CN210704745U - Engineering project management toolbox - Google Patents

Engineering project management toolbox Download PDF

Info

Publication number
CN210704745U
CN210704745U CN201921746248.7U CN201921746248U CN210704745U CN 210704745 U CN210704745 U CN 210704745U CN 201921746248 U CN201921746248 U CN 201921746248U CN 210704745 U CN210704745 U CN 210704745U
Authority
CN
China
Prior art keywords
box
box body
engineering project
project management
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921746248.7U
Other languages
Chinese (zh)
Inventor
孙娟娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921746248.7U priority Critical patent/CN210704745U/en
Application granted granted Critical
Publication of CN210704745U publication Critical patent/CN210704745U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an engineering project management toolbox, including box, range finding subassembly and tape measure, the inside of box is equipped with respectively inserts a area, elastic cord and fixed band, inserts an area fixed mounting in the inner wall of adjacent box top one side, elastic cord fixed mounting is in the inner wall of box one side, and is located under inserting a area. The utility model provides a pair of engineering project management toolbox, through pressing the button, begin to take notes data, then the pulling pull rod, make the box drive the roller motion, rethread hall sensor, on the data transfer display screen that reachs the roller motion, compare with traditional gyro wheel, need not to carry alone, the lug connection is at the box, when not being used for the range finding, also can use as the draw-bar box, thereby easily carry, through the inside pen inserting area of box, elastic cord and fixed band, can fixed data, pen and some gadgets, make every article all fix in the place that corresponds, thereby conveniently look for when using, take.

Description

Engineering project management toolbox
Technical Field
The utility model relates to an engineering management technical field relates to an engineering project management toolbox particularly.
Background
The engineering project management is a management theory and a method from planning, decision making, implementation to completion acceptance, and mainly comprises the early-stage planning of engineering projects, the management organization of the engineering projects, an engineering project management system, the engineering project plan, the implementation control of the engineering projects, the contract and the claim of the engineering projects, the occupational health safety and management of the engineering projects, the risk management of the engineering projects and the like.
The discovery in actual life, engineering project managers need arrive the job site at the company and manage, inspect and accept under dispatching, in order to guarantee the authenticity and the reliability of detected data, need use some instruments and carry out the record to relevant data in the testing process of reality, therefore engineering project managers need carry data, paper pen, gyro wheel and tape measure etc. and the thing is more inconvenient to be carried, and ordinary toolbox can't satisfy the demand, influences work efficiency.
Accordingly, there is a need for improvement in the above-mentioned problems of the prior art.
SUMMERY OF THE UTILITY MODEL
Solves the technical problem
In view of the above problems in the prior art, an aspect of the present invention is to provide an engineering project management tool kit to solve the above problems in the background.
Technical scheme
In order to achieve the above object, the utility model provides a pair of engineering project management toolbox includes:
the pen inserting belt is fixedly arranged on the inner wall of one side of the top of the adjacent box body, the elastic belt is fixedly arranged on the inner wall of one side of the box body and is positioned right below the pen inserting belt, the number of the fixing belts is four, and the four fixing belts are symmetrically arranged on the inner wall of one side of the box body and are positioned on one sides of the pen inserting belt and the elastic belt;
the distance measuring assembly comprises a pull rod, a display screen, Hall sensors, a battery box, idler wheels, fixing plates, a circuit cover and a circuit board, wherein the pull rod is fixedly installed on the central axis of the upper surface of the top of the box body, a button is arranged in the center of the top of the pull rod, the display screen is fixedly installed on the top of the outer wall of one side, adjacent to the box body, of the box body, the quantity of the fixing plates, the number of the idler wheels and the quantity of the Hall sensors are two, the two fixing plates are symmetrically installed on the outer walls of the left side and the right side, adjacent to the bottom of the box body, of the box body respectively, the two Hall sensors are installed on the fixing plates respectively, the two idler wheels are connected to the central axis, far away from the outer wall of one side, of;
and the measuring tape is fixedly arranged in the center of the outer wall of one side of the box body.
Preferably, the distance between the Hall sensor and the top of the fixed plate is 1-2 cm.
Preferably, the box body further comprises two straps and a buckle, the two straps are symmetrically arranged on the outer wall of one side, opposite to the tape measure, of the box body, and a lifting handle is fixedly arranged at the center of the outer side of the top of the box body.
Preferably, the pen inserting belt is 3-5 cm away from the side provided with the lock catch.
Preferably, the elastic band is 5-8 cm away from the bottom of the pen inserting band.
Preferably, the size of the battery box from the bottom of the elastic band is 5-8 cm.
Preferably, the battery box is provided with a fifth battery.
Advantageous effects
Compared with the prior art, the utility model provides a pair of engineering project management toolbox possesses following beneficial effect:
1. the utility model discloses a, through pressing the button, begin the record data, then the pulling pull rod makes the box drive the gyro wheel motion, and rethread hall sensor compares with traditional gyro wheel on the data transfer display screen that the gyro wheel motion reachs, need not to carry alone, and lug connection is at the box, when not being used for the range finding, also can use as the draw-bar box to easily carry.
2. The utility model discloses a, through the inside pen inserting area, elastic cord and the fixed band of box, can fix data, pen and some gadgets, make every article all fix in the place that corresponds to conveniently look for, take when using.
3. The utility model discloses a, through the tape measure of box outer wall grafting installation, can directly take off the use when needs, measure, because the measuring place generally has more dust, is stained with more dust on measuring the tape measure after accomplishing, can directly insert and connect back box outer wall to inside the box that can not make dirty, keep the clean of box.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.
This document provides an overview of various implementations or examples of the technology described in this disclosure, and is not a comprehensive disclosure of the full scope or all features of the disclosed technology.
Drawings
FIG. 1 is a schematic structural view of an engineering project management tool box according to the present invention;
FIG. 2 is a schematic view of the front vertical surface structure of the engineering project management tool box of the present invention;
fig. 3 is the utility model discloses engineering project management toolbox back of body facade structure sketch map.
The main reference numbers:
1. a button; 2. a pull rod; 3. a handle; 4. a display; 5. locking; 6. a pen insertion belt; 7. elastic bands; 8. a Hall sensor; 9. a battery case; 10. fixing belts; 11. a box body; 12. a roller; 13. a fixing plate; 14. a circuit cover; 15. a circuit board; 16. a tape measure; 17. a handle; 18. a harness; 19. a ranging assembly.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present disclosure more clear, the technical solutions of the embodiments of the present disclosure will be described below clearly and completely with reference to the accompanying drawings of the embodiments of the present disclosure. It is to be understood that the described embodiments are only a few embodiments of the present disclosure, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the described embodiments of the disclosure without any inventive step, are within the scope of protection of the disclosure.
Unless otherwise defined, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this disclosure belongs. The use of the word "comprising" or "comprises", and the like, in this disclosure is intended to mean that the elements or items listed before that word, include the elements or items listed after that word, and their equivalents, without excluding other elements or items. The terms "connected" or "coupled" and the like are not restricted to physical or mechanical connections, but may also include electrical connections, whether direct or indirect. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships may also be changed accordingly.
To maintain the following description of the embodiments of the present disclosure clear and concise, a detailed description of known functions and known components have been omitted from the present disclosure.
Referring to fig. 1-3, an engineering project management tool box comprises a box body 11, a distance measuring assembly 19 and a tape measure 16, when an engineering project manager measures on a construction site, the engineering project manager starts to record data by pressing a button 1, then pulls a pull rod 2 to enable the box body 11 to drive a roller 12 to move, and then transmits the data obtained by the movement of the roller 12 to a display screen 4 through a hall sensor 8.
The utility model discloses among the further technical scheme that provides, specifically as follows:
as shown in fig. 1, a pen inserting belt 6, an elastic belt 7 and fixing belts 10 are respectively arranged inside the box body 11, the pen inserting belt 6 is fixedly installed on the inner wall of one side of the top of the adjacent box body 11, the elastic belt 7 is fixedly installed on the inner wall of one side of the box body 11 and is located under the pen inserting belt 6, the number of the fixing belts 10 is four, the four fixing belts 10 are symmetrically installed on the inner wall of one side of the box body 11 and are located on one side of the pen inserting belt 6 and the elastic belt 7. The pen is fixed by the pen inserting belt 6, the screwdriver and other small articles are fixed by the elastic belt 7, and data and paper are fixed by the four fixing belts 10.
As shown in FIG. 1, the distance measuring assembly 19 includes a pull rod 2, a display screen 4, Hall sensors 8, a battery box 9, rollers 12, fixing plates 13, a circuit cover 14 and a circuit board 15, the pull rod 2 is fixedly installed on the central axis of the upper surface of the top of the case 11, a button 1 is arranged at the center of the top of the pull rod 2, the display screen 4 is fixedly installed on the top of the outer wall of the adjacent side of the case 11, the number of the fixing plates 13, the rollers 12 and the Hall sensors 8 is two, the two fixing plates 13 are respectively and symmetrically installed on the outer walls of the left side and the right side of the adjacent bottom of the case 11, the two Hall sensors 8 are respectively installed on the fixing plates 13, the two rollers 12 are respectively coupled to the central axis of the outer wall of the mutually far side of the two fixing plates 13, the battery box 9 is fixedly installed, the distance traveled by the roller 12 can be measured by the distance measuring assembly 19 to derive data.
As shown in fig. 2, the measuring tape 16 is fixedly installed at the center of the outer wall of one side of the box 11, and the measuring tape 16 can be conveniently taken out through the insertion structure, so that the measurement can be conveniently taken out.
As shown in fig. 1, the hall sensor 8 is 1-2 cm from the top of the fixed plate 13.
As shown in fig. 3, the box 11 further includes straps 18 and buckles 5, the number of straps 18 is two, two straps 18 are symmetrically installed on the outer wall of the box 11 on one side of the tape 16, the number of buckles 5 is two, the box 11 is opened and closed through two buckles 5, through the straps 18, the engineering project management tool box can be carried when the road is bumpy, and the box 11 can be conveniently opened or closed through two buckles 5.
As shown in FIG. 1, a handle 3 is fixedly installed at the center of the outer side of the top of the box 11, and the engineering project management tool box can be lifted up through the handle 3 when the road is bumpy.
As shown in fig. 1, the pen strip 6 is 3-5 cm away from the side where the lock catch 5 is installed.
As shown in figure 1, the distance between the elastic band 7 and the bottom of the pen inserting band 6 is 5-8 cm.
As shown in fig. 1, the battery case 9 is 5-8 cm away from the bottom of the elastic band 7.
The working principle is as follows: through pressing button 1, begin the record data, then pulling pull rod 2, make box 11 drive gyro wheel 12 motion, rethread hall sensor 8, data transfer that reachs gyro wheel 12 motion is on display screen 4, reachs measured data, the tape measure 16 of box 11 outer wall grafting installation, directly take off the use when using, measure, then open box 11 through padlock 5, the inside of box 11 is equipped with pen inserting belt 6, elastic cord 7 and fixed band 10, can the fixed data, pen and some gadgets, make every article all fix in the place that corresponds, make things convenient for the pen to take out, the record data, when not using engineering project management toolbox, can pull through pull rod 2, handle 3 mentions or braces 18 moves on the back.
The above embodiments are merely exemplary embodiments of the present invention, which is not intended to limit the present invention, and the scope of the present invention is defined by the appended claims. Various modifications and equivalents may be made by those skilled in the art to the present invention without departing from the spirit and scope of the invention, and such modifications and equivalents should be considered to be within the scope of the invention.

Claims (7)

1. An engineering project management tool kit, comprising:
the pen inserting box comprises a box body (11), wherein pen inserting belts (6), elastic belts (7) and fixing belts (10) are respectively arranged inside the box body (11), the pen inserting belts (6) are fixedly arranged on the inner wall of one side of the top of the adjacent box body (11), the elastic belts (7) are fixedly arranged on the inner wall of one side of the box body (11) and are positioned right below the pen inserting belts (6), the number of the fixing belts (10) is four, and the four fixing belts (10) are symmetrically arranged on the inner wall of one side of the box body (11) and are positioned on one sides of the pen inserting belts (6) and the elastic belts (7);
a distance measuring assembly (19), wherein the distance measuring assembly (19) comprises a pull rod (2), a display screen (4), Hall sensors (8), a battery box (9), rollers (12), fixing plates (13), a circuit cover (14) and a circuit board (15), the pull rod (2) is fixedly installed on the central axis of the upper surface of the top of the box body (11), a button (1) is arranged at the center of the top of the pull rod (2), the display screen (4) is fixedly installed on the top of the outer wall of the adjacent side of the box body (11), the fixing plates (13), the rollers (12) and the Hall sensors (8) are respectively two in number, the two fixing plates (13) are respectively and symmetrically installed on the outer walls of the left side and the right side of the adjacent bottom of the box body (11), the two Hall sensors (8) are respectively installed on the fixing plates (13), and the two rollers (12) are respectively in shaft connection with the middle shafts of the outer, the battery box (9) is fixedly arranged on the inner wall of one side of the box body (11), the circuit cover (14) is fixedly arranged at the bottom of the inner side of the box body (11), and the circuit board (15) is fixedly arranged in the circuit cover (14);
the measuring tape (16) is fixedly arranged in the center of the outer wall of one side of the box body (11).
2. An engineering project management toolbox according to claim 1, characterized in that the hall sensor (8) is 1-2 cm from the top of the fixed plate (13).
3. The engineering project management tool box as claimed in claim 1, wherein the box body (11) further comprises two straps (18) and two latches (5), the two straps (18) are symmetrically mounted on the outer wall of the box body (11) on one side opposite to the measuring tape (16), the two latches (5) are two, and the box body (11) is opened and closed through the two latches (5).
4. An engineering project management tool box according to claim 1, characterized in that a handle (3) is fixedly arranged at the center of the outer side of the top of the box body (11).
5. An engineering project management toolbox according to claim 1, characterized in that the penholder strip (6) is 3-5 cm from the side where the padlock (5) is installed.
6. An engineering project management tool box according to claim 1, characterized in that the elastic band (7) is 5-8 cm from the bottom of the pen strip (6).
7. An engineering project management tool kit according to claim 1, characterized in that the battery compartment (9) is 5-8 cm from the bottom of the elastic band (7).
CN201921746248.7U 2019-10-17 2019-10-17 Engineering project management toolbox Expired - Fee Related CN210704745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921746248.7U CN210704745U (en) 2019-10-17 2019-10-17 Engineering project management toolbox

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921746248.7U CN210704745U (en) 2019-10-17 2019-10-17 Engineering project management toolbox

Publications (1)

Publication Number Publication Date
CN210704745U true CN210704745U (en) 2020-06-09

Family

ID=70963538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921746248.7U Expired - Fee Related CN210704745U (en) 2019-10-17 2019-10-17 Engineering project management toolbox

Country Status (1)

Country Link
CN (1) CN210704745U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11884456B2 (en) 2020-09-25 2024-01-30 Techtronic Cordless Gp Tool storage system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11884456B2 (en) 2020-09-25 2024-01-30 Techtronic Cordless Gp Tool storage system

Similar Documents

Publication Publication Date Title
CN210704745U (en) Engineering project management toolbox
CN207020178U (en) A kind of portable environment engineering contaminated soil detection means
CN207570422U (en) A kind of multi-use architecture steel tape
CN209615453U (en) A kind of engineering mapping portable dam storing unit
CN211044802U (en) Novel portable marketing simulation sand table
CN208148909U (en) A kind of portable engineering mapping plate
CN211466339U (en) Laboratory testing tool box
CN204969943U (en) Intelligence hand (hold)
CN208860264U (en) A kind of tape measure of field test rapid survey caliber
CN210329655U (en) Draw-bar box for metering
CN216102129U (en) Portable debugging device for subway axle counting system
CN205889107U (en) Portable long -range initiative repair tool box
CN216052193U (en) Multifunctional engineering quality detection device
CN214334900U (en) Portable water quality tester with high safety performance
CN216205743U (en) Detection ruler for water conservancy and hydropower
CN215824323U (en) Electric drill with level ruler
CN213841970U (en) Project management's detection chi
CN214472267U (en) Detection device for building structure reinforcement
CN211927995U (en) Fill electric pile with ammeter case of being convenient for observe reading
CN219165840U (en) Draw-bar mechanism of draw-bar box
CN220094570U (en) Green toolbox for architectural design
CN218765037U (en) Special gap verifying attachment of elevator inspection
CN218270435U (en) Thickness tester
CN213748505U (en) Portable environment monitoring equipment
CN220575885U (en) Building auxiliary tool case

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200609

Termination date: 20211017

CF01 Termination of patent right due to non-payment of annual fee