CN210736448U - Construction land for use effluent treatment plant - Google Patents

Construction land for use effluent treatment plant Download PDF

Info

Publication number
CN210736448U
CN210736448U CN201921512247.6U CN201921512247U CN210736448U CN 210736448 U CN210736448 U CN 210736448U CN 201921512247 U CN201921512247 U CN 201921512247U CN 210736448 U CN210736448 U CN 210736448U
Authority
CN
China
Prior art keywords
fixedly connected
waste water
belt pulley
box
treatment box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921512247.6U
Other languages
Chinese (zh)
Inventor
王朝红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Ouliang Environmental Protection Technology Co ltd
Original Assignee
Shanghai Ouliang Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ouliang Environmental Protection Technology Co ltd filed Critical Shanghai Ouliang Environmental Protection Technology Co ltd
Priority to CN201921512247.6U priority Critical patent/CN210736448U/en
Application granted granted Critical
Publication of CN210736448U publication Critical patent/CN210736448U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Water Treatment By Electricity Or Magnetism (AREA)

Abstract

The utility model relates to a building site waste water treatment technical field just discloses a ground effluent treatment plant is used in construction, including the base, the upper surface of base and the bottom fixed connection who handles the case, handle the bottom of case one side and one side fixed connection of backing plate, the bottom of backing plate and the one end fixed connection of base upper surface, the upper surface of backing plate and the bottom fixed connection of motor, one side of motor is through the one end fixed connection of belt one and a belt pulley surface. This construction is with ground effluent treatment plant, through arrange the waste water of building site after handling incasement portion, the iron material of magnet pole in with the waste water adsorbs on the surface, filter secondary filter waste water has reached the iron material adsorption in the waste water, building residue and sewage separation's purpose, has solved traditional processing building site waste water process and has roughly been put, and the effect is unsatisfactory, does not reach emission standard and just arranges waste water to the sewer, the problem of polluted environment and water resource.

Description

Construction land for use effluent treatment plant
Technical Field
The utility model relates to a building site waste water treatment technical field specifically is a building site effluent treatment plant is used in construction.
Background
Along with the development of science and technology, China pays more and more attention to the development of buildings, has the title of capital construction and crazy magic, and various residential buildings, apartment buildings and office buildings are erected in all corners of cities in China.
Often can use a large amount of water resources at the in-process of construction, will produce a large amount of sewage thereupon, the sewage the inside includes the various building rubbish that drop in the work progress, building residue and so on, if direct arrange the sewer with waste water, can lead to the sewer to block up, the iron nail that contains in the waste water, waste materials such as reinforcing bar can be to the water resource, soil and environment cause serious pollution, current effluent treatment plant can not come out with the effectual clearance of iron material article and construction waste in the waste water, the clearance process is complicated, low efficiency, waste time and energy.
SUMMERY OF THE UTILITY MODEL
The utility model is not enough to prior art, the utility model provides a building site effluent treatment plant is used in construction, possess quick effectual building residue and the clearance of iron material impurity in the building site waste water come out, water resource and environment are protected, time saving and labor saving, improve waste water treatment's work efficiency, intensity of labour when reducing workman's clearance waste water, the use can be backfilled to the impurity of clearance out, resources are saved, advantages such as reduction in production cost, it is inefficient to have solved traditional clearance work ground waste water, the effect is not obvious, seriously influence the engineering progress of building site construction, workman's intensity of labour is big, waste time and energy, work efficiency is low, increase manufacturing cost's problem.
The utility model provides a technical scheme that its technical problem adopted is: a construction land waste water treatment device comprises a base, wherein the upper surface of the base is fixedly connected with the bottom of a treatment box, the bottom of one side of the treatment box is fixedly connected with one side of a backing plate, the bottom of the backing plate is fixedly connected with one end of the upper surface of the base, the upper surface of the backing plate is fixedly connected with the bottom of a motor, one side of the motor is fixedly connected with one end of the outer surface of a belt pulley through a belt I, the belt pulley is sleeved on the outer surface of one end of a rotating shaft, one end of the rotating shaft, far away from the belt pulley I, penetrates through a bearing II fixedly connected with one side of the treatment box, a threaded sleeve I is sleeved on the outer surface of the middle part of the rotating shaft, one side of the threaded sleeve I is fixedly connected with one end of a scraper, the other end of the scraper is slidably connected with the upper surface, the other end of the sliding plate II penetrates through an outlet on one side of the treatment box and is fixedly connected with one side of the impurity box, the bottom of the impurity box is fixedly connected with one end of the upper surface of the base, and a supporting plate is fixedly arranged on one side of the treatment box away from the base plate;
one end of the belt pulley I, which is far away from the belt I, is movably connected with one end of the belt pulley II through the belt II, the belt pulley is sleeved on the outer surface of one end of the rotating rod, the other end of the rotating rod penetrates through the bearing I fixedly connected to one side of the processing box, the outer surface of the rotating rod, which is far away from the belt pulley II, is sleeved with the threaded sleeve II, the bottom of the threaded sleeve II is fixedly connected with one end of the connecting rod, the other end of the connecting rod is fixedly connected with one side of the scraping ring, the scraping ring is sleeved on the outer surface of the magnet rod, and.
Further, one side of handling the incasement wall is provided with slide one, and the round hole that the diameter is 1 centimetre is all seted up on slide one and the surface of filter to the inclination of slide one is 60 degrees.
Further, the bottom of treating incasement wall is the slope bottom surface to it has the outlet pipe to handle the intercommunication of case lowest department, and the outlet pipe runs through the bottom of backing plate.
Furthermore, the number of the first bearings and the second bearings is two, and the first bearings and the second bearings are symmetrically arranged on two sides of the outer wall of the treatment box.
Furthermore, the two ends of the magnet rod are connecting rods made of rubber materials without magnetism.
Further, the motor is a bidirectional alternating current motor.
The utility model has the advantages that:
1. this construction is with ground effluent treatment plant, through arrange the waste water of building site after handling incasement portion, the iron material of magnet pole in with the waste water adsorbs on the surface, filter secondary filter waste water has reached the iron material adsorption in the waste water, building residue and sewage separation's purpose, has solved traditional processing building site waste water process and has roughly been put, and the effect is unsatisfactory, does not reach emission standard and just arranges waste water to the sewer, the problem of polluted environment and water resource.
2. This recruitment ground effluent treatment plant is used in construction, can be quick with building residue in the waste water and building site with magazine such as reinforcing bar isolate, labour saving and time saving improves the work efficiency of handling waste water, reduces workman's intensity of labour, resources are saved, environmental protection and water resource are convenient for remove, adaptability is strong, can adapt to various operational environment and place, easy operation, the maintenance in the later stage of being convenient for.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below.
FIG. 1 is a schematic structural section view of the present invention;
FIG. 2 is a right side view of the structure of the present invention;
FIG. 3 is a top view of the present invention;
fig. 4 is an enlarged schematic view of a point a in the structure diagram of the present invention 1.
Description of reference numerals: 1-base, 2-water outlet pipe, 3-backing plate, 4-motor, 5-belt I, 6-belt pulley I, 7-belt II, 8-scraping ring, 9-rotating rod, 10-belt pulley II, 11-treatment box, 12-scraping plate, 13-threaded sleeve I, 14-sliding plate I, 15-filtering plate, 16-sliding plate II, 17-impurity box, 18-rotating shaft, 19-supporting plate, 20-magnet rod, 21-bearing I, 22-connecting rod, 23-bearing II and 24-threaded sleeve II.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-4, a construction site wastewater treatment device comprises a base 1, wherein the upper surface of the base 1 is fixedly connected with the bottom of a treatment box 11, the bottom of the inner wall of the treatment box 11 is an inclined bottom surface, the lowest part of the treatment box 11 is communicated with a water outlet pipe 2, the water outlet pipe 2 penetrates through the bottom of a backing plate 3, the bottom of the treatment box 11 is provided with an inclined bottom plate for facilitating the discharge of filtered wastewater and improving the working efficiency of the waste treatment, the bottom of one side of the treatment box 11 is fixedly connected with one side of the backing plate 3, the bottom of the backing plate 3 is fixedly connected with one end of the upper surface of the base 1, the upper surface of the backing plate 3 is fixedly connected with the bottom of a motor 4, the motor 4 is a bidirectional alternating current motor 4, the motor 4 uses a bidirectional motor 4 for facilitating the rotation of a rotating shaft 18 and a rotating shaft 9 in two directions for facilitating the treatment of impurities in the wastewater, one side of, the first belt pulley 6 is sleeved on the outer surface of one end of the rotating shaft 18, far away from the first belt pulley 6, penetrates through a second bearing 23 fixedly connected to one side of the processing box 11, the outer surface of the middle part of the rotating shaft 18 is sleeved with a first threaded sleeve 13, one side of the first threaded sleeve 13 is fixedly connected with one end of the scraper 12, the other end of the scraper 12 is slidably connected with the upper surface of the filter plate 15, one end of the filter plate 15 is fixedly connected with one side of the inner wall of the processing box 11, the other end of the filter plate 15 is fixedly connected with one end of the sliding plate 16, the other end of the sliding plate 16 penetrates through an outlet at one side of the processing box 11 and is fixedly connected with one side of the impurity box 17, the bottom of the impurity box 17 is fixedly connected with one end of the upper surface of the base 1, a supporting plate 19 is fixedly arranged at one side, round holes with the diameter of 1 cm are formed in the surfaces of the first sliding plate 14 and the filter plate 15, the inclination angle of the first sliding plate 14 is 60 degrees, and the round holes are formed in the surfaces of the first sliding plate 14 and the filter plate 15, so that iron impurities on the surface of the magnet rod 20 can be scraped out by the scraping ring 8 conveniently, building residues are filtered on the surface of the filter plate 15, and the working efficiency of solid-liquid separation is improved;
one end of a belt pulley 6, which is far away from a belt I5, is movably connected with one end of a belt pulley II 10 through a belt II 7, the belt pulley II 10 is sleeved on the outer surface of one end of a rotating rod 9, the other end of the rotating rod 9 penetrates through a bearing I21 fixedly connected to one side of a treatment box 11, the number of the bearing I21 and the number of the bearing II 23 are two, two bearing I22 and two bearing II 24 are symmetrically arranged on two sides of the outer wall of the treatment box 11, two bearing I21 and two bearing II 23 are arranged, so that the rotating shaft 18 and the rotating rod 9 can rotate conveniently, the outer surface of the rotating rod 9, which is far away from the belt pulley II 10, is sleeved with a threaded sleeve II 24, the belt pulley II 10 is sleeved on the outer surface of one end of a magnet rod 20, two ends of the magnet rod 20 are connecting rods which do not contain magnetic rubber materials, two ends of the, the bottom of the second threaded sleeve 24 is fixedly connected with one end of the connecting rod 22, the other end of the connecting rod 22 is fixedly connected with one side of the scraping ring 8, the scraping ring 8 is sleeved on the outer surface of the magnet rod 20, and one end of the magnet rod 20 is fixedly connected with one side of the inner wall of the processing box 11.
When the device is used, wastewater is discharged into the treatment box 11, the motor 4 is started, the motor 4 drives the rotating shaft 18 to rotate through the belt I5, the threaded sleeve I13 moves left and right on the surface of the rotating shaft 18 in the rotating process of the rotating shaft 18, so that the building impurities on the surface of the filter plate 15 are scraped to the impurity box 17 through the sliding plate II 16 by the scraper 12 at the bottom of the threaded sleeve I13, the rotating shaft 18 rotates and drives the rotating rod 9 to rotate through the belt II 7, the threaded sleeve II 24 moves left and right on the surface of the rotating rod 9 in the rotating process of the rotating rod 9, the scraper ring 8 is driven to move on the surface of the magnet rod 20, iron impurities adsorbed on the surface of the magnet rod 20 slide down to the surface of the supporting plate 19 through the sliding plate I14, and the purpose of solid-liquid separation of the.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides a construction land for use effluent treatment plant, includes base (1), its characterized in that: the upper surface of the base (1) is fixedly connected with the bottom of the treatment box (11), the bottom of one side of the treatment box (11) is fixedly connected with one side of the backing plate (3), the bottom of the backing plate (3) is fixedly connected with one end of the upper surface of the base (1), the upper surface of the backing plate (3) is fixedly connected with the bottom of the motor (4), one side of the motor (4) is fixedly connected with one end of the outer surface of the belt pulley I (6) through the belt I (5), the belt pulley I (6) is sleeved on the outer surface of one end of the rotating shaft (18), which is far away from the belt pulley I (6), penetrates through the bearing II (23) fixedly connected with one side of the treatment box (11), the outer surface of the middle part of the rotating shaft (18) is sleeved with the threaded sleeve I (13), one side of the threaded sleeve I (13) is fixedly connected with one end of the scraper (12), and the, one end of the filter plate (15) is fixedly connected with one side of the inner wall of the treatment box (11), the other end of the filter plate (15) is fixedly connected with one end of the sliding plate II (16), the other end of the sliding plate II (16) penetrates through an outlet in one side of the treatment box (11) and is fixedly connected with one side of the impurity box (17), the bottom of the impurity box (17) is fixedly connected with one end of the upper surface of the base (1), and a supporting plate (19) is fixedly arranged on one side, away from the backing plate (3), of the treatment box (11);
one end of a belt pulley (6) far away from a belt (5) is movably connected with one end of a belt pulley (10) through a belt (7), the belt pulley (10) is sleeved on the outer surface of one end of a rotating rod (9), the other end of the rotating rod (9) penetrates through a bearing (21) fixedly connected to one side of a processing box (11), a threaded sleeve (24) is sleeved on the outer surface of the rotating rod (9) far away from the belt pulley (10), the bottom of the threaded sleeve (24) is fixedly connected with one end of a connecting rod (22), the other end of the connecting rod (22) is fixedly connected with one side of a scraping ring (8), the scraping ring (8) is sleeved on the outer surface of a magnet rod (20), and one end of the magnet rod (20) is fixedly connected with one side of the inner wall of the processing box (11).
2. The construction site wastewater treatment device according to claim 1, wherein: one side of the inner wall of the treatment box (11) is provided with a first sliding plate (14), round holes with the diameter of 1 cm are formed in the first sliding plate (14) and the surface of the filtering plate (15), and the inclination angle of the first sliding plate (14) is 60 degrees.
3. The construction site wastewater treatment device according to claim 1, wherein: the bottom of the inner wall of the treatment box (11) is an inclined bottom surface, the lowest part of the treatment box (11) is communicated with a water outlet pipe (2), and the water outlet pipe (2) penetrates through the bottom of the backing plate (3).
4. The construction site wastewater treatment device according to claim 1, wherein: the number of the first bearings (21) and the second bearings (23) is two, and the first bearings (21) and the second bearings (23) are symmetrically arranged on two sides of the outer wall of the treatment box (11).
5. The construction site wastewater treatment device according to claim 1, wherein: the two ends of the magnet rod (20) are connecting rods made of rubber materials without magnetism.
6. The construction site wastewater treatment device according to claim 1, wherein: the motor (4) is a bidirectional alternating current motor (4).
CN201921512247.6U 2019-09-11 2019-09-11 Construction land for use effluent treatment plant Active CN210736448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921512247.6U CN210736448U (en) 2019-09-11 2019-09-11 Construction land for use effluent treatment plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921512247.6U CN210736448U (en) 2019-09-11 2019-09-11 Construction land for use effluent treatment plant

Publications (1)

Publication Number Publication Date
CN210736448U true CN210736448U (en) 2020-06-12

Family

ID=70989434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921512247.6U Active CN210736448U (en) 2019-09-11 2019-09-11 Construction land for use effluent treatment plant

Country Status (1)

Country Link
CN (1) CN210736448U (en)

Similar Documents

Publication Publication Date Title
CN106966519A (en) A kind of preliminary processing equipment for construction site sewage
CN214865853U (en) Hydraulic engineering pipeline dredging device
CN216584556U (en) Concrete preparation waste water recycle system
CN210736448U (en) Construction land for use effluent treatment plant
CN214571080U (en) Sewage treatment plant for municipal works
CN109608007A (en) River dredging sludge treatment equipment
CN214005788U (en) Silt cleaning equipment for river course ecological restoration
CN206617329U (en) It is a kind of to be easy to fixed sewer pipe dredge pump
CN213060631U (en) Washing water preparation and recycling equipment for ditch dredging sludge treatment
CN213060455U (en) Chemical sewage treatment equipment
CN213037562U (en) Sewage treatment case that sewage treatment used
CN108824625A (en) A kind of municipal works drainage dredging device
CN213143363U (en) Municipal administration public works sewer scrubbing equipment
CN211901025U (en) Suction fan for engineering machinery
CN210315937U (en) Urban road rainwater collecting system
CN211395933U (en) Integrated intelligent abandoning well with silt removing mechanism
CN210230107U (en) Building rubbish collecting and treating pool
CN210971463U (en) Device of decontaminating of hydroelectric power plant
CN210683244U (en) Concrete laboratory blowdown settling basin
CN206956920U (en) A kind of architectural engineering sewage withdrawing device
CN209099499U (en) A kind of discharge sewer water wellhead assembly
CN215211229U (en) Municipal drainage engineering mud pit desilting device
CN211973733U (en) Sewage collection device for municipal works
CN210253395U (en) Dredging device for hydraulic engineering
CN214611607U (en) Waste water treatment device for live pig farm

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant