CN210713425U - Aluminum plate assembly convenient for integral installation for building curtain wall - Google Patents

Aluminum plate assembly convenient for integral installation for building curtain wall Download PDF

Info

Publication number
CN210713425U
CN210713425U CN201920950972.5U CN201920950972U CN210713425U CN 210713425 U CN210713425 U CN 210713425U CN 201920950972 U CN201920950972 U CN 201920950972U CN 210713425 U CN210713425 U CN 210713425U
Authority
CN
China
Prior art keywords
aluminum
frame
wall
building curtain
plate assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920950972.5U
Other languages
Chinese (zh)
Inventor
吴凯贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Changtai Aluminum Curtain Wall Engineering Co Ltd
Original Assignee
Changzhou Changtai Aluminum Curtain Wall Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Changtai Aluminum Curtain Wall Engineering Co Ltd filed Critical Changzhou Changtai Aluminum Curtain Wall Engineering Co Ltd
Priority to CN201920950972.5U priority Critical patent/CN210713425U/en
Application granted granted Critical
Publication of CN210713425U publication Critical patent/CN210713425U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses an aluminum plate component for building curtain wall convenient for integral installation, belonging to the field of building curtain wall and aiming at providing an aluminum plate component which can not damage the wall body, the technical proposal comprises an aluminum panel and an aluminum frame, wherein the aluminum panel is arranged in the aluminum frame; the connecting piece is characterized by also comprising a connecting piece, wherein the surface of the connecting piece is provided with a plurality of first connecting parts which are uniformly arranged along the circumferential direction of the connecting piece; the aluminum frame is close to one side of the connecting piece is evenly distributed with a plurality of second connecting parts along the circumferential direction, and the first connecting parts are in matched clamping connection with the second connecting parts. The utility model provides a need reduce and produce the large tracts of land damage to the wall body, and need often dismantle the aluminum plate subassembly for building curtain of installation.

Description

Aluminum plate assembly convenient for integral installation for building curtain wall
Technical Field
The utility model relates to a building curtain technical field, more specifically say, it relates to an aluminum plate subassembly for building curtain convenient to integral erection.
Background
The curtain wall is an outer wall enclosure of a building, does not bear load, is hung like a curtain, is also called as a curtain wall, and is a light wall with a decorative effect commonly used by modern large and high buildings. At present, the curtain wall made of aluminum materials is unique in texture, rich and durable in color and luster, and diversified in appearance and shape.
Curtain wall that uses on the building generally adopts the glass board, but also adopts aluminum plate, because aluminum plate surface and back are the plane, be not convenient for with the being connected of wall body, because adopt the bonding to glue the requirement height to the bonding to the curtain wall that bonds for a long time is easy to be out of shape and drops, causes the potential safety hazard easily.
The existing Chinese patent with publication number CN207686077U is an aluminum plate of a building curtain wall, which solves the problems. The panel, the positioning strips and the convex blocks are connected into a whole, the convex blocks used for fixed connection are arranged on two sides of the lower end of each positioning strip, and the lower ends of the convex blocks are provided with conical surfaces; the back of the panel is provided with a corrugated surface.
The above prior art solutions have the following drawbacks: be equipped with location strip and lug in above-mentioned scheme behind in aluminum plate, integral type shaping aluminum plate then direct mount on the wall body, the lug can produce the damage to the wall body, so wait to improve.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a need reduce the building aluminum plate subassembly for curtain that produces the large tracts of land damage to the wall body.
In order to achieve the above purpose, the utility model provides a following technical scheme:
an aluminum plate assembly for a building curtain wall convenient for integral installation comprises an aluminum panel and an aluminum frame, wherein the aluminum panel is arranged in the aluminum frame; the connecting piece is characterized by also comprising a connecting piece, wherein the surface of the connecting piece is provided with a plurality of first connecting parts which are uniformly arranged along the circumferential direction of the connecting piece; the aluminum frame is close to one side of the connecting piece is evenly distributed with a plurality of second connecting parts along the circumferential direction, and the first connecting parts are in matched clamping connection with the second connecting parts.
Through adopting above-mentioned technical scheme, in aluminium panel installation and the aluminium frame, the second connecting portion joint on aluminium frame passes through first connecting portion and the connecting piece, and two connecting portions mutually support, have realized the installation of aluminum plate subassembly with the connecting piece, have reduced the damage that produces the wall body. The first connecting portion are close to along the aluminum frame one side of connecting piece is along circumference evenly distributed, and the second connecting portion are along the circumference evenly arranged of connecting piece.
Furthermore, the first connecting parts are positioned on one side of the connecting part close to the aluminum panel and are provided with 1-5 connecting parts; the second connecting parts are positioned on the side wall of the aluminum frame close to the connecting piece and are provided with 3-6 connecting parts.
Through adopting above-mentioned technical scheme, one of them second connecting portion of one of them first connecting portion fixed aluminium frame of each connecting piece, a plurality of connecting piece acts on the fixed of an aluminium frame jointly. According to the shape of the aluminum frame and the actual installation requirement of the curtain wall, the number of the first connecting parts on the connecting pieces ranges from 1 to 5, and the number of the second connecting parts on the aluminum frame ranges from 3 to 8.
Furthermore, the first connecting part comprises a buckle accommodating cavity, and an annular first buckle flange is arranged on the side wall of the buckle accommodating cavity, which is close to one side of the aluminum frame; the second connecting part comprises a bowl-shaped buckle and a first connecting column positioned in the center of the bowl-shaped buckle, and the bowl-shaped buckle is fixedly connected with the first connecting column; the diameter of the bowl opening of the bowl-shaped buckle is larger than that of the inner wall of the flange of the first buckle.
Through adopting above-mentioned technical scheme, first connecting portion are the buckle that has the annular first buckle flange of round and hold the chamber, and second connecting portion are the bowl form buckle that has first connector strut. The bowl mouth diameter of bowl form buckle is greater than the diameter of first buckle flange inner wall, and the buckle holds the chamber when bowl form buckle card advances, and the bowl mouth of bowl form buckle contacts and the chucking with the lower surface of first buckle flange.
Furthermore, the first connecting part also comprises a second connecting column which is fixedly arranged on the aluminum frame; the first connecting column is detachably connected with the second connecting column.
Through adopting above-mentioned technical scheme, first spliced pole is fixed at the aluminium frame, second spliced pole and bowl form buckle fixed connection, and first connecting portion realize dismantling the connection through first spliced pole and second spliced pole.
Further, the first connecting column is an annular cylinder, and the diameter of the outer wall of the first connecting column is smaller than that of the inner wall of the first buckle flange; the diameter of the inner wall of the first connecting column is larger than that of the outer wall of the second connecting column; the first connecting column is sleeved on the outer wall of the second connecting portion and clamped with the outer wall of the second connecting portion.
Through adopting above-mentioned technical scheme, first spliced pole is the annular cylinder, cup joints at second connecting portion outer wall and both looks joints through first spliced pole, realizes dismantling the connection and install.
Furthermore, the device also comprises a support frame, and the connecting piece is detachably arranged on the support frame.
By adopting the technical scheme, the shape of the support frame is manufactured according to the shape required by the curtain wall, and the support frame is fixedly connected with the wall body. The connecting piece can be detachably arranged on the support frame in a screw mode and the like.
Furthermore, the support frame is formed by arranging and combining a plurality of frames, and the size of each frame is consistent with the shape and size of the aluminum frame.
By adopting the technical scheme, the support frame is formed by arranging and combining the plurality of frames, and the sizes of the frames are the same as the sizes of the frames according to the appearance and the sizes of the aluminum frames, so that gaps can not be generated between the aluminum frames when the aluminum frames are arranged on the support frame, and the integral smoothness and the attractive effect are ensured.
Further, the connecting piece is detachably arranged at the connecting position of the frame of the supporting frame; the positions, close to four corners, of the connecting pieces are respectively provided with one first connecting part, and the first connecting parts are symmetrically arranged; the positions of the aluminum frame, which are close to the four corners, are respectively provided with one second connecting part; the aluminum frame and the frame are correspondingly connected through the first connecting part and the second connecting part.
Through adopting above-mentioned technical scheme, the connecting piece is installed in the junction of the frame of support frame, and when the frame was square frame, the connecting piece mountable was at the cross node of support frame. When connecting piece and aluminium frame are regular square, first connecting portion are located the position that the connecting piece is close to the four corners, and second connecting portion are located the position that the aluminium frame is close to the four corners. The aluminum frame is correspondingly connected with the square frame through the first connecting part and the second connecting part.
Further, the aluminum frame comprises two aluminum side plates and two aluminum end plates, and the aluminum side plates and the end plates are integrally formed; an open slot is arranged on any one of the aluminum end plates; and one side of the aluminum frame, which is in contact with the aluminum panel, is provided with a mounting groove for embedding the aluminum panel.
By adopting the technical scheme, the aluminum frame is formed by the two aluminum side plates and the two aluminum end plates in an integrated mode, an open slot is formed in one of the aluminum end plates and used for placing the aluminum panel into the aluminum frame, and the aluminum panel is fixed through the mounting groove in the inner side face of the aluminum frame.
To sum up, the utility model discloses following beneficial effect has:
1. through the arrangement of the first connecting part and the second connecting part, the detachable and mountable connection effect of the aluminum frame, the aluminum panel and the connecting piece can be achieved;
2. through the arrangement of the connecting piece and the supporting frame, the integral installation and disassembly effects of the aluminum plate building curtain wall can be achieved, and the wall body cannot be damaged in a large area;
3. through the setting of dismantling of aluminium frame, connecting piece, support frame, can play according to the design of different building curtain molding, make aluminium frame, connecting piece, support frame can both change the design thereupon and not influence the functional effect, have the commonality.
Drawings
FIG. 1 is a schematic view showing the positional connection relationship of an aluminum panel, an aluminum frame, a connecting member and a supporting frame in the embodiment.
Fig. 2 is a sectional view showing a connection relationship between the first connection aluminum frame and the connection member in the embodiment.
Fig. 3 is a schematic view of the structural connection relationship between the connecting member and the supporting frame in fig. 1.
Fig. 4 is a schematic diagram for embodying an aluminum frame structure in the embodiment.
In the figure, 1, an aluminum panel; 2. an aluminum frame; 3. a connecting member; 4. a first connection portion; 5. a second connecting portion; 6. a buckle accommodating cavity; 7. a first snap flange; 8. a bowl-shaped fastener; 9. a first connecting column; 10. a second connecting column; 11. a support frame; 12. a frame; 13. an aluminum side plate; 14. an aluminum end plate; 15. an open slot; 16. mounting grooves; 17. a screw; 18. a support strip.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example (b):
referring to fig. 1, an aluminum plate assembly for a building curtain wall convenient to integrally install comprises an aluminum panel 1 and an aluminum frame 2, wherein the aluminum panel 1 is arranged in the aluminum frame 2. The aluminum plate assembly further comprises a connecting piece 3 for further connecting and fixing the aluminum panel 1.
Referring to fig. 1, the aluminum frame 2 includes two aluminum side plates 13 and two aluminum end plates 14, and the aluminum side plates 13 and the aluminum end plates 14 are integrally formed therebetween. An open slot 15 (see fig. 4) is arranged on any aluminum end plate 14; the side of the aluminum frame 2 contacting the aluminum panel 1 is provided with an installation groove 16 (see fig. 4) for embedding the aluminum panel 1. Referring to fig. 1, the surface of the connecting piece 3 is provided with a plurality of first connecting parts 4 which are uniformly arranged along the circumferential direction of the connecting piece 3; one side of the aluminum frame 2 close to the connecting piece 3 is evenly distributed with a plurality of second connecting parts 5 (see fig. 4) along the circumferential direction, and the first connecting parts 4 are matched and clamped with the second connecting parts 5 (see fig. 2). Preferably, the first connecting portion 4 is located on one side of the connecting member 3 close to the aluminum panel 1 and is provided with 1-5 (not shown in the figure); the second connecting portion 5 is located on the side wall of the aluminum frame 2 near the connecting member 3 and is provided with 3-8 (not shown in the figure). According to the curtain molding of difference and the application of aluminium frame 2, connecting piece 3 and aluminium frame 2 can select for use the connecting portion of different quantity. At least one first connecting part 4 is arranged on each connecting piece 3 and can be used for fixing each second connecting part 5 on the aluminum frame 2 one by one; in order to reduce the number of connecting elements 3 to be installed and to fit the tiling of differently shaped aluminum frames 2, the number of first connecting portions 4 on the connecting elements 3 can be up to 5. The number of the second connecting parts 5 on the aluminum frame 2 is at least 3, 3 points can fix a plane, and at most 8 points can be arranged for fixing the aluminum frame 2 with a larger area.
Referring to fig. 2, the first connecting portion 4 includes a buckle accommodating chamber 6, and an annular first buckle flange 7 is provided on a side wall of the buckle accommodating chamber 6 on a side close to the aluminum frame 2. The second connecting part 5 comprises a bowl-shaped buckle 8 and a first connecting column 9 positioned at the center of the bowl-shaped buckle 8, and the bowl-shaped buckle 8 is fixedly connected with the first connecting column 9. When the bowl-shaped buckle 8 is clamped into the buckle accommodating cavity 6, the bottom wall of the buckle accommodating cavity 6 is in contact with the bottom wall of the bowl-shaped buckle 8. When the buckle that bowl form buckle 8 blocks into first buckle flange 7 lower extreme holds the in-process in chamber 6, because bowl mouth diameter of bowl form buckle 8 is greater than the bowl mouth of the diameter bowl form buckle 8 of first buckle flange 7 inner wall, when the bowl mouth kick-backs to normal diameter, bowl mouth that bowl form buckle 8 was blocked to first buckle flange 7.
Referring to fig. 3, the first connecting portion 4 further includes a second connecting column 10, and the second connecting column 10 is fixedly mounted on the aluminum frame 2; the first connecting column 9 is detachably connected with the second connecting column 10. The first connecting column 9 is an annular cylinder, and the diameter of the outer wall of the first connecting column 9 is smaller than that of the inner wall of the first buckle flange 7; the diameter of the inner wall of the first connecting column 9 is larger than that of the outer wall of the second connecting column 10; the first connecting post 9 is sleeved on the outer wall of the second connecting part 5 and clamped with the second connecting part.
Referring to fig. 1 and 3, the aluminum plate assembly for a building curtain wall convenient for integral installation further comprises a support frame 11, and the connecting piece 3 is detachably installed on the support frame 11. The support frame 11 is formed by arranging and combining a plurality of frames 12, and the size of the frames 12 is consistent with the shape and size of the aluminum frame 2. The present embodiment employs the square frame 12 and the square aluminum frame 2 and the aluminum panel 1. The connecting piece 3 is detachably arranged at the joint of the frame 12 of the supporting frame 11. In the embodiment, a square connecting piece 3 is adopted, the positions of the connecting piece 3 close to four corners are respectively provided with a first connecting part 4, and the first connecting parts 4 are symmetrically arranged; the positions of the aluminum frame 2 close to the four corners are respectively provided with a second connecting part 5 (see fig. 4); the aluminum frame 2 and the frame 12 are correspondingly connected by the first connection portion 4 and the second connection portion 5.
The specific implementation process comprises the following steps: when the aluminum plate assembly of this scheme of utilization, according to the molding design of building curtain, the support frame 11 of preparation cooperation shape, support frame 11 can be integrative, also can adopt a plurality of support frames 11 concatenation to form according to actual molding, size. According to the area and the shape of a building curtain wall, the sizes of the aluminum panel 1 and the aluminum frame 2 in proper shapes are manufactured, the supporting frames 11 are provided with the supporting bars 18 of the frames 12 in a matching mode, the shapes and the sizes of the frames 12 are consistent with the shapes and the sizes of the aluminum frames 2, and the smoothness and the attractiveness of the surface of the curtain wall are guaranteed after splicing conveniently.
When the aluminum panel is installed, the aluminum panel 1 is inserted into the aluminum frame 2 through the opening groove 15 of the aluminum frame 2 and is fixed through the installation groove 16. When the curtain wall is installed, the open slot 15 of the aluminum frame 2 is placed upwards. Then, the number and the size of the connecting members 3 are selected according to the arrangement and the number of the second connecting portions 5. The connecting element 3 is then fixed to the support 11 by means of a number of screws 17. The back of the connecting member 3 can be provided with a plurality of grooves matched with the supporting bars 18 according to the width of the supporting bars 18 of the upper frame 12 of the supporting frame 11 so as to be embedded with the supporting bars 18. The shape and size of the connecting member 3 are not particularly limited without affecting the function of the connecting member 3.
Then, the aluminum frame 2 with the aluminum panel 1 is inserted into the first connecting portion 4 of the connecting member 3 connected to the node of the frame 12 corresponding to the supporting frame 11 with the same shape and shape. Is connected with the second connecting part 5 on the connecting piece 3 through the first connecting part 4 on the aluminum frame 2 in a buckling way. The aluminium frame 2 is mountable to the connecting piece 3 by the bowl mouth of the bowl-shaped catch 8 contacting and clamping against the lower surface of the first catch flange 7. Fix at aluminium frame 2 through first spliced pole 9, second spliced pole 10 and bowl form buckle 8 fixed connection realize dismantling of aluminium frame 2 and connecting piece 3 through first spliced pole 9 and second spliced pole 10.
One of the first connecting parts 4 of each connecting piece 3 fixes one of the second connecting parts 5 of one aluminum frame 2, and a plurality of connecting pieces 3 jointly act on the fixation of one aluminum frame 2. According to the shape of the aluminum frame 2 and the actual installation requirement of the curtain wall, the number of the first connecting parts 4 on the connecting pieces 3 ranges from 1 to 5, and the number of the second connecting parts 5 on the aluminum frame 2 ranges from 4 to 6. And finally, connecting the support frame 11 to the wall body of the curtain wall.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (9)

1. An aluminum plate assembly convenient for integral installation for a building curtain wall comprises an aluminum panel (1) and an aluminum frame (2), wherein the aluminum panel (1) is arranged in the aluminum frame (2); the method is characterized in that: the connecting piece (3) is further included, and a plurality of first connecting parts (4) which are uniformly arranged along the circumferential direction of the connecting piece (3) are arranged on the surface of the connecting piece (3); the aluminum frame (2) is close to one side of the connecting piece (3) is uniformly provided with a plurality of second connecting parts (5) along the circumferential direction, and the first connecting parts (4) are connected with the second connecting parts (5) in a matched and clamped mode.
2. The aluminum plate assembly for a building curtain wall convenient for integral installation of claim 1, wherein: the first connecting parts (4) are positioned on one side of the connecting part (3) close to the aluminum panel (1) and are provided with 1-5; the second connecting parts (5) are positioned on the side wall of the aluminum frame (2) close to one side of the connecting part (3) and are 3-8.
3. The aluminum plate assembly for building curtain walls convenient for integral installation of claim 2, wherein: the first connecting part (4) comprises a buckle accommodating cavity (6), and an annular first buckle flange (7) is arranged on the side wall of one side, close to the aluminum frame (2), of the buckle accommodating cavity (6); the second connecting part (5) comprises a bowl-shaped buckle (8) and a first connecting column (9) positioned in the center of the bowl-shaped buckle (8), and the bowl-shaped buckle (8) is fixedly connected with the first connecting column (9); the diameter of the bowl opening of the bowl-shaped buckle (8) is larger than that of the inner wall of the first buckle flange (7).
4. The aluminum plate assembly for building curtain walls convenient for integral installation of claim 3, wherein: the first connecting part (4) further comprises a second connecting column (10), and the second connecting column (10) is fixedly arranged on the aluminum frame (2); the first connecting column (9) is detachably connected with the second connecting column (10).
5. The aluminum plate assembly for building curtain walls convenient for integral installation of claim 4, wherein: the first connecting column (9) is an annular cylinder, and the diameter of the outer wall of the first connecting column (9) is smaller than that of the inner wall of the first buckle flange (7); the diameter of the inner wall of the first connecting column (9) is larger than that of the outer wall of the second connecting column (10); the first connecting column (9) is sleeved on the outer wall of the second connecting portion (5) and clamped with the outer wall of the second connecting portion and the outer wall of the second connecting portion.
6. The aluminum plate assembly for a building curtain wall convenient for integral installation of claim 1, wherein: the connecting piece is characterized by further comprising a supporting frame (11), and the connecting piece (3) is detachably mounted on the supporting frame (11).
7. The aluminum plate assembly for a building curtain wall convenient for integral installation of claim 6, wherein: the supporting frame (11) is formed by arranging and combining a plurality of frames (12), and the size of each frame (12) is consistent with the shape and the size of the aluminum frame (2).
8. An aluminum plate assembly for a building curtain wall convenient for integral installation according to claim 6 or 7, wherein: the connecting piece (3) is detachably arranged at the joint of the frame (12) of the support frame (11); the positions, close to four corners, of the connecting pieces (3) are respectively provided with one first connecting part (4), and the first connecting parts (4) are symmetrically arranged; the positions, close to four corners, of the aluminum frame (2) are respectively provided with one second connecting part (5); the aluminum frame (2) and the frame (12) are correspondingly connected through the first connecting part (4) and the second connecting part (5).
9. The aluminum plate assembly for a building curtain wall convenient for integral installation of claim 1, wherein: the aluminum frame (2) comprises two aluminum side plates (13) and two aluminum end plates (14), and the aluminum side plates (13) and the end plates are integrally formed; an open slot (15) is arranged on any aluminum end plate (14); the aluminum frame (2) and one side of the aluminum panel (1) in contact are provided with a mounting groove (16) for embedding the aluminum panel (1).
CN201920950972.5U 2019-06-22 2019-06-22 Aluminum plate assembly convenient for integral installation for building curtain wall Active CN210713425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920950972.5U CN210713425U (en) 2019-06-22 2019-06-22 Aluminum plate assembly convenient for integral installation for building curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920950972.5U CN210713425U (en) 2019-06-22 2019-06-22 Aluminum plate assembly convenient for integral installation for building curtain wall

Publications (1)

Publication Number Publication Date
CN210713425U true CN210713425U (en) 2020-06-09

Family

ID=70933014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920950972.5U Active CN210713425U (en) 2019-06-22 2019-06-22 Aluminum plate assembly convenient for integral installation for building curtain wall

Country Status (1)

Country Link
CN (1) CN210713425U (en)

Similar Documents

Publication Publication Date Title
US8136315B2 (en) Connecting device for curtain wall units
CN109473049B (en) Display lamp box
CN110131894B (en) Water heater decoration and water heater
CN210713425U (en) Aluminum plate assembly convenient for integral installation for building curtain wall
CN203947628U (en) A kind of house ornamentation wall
CN108468499B (en) Fixing structure for door plate and glass and door
CN109780481B (en) Spliced lamp and fixing support thereof
CN213449245U (en) Wooden wall convenient to assemble and hang
KR100954551B1 (en) Device for catching corner of fire prevention unit frame
CN209990004U (en) Light and shade joint formula smallpox system
CN209281797U (en) A kind of high clear screen fixed installation external member
CN216713328U (en) Assembled wall body and floor fixed knot construct
CN107183972B (en) Side edge sealing structure of aluminum furniture plate and decoration strip assembly thereof
CN212213609U (en) Fast assembling and disassembling type shower room
CN201924652U (en) Assembly type glass rail
CN211021983U (en) Screen of hidden installation
CN214220389U (en) Building decorative panel subassembly convenient to equipment
CN210831858U (en) Mounting structure of lamp decorative sheet
CN210842474U (en) Assembled support suspension system and suspension type showcase
CN217565329U (en) Wall-mounted bookshelf
CN219638181U (en) Panoramic glass curtain wall
CN211259248U (en) Panel
CN219732572U (en) Building externally hung decoration prefabricated member
CN216047203U (en) LED ceiling lamp convenient to equipment
CN218338121U (en) Magnetic force concatenation photo holder frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant