CN210712987U - Simple recyclable static load test pile steel pile cap - Google Patents

Simple recyclable static load test pile steel pile cap Download PDF

Info

Publication number
CN210712987U
CN210712987U CN201921616644.8U CN201921616644U CN210712987U CN 210712987 U CN210712987 U CN 210712987U CN 201921616644 U CN201921616644 U CN 201921616644U CN 210712987 U CN210712987 U CN 210712987U
Authority
CN
China
Prior art keywords
pile
steel
foundation pile
cap
static load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921616644.8U
Other languages
Chinese (zh)
Inventor
陆凤卫
张守年
谭绪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yonghao Construction Engineering Co ltd
Original Assignee
Anhui Yonghao Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Yonghao Construction Engineering Co ltd filed Critical Anhui Yonghao Construction Engineering Co ltd
Priority to CN201921616644.8U priority Critical patent/CN210712987U/en
Application granted granted Critical
Publication of CN210712987U publication Critical patent/CN210712987U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a simple and easy experimental stake steel pile cap of static load of circulated use, characterized by: the steel pile cap is formed by a pair of semicircular steel cylinders which are encircled and tightly hooped at the upper end of the foundation pile to form a foundation pile upper end steel hoop, the top edge of the foundation pile upper end steel hoop is not lower than the height of the top plane of the foundation pile, an end steel plate is placed on the foundation pile upper end steel hoop, and the load test equipment is installed on the end steel plate. The utility model discloses can effectively protect the pile head, reuse after its steel pile cap can be dismantled reduces the wasting of resources, and its preparation is simple and convenient, high-efficient for the installation, is particularly useful for multiple pile shapes such as drilling bored concrete pile, CFG stake and prestressed pipe pile as static load test's pile bolck enhancement processing apparatus.

Description

Simple recyclable static load test pile steel pile cap
Technical Field
The utility model relates to a static load test stake steel pile cap, the more specifically multiple pile types such as specially adapted drilling bored concrete pile, CFG stake and prestressed pipe pile when as static load test stake top enhancement processing with static load test stake steel pile cap that says so.
Background
Pile testing is carried out before pile foundation engineering construction, and after the construction of the engineering piles is finished, 1% of engineering piles are extracted according to standard requirements and are not less than 3 engineering piles to be subjected to static load test detection. Before static load tests are carried out on all test piles such as cast-in-situ bored piles, CFG piles, prestressed pipe piles and the like, in order to ensure that pile heads are not crushed, the pile heads are required to be reinforced. The traditional method is to add reinforcing steel bars, stirrups and reinforcing steel bar meshes in the range of 0.5-1 m of a pile head, and then pour concrete with the strength 1 grade higher than that of a pile body to form a reinforced concrete pouring pile cap, and the following defects exist: firstly, the processes of formwork support, steel bar mesh manufacturing, concrete pouring and the like are complex, and the efficacy is low; the concrete strength maintenance period is long, and the construction period is delayed; thirdly, the fertilizer cannot be repeatedly applied; fourthly, the waste of steel and concrete is more; fifthly, chiseling is needed after detection is finished, which is labor-consuming and time-consuming.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a for avoiding above-mentioned prior art not enough, provide a simple and easy experimental stake steel pile cap of static load of circulated use to be applicable to multiple pile forms such as drilling bored concrete pile, CFG stake and prestressed pipe pile and strengthen processing apparatus as the pile bolck of static load test.
The utility model discloses a solve the problem and adopt following technical scheme:
the utility model discloses simple and easy cyclic use's static load test stake steel pile cap's characteristics are: the steel pile cap is characterized in that a pair of semicircular steel cylinders embraces and tightly hoops the upper end of the foundation pile to form a steel hoop at the upper end of the foundation pile, the top edge of the steel hoop at the upper end of the foundation pile is not lower than the height of the top plane of the foundation pile, an end steel plate is placed on the steel hoop at the upper end of the foundation pile, and load test equipment is installed on the end steel plate.
The utility model discloses simple and easy cyclic use's static load test stake steel pile cap's characteristics also lie in: and setting the top edge of the steel hoop at the upper end of the foundation pile to be 2-3mm higher than the top plane of the foundation pile, and densely filling yellow sand between the end steel plate and the top plane of the foundation pile.
The utility model discloses simple and easy cyclic use's static load test stake steel pile cap's characteristics also lie in: wing plates are fixedly connected to two sides of the semicircular steel cylinder respectively, through holes are formed in the wing plates, and reinforcing rib plates are arranged between the wing plates and the semicircular steel cylinder; and the pair of the surrounding semicircular steel cylinders are tightly connected in the through hole by utilizing a high-strength bolt and a high-strength nut.
Compared with the prior art, the utility model discloses beneficial effect embodies:
1. the semi-circular steel cylinder in the utility model is processed and welded with the wing plate, and the like, and is formed in one step in a production workshop according to the pile diameter requirement, the manufacture is simple, the process is simple and convenient, the speed is high, and the safety and the high efficiency are realized, especially for the installation of a test pile head;
2. in the concrete application of the utility model, the test pile can be disassembled and recovered after the test pile load is applied and unloaded, and can be repeatedly used, thereby avoiding resource waste;
3. compared with the existing reinforced concrete cast-in-place pile cap, the utility model greatly shortens the construction period, reduces the use of steel, concrete and manpower, saves resources and is green and environment-friendly;
4. the utility model discloses in set up the topside of foundation pile upper end steel staple bolt and exceed the top plane of foundation pile to closely knit packing yellow sand between them, make pile tip atress even, effectively avoid the stress concentration that pile tip top arouses because of the unevenness, and then cause the pile tip to be crushed, stable in structure is reliable.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the installation structure of the steel anchor ear at the upper end of the foundation pile of the utility model;
reference numbers in the figures: 1 steel staple bolt in the foundation pile, 2 pterygoid lamina, 3 reinforced rib plate, 4 high-strength bolt, 5 high-strength nut, 6 end board, 7 foundation piles, 8 yellow sand.
Detailed Description
The simple recyclable static load test pile steel pile cap in the embodiment has the following structural form: the steel pile cap is formed by a pair of semicircular steel cylinders which are encircled and tightly hooped at the upper end of a foundation pile 7, a steel hoop 1 at the upper end of the foundation pile is formed, the top edge of the steel hoop 1 at the upper end of the foundation pile is not lower than the height of the top plane of the foundation pile 7, an end steel plate 6 is placed on the steel hoop 1 at the upper end of the foundation pile, and load test equipment is installed on the end steel plate 6.
In this embodiment, the top edge of the steel hoop 1 at the upper end of the foundation pile is 2-3mm higher than the top plane of the foundation pile 7, the yellow sand 8 is densely filled between the end steel plate 6 and the top plane of the foundation pile 7, and the yellow sand 8 is uniformly compacted at the initial stage of the static pressure test, so that the stress of the pile end is uniform, and therefore, the stress concentration caused by unevenness at the top of the pile end is effectively avoided, and the pile end is crushed.
In the embodiment, in order to facilitate disassembly and assembly, wing plates 2 are respectively and fixedly connected to two sides of the semicircular steel cylinder, through holes are formed in the wing plates 2, and reinforcing rib plates 3 are arranged between the wing plates 2 and the semicircular steel cylinder; a pair of semicircular steel cylinders which are embraced are tightly connected in the through hole by a high-strength bolt 4 and a high-strength nut 5.
In specific implementation, the semicircular steel cylinder is cut into a pair of semicircular cylinders after a steel plate is rolled into a cylinder in a factory, and three through holes are vertically formed in the wing plate and used for installing shear bolts; the types of the semicircular steel cylinder, the wing plate, the end steel plate, the high-strength bolt, the high-strength nut and the like are set according to the size of the pile diameter and the bearing capacity.
In the foundation pile static load test, before the last section of foundation pile test, the steel pile cap of the utility model is arranged at the pile top of the precast pile, when the static load test is carried out, the steel pile cap is utilized to restrain the top of the foundation pile, the damage of larger load to the top of the foundation pile is effectively avoided, after the static load test is finished, the earth around the test pile is excavated to the elevation of the lower opening of the steel pile cap, and the high-strength bolt and the high-strength nut are removed, so that the steel pile cap can be detached; and the subsequent second detection pile can be repeatedly used, so that the resource waste is avoided.

Claims (3)

1. The utility model provides a simple and easy experimental stake steel pile cap of static load of circulated use which characterized by: the steel pile cap is characterized in that a pair of semicircular steel cylinders embraces and tightly hoops the upper end of a foundation pile (7) to form a foundation pile upper end steel hoop (1), the top edge of the foundation pile upper end steel hoop (1) is not lower than the height of the top plane of the foundation pile (7), an end steel plate (6) is placed on the foundation pile upper end steel hoop (1), and load test equipment is installed on the end steel plate (6).
2. The simple recyclable static load test pile steel pile cap as claimed in claim 1, which is characterized in that: and the top edge of the steel anchor ear (1) at the upper end of the foundation pile is arranged to be 2-3mm higher than the top plane of the foundation pile (7), and yellow sand (8) is densely filled between the end steel plate (6) and the top plane of the foundation pile (7).
3. The simple recyclable static load test pile steel pile cap as claimed in claim 1 or 2, which is characterized in that: wing plates (2) are fixedly connected to two sides of the semicircular steel cylinder respectively, through holes are formed in the wing plates (2), and reinforcing rib plates (3) are arranged between the wing plates (2) and the semicircular steel cylinder; and a pair of embracing semicircular steel cylinders are tightly connected in the through holes by high-strength bolts (4) and high-strength nuts (5).
CN201921616644.8U 2019-09-26 2019-09-26 Simple recyclable static load test pile steel pile cap Active CN210712987U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921616644.8U CN210712987U (en) 2019-09-26 2019-09-26 Simple recyclable static load test pile steel pile cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921616644.8U CN210712987U (en) 2019-09-26 2019-09-26 Simple recyclable static load test pile steel pile cap

Publications (1)

Publication Number Publication Date
CN210712987U true CN210712987U (en) 2020-06-09

Family

ID=70935982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921616644.8U Active CN210712987U (en) 2019-09-26 2019-09-26 Simple recyclable static load test pile steel pile cap

Country Status (1)

Country Link
CN (1) CN210712987U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529816A (en) * 2021-07-07 2021-10-22 中国科学院武汉岩土力学研究所 In-situ test method for pile-soil load sharing ratio of CFG pile composite foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529816A (en) * 2021-07-07 2021-10-22 中国科学院武汉岩土力学研究所 In-situ test method for pile-soil load sharing ratio of CFG pile composite foundation
CN113529816B (en) * 2021-07-07 2022-05-03 中国科学院武汉岩土力学研究所 In-situ test method for pile-soil load sharing ratio of CFG pile composite foundation

Similar Documents

Publication Publication Date Title
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
KR100886922B1 (en) Footing reinforcing or structure recovering method
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN108643219B (en) Static pressure miniature pile foundation of anchor rod of assembled power transmission line and construction method of static pressure miniature pile foundation
CN210712987U (en) Simple recyclable static load test pile steel pile cap
CN110397305A (en) A kind of concrete underpinning structure and the method using its progress decaying concrete displacement
CN107165056B (en) Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof
CN102561212A (en) Method for strengthening vertical crack of single-pillar concrete pier
CN210066493U (en) Hoop mold for trestle hanging mold construction
CN107984610A (en) A kind of prestressing force small box girder production method
CN104763161A (en) Beam-adding reinforced structure of a reinforced concrete floor with an opening and construction method
CN113090067A (en) Replacement device and replacement method for concrete damaged column
CN103386709A (en) Shakeproof lift-preventing anti-bending preformed pile and manufacturing process of preformed pile
CN111486060B (en) Fan foundation recycling method
CN214644692U (en) Post-tensioning precast concrete supporting member and inner supporting system
CN111254973B (en) Method for repairing extruded deformation of cutting retaining wall
CN211036710U (en) Cast-in-place box girder support system
CN203129133U (en) Centrifugal poured prestressed steel bar concrete H-shaped section support pile
CN111424554A (en) Construction method for suspended formwork of seascape trestle
KR101211101B1 (en) A bridge post strengthen structure and construction methode there of
CN112502160A (en) Post-tensioning precast concrete supporting member, inner supporting system and construction method
CN206173949U (en) Concatenation formula does not have spin of spoir and strengthens piling bar
CN109629710B (en) Reinforced block filling type wall body applying pre-compression stress and construction method
CN115573376B (en) Method for treating cracking of foundation of circular transmission tower
CN207331730U (en) A kind of fixed type tower crane anchor bolt fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A Simple and Reusable Steel Pile Cap for Static Load Test Piles

Effective date of registration: 20231221

Granted publication date: 20200609

Pledgee: Huishang Bank Co.,Ltd. Hefei Xiyou road sub branch

Pledgor: Anhui Yonghao Construction Engineering Co.,Ltd.

Registration number: Y2023980073389