CN210713178U - Vestibule - Google Patents

Vestibule Download PDF

Info

Publication number
CN210713178U
CN210713178U CN201921130878.1U CN201921130878U CN210713178U CN 210713178 U CN210713178 U CN 210713178U CN 201921130878 U CN201921130878 U CN 201921130878U CN 210713178 U CN210713178 U CN 210713178U
Authority
CN
China
Prior art keywords
corridor
truss
groove
attached
buffer layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921130878.1U
Other languages
Chinese (zh)
Inventor
孙振宇
周宇
黄守乐
李帛谦
张艺飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201921130878.1U priority Critical patent/CN210713178U/en
Application granted granted Critical
Publication of CN210713178U publication Critical patent/CN210713178U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型涉及一种连廊,包括:至少一个竖向设置的支撑柱;套设于支撑柱顶部的限位座,限位座的顶部形成有凹槽和横向连接于凹槽的至少一个承托板,凹槽内贴设有具有弹性的第一缓冲层;横向设于支撑柱上且连接于建筑结构之间的连廊桁架,连廊桁架的底部形成有插设于对应的凹槽且贴设于第一缓冲层的底部接头,且连廊桁架的底部贴设于承托板上;设于连廊桁架端部的卡接钩,建筑结构形成有设置方向和连廊桁架长度方向一致的卡接槽,卡接槽内壁贴设有具有弹性的第二缓冲层,卡接钩插设于卡接槽内且贴设于第二缓冲层。本实用新型通过将卡接钩插设于卡接槽内贴设于第二缓冲层,卡接钩在卡接槽内进行适应性调节防止震动破坏连廊桁架和建筑结构连接。

Figure 201921130878

The utility model relates to a corridor, comprising: at least one vertically arranged support column; a limit seat sleeved on the top of the support column, the top of the limit seat is formed with a groove and at least one support horizontally connected to the groove The supporting plate, the first buffer layer with elasticity is attached in the groove; the corridor truss is horizontally arranged on the support column and connected between the building structures, and the bottom of the corridor truss is formed with a corresponding groove and It is attached to the bottom joint of the first buffer layer, and the bottom of the corridor truss is attached to the support plate; the clamping hooks arranged at the end of the corridor truss, the building structure is formed with the setting direction consistent with the length direction of the corridor truss An elastic second buffer layer is attached to the inner wall of the clip slot, and the clip hook is inserted into the clip slot and attached to the second buffer layer. The utility model is attached to the second buffer layer by inserting the clamping hook in the clamping groove, and the clamping hook is adaptively adjusted in the clamping groove to prevent vibration from destroying the connection between the corridor truss and the building structure.

Figure 201921130878

Description

连廊corridor

技术领域technical field

本实用新型涉及建筑施工领域,尤指一种连廊。The utility model relates to the field of building construction, in particular to a corridor.

背景技术Background technique

连廊,原是中国古建的一种形式,即建筑和建筑之间的连接构筑物,上有顶,没有围护结构。连廊设置一方面出于建筑功能上的要求,它可以方便两塔楼之间的联系。同时连体具有良好的采光效果和广阔的视野而可以用做观光走廊或休闲咖啡厅等。Corridor was originally a form of ancient Chinese architecture, that is, a connecting structure between buildings and buildings, with a roof and no enclosure structure. On the one hand, the setting of the corridor is due to the requirements of architectural functions, which can facilitate the connection between the two towers. At the same time, the conjoined body has good lighting effect and wide field of vision and can be used as a sightseeing corridor or a leisure cafe.

现有技术中,连廊一般包括横向支设于两个建筑结构之间的连廊桁架和支撑连廊桁架的钢柱,并在连廊桁架上浇筑混凝土形成连廊。但是,一般是在高空将连廊桁架的相对两端和对应的建筑结构直接进行焊接固定,但是连廊桁架相对两端和建筑结构的刚性连接位置的应力大,在发生震动时容易被破坏。In the prior art, a corridor generally includes a corridor truss supported laterally between two building structures and a steel column supporting the corridor truss, and concrete is poured on the corridor truss to form the corridor. However, generally, the opposite ends of the gallery truss and the corresponding building structure are directly welded and fixed at high altitude, but the stress of the rigid connection position between the opposite ends of the gallery truss and the building structure is large, and it is easily damaged when vibration occurs.

实用新型内容Utility model content

本实用新型的目的在于克服现有技术的缺陷,提供一种连廊,解决现有技术中连廊桁架相对两端和建筑结构的刚性连接位置的应力大,在发生震动时容易被破坏的问题。The purpose of the utility model is to overcome the defects of the prior art and provide a corridor, which solves the problem that the rigid connection position between the opposite ends of the corridor truss and the building structure in the prior art is large and easily destroyed when vibration occurs. .

实现上述目的的技术方案是:The technical solution to achieve the above purpose is:

本实用新型提供一种连廊,包括:The utility model provides a corridor, comprising:

至少一个竖向设置的支撑柱;at least one vertically arranged support column;

套设于所述支撑柱顶部的限位座,所述限位座的顶部形成有凹槽和横向连接于所述凹槽的至少一个承托板,所述凹槽内贴设有具有弹性的第一缓冲层;A limit seat sleeved on the top of the support column, the top of the limit seat is formed with a groove and at least one support plate laterally connected to the groove, and an elastic elastic plate is attached to the groove. the first buffer layer;

横向设于所述支撑柱上且连接于建筑结构之间的连廊桁架,所述连廊桁架的底部形成有插设于对应的所述凹槽且贴设于所述第一缓冲层的底部接头,且所述连廊桁架的底部贴设于所述承托板上;以及A corridor truss laterally arranged on the support columns and connected between the building structures, the bottom of the corridor truss is formed to be inserted into the corresponding groove and attached to the bottom of the first buffer layer joints, and the bottom of the corridor truss is attached to the support plate; and

设于所述连廊桁架端部的卡接钩,所述建筑结构形成有设置方向和所述连廊桁架长度方向一致的卡接槽,所述卡接槽的内壁贴设有具有弹性的第二缓冲层,所述卡接钩插设于所述卡接槽内且贴设于所述第二缓冲层。A snap hook is arranged at the end of the corridor truss, the building structure is formed with a snap slot whose installation direction is consistent with the length direction of the link truss, and the inner wall of the snap slot is attached with an elastic first. Two buffer layers, the snap hooks are inserted into the snap slots and attached to the second buffer layer.

本实用新型连廊的进一步改进在于,所述连廊桁架包括多个相互拼接的工字钢,相邻两个工字钢通过连接座连接,所述连接座的相对两端形成有和对应的工字钢的腹板卡设连接的连接槽。A further improvement of the corridor of the present invention is that the corridor truss includes a plurality of I-beams spliced with each other, and two adjacent I-beams are connected by a connecting seat, and opposite ends of the connecting seat are formed with corresponding The web of the I-beam is clamped with a connecting slot for connection.

本实用新型连廊的有益效果:The beneficial effects of the corridor of the utility model:

本实用新型连廊通过在建筑结构形成有和所述连廊桁架长度方向一致的卡接槽,所述连廊桁架端部设置卡接钩,通过将卡接钩插设于卡接槽内且贴设于具有弹性的第二缓冲层,从而在震动过程中卡接钩在卡接槽内可进行适应性移动调节,减小震动的影响,防止震动过大而破坏连廊桁架和建筑结构的连接。通过竖向设置的支撑柱和套设于支撑柱的顶部的限位座,利用限位座的的承托板和连廊桁架相互贴设,增大支撑面积,增强稳定性。The connecting corridor of the utility model forms a snap-fit groove in the building structure consistent with the length direction of the connecting corridor truss, the end of the connecting corridor truss is provided with snap-fit hooks, and the snap-fit hook is inserted into the snap-fit groove and It is attached to the second elastic buffer layer, so that the clip hook can be adjusted adaptively in the clip slot during the vibration process, reducing the impact of vibration and preventing the damage of the corridor truss and building structure due to excessive vibration. connect. Through the vertically arranged support column and the limit seat sleeved on the top of the support column, the support plate of the limit seat and the corridor truss are attached to each other to increase the support area and enhance the stability.

本实用新型连廊的进一步改进在于,所述连接座设有通孔,通过螺栓穿设所述通孔和所述工字钢实现所述连接座和所述工字钢固定连接。A further improvement of the corridor of the present invention is that the connecting seat is provided with a through hole, and the connecting seat and the I-beam are fixedly connected by bolts passing through the through hole and the I-beam.

本实用新型连廊的进一步改进在于,所述连廊桁架的顶部形成有供吊装设置连接的吊钩。A further improvement of the corridor of the present invention is that the top of the corridor truss is formed with hooks for hoisting, setting and connection.

附图说明Description of drawings

图1为本实用新型连廊的主视图。Fig. 1 is the front view of the utility model connecting corridor.

图2为本实用新型连廊的限位座的结构示意图。FIG. 2 is a schematic structural diagram of the limit seat of the connecting corridor of the present invention.

图3为本实用新型连廊的连接台的俯视图。FIG. 3 is a top view of the connecting platform of the corridor of the present invention.

图4为本实用新型连廊的连廊桁架的分解示意图。FIG. 4 is an exploded schematic view of the corridor truss of the corridor of the present invention.

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型作进一步说明。The present utility model will be further described below in conjunction with the accompanying drawings and specific embodiments.

参阅图1,显示了本实用新型连廊的主视图。图2为本实用新型连廊的限位座的结构示意图。图3为本实用新型连廊的连接台的俯视图。结合图1至图3所示,本实用新型连廊包括:至少一个竖向设置的支撑柱10;Referring to FIG. 1, the front view of the connecting corridor of the present invention is shown. FIG. 2 is a schematic structural diagram of the limit seat of the connecting corridor of the present invention. FIG. 3 is a top view of the connecting platform of the corridor of the present invention. 1 to 3, the corridor of the present invention includes: at least one vertically arranged support column 10;

套设于所述支撑柱10的顶部的限位座20,所述限位座20的顶部形成有凹槽和横向连接于所述凹槽的至少一个承托板21。所述凹槽内贴设有具有弹性的第一缓冲层;The limiting seat 20 is sleeved on the top of the support column 10 , the top of the limiting seat 20 is formed with a groove and at least one supporting plate 21 transversely connected to the groove. An elastic first buffer layer is attached in the groove;

横向设于所述支撑柱10上且连接于建筑结构之间的连廊桁架30,所述连廊桁架30的底部形成有插设于对应的所述凹槽且贴设于所述第一缓冲层的的底部接头40,且所述连廊桁架30的底部贴设于所述承托板21上;以及The corridor truss 30 is laterally arranged on the support column 10 and connected between the building structures. The bottom of the corridor truss 30 is formed to be inserted into the corresponding groove and attached to the first buffer. The bottom joint 40 of the layer, and the bottom of the corridor truss 30 is attached to the support plate 21; and

设于所述连廊桁架30端部的卡接钩50,所述建筑结构形成有设置方向和所述连廊桁架30长度方向一致的卡接槽61,所述卡接槽61的内壁贴设有具有弹性的第二缓冲层,所述卡接钩插设于所述卡接槽内且贴设于所述第二缓冲层。The snap hooks 50 arranged at the ends of the corridor trusses 30, the building structure is formed with a snap slot 61 whose installation direction is consistent with the length direction of the corridor truss 30, and the inner wall of the snap slot 61 is attached There is an elastic second buffer layer, and the snap hook is inserted into the snap slot and attached to the second buffer layer.

在本实施例中,建筑结构的端部凸伸形成有一连接台60,连接台60上卡设有卡接槽61。卡接槽61为条形槽,其长度适配于实际发生震动时连廊桁架30的位移大小。连廊桁架30在震动下发生横向位移时,通过卡接钩50在卡接槽61内进行适应性移动调节,并利用具有弹性的第二缓冲层进行减震,防止连廊桁架30和建筑结构的连接位置因震动发生撞击拉扯等应力损伤。In this embodiment, a connecting platform 60 is formed protruding from the end of the building structure, and the connecting platform 60 is clamped with a clamping groove 61 . The snap-fit slot 61 is a strip-shaped slot, and its length is adapted to the displacement of the corridor truss 30 when vibration actually occurs. When the corridor truss 30 undergoes lateral displacement under vibration, the adaptive movement is adjusted in the clip slot 61 through the snap hooks 50, and the second elastic buffer layer is used for shock absorption to prevent the corridor truss 30 from being damaged by the building structure. The connection position is damaged by stress such as impact and pull due to vibration.

作为本实用新型连廊的一较佳实施方式,参阅图4为本实用新型连廊的连廊桁架的分解示意图。结合图1至图4所示,所述连廊桁架30包括多个相互拼接的工字钢31,相邻两个工字钢31通过连接座32连接,所述连接座32的相对两端形成有和对应的工字钢31的腹板卡设连接的连接槽。As a preferred embodiment of the corridor of the present invention, referring to FIG. 4 is an exploded schematic view of the corridor truss of the corridor of the present invention. As shown in FIGS. 1 to 4 , the corridor truss 30 includes a plurality of I-beams 31 spliced with each other, and two adjacent I-beams 31 are connected by a connecting seat 32 , and opposite ends of the connecting seat 32 are formed There is a connecting groove connected with the web of the corresponding I-beam 31.

在本实施例中,工字钢31的相对的两个翼缘板横向设置,连接于相对的两个翼缘板的腹板竖向设置,连接座32相对两端的连接槽和对应的腹板卡设连接。In this embodiment, the two opposite flange plates of the I-beam 31 are arranged horizontally, the webs connected to the two opposite flange plates are arranged vertically, and the connecting grooves at opposite ends of the connecting seat 32 and the corresponding webs Card connection.

进一步地,所述连接座设有通孔,通过螺栓穿设所述通孔和所述工字钢实现所述连接座和所述工字钢的腹板固定连接,进一步实现固定。Further, the connecting seat is provided with a through hole, and bolts are passed through the through hole and the I-beam to realize the fixed connection between the connecting seat and the web of the I-beam, and further realize the fixing.

在本实施例中,限位座20包括上下相对连通的两个套管,位于下方的套管套设于支撑柱10,位于上方的套管套设于连廊桁架30的底部接头40。位于上方的套管的顶部形成有四个承托板21,四个承托板21两两相对设置,均匀受力。In this embodiment, the limiting seat 20 includes two bushings that are connected up and down relative to each other. Four supporting plates 21 are formed on the top of the upper casing, and the four supporting plates 21 are arranged opposite to each other and bear uniform force.

作为本实用新型连廊的一较佳实施方式,所述连廊桁架30的顶部形成有供吊装设置连接的吊钩33。在管廊桁架装配好之后通过吊装设备整体吊装到支撑柱上进行安装,从而无需进行高空焊接,方便操作。As a preferred embodiment of the corridor of the present invention, a hook 33 is formed on the top of the corridor truss 30 for hoisting, installation and connection. After the pipe gallery truss is assembled, it is hoisted to the support column as a whole by hoisting equipment for installation, so that no high-altitude welding is required, which is convenient for operation.

在本实施例中,支撑柱10包括上下相互拼接的两段支撑柱单元,支撑柱单元的端部设有供对接的拼接板。In this embodiment, the support column 10 includes two sections of support column units that are spliced up and down with each other, and the end of the support column unit is provided with a splicing plate for butt joint.

本实用新型连廊的有益效果为:The beneficial effects of the corridor of the utility model are:

本实用新型连廊通过在建筑结构形成有和所述连廊桁架长度方向一致的卡接槽,所述连廊桁架端部设置卡接钩,通过将卡接钩插设于卡接槽内且贴设于具有弹性的第二缓冲层,从而在震动过程中卡接钩在卡接槽内可进行适应性移动调节,减小震动的影响,防止震动过大而破坏连廊桁架和建筑结构的连接。通过竖向设置的支撑柱和套设于支撑柱的顶部的限位座,利用限位座的的承托板和连廊桁架相互贴设,增大支撑面积,增强稳定性。The connecting corridor of the utility model forms a snap-fit groove in the building structure consistent with the length direction of the connecting corridor truss, the end of the connecting corridor truss is provided with snap-fit hooks, and the snap-fit hook is inserted into the snap-fit groove and It is attached to the second elastic buffer layer, so that the clip hook can be adjusted adaptively in the clip slot during the vibration process, reducing the impact of vibration and preventing the damage of the corridor truss and building structure due to excessive vibration. connect. Through the vertically arranged support column and the limit seat sleeved on the top of the support column, the support plate of the limit seat and the corridor truss are attached to each other to increase the support area and enhance the stability.

以上结合附图实施例对本实用新型进行了详细说明,本领域中普通技术人员可根据上述说明对本实用新型做出种种变化例。因而,实施例中的某些细节不应构成对本实用新型的限定,本实用新型将以所附权利要求书界定的范围作为本实用新型的保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those of ordinary skill in the art can make various modifications to the present invention according to the above description. Therefore, some details in the embodiments should not be construed to limit the present invention, and the present invention will take the scope defined by the appended claims as the protection scope of the present invention.

Claims (4)

1. A vestibule, comprising:
at least one vertically arranged support column;
the limiting seat is sleeved on the top of the supporting column, a groove and at least one supporting plate transversely connected to the groove are formed in the top of the limiting seat, and a first elastic buffer layer is attached to the groove;
the corridor truss is transversely arranged on the support columns and connected between building structures, a bottom connector which is inserted into the corresponding groove and is attached to the first buffer layer is formed at the bottom of the corridor truss, and the bottom of the corridor truss is attached to the support plate; and
locate the joint hook of vestibule truss tip, building structure be formed with set up the direction with the unanimous joint groove of vestibule truss length direction, the inner wall subsides in joint groove are equipped with and have elastic second buffer layer, the joint hook is inserted and is located the joint inslot and subsides are located the second buffer layer.
2. The vestibule of claim 1,
the vestibule truss comprises a plurality of mutually spliced I-beams, two adjacent I-beams are connected through a connecting seat, and connecting grooves for connection are formed at the two opposite ends of the connecting seat and clamped with webs of the corresponding I-beams.
3. The vestibule of claim 2,
the connecting seat is provided with a through hole, and the through hole and the I-shaped steel are penetrated through by a bolt to realize the fixed connection of the connecting seat and the I-shaped steel.
4. The vestibule of claim 1, wherein the top of the vestibule truss is formed with hooks for attachment of a lifting device.
CN201921130878.1U 2019-07-18 2019-07-18 Vestibule Expired - Fee Related CN210713178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921130878.1U CN210713178U (en) 2019-07-18 2019-07-18 Vestibule

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921130878.1U CN210713178U (en) 2019-07-18 2019-07-18 Vestibule

Publications (1)

Publication Number Publication Date
CN210713178U true CN210713178U (en) 2020-06-09

Family

ID=70966247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921130878.1U Expired - Fee Related CN210713178U (en) 2019-07-18 2019-07-18 Vestibule

Country Status (1)

Country Link
CN (1) CN210713178U (en)

Similar Documents

Publication Publication Date Title
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN111519786A (en) U-shaped steel-friction energy dissipation node and external wall system for prefabricated external wall panels
CN108343157A (en) Inverse construction method for steel truss conversion layer Construction control
CN113175116A (en) Truss type replaceable energy dissipation connecting beam with friction energy dissipation support
CN211774554U (en) A reinforced steel structure load-bearing beam structure for building
CN210918165U (en) Multi-row overhanging support frame for high-rise building
CN204728510U (en) A kind of structure for improving the isolated building safety with degree of freedom
CN205330140U (en) Tall support rack of structure encorbelments greatly in high altitude
CN111561092A (en) A glass curtain wall support system
CN106337569A (en) Tiebeam-column structural-deformation and energy-consumption node
CN215106084U (en) Shock-absorbing connection structures for asymmetrical buildings and connectors
CN104963410A (en) Sliding connecting joint of steel structure beam column
CN211341677U (en) A down-supported maintenance horse track structure
CN204624885U (en) A kind of standard knot support chassis of elevator
CN109914594B (en) A shock-absorbing steel structure node member
CN209081302U (en) A tower crane attached assembled operation maintenance platform
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN206680869U (en) Short line casting box beam pier top block rackwork
CN208347296U (en) A kind of belt lacing rod piece
CN110748007A (en) Prestress inhaul cable connection node structure suitable for pipe truss structure
CN106049279A (en) Cable anchor structure in steel box girder
CN202305194U (en) Loading device for space beam post node bearing force tests
CN211447266U (en) Connection structure of pipe truss and prestressed cable
CN115162695A (en) A suspended work platform facing I-beam
CN219343541U (en) Connecting device for steel frame beam and concrete column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200609