CN210713294U - Building outer wall heat preservation construction equipment - Google Patents

Building outer wall heat preservation construction equipment Download PDF

Info

Publication number
CN210713294U
CN210713294U CN201921537934.3U CN201921537934U CN210713294U CN 210713294 U CN210713294 U CN 210713294U CN 201921537934 U CN201921537934 U CN 201921537934U CN 210713294 U CN210713294 U CN 210713294U
Authority
CN
China
Prior art keywords
wall
construction
nail
installation
heat preservation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921537934.3U
Other languages
Chinese (zh)
Inventor
王孝勇
汪诚
周云
孙四新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Yonglianda Coating Engineering Co Ltd
Original Assignee
Chongqing Yonglianda Coating Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yonglianda Coating Engineering Co Ltd filed Critical Chongqing Yonglianda Coating Engineering Co Ltd
Priority to CN201921537934.3U priority Critical patent/CN210713294U/en
Application granted granted Critical
Publication of CN210713294U publication Critical patent/CN210713294U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a construction technical field specifically is a building outer wall heat preservation construction equipment, including wall and construction case, the construction case is located one side of wall, the inside sliding connection installing frame of construction case, both sides all weld about the outer end of construction case and are equipped with the handle, the upper and lower both ends of installing frame all with construction case sliding connection, the installation cavity has been seted up to the outer end of installing frame, the outer end inboard of installing frame is equipped with the nail chamber, the inside laminating of installation cavity is equipped with the heat preservation, and the heat preservation laminating is on the wall, five are no less than to the quantity in nail chamber, and each nail chamber is hollow tubular structure, beneficial effect is: this practicality can laminate the heat preservation earlier on the wall when the construction, then makes the adjustment and remove according to the condition, and the restart cylinder nail is gone into the wall nail after the position is suitable, compares the conventional art, and this practicality can be convenient makes the adjustment to the position of heat preservation, ensures that the neat steady nail of heat preservation is on the wall.

Description

Building outer wall heat preservation construction equipment
Technical Field
The utility model relates to a construction technical field specifically is a building outer wall heat preservation construction equipment.
Background
At present, the heat insulation layer of the building outer wall is usually made of light heat insulation materials with small heat conductivity coefficient, generally in a rectangular block structure, and is fixedly installed on the outer side of the wall body through wall nails. During the construction, the workman is manual with the heat preservation attached on the wall to it is fixed to hand the nail rifle to carry out the nailing, relatively speaking, this kind of mode has following two defects:
1. workers need to press the heat-insulating layer with one hand and then hold the nail gun with the other hand to nail, so that the nail gun is inconvenient to use and has certain danger coefficient when nailing;
2. because constructors always need to hold the nail gun with one hand, the position of the heat-insulating layer is difficult to adjust, and the heat-insulating layer is difficult to be fixed on a wall neatly and stably by the mode. Therefore, the utility model provides a building outer wall heat preservation construction equipment is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building outer wall heat preservation construction equipment to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a construction device for a heat-insulating layer of an external wall of a building comprises the wall surface and a construction box, wherein the construction box is positioned on one side of the wall surface, the inside of the construction box is slidably connected with an installation frame, the upper side and the lower side of the outer end of the construction box are respectively welded with a handle, the upper end and the lower end of the installation frame are both slidably connected with the construction box, the outer end of the installation frame is provided with an installation cavity, the inner side of the outer end of the installation frame is provided with a nail cavity, the inside of the installation cavity is provided with a heat-insulating layer in a laminating manner, the heat-insulating layer is laminated on the wall surface, the number of the nail cavities is not less than five, each nail cavity is of a hollow tubular structure, the nail cavities are respectively welded and fixed on the inner side wall of the installation frame, the inside of the construction box is vertically provided with an installation side plate, one side of the installation side plate, which is close to the nail cavities, the outer end center of the construction box is provided with a cylinder, the cylinder is fixedly installed on the outer wall of the construction box, and the end part of a piston rod of the cylinder penetrates through the construction box and is fixedly connected with the installation side plate.
Preferably, the inboard laminating of installation cavity is equipped with the sealing washer, the outer lane of sealing washer is spliced and is fixed on the installation cavity, and the inner circle of sealing washer all laminates on the side of heat preservation.
Preferably, telescopic columns are arranged on the upper side and the lower side of the inner end of the installation side plate and are formed by mutually sleeving two tubular structures with different diameters, one tubular structure is connected with the installation side plate, and the other tubular structure is connected with the inner wall of the construction box.
Preferably, the upper side and the lower side of the interior of the construction box are respectively provided with an elastic column, the elastic columns are formed by sleeving a compression spring on the outer side of the rubber rod, and two ends of each elastic column are respectively fixedly connected with the inner side wall of the construction box and the inner end of the installation frame.
Preferably, the catch bar inserts and is equipped with the catch piece in the one end welding of nail intracavity portion, the outer end of catch piece splices and is equipped with the magnetic path, the magnetic path all adsorbs on the tip of wall nail.
Compared with the prior art, the beneficial effects of the utility model are that:
1. when the utility model is used for construction, workers can hold the two handles outside the construction box, then the air cylinder is used for pushing the mounting side plate to move, and then the pushing rod at the outer end of the mounting side plate is used for nailing wall nails into the heat preservation layer and the wall surface, so that compared with the traditional technology, the utility model is more convenient and has no danger coefficient;
2. this practicality can laminate the heat preservation earlier on the wall when the construction, then makes the adjustment and remove according to the condition, and the restart cylinder nail is gone into the wall nail after the position is suitable, compares the conventional art, and this practicality can be convenient makes the adjustment to the position of heat preservation, ensures that the neat steady nail of heat preservation is on the wall.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged schematic view of the structure at a position a of the present invention.
In the figure: 1 wall, 2 construction cases, 3 installing frames, 4 sealing rings, 5 heat preservation layers, 6 nail cavities, 7 installing side plates, 8 air cylinders, 9 push rods, 10 push sheets, 11 magnetic blocks, 12 wall nails, 13 telescopic columns, 14 elastic columns and 15 handles.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: the utility model provides a building outer wall heat preservation construction equipment, including wall 1 and construction case 2, construction case 2 is located one side of wall 1, construction case 2's inside sliding connection installing frame 3, both sides all weld about construction case 2's the outer end and are equipped with handle 15, installing frame 3's upper and lower both ends all with construction case 2 sliding connection, the installation cavity has been seted up to installing frame 3's outer end, installing frame 3's outer end inboard is equipped with nail chamber 6, the inside laminating of installation cavity is equipped with heat preservation 5, and the 5 laminating of heat preservation is on wall 1, construction case 2, the structural position of installing frame 3 and heat preservation 5 is shown in figure 1, wherein installing frame 3 can slide around the inside of construction case 2, and heat preservation 5 then imbeds inside the installation cavity, and the thickness of heat preservation 5 is greater than the inside degree of depth of installation cavity.
Five are no less than to the quantity in nail chamber 6, and each nail chamber 6 is hollow tubular structure, and the equal welded fastening in nail chamber 6 is on the inside wall of installing frame 3, and the inside in nail chamber 6 all is equipped with wall nail 12, as shown in figure 1, the through-hole has evenly been seted up to the tip of installing frame 3, and the aperture of through-hole is the same with the internal diameter in nail chamber 6, and the through-hole aligns the setting with nail chamber 6.
The inside of construction case 2 is vertical to be equipped with installation curb plate 7, one side welding that installation curb plate 7 is close to nail chamber 6 is equipped with catch bar 9, the quantity of catch bar 9 equals with the quantity in nail chamber 6, and the outer end of each catch bar 9 inserts respectively in the inside in each nail chamber 6, the outer end central authorities of construction case 2 are equipped with cylinder 8, 8 fixed mounting of cylinder are on the outer wall of construction case 2, and 8's tailpiece of the piston rod portion of cylinder run through construction case 2 and with installation curb plate 7 fixed connection, the steerable installation curb plate 7 back-and-forth movement of cylinder 8 promptly, and installation curb plate 7 can utilize catch bar 9 to promote the wall nail 12 of nail chamber 6 inside.
The inboard laminating of installation cavity is equipped with sealing washer 4, and the outer lane of sealing washer 4 splices and fixes on the installation cavity, and the inner circle of sealing washer 4 all laminates on the side of heat preservation 5, and sealing washer 4 is made for elastic material, consequently when heat preservation 5 puts into the inside back of installation cavity, can have certain static friction power between the two, prevents that heat preservation 5 from dropping.
Both sides all are equipped with flexible post 13 about the inner of installation curb plate 7, and flexible post 13 is cup jointed each other by two tubular structure of diameter difference and forms, and one of them tubular structure all is connected with installation curb plate 7, and another tubular structure all is connected with the inner wall of construction case 2, as shown in figure 1, the effect of flexible post 13 is used for supporting installation curb plate 7, avoids rocking.
The upper side and the lower side of the interior of the construction box 2 are respectively provided with an elastic column 14, the elastic columns 14 are formed by sleeving a compression spring on the outer side of a rubber rod, two ends of each elastic column 14 are respectively fixedly connected with the inner side wall of the construction box 2 and the inner end of the installation frame 3, the elastic columns 14 play a role in stabilization, and the structural positions of the elastic columns are shown in figure 1.
The catch bar 9 inserts and is equipped with the catch piece 10 in the inside one end welding in nail chamber 6, and the outer end of catch piece 10 splices and is equipped with magnetic path 11, and magnetic path 11 all adsorbs on the tip of wall nail 12, and magnetic path 11 is used for adsorbing wall nail 12, avoids dropping.
The working principle is as follows: the utility model discloses during the use, at first need all put into a wall nail 12 in the inside in each nail chamber 6, then put into the inside of installation cavity with heat preservation 5 again. Handle 15 is held to the outer end laminating that makes heat preservation 5 is on wall 1, then starts cylinder 8, and cylinder 8 promotes installation curb plate 7 and moves forward, and each catch bar 9 will promote wall nail 12 and advance this moment, and make wall nail 12 nail go into in heat preservation 5 and wall 1, make heat preservation 5 fix on wall 1. Wherein the inboard of installation cavity is spliced and is provided with sealing washer 4, and the inner circle laminating of sealing washer 4 is on the side of heat preservation 5, and its effect is that stop heat preservation 5 drops, the construction of being convenient for. The upper side and the lower side of the interior of the construction box 2 are respectively provided with an elastic column 14, and the elastic columns 14 are used for stabilizing the installation frame 3, so that the installation frame is still kept at a certain position under the action of no system external force. The upper and lower both sides of installing frame 3 all are equipped with flexible post 13, and the both ends of flexible post 13 are connected with construction case 2 and installing frame 3 respectively, and its effect is stable installing frame 3, guarantees its steady slip, also ensures that wall nail 12 can be steady insert in the heat preservation 5. The outer end of catch bar 9 is provided with catch 10, and the outer end of catch 10 is provided with magnetic path 11, and magnetic path 11 passes through magnetic force with wall nail 12 and adsorbs, and its effect is to avoid wall nail 12 to drop to make wall nail 12 perpendicular to heat preservation 5, make things convenient for wall nail 12 to insert perpendicularly in heat preservation 5.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a building outer wall heat preservation construction equipment, includes wall (1) and construction case (2), its characterized in that: the construction box (2) is located on one side of a wall surface (1), the construction box (2) is slidably connected with an installation frame (3) inside, handles (15) are welded on the upper side and the lower side of the outer end of the construction box (2), the upper end and the lower end of the installation frame (3) are slidably connected with the construction box (2), an installation cavity is formed in the outer end of the installation frame (3), a nail cavity (6) is arranged on the inner side of the outer end of the installation frame (3), a heat insulation layer (5) is arranged in the installation cavity in a fit mode, the heat insulation layer (5) is in a fit mode on the wall surface (1), five nail cavities (6) are not less than in number, each nail cavity (6) is of a hollow tubular structure, the nail cavities (6) are welded and fixed on the inner side wall surface of the installation frame (3), wall nails (12) are arranged inside the nail cavities (6), and installation side plates (7) are vertically arranged inside, installation curb plate (7) are close to one side welding of nail chamber (6) and are equipped with catch bar (9), the quantity of catch bar (9) equals with the quantity in nail chamber (6), and the outer end of each catch bar (9) inserts respectively in the inside in each nail chamber (6), the outer end central authorities of construction case (2) are equipped with cylinder (8), cylinder (8) fixed mounting is on the outer wall of construction case (2), and the piston rod tip of cylinder (8) run through construction case (2) and with installation curb plate (7) fixed connection.
2. The construction device of the heat-insulating layer of the external wall of the building as claimed in claim 1, wherein: the inboard laminating of installation cavity is equipped with sealing washer (4), the outer lane of sealing washer (4) is spliced and is fixed on the installation cavity, and the inner circle of sealing washer (4) all laminates on the side of heat preservation (5).
3. The construction device of the heat-insulating layer of the external wall of the building as claimed in claim 1, wherein: the upper side and the lower side of the inner end of the installation side plate (7) are respectively provided with a telescopic column (13), the telescopic columns (13) are formed by mutually sleeving two tubular structures with different diameters, one tubular structure is connected with the installation side plate (7), and the other tubular structure is connected with the inner wall of the construction box (2).
4. The construction device of the heat-insulating layer of the external wall of the building as claimed in claim 1, wherein: the upper side and the lower side of the interior of the construction box (2) are respectively provided with an elastic column (14), the elastic column (14) is formed by sleeving a compression spring on the outer side of a rubber rod, and two ends of the elastic column (14) are fixedly connected with the inner side wall of the construction box (2) and the inner end of the installation frame (3) respectively.
5. The construction device of the heat-insulating layer of the external wall of the building as claimed in claim 1, wherein: the push rod (9) is inserted into one end welding inside the nail cavity (6) and is provided with a push sheet (10), the outer end of the push sheet (10) is connected with a magnetic block (11), and the magnetic block (11) is adsorbed on the end part of the wall nail (12).
CN201921537934.3U 2019-09-17 2019-09-17 Building outer wall heat preservation construction equipment Expired - Fee Related CN210713294U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921537934.3U CN210713294U (en) 2019-09-17 2019-09-17 Building outer wall heat preservation construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921537934.3U CN210713294U (en) 2019-09-17 2019-09-17 Building outer wall heat preservation construction equipment

Publications (1)

Publication Number Publication Date
CN210713294U true CN210713294U (en) 2020-06-09

Family

ID=70967005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921537934.3U Expired - Fee Related CN210713294U (en) 2019-09-17 2019-09-17 Building outer wall heat preservation construction equipment

Country Status (1)

Country Link
CN (1) CN210713294U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734150A (en) * 2020-07-06 2020-10-02 程岚 Installation and construction method for rock wool heat-insulation structure of outer wall
CN113775128A (en) * 2021-10-08 2021-12-10 上海蓝天房屋装饰工程有限公司 Assembled wall metal plate and construction process thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734150A (en) * 2020-07-06 2020-10-02 程岚 Installation and construction method for rock wool heat-insulation structure of outer wall
CN111734150B (en) * 2020-07-06 2021-08-27 安徽旻扬建设工程有限公司 Installation and construction method for rock wool heat-insulation structure of outer wall
CN113775128A (en) * 2021-10-08 2021-12-10 上海蓝天房屋装饰工程有限公司 Assembled wall metal plate and construction process thereof

Similar Documents

Publication Publication Date Title
CN210713294U (en) Building outer wall heat preservation construction equipment
CN211473494U (en) Building structure's reinforcement connecting device
CN210887859U (en) Multifunctional aluminum plate
CN211200856U (en) Quick detach formula building curtain
CN210828432U (en) Concrete heel post later stage strengthening mechanism
CN204322093U (en) A kind of fixture for double glazing processing
CN211421501U (en) Aluminum veneer convenient to installation
CN216299080U (en) Clamping device of composite wallboard production line
CN208068401U (en) A kind of adhesive tape materials in the tube production fixing device
CN210104995U (en) Composite board for constructional engineering
CN217353045U (en) Energy-saving assembled building wall
CN207714528U (en) A kind of locating rack being used in the construction of building heat preservation system
CN210237097U (en) Fireproof material filling device
KR101990912B1 (en) Cutting apparatus for excess part of inorganic expanded panel in composite insulation panel and cutting method for excess part of inorganic expanded panel using the same
CN214995594U (en) Wood floor convenient to pave
CN218933691U (en) Outer wall surface stone dry hanging installation node
CN210530228U (en) High-compression-resistance prefabricated composite wallboard for wall
CN217713903U (en) Pipeline pipe hoop for mounting gas pipeline wall surface
CN217984344U (en) High and cold erosion resistant light bridge
CN215716793U (en) Ceramic tile composite wall board for bathroom
CN211597254U (en) Interlayer unit curtain wall structure
CN211421888U (en) Building curtain wall mounting tool
CN210343160U (en) Door plate filled with novel polymer synthetic material
CN212478268U (en) Energy-saving heat-insulating wallboard for building
CN211369356U (en) Assembled building external wall panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Xiaoyong

Inventor after: Wang Cheng

Inventor after: Zhou Yun

Inventor after: Sun Sixin

Inventor before: Wang Xiaoyong

Inventor before: Wang Cheng

Inventor before: Zhou Yun

Inventor before: Sun Sixin

CB03 Change of inventor or designer information
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A construction device for building external wall thermal insulation layer

Effective date of registration: 20201106

Granted publication date: 20200609

Pledgee: Societe Generale Limited by Share Ltd. Chongqing branch

Pledgor: Chongqing yonglianda coating Engineering Co.,Ltd.

Registration number: Y2020500000016

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20211115

Granted publication date: 20200609

Pledgee: Societe Generale Limited by Share Ltd. Chongqing branch

Pledgor: Chongqing yonglianda coating Engineering Co.,Ltd.

Registration number: Y2020500000016

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200609