apparatus comprises: the first connecting block (15) and the second connecting block (19) are respectively provided with two pairs, and the vertical rod (16) sequentially penetrates through the first connecting block (15) and the second connecting block (19).
6. The apparatus of claim 1, wherein the apparatus comprises: the solar cell panels (21) are provided with a pair of solar cell panels, and the two solar cell panels (21) are respectively arranged at two ends of the mounting rack (20).
CN201921903796.6U 2019-11-06 2019-11-06 But building site faces device that makes full use of construction facilities Expired - Fee Related CN210740348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921903796.6U CN210740348U (en) 2019-11-06 2019-11-06 But building site faces device that makes full use of construction facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921903796.6U CN210740348U (en) 2019-11-06 2019-11-06 But building site faces device that makes full use of construction facilities

Publications (1)

Publication Number Publication Date
CN210740348U true CN210740348U (en) 2020-06-12

Family

ID=71009308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921903796.6U Expired - Fee Related CN210740348U (en) 2019-11-06 2019-11-06 But building site faces device that makes full use of construction facilities

Country Status (1)

Country Link
CN (1) CN210740348U (en)

Similar Documents

Publication Publication Date Title
CN207484928U (en) A kind of scaffold for building for facilitating adjusting
CN217071395U (en) Photovoltaic installation auxiliary mechanism
CN210740348U (en) But building site faces device that makes full use of construction facilities
CN204947958U (en) A kind of solar panels supporting structure
CN210201945U (en) Building construction management supervisory equipment
CN213420950U (en) Multi-section combined solar lamp pole
CN211038061U (en) Simple tent for field activities
CN111945884B (en) Steel structure upright post assembly capable of improving connection strength
CN214329828U (en) Effectual frame of climbing of antiskid
CN201263129Y (en) Solar power station stent
CN210319498U (en) Apply to LED lighting device of municipal construction
CN209386181U (en) A kind of construction and decoration sunlamp support frame
CN209371095U (en) A kind of solar street light bar having alarm function
CN210067618U (en) Road construction road sealing plate convenient to dismantle
CN211201306U (en) Steel construction that transformer substation used
CN218467042U (en) A support device for photovoltaic construction
CN219931823U (en) Outdoor railing with adjustable
CN214009058U (en) Solar photovoltaic power generation wisdom street lamp
CN215523805U (en) Solar cell panel mounting rack convenient to dismantle
CN221839618U (en) Assembled solar street lamp
CN113446558A (en) Solar energy LED street lamp convenient to maintenance
CN210247905U (en) Sheep is bred and uses rail with illumination function
CN215336082U (en) Staple bolt formula solar energy integration lithium cell street lamp
CN219931859U (en) Recyclable steel member
CN214659135U (en) Energy-concerving and environment-protective type is oblique positive canopy for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200612