CN210732759U - Concrete test block mould - Google Patents
Concrete test block mould Download PDFInfo
- Publication number
- CN210732759U CN210732759U CN201921369898.4U CN201921369898U CN210732759U CN 210732759 U CN210732759 U CN 210732759U CN 201921369898 U CN201921369898 U CN 201921369898U CN 210732759 U CN210732759 U CN 210732759U
- Authority
- CN
- China
- Prior art keywords
- box
- test block
- concrete test
- block
- grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model relates to a concrete test block mould relates to the technical field of preparation concrete test block, including holding the box and can dismantling the grid that sets up in holding the box, the grid includes polylith mutually perpendicular's transverse baffle and longitudinal baffle and constitutes, transverse baffle consolidates with longitudinal baffle, and top surface between them and hold box top surface parallel and level, hold four curb plate tops of box even draw-in groove of having seted up in interval respectively, transverse baffle and longitudinal baffle's both ends have set firmly the fixture block that can block into the draw-in groove respectively, the outside protrusion of fixture block holds the box curb plate. The utility model has the advantages of the test block is convenient to make, efficient and convenient to remove the mould.
Description
Technical Field
The utility model belongs to the technical field of the technique of preparation concrete test block and specifically relates to a concrete test block mould is related to.
Background
The concrete is cement concrete prepared by mixing cement as cementing material, sand and stone as aggregate and water in a certain proportion and stirring, and is widely applied to civil engineering.
Different buildings need concrete with different performances, and in order to prepare concrete meeting the requirements, the concrete needs to be tested for various performance indexes. The sample used in the test is a concrete test block, the standard specification of the test block is usually 150 × 150, and the test block is a common tool for preparing the concrete test block. The preparation of the concrete test block comprises the operation steps of pouring, curing, demoulding and the like.
At present, the examination mould includes that the upper portion opening sets up holds the box, holds the inside size of box and unanimous with the test block specification. During the experiment, at first paint a layer of oil in holding the box, pour the concrete into holding the box in, the concrete that will hold in the box is poured to the reality, and the top is floating, treats that the concrete solidifies after, takes out the test block from holding in the box.
The above prior art solutions have the following drawbacks: because when taking out the test block, general staff take up the box that holds that is equipped with the concrete, the opening is down, then whipps downwards and holds the box, utilizes inertial effect, makes the test block break away from and holds the box. The above process has the following problems:
1. in the test block manufacturing process, the test blocks are generally poured and demoulded one by one, so that the working efficiency is low;
2. when the test block drawing of patterns, need will hold box and test block and take up, throw, utilize inertia drawing of patterns, difficult drawing of patterns just wastes time and energy.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a concrete test block mould has avoided traditional examination mould to waste time and energy, and the problem of form removal difficulty has the advantage that the test block preparation is convenient, efficient and be convenient for form removal.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a concrete test block mould, is including holding the box and can dismantling the grid that sets up in holding the box, the grid includes that polylith mutually perpendicular's horizontal separators and longitudinal baffle constitute, horizontal separators concreties with longitudinal baffle, and top surface between them and the box top surface parallel and level that holds, hold four curb plate tops of box respectively the even draw-in groove of having seted up in interval, the both ends of horizontal separators and longitudinal baffle set firmly respectively can block into the fixture block of draw-in groove, the outside protrusion of fixture block holds the box curb plate.
By adopting the technical scheme, the grid with the space size consistent with the size of the test block is arranged in the accommodating box, so that the accommodating box is divided into a plurality of test block spaces, when the test block is poured, a plurality of test blocks can be poured at one time, the construction is more convenient, and the working efficiency is higher; when form removal simultaneously, hold the fixture block of box curb plate through the protrusion, lift the grid, with holding the box separation, make the test block stay hold in the box, avoid will holding the process that box and test block were mentioned, it is more convenient, laborsaving to tear the form open. Avoided in the test block manufacture process, generally one pour, the drawing of patterns, work efficiency is low and when the test block drawing of patterns, need will hold box and test block and take up, whip, utilize the inertia drawing of patterns, difficult drawing of patterns and the problem that wastes time and energy.
The utility model discloses further set up to: the bottom of the accommodating box is provided with an accommodating groove for clamping and embedding the transverse partition plate and the longitudinal partition plate.
Through adopting above-mentioned technical scheme, the bottom of horizontal baffle and longitudinal baffle inserts the storage tank internal fixation, and stability is better, and bottom fixed strength is higher.
The utility model discloses further set up to: and U-shaped handles are fixedly arranged on two opposite sides of the grating, and two ends of each handle are fixedly arranged on the clamping blocks respectively.
Through adopting above-mentioned technical scheme, when installing or detaching the grid in to holding the box, can remove the grid through the handle, it is more convenient to operate.
The utility model discloses further set up to: and a handle is arranged on the side plate of the accommodating box.
Through adopting above-mentioned technical scheme, regard as the holding force point through the handle, be convenient for remove and hold the box.
The utility model discloses further set up to: and idler wheels are arranged at the four corners of the bottom of the accommodating box respectively.
Through adopting above-mentioned technical scheme, be convenient for remove the box that holds that is equipped with the test block.
The utility model discloses further set up to: and the bottom plate of the containing box is provided with a through hole corresponding to the test block space formed by each transverse partition plate and each longitudinal partition plate.
Through adopting above-mentioned technical scheme, the perforation not only can make when concreting unnecessary muddy water go out the outflow from perforating, avoids influencing the quality of test block, can balance inside and outside atmospheric pressure moreover, prevents to solidify because of the test block, and the shrinkage deformation, and hold and form the atmospheric pressure difference between the box bottom plate, cause the problem of difficult form removal.
The utility model discloses further set up to: the containing box bottom plate is provided with bolts at positions where the rollers are arranged, the rollers are provided with positioning holes, and the bolts can be inserted into the positioning holes.
Through adopting above-mentioned technical scheme, the bolt inserts in the locating hole, can be with the rigidity that holds the box, prevents to hold the box when concreting or tamping concrete and takes place to remove to influence the preparation of test block.
The utility model discloses further set up to: the containing box is characterized in that a fixing block is fixedly arranged on the containing box bottom plate, a through hole is formed in the fixing block, and the bolt is inserted in the through hole.
By adopting the technical scheme, the structure is simple, and the operation is convenient.
The utility model discloses further set up to: and limiting bulges are fixedly arranged on the two sides of the fixed block on the inserting pin respectively.
Through adopting above-mentioned technical scheme, can prevent that the bolt from breaking away from the fixed block, causing and losing.
To sum up, the utility model discloses a beneficial technological effect does:
1. the grid with the space consistent with the size of the test block is arranged in the accommodating box, so that the accommodating box is divided into a plurality of test block spaces, when the test block is poured, a plurality of test blocks can be poured at one time, the construction is convenient, the working efficiency is high, and in addition, when the mold is removed, the grid can be removed, so that the disassembly is convenient, and the time and the labor are saved;
2. by arranging the accommodating groove, the bottoms of the transverse partition plate and the longitudinal partition plate are inserted into the accommodating groove for fixation, so that the stability is better, and the fixation strength of the bottoms is higher;
3. by arranging the handle, when the grating is installed in or detached from the accommodating box, the grating can be moved through the handle, so that the operation is more convenient;
4. through setting up gyro wheel and bolt, be convenient for remove the box that holds that is equipped with the test block, the bolt inserts in the locating hole, can be with the rigidity who holds the box, prevents to hold the box when concreting or tamping concrete and takes place to remove to influence the preparation of test block.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is an exploded view of the grille of the present invention;
fig. 3 is a partially enlarged schematic view of a portion a in fig. 1.
In the figure, 1, a housing box; 11. perforating; 2. a grid; 21. a transverse partition; 22. a longitudinal partition; 3. a card slot; 4. a clamping block; 5. a containing groove; 6. a handle; 7. a handle; 8. a roller; 81. positioning holes; 9. a fixed block; 91. a bolt; 92. and a limiting bulge.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for the utility model discloses a concrete test block mould, including holding box 1 and can dismantling the grid 2 that sets up in holding box 1, grid 2 is placed in holding box 1. The grid 2 comprises a plurality of transverse partition plates 21 and longitudinal partition plates 22 which are perpendicular to each other, a space for processing concrete test blocks is formed between the transverse partition plates 21 and the longitudinal partition plates 22, the transverse partition plates 21 and the vertical partition plates are fixedly connected with each other, and the top surfaces of the transverse partition plates 21 and the longitudinal partition plates 22 are flush with the top surface of the accommodating box 1. The top ends of four side plates of the containing box 1 are respectively provided with clamping grooves 3 with upward openings at uniform intervals, and the distance between every two adjacent clamping grooves 3 is 100mm or 150 mm; the two ends of the transverse partition plate 21 and the longitudinal partition plate 22 are respectively and fixedly provided with a fixture block 4, the fixture block 4 protrudes outwards to form a side plate of the accommodating box 1, the fixture block 4 can be clamped into the clamping groove 3, and the transverse partition plate 21 and the longitudinal partition plate 22 are fixed on the accommodating box 1.
During the use, place grid 2 in holding box 1, make fixture block 4 block go into draw-in groove 3, the top surface of horizontal separators 21 and longitudinal baffle 22 and the top surface parallel and level that holds box 1 scribble a layer of oil to holding box 1 lateral wall, horizontal separators 21 and longitudinal baffle 22 that every check test block corresponds. Concrete is poured into the accommodating box 1, so that the concrete is filled in the space of each test block, the vibrating rod is used for pouring, and then the trowel is used for trowelling and maintaining. After the test block in the accommodating box 1 is hardened, the grid 2 is lifted upwards through the fixture block 4 protruding from the side plate of the accommodating box 1, so that the grid 2 is separated from the test block, the test block is left in the accommodating box 1, and finally the test block is taken out of the accommodating box 1. When the grid 2 is lifted, the test block is adhered to the grid 2, and the test block can be separated from the grid 2 by lifting the grid 2 and pressing the test block downwards, so that the operation is convenient.
The grid 2 with the space size consistent with the size of the test block is arranged in the accommodating box 1, so that the accommodating box 1 is divided into a plurality of test block spaces, when the test block is poured, a plurality of test blocks can be poured at one time, the construction is more convenient, and the working efficiency is higher; when form removal simultaneously, hold fixture block 4 of box 1 curb plate through the protrusion, lift grid 2, with holding box 1 separation, make the test block stay in holding box 1, avoid will holding the process that box 1 and test block mention, it is more convenient, laborsaving to form removal. Avoided in the test block manufacture process, generally one pour, the drawing of patterns, work efficiency is low and when the test block drawing of patterns, need will hold box 1 and test block and take up, whip, utilize the inertia drawing of patterns, difficult drawing of patterns and the problem that wastes time and energy.
Referring to fig. 2, owing to when concreting to holding box 1, need utilize the tamper with the concrete tamping, in order to avoid grid 2 to take place to remove or the dislocation, seted up storage tank 5 holding box 1 bottom, the bottom of horizontal baffle 21 and longitudinal baffle 22 inserts storage tank 5 internal fixation, and stability is better, and bottom fixed strength is higher.
Referring to fig. 1, U-shaped handles 6 are respectively fixedly disposed on two opposite sides of the grid 2, the handles 6 are disposed in the middle of the grid 2, and two ends of each handle are respectively fixed on the fixture blocks 4. When the grating 2 is installed or detached in the accommodating box 1, the grating 2 can be moved by the handle 6, and the operation is more convenient.
Referring to fig. 1, a handle 7 is fixedly arranged on a side plate of the containing box 1, and the containing box 1 is convenient to move by taking the handle 7 as a force bearing point.
Referring to fig. 1, further, because hold box 1 and after pouring the completion, need remove to the idle position and carry out the maintenance, because it is more to hold the test block in box 1, weight is heavy, and be not convenient for remove, consequently set up gyro wheel 8 respectively holding box 1 bottom four corners department to be convenient for remove and be equipped with the box 1 that holds of test block.
Referring to fig. 3, latch pins 91 are respectively provided on the bottom plate of the housing box 1 at positions where the rollers 8 are provided, the latch pins 91 being provided at a side near the outside of the housing box 1. Seted up locating hole 81 on gyro wheel 8, in bolt 91 inserted locating hole 81, can be with the fixed position who holds box 1, prevent to hold box 1 when concreting or tamping concrete and take place to remove to influence the preparation of test block. Specifically, hold fixed block 9 of fixedly setting up on the bottom plate of box 1, set up the via hole on the fixed block 9, bolt 91 wears to establish in the via hole to bolt 91 can insert in locating hole 81 through the via hole.
Spacing arch 92 has set firmly respectively in fixed block 9 both sides on the bolt 91, and spacing arch 92 can't pass through the via hole, can prevent that bolt 91 from breaking away from fixed block 9, causes to lose.
Referring to fig. 2, in order to facilitate demolding, a through hole 11 is formed in the bottom plate of the accommodating box 1 corresponding to a test block space formed by each transverse partition 21 and each longitudinal partition 22. Perforation 11 not only can make when concreting unnecessary muddy water go out from perforation 11 and flow out, avoids influencing the quality of test block, can balance inside and outside atmospheric pressure moreover, prevents because of the test block solidifies, and the shrink warp, and hold and form the atmospheric pressure difference between box 1 bottom plate, cause the problem of difficult form removal.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (9)
1. The utility model provides a concrete test block mould which characterized in that: including holding box (1) and dismantling grid (2) of setting in holding box (1), grid (2) include polylith mutually perpendicular's transverse partition board (21) and longitudinal baffle (22) and constitute, transverse partition board (21) concreties with longitudinal baffle (22), and top surface between them with hold box (1) top surface parallel and level, hold four curb plate tops of box (1) respectively the even draw-in groove (3) of having seted up in interval, the both ends of transverse partition board (21) and longitudinal baffle (22) set firmly respectively and can block into fixture block (4) of draw-in groove (3), fixture block (4) outside protrusion holds box (1) curb plate.
2. The concrete test block mold of claim 1, wherein: the bottom of the accommodating box (1) is provided with an accommodating groove (5) for clamping and embedding the transverse partition plate (21) and the longitudinal partition plate (22).
3. The concrete test block mold of claim 1, wherein: the two opposite sides of the grating (2) are fixedly provided with U-shaped handles (6), and two ends of each handle (6) are fixedly arranged on the corresponding fixture block (4) respectively.
4. The concrete test block mold of claim 1, wherein: a handle (7) is arranged on the side plate of the containing box (1).
5. The concrete test block mold of claim 1, wherein: and idler wheels (8) are respectively arranged at the four corners of the bottom of the accommodating box (1).
6. The concrete test block mold of claim 1, wherein: the containing box (1) is characterized in that a perforated hole (11) is formed in the bottom plate of the containing box (1) corresponding to a test block space formed by each transverse partition plate (21) and each longitudinal partition plate (22).
7. The concrete test block mold of claim 1, wherein: the accommodating box is characterized in that bolts (91) are respectively arranged on the bottom plate of the accommodating box (1) at positions where the idler wheels (8) are arranged, positioning holes (81) are formed in the idler wheels (8), and the bolts (91) can be inserted into the positioning holes (81).
8. The concrete test block mold of claim 7, wherein: the containing box is characterized in that a fixing block (9) is fixedly arranged on a bottom plate of the containing box (1), a through hole is formed in the fixing block (9), and the bolt (91) is inserted in the through hole.
9. The concrete test block mold of claim 8, wherein: and limiting bulges (92) are fixedly arranged on the bolt (91) at two sides of the fixing block (9) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921369898.4U CN210732759U (en) | 2019-08-21 | 2019-08-21 | Concrete test block mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921369898.4U CN210732759U (en) | 2019-08-21 | 2019-08-21 | Concrete test block mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210732759U true CN210732759U (en) | 2020-06-12 |
Family
ID=70987242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921369898.4U Expired - Fee Related CN210732759U (en) | 2019-08-21 | 2019-08-21 | Concrete test block mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210732759U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111993533A (en) * | 2020-09-09 | 2020-11-27 | 曹凯悦 | Glazed ceramic tile processing and forming method |
CN113155586A (en) * | 2021-04-25 | 2021-07-23 | 中冶南方城市建设工程技术有限公司 | Concrete test block sample auxiliary device |
CN114147840A (en) * | 2021-09-07 | 2022-03-08 | 莆田学院 | Accurate concrete test block manufacturing method and tooling die |
CN115847581A (en) * | 2022-10-26 | 2023-03-28 | 扬州大学 | Preparation mold and preparation method of sandwich composite wallboard |
-
2019
- 2019-08-21 CN CN201921369898.4U patent/CN210732759U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111993533A (en) * | 2020-09-09 | 2020-11-27 | 曹凯悦 | Glazed ceramic tile processing and forming method |
CN111993533B (en) * | 2020-09-09 | 2021-05-14 | 广东冠星陶瓷企业有限公司 | Glazed ceramic tile processing and forming method |
CN113155586A (en) * | 2021-04-25 | 2021-07-23 | 中冶南方城市建设工程技术有限公司 | Concrete test block sample auxiliary device |
CN114147840A (en) * | 2021-09-07 | 2022-03-08 | 莆田学院 | Accurate concrete test block manufacturing method and tooling die |
CN115847581A (en) * | 2022-10-26 | 2023-03-28 | 扬州大学 | Preparation mold and preparation method of sandwich composite wallboard |
CN115847581B (en) * | 2022-10-26 | 2024-02-23 | 扬州大学 | Preparation mold and preparation method of sandwich composite wallboard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210732759U (en) | Concrete test block mould | |
CN104631706B (en) | One kind exempts from form removal concrete column and its construction method | |
CN205668316U (en) | A kind of composite assembly precast concrete plate mould of simple in construction | |
CN109262811B (en) | Quick-splicing combined prefabricated composite floor slab die | |
CN208072950U (en) | A kind of combination set shaped steel formwork | |
CN211850343U (en) | Precast concrete wallboard | |
CN106564114A (en) | Factorial construction technology for small prefabricated components | |
CN112659332A (en) | Precast concrete square culvert mould | |
CN105350767A (en) | Aluminium alloy template protruded-section profile and unit template structure thereof | |
CN209737901U (en) | Wood formwork for laboratory based on mortise and tenon technology | |
CN210002432U (en) | precast concrete template reinforcing structure for building pile foundation bearing platform | |
KR101102824B1 (en) | Top base concrete block, and the molding frame, and the forming apparatus and forming method thereof | |
CN107160542B (en) | Bracket type inner form support system construction method | |
CN214740053U (en) | Drawer type detachable die for accurately pre-burying shear groove of steel structure | |
CN104908148A (en) | Cable trough cover plate prefabricated template and construction method thereof | |
CN201687199U (en) | Corridor gutter formed molding board | |
CN213563293U (en) | Prefabricated wallboard mould | |
CN210011144U (en) | Construction site fence prefabricated foundation | |
CN208280733U (en) | Reusable enclosing basis | |
CN205713066U (en) | Casting concrete non-dismantling formwork and for forming the mould of non-dismantling formwork | |
CN206916760U (en) | A kind of reusable sump internal mould device | |
CN210589839U (en) | Triangular component manufacturing mold for masonry of filler wall | |
CN210453139U (en) | Rectangular lintel manufacturing die for masonry of infilled wall | |
CN218264910U (en) | Mould device for pouring large-area concrete slab | |
CN216465251U (en) | Batch assembly type fence plate prefabricating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200612 Termination date: 20210821 |
|
CF01 | Termination of patent right due to non-payment of annual fee |