CN210738047U - Concrete pouring operation rack for building floor slab - Google Patents

Concrete pouring operation rack for building floor slab Download PDF

Info

Publication number
CN210738047U
CN210738047U CN201920909592.7U CN201920909592U CN210738047U CN 210738047 U CN210738047 U CN 210738047U CN 201920909592 U CN201920909592 U CN 201920909592U CN 210738047 U CN210738047 U CN 210738047U
Authority
CN
China
Prior art keywords
base
electric telescopic
workbench
operation rack
telescopic rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920909592.7U
Other languages
Chinese (zh)
Inventor
朱柳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Xiong'an Branch Of China Construction Design Group Co Ltd
China Construction Engineering Design Group Corp Ltd
Original Assignee
Hebei Xiong'an Branch Of China Construction Design Group Co Ltd
China Construction Engineering Design Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Xiong'an Branch Of China Construction Design Group Co Ltd, China Construction Engineering Design Group Corp Ltd filed Critical Hebei Xiong'an Branch Of China Construction Design Group Co Ltd
Priority to CN201920909592.7U priority Critical patent/CN210738047U/en
Application granted granted Critical
Publication of CN210738047U publication Critical patent/CN210738047U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a floor concrete placement operation rack is built in room, the on-line screen storage device comprises a base, first recess has all been seted up all around at base top, the bottom fixed mounting of first recess inner chamber has first electric telescopic handle, first electric telescopic handle's top fixedly connected with workstation, the top of workstation is inlayed and is equipped with the weight inductor, the bottom of workstation is inlayed and is equipped with the spirit level, the upper portion fixed mounting of the positive surface middle-end of base has the display, the upper portion fixed mounting of the positive surface right-hand member of base has the siren, the right-hand member of the positive surface of base and the lower part fixed mounting who is located the siren have the controller. The utility model discloses a base, ladder, first electric telescopic handle, workstation, siren, insert nail, fixed block, weight inductor and spirit level and mutually support, it all is assembled to have solved present operation rack, all needs the equipment very troublesome before using at every turn, and the not high problem of stability.

Description

Concrete pouring operation rack for building floor slab
Technical Field
The utility model relates to a building engineering technical field specifically is a floor concrete placement operation rack is built in room.
Background
When building floor concrete placement is under construction, operating personnel tramples on the bound floor steel reinforcement framework, the deformation and displacement of the floor steel reinforcement framework are inevitably caused, the thickness of a structural steel reinforcement protective layer is not enough, particularly, the steel reinforcement framework formed by two layers of steel reinforcements causes the sinking of upper negative reinforcements, when floor surface smoothing and press polishing operation is carried out, the operating personnel tramples on waterproof rubber shoes to operate on the concrete surface just poured, the deformation and displacement of the floor structural steel reinforcements can be caused, so people need to use an operating rack when pouring, but the existing operating rack is assembled, the assembly is very troublesome before each use, and the stability is not high, therefore, the building floor concrete placement operating rack is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a floor concrete placement operation rack is built in room possesses the advantage that does not need equipment and stability is high, has solved present operation rack and all is assembled, all need the equipment very troublesome before using at every turn, and the not high problem of stability.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a floor concrete placement operation rack is built in room, includes the base, first recess has all been seted up all around at base top, the bottom fixed mounting of first recess inner chamber has first electric telescopic handle, first electric telescopic handle's top fixedly connected with workstation, the top of workstation is inlayed and is equipped with the weight inductor, the bottom of workstation is inlayed and is equipped with the spirit level, the upper portion fixed mounting of the positive surface middle-end of base has the display, the upper portion fixed mounting of the positive surface right-hand member of base has the siren, the right-hand member of the positive surface of base and the lower part fixed mounting who is located the siren have the controller, the second recess has all been seted up all around to base bottom, the top fixed mounting of second recess inner chamber has second electric telescopic handle, the bottom of second electric telescopic handle is rotated through the bearing and is installed and is removed the wheel.
Preferably, a battery jar is arranged at the middle end of the inner cavity of the base, a storage battery is fixedly arranged in the inner cavity of the battery jar, and a socket is arranged at the middle end of the front surface of the base and at the lower part of the display.
Preferably, the middle end on the left side of the base is fixedly connected with a ladder, and the top on the right side of the ladder is movably connected with the left side of the workbench.
Preferably, the equal fixedly connected with fixed block in both ends around both ends and the base right side around the base left side, be provided with the plug pin on the fixed block.
Preferably, the bottom of the moving wheel and the bottom of the base are in the same horizontal plane, and the controller is in the model of MAM-100.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model combines the base, the first electric telescopic rod and the workbench to form an integrated operation rack, can be directly used without assembly to save time, when the height of the operation rack is required to be adjusted, the height of the workbench can be changed by controlling the extension of the first electric telescopic rod, the height can be adjusted without re-erection of the assembly, the operation rack is very convenient, the weight on the workbench can be detected by the weight sensor, the influence of the overweight weight on the workbench on the stability of the device can be avoided, the leveller is utilized to detect whether the device is horizontal, the alarm is opened when the inclination of the device is overhigh, people are reminded by the alarm, the stability of the device is improved, the device can be fixed by the inserting nails and the fixed blocks, the sliding of the device is avoided, the stability is improved, and the problem that the existing operation rack is assembled is solved, the assembly is very troublesome before each use and the stability is not high.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1. a base; 2. a display; 3. a ladder; 4. a first electric telescopic rod; 5. a work table; 6. an alarm; 7. inserting a nail; 8. a fixed block; 9. a controller; 10. a socket; 11. a first groove; 12. a weight sensor; 13. a level gauge; 14. a storage battery; 15. a battery case; 16. a second groove; 17. a second electric telescopic rod; 18. the wheel is moved.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model discloses a base 1, display 2, ladder 3, first electric telescopic handle 4, workstation 5, siren 6, insert nail 7, fixed block 8, controller 9, socket 10, first recess 11, weight inductor 12, spirit level 13, battery 14, battery jar 15, second recess 16, second electric telescopic handle 17 and removal wheel 18 part are general standard or the part that technical staff in the field knows, its structure and principle all are that this technical staff all can learn through the technical manual or learn through conventional experimental method.
Referring to fig. 1-3, a building floor concrete pouring operation rack comprises a base 1, wherein first grooves 11 are formed around the top of the base 1, a first electric telescopic rod 4 is fixedly installed at the bottom of an inner cavity of each first groove 11, a workbench 5 is fixedly connected to the top of each first electric telescopic rod 4, a ladder 3 is fixedly connected to the middle end of the left side of the base 1, the top of the right side of the ladder 3 is movably connected to the left side of the workbench 5, a weight sensor 12 is embedded in the top of the workbench 5, a level meter 13 is embedded in the bottom of the workbench 5, a display 2 is fixedly installed on the upper portion of the middle end of the front surface of the base 1, an alarm 6 is fixedly installed on the upper portion of the right end of the front surface of the base 1, fixed blocks 8 are fixedly connected to the front end and the rear end of the left side of the base 1 and the front end and rear end of the right side of the base 1, inserting nails 7 are arranged on, the periphery of the bottom of the base 1 is provided with second grooves 16, the top of the inner cavity of each second groove 16 is fixedly provided with a second electric telescopic rod 17, the bottom of each second electric telescopic rod 17 is rotatably provided with a movable wheel 18 through a bearing, the base 1, the first electric telescopic rod 4 and the workbench 5 are mutually matched to form an integrated operation rack, the operation rack can be directly used without assembly, the time can be saved, when the height of the operation rack is required to be adjusted, the height of the workbench 5 can be changed by controlling the extension and retraction of the first electric telescopic rod 4, the height can be adjusted without re-erection of the assembly, the operation rack is very convenient, the weight on the workbench 5 can be detected through the weight sensor 12, the stability of the device can be prevented from being influenced by the overweight on the workbench 5, whether the device is horizontal or not can be detected by using the level meter 13, and the alarm 6 is opened when the inclination of the device, utilize siren 6 to remind people, improve the stability of this device, utilize and insert nail 7 and fixed block 8, can fix this device, avoid this device to slide, improve stability, it all is the assembled to have solved present operation rack, it is very troublesome all to need the equipment before using at every turn, and the not high problem of stability, battery jar 15 has been seted up to the middle-end of base 1 inner chamber, battery jar 15's inner chamber fixed mounting has battery 14, socket 10 has been seted up to the middle-end of base 1 positive surface and the lower part that is located display 2, the bottom of removal wheel 18 is in same horizontal plane with the bottom of base 1, the model of controller 9 is MAM-100.
When the device is used, the base 1, the first electric telescopic rod 4 and the workbench 5 are mutually matched to form an integrated operation rack, the device can be directly used without being assembled, the time is saved, when the height of the operation rack is required to be adjusted, the height of the workbench 5 can be changed by controlling the extension and retraction of the first electric telescopic rod 4, the height can be adjusted without being erected again, the device is very convenient, the weight on the workbench 5 can be detected through the weight sensor 12, the phenomenon that the stability of the device is influenced by the overweight on the workbench 5 can be avoided, the level instrument 13 is used for detecting whether the device is horizontal or not, the alarm 6 is opened when the inclination of the device is too high, people are reminded by the alarm 6, the stability of the device is improved, the device can be fixed by the inserting nails 7 and the fixed blocks 8, the sliding of the device is avoided, and the stability is improved, the problem of present operation rack all be assembled, it is very troublesome all to need assemble before using each time, and stability is not high is solved.
In summary, the following steps: this floor concrete placement operation rack is built in room, through base 1, ladder 3, first electric telescopic handle 4, workstation 5, siren 6, insert nail 7, fixed block 8, weight inductor 12 and spirit level 13 and mutually support, solved present operation rack and all be assembled, all need the equipment very troublesome before using at every turn, and the not high problem of stability.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a floor concrete placement operation rack is built in room, includes base (1), its characterized in that: the device is characterized in that first grooves (11) are formed in the periphery of the top of the base (1), a first electric telescopic rod (4) is fixedly installed at the bottom of an inner cavity of the first grooves (11), a workbench (5) is fixedly connected to the top of the first electric telescopic rod (4), a weight sensor (12) is embedded in the top of the workbench (5), a level gauge (13) is embedded in the bottom of the workbench (5), a display (2) is fixedly installed on the upper portion of the middle end of the front surface of the base (1), an alarm (6) is fixedly installed on the upper portion of the right end of the front surface of the base (1), a controller (9) is fixedly installed at the right end of the front surface of the base (1) and positioned on the lower portion of the alarm (6), second grooves (16) are formed in the periphery of the bottom of the base (1), and a second electric telescopic rod (17) is fixedly installed at the top of the inner cavity of the, the bottom of the second electric telescopic rod (17) is rotatably provided with a movable wheel (18) through a bearing.
2. The building floor concrete pouring work bench of claim 1, characterized in that: a battery jar (15) is arranged at the middle end of the inner cavity of the base (1), a storage battery (14) is fixedly arranged in the inner cavity of the battery jar (15), and a socket (10) is arranged at the middle end of the front surface of the base (1) and is positioned at the lower part of the display (2).
3. The building floor concrete pouring work bench of claim 1, characterized in that: the multifunctional pedestal is characterized in that the middle end on the left side of the pedestal (1) is fixedly connected with a ladder (3), and the top on the right side of the ladder (3) is movably connected with the left side of the workbench (5).
4. The building floor concrete pouring work bench of claim 1, characterized in that: the base is characterized in that the front end and the rear end of the left side of the base (1) and the front end and the rear end of the right side of the base (1) are fixedly connected with fixing blocks (8), and the fixing blocks (8) are provided with inserting nails (7).
5. The building floor concrete pouring work bench of claim 1, characterized in that: the bottom of the moving wheel (18) and the bottom of the base (1) are positioned on the same horizontal plane, and the type of the controller (9) is MAM-100.
CN201920909592.7U 2019-06-17 2019-06-17 Concrete pouring operation rack for building floor slab Expired - Fee Related CN210738047U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920909592.7U CN210738047U (en) 2019-06-17 2019-06-17 Concrete pouring operation rack for building floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920909592.7U CN210738047U (en) 2019-06-17 2019-06-17 Concrete pouring operation rack for building floor slab

Publications (1)

Publication Number Publication Date
CN210738047U true CN210738047U (en) 2020-06-12

Family

ID=70984704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920909592.7U Expired - Fee Related CN210738047U (en) 2019-06-17 2019-06-17 Concrete pouring operation rack for building floor slab

Country Status (1)

Country Link
CN (1) CN210738047U (en)

Similar Documents

Publication Publication Date Title
CN112096093A (en) Assembled wall body installing support
CN113008167A (en) Building decoration wall flatness detection device with lifting function
CN210738047U (en) Concrete pouring operation rack for building floor slab
CN214702071U (en) Dedicated gap verifying attachment of elevator inspection
CN212359156U (en) Cast-in-place ground elevation controller of concrete
CN214981838U (en) Supporting mechanism for prefabricated concrete slab
CN210401072U (en) Building material intensity detection device convenient to remove
CN213207159U (en) On-spot mapping device of building engineering cost
CN212406165U (en) Assembled wall body installing support
CN213391110U (en) Building brick device for building house
CN211783479U (en) Graphics mapping device that villages and small towns planning was used
CN214001758U (en) Pipeline spare arrangement frame for building engineering
CN211736288U (en) Special work bench for building stairs
CN210070908U (en) Building engineering quality flatness detection device
CN210953654U (en) Mortar strength measuring device for measuring compressive strength of mortar
CN213391111U (en) Suspended ceiling supporting device for building construction
CN112964239A (en) Construction engineering construction detection device
CN212988413U (en) Adjustable expansion device for road and bridge detection
CN112065077A (en) Adjustable leveling structure for assembled ground
CN217537911U (en) Concrete placement workstation is built in room
CN213990259U (en) Assembled superimposed sheet supporting mechanism for building engineering
CN219967931U (en) Fireproof door installation height adjusting tool
CN219720272U (en) Cartoon handy showing stand convenient to replace
CN218035097U (en) Building engineering environment detection device
CN218509395U (en) Stable in structure's electric power overhaul ladder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200612