CN210712477U - Drilling equipment is used in road bridge municipal construction - Google Patents

Drilling equipment is used in road bridge municipal construction Download PDF

Info

Publication number
CN210712477U
CN210712477U CN201921491567.8U CN201921491567U CN210712477U CN 210712477 U CN210712477 U CN 210712477U CN 201921491567 U CN201921491567 U CN 201921491567U CN 210712477 U CN210712477 U CN 210712477U
Authority
CN
China
Prior art keywords
drilling
dust collection
collection box
top end
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921491567.8U
Other languages
Chinese (zh)
Inventor
许磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921491567.8U priority Critical patent/CN210712477U/en
Application granted granted Critical
Publication of CN210712477U publication Critical patent/CN210712477U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model discloses a drilling equipment is used in road and bridge municipal construction, including the suction box, the inside fixed mounting of suction box has the drilling box, the inside running through of drilling box installs the drilling parts, the equal fixed mounting in suction box top left and right sides surface has the backup pad, every backup pad top fixed mounting has the pulley, the inside equal slidable mounting in suction box top left and right sides has the filter. The utility model discloses a damping spring is connected first shock attenuation pole and second shock attenuation pole, can eliminate the vibration that produces when will drilling through damping spring's cushioning effect, and then can avoid the user to hold this device time-out because the vibration can't be stable hold to install the fixed plate at first shock attenuation pole bottom, can hug closely this device in the ground of required drilling, and then the person of facilitating the use needn't hold drilling parts always, comparatively practical, be fit for extensively promoting and using.

Description

Drilling equipment is used in road bridge municipal construction
Technical Field
The utility model is suitable for a drilling equipment field, in particular to drilling equipment is used in road bridge municipal construction.
Background
Currently, a drilling machine is a general term for machines and apparatuses that leave a cylindrical hole or hole in an object by means of rotary cutting or rotary pressing using a tool harder and sharper than the object. During the construction of roads and bridges, drilling holes are often drilled by drilling machines for installing roadblocks, speed bumps and the like.
However, since the drilling machine used today generates a lot of dust when drilling, which in turn affects the health of the user and the surrounding environment, and during the use, the stability of the user holding the drilling device is affected due to the vibration of the drilling machine, which in turn affects the construction process. Therefore, we propose a drilling equipment for road and bridge municipal construction.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a drilling equipment is used in road bridge municipal construction can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a drilling device for road and bridge municipal construction comprises a dust collection box, wherein a drilling box is fixedly installed inside the dust collection box, drilling machine parts penetrate through the inside of the drilling box, supporting plates are fixedly installed on the left side surface and the right side surface of the top end of the dust collection box, a pulley is fixedly installed at the top end of each supporting plate, filter plates are slidably installed inside the left side surface and the right side surface of the top end of the dust collection box, the bottom end surface of each filter plate is tightly attached to the top end surface of the pulley, a bearing is fixedly installed in the middle of the top end of the dust collection box, a follow-up rod penetrates through the inner side wall of the bearing and is installed on the inner side wall of the bearing, a follow-up gear is;
a rotating motor is fixedly installed on the right side surface of the top end of the dust collection box, a transmission gear is installed on the top end surface of the rotating motor in an embedded mode, the left side of the transmission gear is meshed with the right side of the follow-up gear, connecting rods are fixedly installed on the left side surface and the right side surface of the middle end of the dust collection box, and a second damping rod is fixedly installed on the bottom end surface of each connecting rod;
the dust absorption box left side top fixed surface installs the control cabinet, control cabinet left side top fixed surface installs drilling parts control button and rotates motor control button, control cabinet top fixed surface installs the battery.
Preferably, a damping spring is fixedly mounted on the surface of the top end inside the second damping rod, a sliding plate is fixedly mounted on the surface of the bottom end of the damping spring, a first damping rod is fixedly mounted on the surface of the bottom end of the sliding plate, the surface of the top end of the first damping rod penetrates through the second damping rod, and a fixing plate is fixedly mounted between the surfaces of the bottom ends of the first damping rods.
Preferably, a plurality of dust absorption holes are formed in the bottom end of the dust absorption box at equal intervals.
Preferably, the surfaces of the left side and the right side of the top end of the dust collection box are connected with the surface of the bottom end of the handrail through rotating shafts, and the surface of the middle part of the top end of the handrail is fixedly provided with an anti-skidding friction pad.
Preferably, the storage battery is connected with the drilling machine part and the rotating motor through power transmission lines, and the drilling machine part control button and the rotating motor control button are respectively and electrically connected with the drilling machine part and the rotating motor through the storage battery.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses a drilling equipment is used in road bridge municipal construction because there is the dust absorption box at the externally mounted of drilling box, can rotate through rotating the motor and driving the dust absorption flabellum, and then the dust that produces drilling is quick inhales the dust absorption box inside through the dust absorption hole, and then the dust that produces when can avoiding drilling influences constructor's health and environment on every side.
2. The utility model discloses a drilling equipment is used in road and bridge municipal construction, because there is the second shock absorber pole at the equal fixed mounting in the dust absorption box left and right sides, and be connected first shock absorber pole and second shock absorber pole through damping spring, can be through damping spring's cushioning effect, the vibration that produces when will driling is eliminated, and then can avoid the user to hand this device time because the vibration can't stable hold, and install the fixed plate at first shock absorber pole bottom, can hug this device closely the ground at required drilling, and then the person of facilitating the use needn't hold drilling parts always.
3. The utility model discloses a drilling equipment is used in road bridge municipal construction because there is the pulley at dust absorption internally mounted to hug closely the filter bottom on the surface of pulley, can drive the filter through the pulley and remove, and then the person of facilitating the use clears up the filter, avoids piling up too much dust and influences the filter effect.
Drawings
FIG. 1 is a schematic view of the whole internal structure of the drilling device for road and bridge municipal construction of the present invention;
fig. 2 is the utility model discloses drilling equipment for road bridge municipal construction's whole structural schematic that overlooks.
In the figure: 1. a dust collection box; 2. drilling a hole box; 3. a dust collection hole; 4. drilling a machine member; 5. a fixing plate; 6. a first shock-absorbing lever; 7. a sliding plate; 8. a damping spring; 9. a connecting rod; 10. a support plate; 11. a drilling machine member control button; 12. rotating a motor control button; 13. a storage battery; 14. a grab bar; 15. a bearing; 16. a follower rod; 17. an anti-slip friction pad; 18. a transmission gear; 19. rotating the motor; 20. a transmission gear; 21. dust-absorbing fan blades; 22. a rotating shaft; 23. a pull rod; 24. a filter plate; 25. a pulley; 26. a second shock-absorbing lever; 27. a console.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-2, a drilling device for road and bridge municipal construction comprises a dust collection box 1, wherein a drilling box 2 is fixedly installed inside the dust collection box 1, a drilling machine part 4 is installed inside the drilling box 2 in a penetrating manner, support plates 10 are fixedly installed on the left and right side surfaces of the top end of the dust collection box 1, a pulley 25 is fixedly installed on the top end of each support plate 10, filter plates 24 are slidably installed inside the left and right sides of the top end of the dust collection box 1, the bottom end surface of each filter plate 24 is tightly attached to the top end surface of the pulley 25, a bearing 15 is fixedly installed in the middle of the top end of the dust collection box 1, a follower rod 16 is installed on the inner side wall of each bearing 15 in a penetrating manner, a follower gear 18 is installed on the top end of the follower rod 16 in an embedding;
a rotating motor 19 is fixedly installed on the surface of the right side of the top end of the dust collection box 1, a transmission gear 20 is installed on the surface of the top end of the rotating motor 19 in an embedded mode, the left side of the transmission gear 20 is meshed with the right side of the follower gear 18, connecting rods 9 are fixedly installed on the surfaces of the left side and the right side of the middle end of the dust collection box 1, and a second damping rod 26 is fixedly installed on the surface of the bottom end of each connecting rod 9;
the dust absorption box 1 left side top fixed surface installs control cabinet 27, control cabinet 27 left side top fixed surface installs drilling parts control button 11 and rotates motor control button 12, control cabinet 27 top fixed surface installs battery 13.
In this embodiment, as shown in fig. 1 and 2, the rotating motor 19 drives the dust-absorbing fan blades 21 to rotate, so that dust generated by drilling is quickly absorbed into the dust-absorbing box 1 through the dust-absorbing holes 3, and the dust generated during drilling can be prevented from affecting the health of constructors and the surrounding environment.
The damping device comprises a second damping rod 26, a damping spring 8, a sliding plate 7, a first damping rod 6, a fixing plate 5 and a second damping rod 6, wherein the damping spring 8 is fixedly mounted on the top surface inside the second damping rod 26, the sliding plate 7 is fixedly mounted on the bottom surface of the damping spring 8, the first damping rod 6 is fixedly mounted on the bottom surface of the sliding plate 7, the top surface of the first damping rod 6 penetrates through the second damping rod 26, and the fixing plate 5 is fixedly mounted between the bottom surfaces of the first damping rods 6.
In this embodiment, as shown in fig. 1 and fig. 2, the damping spring 8 connects the first damping rod 6 and the second damping rod 26, so that the vibration generated during drilling can be eliminated through the buffering effect of the damping spring 8, and the situation that the user cannot stably hold the device due to vibration when holding the device by hand can be avoided, and the fixing plate 5 is installed at the bottom end of the first damping rod 6, so that the device can be tightly attached to the ground requiring drilling, and the user can conveniently and continuously hold the drilling machine member.
Wherein, a plurality of dust absorption holes 3 are arranged in the bottom of the dust absorption box 1 at equal intervals.
In this embodiment, as shown in fig. 1, a large amount of dust can be sucked and accumulated through the dust suction holes 3.
The surfaces of the left side and the right side of the top end of the dust collection box 1 are connected with the surface of the bottom end of the handrail 14 through rotating shafts 22, and the surface of the middle of the top end of the handrail 14 is fixedly provided with an anti-skidding friction pad 17.
In this embodiment, as shown in FIG. 1, it is convenient for the user to move the device by holding the handrail 14.
The storage battery 13 is connected with the drilling machine part 4 and the rotating motor 19 through power lines, and the drilling machine part control button 11 and the rotating motor control button 12 are respectively electrically connected with the drilling machine part 4 and the rotating motor 19 through the storage battery 13.
In the embodiment, as shown in fig. 1, the difficulty of control can be reduced by controlling the drilling machine 4 and the rotating motor 19 respectively.
It should be noted that the utility model relates to a drilling device for road and bridge municipal construction, which comprises a dust absorption box 1, a drilling box 2, a dust absorption hole 3, a drilling machine part 4, a fixed plate 5, a first shock absorption rod 6, a sliding plate 7, a shock absorption spring 8, a connecting rod 9, a support plate 10, a drilling machine part control button 11, a rotating motor control button 12, a storage battery 13, a handrail 14, a bearing 15, a follower rod 16, an anti-skid friction pad 17, a transmission gear 18, a rotating motor 19, a transmission gear 20, a dust absorption fan blade 21, a rotating shaft 22, a pull rod 23, a filter plate 24, a pulley 25, a second shock absorption rod 26 and a control console 27, wherein the components are all universal standard components or components known by technicians in the field, the structure and principle of the drilling device can be known by technical manuals or conventional experimental methods, and the drilling device can be moved to the position required to be drilled during working, the fixing plate 5 is tightly attached to the ground, the drilling machine part control button 11 and the rotating motor control button 12 are pressed, the drilling machine part 4 and the rotating motor 19 are opened, the drilling construction is carried out on the ground, and a large amount of dust generated by drilling is sucked into the dust suction box 1, when the device is used for a period of time, the filter plate 24 is pulled, the surface of the filter plate 24 is cleaned, compared with the traditional drilling device, the device is characterized in that the first damping rod 6 and the second damping rod 26 are connected through the damping spring 8, the vibration generated during drilling can be eliminated through the buffering effect of the damping spring 8, the situation that a user cannot stably hold the device due to vibration when holding the device by the user can be avoided, the fixing plate 5 is arranged at the bottom end of the first damping rod 6, the device can be tightly attached to the ground needing to be drilled, and the user does not need to hold the drilling machine part all the, and the motor 19 is rotated to drive the dust suction fan blades 21 to rotate, so that dust generated by drilling is quickly sucked into the dust suction box 1 through the dust suction holes 3, and the influence of the dust generated during drilling on the health of constructors and the surrounding environment can be avoided.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a drilling equipment is used in road bridge municipal construction, includes dust absorption box (1), its characterized in that: the dust collection box is characterized in that a drilling box (2) is fixedly installed inside the dust collection box (1), drilling parts (4) are installed inside the drilling box (2) in a penetrating mode, supporting plates (10) are fixedly installed on the surfaces of the left side and the right side of the top end of the dust collection box (1), a pulley (25) is fixedly installed at the top end of each supporting plate (10), filter plates (24) are installed inside the left side and the right side of the top end of the dust collection box (1) in a sliding mode, the surface of the bottom end of each filter plate (24) is tightly attached to the surface of the top end of each pulley (25), a bearing (15) is fixedly installed in the middle of the top end of the dust collection box (1), a follow-up rod (16) is installed on the inner side wall of each bearing (15) in a penetrating mode, a follow-up gear (;
a rotating motor (19) is fixedly installed on the surface of the right side of the top end of the dust collection box (1), a transmission gear (20) is installed on the surface of the top end of the rotating motor (19) in an embedded mode, the left side of the transmission gear (20) is meshed with the right side of the follow-up gear (18), connecting rods (9) are fixedly installed on the surfaces of the left side and the right side of the middle end of the dust collection box (1), and a second damping rod (26) is fixedly installed on the surface of the bottom end of each connecting rod (9);
suction box (1) left side top fixed surface installs control cabinet (27), control cabinet (27) left side top fixed surface installs drilling parts control button (11) and rotates motor control button (12), control cabinet (27) top fixed surface installs battery (13).
2. The drilling device for road and bridge municipal construction according to claim 1, wherein: every equal fixed mounting in inside top surface of second shock absorber pole (26) has damping spring (8), every equal fixed mounting in damping spring (8) bottom surface has sliding plate (7), every equal fixed mounting in sliding plate (7) bottom surface has first shock absorber pole (6), every first shock absorber pole (6) top surface runs through to be installed inside second shock absorber pole (26) bottom, two fixed mounting has fixed plate (5) between first shock absorber pole (6) bottom surface.
3. The drilling device for road and bridge municipal construction according to claim 1, wherein: a plurality of dust collection holes (3) are formed in the bottom end of the dust collection box (1) at equal intervals.
4. The drilling device for road and bridge municipal construction according to claim 1, wherein: the dust collection box is characterized in that the left and right side surfaces of the top end of the dust collection box (1) are connected with the bottom end surface of the handrail (14) through rotating shafts (22), and an anti-skid friction pad (17) is fixedly mounted on the surface of the middle of the top end of the handrail (14).
5. The drilling device for road and bridge municipal construction according to claim 1, wherein: the storage battery (13) is connected with the drilling machine part (4) and the rotating motor (19) through power transmission lines, and the drilling machine part control button (11) and the rotating motor control button (12) are respectively and electrically connected with the drilling machine part (4) and the rotating motor (19) through the storage battery (13).
CN201921491567.8U 2019-09-09 2019-09-09 Drilling equipment is used in road bridge municipal construction Expired - Fee Related CN210712477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921491567.8U CN210712477U (en) 2019-09-09 2019-09-09 Drilling equipment is used in road bridge municipal construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921491567.8U CN210712477U (en) 2019-09-09 2019-09-09 Drilling equipment is used in road bridge municipal construction

Publications (1)

Publication Number Publication Date
CN210712477U true CN210712477U (en) 2020-06-09

Family

ID=70926067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921491567.8U Expired - Fee Related CN210712477U (en) 2019-09-09 2019-09-09 Drilling equipment is used in road bridge municipal construction

Country Status (1)

Country Link
CN (1) CN210712477U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113103198A (en) * 2021-04-05 2021-07-13 丁陈海 A erection equipment for municipal building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113103198A (en) * 2021-04-05 2021-07-13 丁陈海 A erection equipment for municipal building

Similar Documents

Publication Publication Date Title
CN210712477U (en) Drilling equipment is used in road bridge municipal construction
CN203843618U (en) Wall polishing machine free of dust
CN213573895U (en) Drilling machine for engineering
CN108972909B (en) Hydroelectric grooving machine for indoor decoration
CN211668802U (en) Concrete sampler for supervision of constructional engineering
CN210791557U (en) Perforating device for construction
CN109202702B (en) Building materials grinding device with vibration/noise reduction function
CN109085012A (en) A kind of Soil K+adsorption drawing out soil equipment with weeding function
CN201730592U (en) Automatic mud-cleaning device for long-screw piling and pore-forming drill
CN211052610U (en) Drilling device capable of removing dust
CN210675092U (en) Balling disk of convenient clearance
CN210157012U (en) Speed reduction motor with protection function
CN112284795A (en) Sampling device for building concrete strength detection
CN219837532U (en) But waste recovery's brake block processingequipment
CN205414486U (en) Electric actuator with hand wheel transmission function
CN218905267U (en) Impact drill with good vibration reduction effect
CN104001707A (en) Novel electric drill with dust collection function
CN214118080U (en) Rotatory digging device of soil subgrade compactness
CN211648002U (en) Drilling equipment for bridge engineering
CN220716175U (en) Rubbish metal separation equipment
CN214659927U (en) Drilling machine for road construction that flexibility is high
CN204040093U (en) A kind of vibrating device with buffer
CN211890141U (en) Wall polisher for building
CN213648159U (en) Perforating device for municipal construction
CN220178796U (en) Numerical control flat drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200609

Termination date: 20210909