CN210707815U - Observation platform for ocean observation - Google Patents

Observation platform for ocean observation Download PDF

Info

Publication number
CN210707815U
CN210707815U CN201921962292.1U CN201921962292U CN210707815U CN 210707815 U CN210707815 U CN 210707815U CN 201921962292 U CN201921962292 U CN 201921962292U CN 210707815 U CN210707815 U CN 210707815U
Authority
CN
China
Prior art keywords
observation
observation platform
fixed
guardrail
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921962292.1U
Other languages
Chinese (zh)
Inventor
王永芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi University
Original Assignee
Linyi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi University filed Critical Linyi University
Priority to CN201921962292.1U priority Critical patent/CN210707815U/en
Application granted granted Critical
Publication of CN210707815U publication Critical patent/CN210707815U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses an observation platform for ocean observation, which comprises a supporting column, wherein an observation platform is fixed on the supporting column, the outer side wall of the observation platform is circumferentially provided with an installation block, the inner side of the installation block is slidably connected with a first limiting rod, one end of the first limiting rod is fixed with a connecting plate, the surface of one side of the connecting plate is fixed with a first neodymium magnet, and the surface of the side of the installation block is fixed with a second neodymium magnet; through being provided with the connecting plate, first neodymium magnet, first gag lever post, installation piece and second gag lever post, need pass through a plurality of bolt fastening when avoiding installing the guardrail, it is comparatively troublesome and laboursome to twist the bolt, screw portion easily receives sea water moisture corrosion to damage, through being provided with the guide cylinder, the monitoring lever, scale mark and floater, avoid the observation platform lateral wall not have fine survey the distance between the water level apart from the platform, lead to the user not convenient for look over the circumstances that rises to the surface of water, the result of use is poor.

Description

Observation platform for ocean observation
Technical Field
The utility model belongs to the technical field of the ocean observation platform, concretely relates to ocean is surveyd and is used observation platform.
Background
The ocean monitoring technology is an important component of ocean science and technology, plays an important role in the aspects of maintaining ocean rights and interests, developing ocean resources, early warning ocean disasters, protecting ocean environment, strengthening national defense construction, seeking new development space and the like, is also an important mark for displaying national comprehensive national strength, and an ocean observation platform is mainly used for carrying ocean observation instruments and equipment to carry out ocean space carriers.
Present ocean observation platform is in the use, the guardrail at platform upper edge is easily corroded by the moisture of sea water and takes place to damage, need change it, the guardrail is many through the bolt fastening when the installation, the dismouting is comparatively inconvenient, the screw thread portion of bolt also can be corroded by sea water moisture and take place phenomenons such as smooth silk, excellent in use effect, the observation platform lateral wall does not have the distance between the fine survey water face apart from the platform in addition, lead to the user not convenient to look over the circumstances that rises to the surface of water, we propose an ocean observation for this.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an observation platform is used in ocean observation, in order to solve and to propose current ocean observation platform in the above-mentioned background art in the use, the guardrail at platform top edge is easily corroded the moisture of sea water and takes place to damage, need change it, the guardrail passes through bolt fastening when the installation more, the dismouting is comparatively inconvenient, the screw thread portion of bolt also can receive sea water moisture to corrode phenomenons such as smooth silk take place, excellent in use effect, the observation platform lateral wall does not have fine survey water face apart from the distance between the platform in addition, lead to the user not convenient to the problem that the circumstances of rising was looked over to the surface of water.
In order to achieve the above object, the utility model provides a following technical scheme: an observation platform for ocean observation comprises a support post, wherein an observation platform is fixed on the support post, an installation block is arranged on the outer side wall of the observation platform along the circumferential direction, a first limiting rod is connected to the inner side of the installation block in a sliding manner, a connecting plate is fixed at one end of the first limiting rod, a first neodymium magnet is fixed on the surface of one side of the connecting plate, a second neodymium magnet is fixed on the surface of the side of the installation block, the installation block and the connecting plate are connected through the first neodymium magnet and the second neodymium magnet in a magnetic absorption manner, a pin hole is formed in the upper surface of the installation block, a first guardrail rod is arranged on the inner side of the pin hole, a connecting hole is formed in the lower end of the inner side of the first guardrail rod, the first guardrail rod is connected with the first limiting rod in a matching manner through the connecting hole, a second guardrail rod is connected to the inner side of the, and a water level monitoring mechanism is arranged on one side wall of the observation platform.
Preferably, the water level monitoring mechanism comprises a guide cylinder, a monitoring rod and a floating ball, the guide cylinder is fixed on one side surface of the observation platform through a support, the monitoring rod is arranged on the inner side of the guide cylinder in a sliding mode, and the floating ball is fixed at the lower end of the monitoring rod.
Preferably, water level monitoring mechanism still includes the scale mark, monitoring rod side surface is seted up flutedly, the inboard equidistance along length direction of recess is carved with the scale mark, scale mark unit is the millimeter, the coating of scale mark surface has anti-rust paint.
Preferably, the top end of the monitoring rod is fixed with an anti-falling block, and the anti-falling block is spherical.
Preferably, first neodymium magnet is provided with threely along connecting plate length direction equidistance, first gag lever post one end is provided with protruding piece.
Preferably, a sealing rubber ring is fixed on the upper surface of the mounting block, and the inner diameter of the sealing rubber ring is one millimeter to five millimeters smaller than the outer diameter of the first guardrail rod.
Preferably, the second guardrail rod is provided with two to eight along first guardrail rod length direction, the second gag lever post is "T" style of calligraphy.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) through being provided with connecting plate, first neodymium magnet, first gag lever post, installation piece and second gag lever post, be convenient for install fast fixedly to the guardrail, need pass through a plurality of bolt fixings when avoiding installing the guardrail, twist and move the bolt comparatively take trouble hard, and screw portion easily receives sea water moisture corrosion to damage, is convenient for improve the practicality of device.
(2) Through being provided with guide cylinder, monitoring lever, scale sign and floater, avoid the observation platform lateral wall not have fine survey water level apart from the distance between the platform, lead to the user not convenient to look over the circumstances of rising of the surface of water, the result of use is poor, device simple structure, the scale sign is not fragile, the increase device long service life of being convenient for.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic cross-sectional view at a in fig. 1 according to the present invention;
fig. 3 is a schematic cross-sectional view of the utility model at B in fig. 1;
fig. 4 is a schematic cross-sectional view at C of fig. 1 according to the present invention;
in the figure: 1. a pillar; 2. a floating ball; 3. an observation platform; 4. a guide cylinder; 5. a monitoring lever; 6. mounting blocks; 7. a first guard rail; 8. a second guard rail; 9. a connecting plate; 10. a first neodymium magnet; 11. a first limit rod; 12. sealing the rubber ring; 13. a second limiting rod; 14. and (5) scale marking.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an observation platform for ocean observation comprises a supporting column 1, an observation platform 3 is fixed on the supporting column 1, an installation block 6 is arranged on the outer side wall of the observation platform 3 along the circumferential direction, a first limiting rod 11 is connected to the inner side of the installation block 6 in a sliding mode and is convenient for quickly fixing a first guardrail rod 7, a connecting plate 9 is fixed at one end of the first limiting rod 11 and is convenient for pulling a plurality of first limiting rods 11 to withdraw from the inner side of a connecting hole, a first neodymium magnet 10 is fixed on the surface of one side of the connecting plate 9, a second neodymium magnet is fixed on the surface of the side of the installation block 6, the installation block 6 and the connecting plate 9 are connected in a magnetic attraction mode through the first neodymium magnet 10 and the second neodymium magnet to better limit the movement of the connecting plate 9, pin holes are formed in the upper surface of the installation block 6, a first guardrail rod 7 is arranged on the inner side of each pin hole, a connecting hole is formed in the lower end of the, be convenient for better to first guardrail bar 7 with install 6 and be connected fixedly, first guardrail bar 7 inboard sliding connection has second guardrail bar 8, second guardrail bar 8 inboard is provided with second gag lever post 13, 3 lateral walls of observation platform are provided with water level monitoring mechanism.
In this embodiment, preferably, the water level monitoring mechanism includes guide cylinder 4, monitoring rod 5 and floater 2, and 3 a side surface of observation platform is fixed in through the support to guide cylinder 4, and 4 inboard slides and is provided with monitoring rod 5, and the floater 2 is fixed with to the 5 lower extremes of monitoring rod, is convenient for promote the removal of monitoring rod 5 through the buoyancy of the surface of water.
In this embodiment, preferably, water level monitoring mechanism still includes scale mark 14, and 5 side surfaces of monitoring pole are seted up flutedly, and the recess is inboard to be carved with scale mark 14 along length direction equidistance, and 14 units of scale mark are the millimeter, and 14 coats on the surface of scale mark has anti-rust paint, is convenient for better measure the position between the surface of water distance platform.
In this embodiment, preferred, 5 tops of monitoring rod are fixed with the anticreep piece, and the anticreep piece is spherical, is convenient for reduce the anticreep piece closed angle and causes the damage to outside personnel.
In this embodiment, preferably, three first neodymium magnets 10 are equidistantly arranged along the length direction of the connecting plate 9, and one end of the first limiting rod 11 is provided with a protruding block, so as to facilitate a better limiting effect.
In this embodiment, preferably, a sealing rubber ring 12 is fixed on the upper surface of the mounting block 6, and the inner diameter of the sealing rubber ring 12 is one millimeter to five millimeters smaller than the outer diameter of the first guardrail 7, so as to prevent seawater moisture from entering the inner side of the mounting block 6.
In this embodiment, preferably, the second guard rail 8 is provided with two to eight along the length direction of the first guard rail 7, so as to facilitate a better protection effect, and the second limiting rod 13 is shaped like a letter "T".
The utility model discloses a theory of operation and use flow: when the device is used, only one side departing from the installation block 6 needs to pull the connecting plate 9, so that the connecting plate 9 drives the first neodymium magnet 10 to be separated from the second neodymium magnet, and simultaneously drives the first limiting rod 11 to be separated from the inner side of the connecting hole, at the moment, the first guardrail rod 7 can be pulled out from the inner side of the installation block 6 to be rapidly replaced, the second limiting rod 13 can be further pulled out from the inner side of the first guardrail rod 7, then the second guardrail rod 8 is pulled to move to one side departing from the first guardrail rod 7, so that the second guardrail rod 8 is separated from the first guardrail rod 7, the second guardrail rod 8 can be conveniently and independently maintained and replaced, the device is simple to operate and can be operated in reverse order during assembly, when the water surface rises, the monitoring rod 5 can conveniently slide along the vertical direction of the guide cylinder 4 through the buoyancy effect of water on the floating ball 2, and a user can conveniently check the position of the water surface distance platform through the scale mark 14 on one side wall, be convenient for reduce the contact wear of scale mark 14 and monitoring pole 5 through the recess, simultaneously through the anti-rust paint of 14 surfaces of scale mark, be convenient for reduce scale mark 14 and receive the influence of damp gas and take place the corrosion, improve the life of device.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an observation platform for ocean observation, includes pillar (1), be fixed with observation platform (3) on pillar (1), its characterized in that: the observation platform (3) lateral wall is provided with an installation block (6) along circumference, the inboard sliding connection of installation block (6) has first gag lever post (11), the one end of first gag lever post (11) is fixed with connecting plate (9), connecting plate (9) side fixed surface has first neodymium magnet (10), installation block (6) side fixed surface has second neodymium magnet, installation block (6) and connecting plate (9) carry out magnetism through first neodymium magnet (10) and second neodymium magnet and inhale the connection, the pinhole has been seted up to installation block (6) upper surface, the pinhole inboard is provided with first guardrail bar (7), the connecting hole has been seted up to the inboard lower extreme of first guardrail bar (7), first guardrail bar (7) is connected through the connecting hole cooperation with first gag lever post (11), the inboard sliding connection of first guardrail bar (7) has second guardrail bar (8), the inboard second gag lever post (13) that is provided with of second guardrail bar (8), observation platform (3) a lateral wall is provided with water level monitoring mechanism.
2. An observation platform for ocean observation according to claim 1, wherein: the water level monitoring mechanism comprises a guide cylinder (4), a monitoring rod (5) and a floating ball (2), wherein the guide cylinder (4) is fixed on one side surface of the observation platform (3) through a support, the monitoring rod (5) is arranged on the inner side of the guide cylinder (4) in a sliding mode, and the floating ball (2) is fixed at the lower end of the monitoring rod (5).
3. An observation platform for ocean observation according to claim 2, wherein: the water level monitoring mechanism further comprises a scale mark (14), a side surface of the monitoring rod (5) is provided with a groove, the inner side of the groove is provided with the scale mark (14) along the equal distance of the length direction, the unit of the scale mark (14) is millimeter, and the outer surface of the scale mark (14) is coated with antirust paint.
4. An observation platform for ocean observation according to claim 3, wherein: the top end of the monitoring rod (5) is fixed with an anti-drop block, and the anti-drop block is spherical.
5. An observation platform for ocean observation according to claim 1, wherein: first neodymium magnet (10) are provided with three along connecting plate (9) length direction equidistance, first gag lever post (11) one end is provided with protruding piece.
6. An observation platform for ocean observation according to claim 1, wherein: the upper surface of the mounting block (6) is fixed with a sealing rubber ring (12), and the inner diameter of the sealing rubber ring (12) is smaller than the outer diameter of the first guardrail rod (7) by one millimeter to five millimeters.
7. An observation platform for ocean observation according to claim 1, wherein: the second guardrail rod (8) is provided with two to eight along first guardrail rod (7) length direction, second gag lever post (13) are "T" style of calligraphy.
CN201921962292.1U 2019-11-14 2019-11-14 Observation platform for ocean observation Expired - Fee Related CN210707815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921962292.1U CN210707815U (en) 2019-11-14 2019-11-14 Observation platform for ocean observation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921962292.1U CN210707815U (en) 2019-11-14 2019-11-14 Observation platform for ocean observation

Publications (1)

Publication Number Publication Date
CN210707815U true CN210707815U (en) 2020-06-09

Family

ID=70955807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921962292.1U Expired - Fee Related CN210707815U (en) 2019-11-14 2019-11-14 Observation platform for ocean observation

Country Status (1)

Country Link
CN (1) CN210707815U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608160A (en) * 2020-07-27 2020-09-01 鲁东大学 Observation platform for ocean observation with good safety performance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608160A (en) * 2020-07-27 2020-09-01 鲁东大学 Observation platform for ocean observation with good safety performance

Similar Documents

Publication Publication Date Title
CN210707815U (en) Observation platform for ocean observation
CN203444708U (en) Aviation warning ball
CN207489375U (en) A kind of special preceding maintenance tool of LED display module
CN206514141U (en) A kind of LED wall wash lamp of convenient combination
CN209940377U (en) Jacking mechanism
CN213336919U (en) Novel gravity sampler piston
CN209310875U (en) A kind of Hydraulic Projects installation water level detecting device structure
CN202899114U (en) An ocean platform wind-shield wall fixed through a novel bolt assembly
CN219637350U (en) Marine wind-powered electricity generation anticorrosion cathodic protection device
CN207762171U (en) A kind of rubber parts of noise reduction easy to install
CN203444730U (en) Route indicating device
CN207311797U (en) A kind of underwater environment monitoring robot propulsion device
CN215290879U (en) Fixed connection structure for building curtain wall engineering
CN218542884U (en) Rust-proof nut
CN219345202U (en) Positioning bayonet lock structure
CN211260087U (en) Stable monitoring camera
CN202598423U (en) Lamp fixing device
CN212276696U (en) Nameplate with strong durability
CN217321332U (en) Paper tube fastener
CN216301405U (en) EVA (ethylene vinyl acetate) floating plate suitable for navigation mark of navigation channel
CN111521261B (en) A installation device for fishing lamp is illuminance sensor under water
CN208408292U (en) Stripper plate guide sleeve
CN214249498U (en) Lamp holder and lamp
CN208005517U (en) A kind of magnetic material member
CN204217032U (en) Air-cooled protective cover

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200609

Termination date: 20201114

CF01 Termination of patent right due to non-payment of annual fee