CN210693409U - Hydraulic engineering construction pipe laying and line fixing device - Google Patents

Hydraulic engineering construction pipe laying and line fixing device Download PDF

Info

Publication number
CN210693409U
CN210693409U CN201922201071.9U CN201922201071U CN210693409U CN 210693409 U CN210693409 U CN 210693409U CN 201922201071 U CN201922201071 U CN 201922201071U CN 210693409 U CN210693409 U CN 210693409U
Authority
CN
China
Prior art keywords
fixing plate
fixedly connected
hydraulic engineering
groove
sliding block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922201071.9U
Other languages
Chinese (zh)
Inventor
赵旺锋
王玲
何万社
任小朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Corp Engineering Bureau 15 Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922201071.9U priority Critical patent/CN210693409U/en
Application granted granted Critical
Publication of CN210693409U publication Critical patent/CN210693409U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a hydraulic engineering technical field just discloses a hydraulic engineering construction pipe laying solidus device, include: a first fixing plate and a second fixing plate; the two connecting rods are fixedly connected between the first fixing plate and the second fixing plate; the first supporting rods are fixedly connected to one side of the first fixing plate opposite to the first fixing plate; the left clamping ring is fixedly connected to one ends of the two first supporting rods, which are opposite to each other; the grooves are uniformly arranged in the first fixing plate and the second fixing plate at equal intervals. The utility model discloses a set up first fixed plate, second fixed plate, connecting rod, first bracing piece, left clamp ring, recess, slide bar, slider, second bracing piece, right clamp ring, sleeve, inserted bar, handle, first reset spring, fender ring, second reset spring and spout, reach the fixed action to the cable, therefore convenient to use, the practicality is strong.

Description

Hydraulic engineering construction pipe laying and line fixing device
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a hydraulic engineering construction pipe laying solidus device.
Background
Water is the essential valuable resource of human production and life, but its state that exists naturally does not completely accord with human needs, only build hydraulic engineering, just can control rivers, prevent the flood calamity, and carry out the regulation and the distribution of water yield, in order to satisfy people's life and the needs of production to the water resource, hydraulic engineering needs to be built dam, dyke, spillway, sluice, water inlet, channel, ferry tank, raft and fishway the different grade type hydraulic buildings such as, in order to realize its target, hydraulic engineering needs a large amount of spool in the construction process, many spools are required to be buried underground in muddy earth, in order to make things convenient for follow-up to lay wire and cable, communication optical cable and the pre-buried pipeline of sensing optic fibre for structural health monitoring.
The existing hydraulic engineering construction pipe burying and line fixing device has some defects in some aspects and needs further improvement, and the existing hydraulic engineering construction pipe burying and line fixing device is not convenient enough to fix a cable when in use, and is complex to operate, so that the practicability is poor.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to solve the above-mentioned problem of prior art, the utility model provides a hydraulic engineering construction pipe laying solidus device.
(II) technical scheme
In order to achieve the above object, the utility model discloses a main technical scheme include:
a hydraulic engineering construction pipe laying and line fixing device comprises:
a first fixing plate and a second fixing plate;
the two connecting rods are fixedly connected between the first fixing plate and the second fixing plate;
the first supporting rods are fixedly connected to one side of the first fixing plate opposite to the first fixing plate;
the left clamping ring is fixedly connected to one ends of the two first supporting rods, which are opposite to each other;
the grooves are uniformly arranged in the first fixing plate and the second fixing plate at equal intervals;
the sliding rod is fixedly connected inside the groove;
the sliding block is arranged inside the groove and is sleeved on the surface of the sliding rod;
the second supporting rod is fixedly connected to one side, opposite to the sliding block in the groove in the surface of the first fixing plate, of the sliding block in the groove in the surface of the second fixing plate;
the right clamping ring is fixedly connected to one end of the two second supporting rods, which is opposite to the first supporting rod;
the sleeves are uniformly embedded at the top of the first fixing plate at equal intervals;
the insertion rod penetrates through the sleeve, and the bottom end of the insertion rod is inserted into the sliding block;
the handle, handle fixed connection is at the top of inserted bar.
In a further embodiment, a first return spring is fixedly connected between the right side surface of the sliding block and the right side wall of the groove, and the first return spring is sleeved on the surface of the sliding rod.
In a further embodiment, the bottom of the surface of the inserted link is fixedly sleeved with a baffle ring, a second return spring is fixedly connected between the baffle ring and the top of the inner wall of the groove, and the second return spring is sleeved on the surface of the inserted link.
In a further embodiment, the top of the sliding block is provided with a jack, and the inserted link is inserted into the jack.
In a further embodiment, sliding grooves are formed in the opposite sides of the first fixing plate and the second fixing plate, the sliding grooves are communicated with the grooves, and the second supporting rod penetrates through the sliding grooves.
(III) advantageous effects
The utility model provides a hydraulic engineering construction pipe laying solidus device. The method has the following beneficial effects:
the hydraulic engineering construction pipe laying and line fixing device is characterized in that a first fixing plate, a second fixing plate, a connecting rod, a first supporting rod, a left clamping ring, a groove, a sliding rod, a sliding block, a second supporting rod, a right clamping ring, a sleeve, an inserting rod, a handle, a first return spring, a baffle ring, a second return spring and a sliding groove are arranged, the inserting rod is pulled by the handle to move upwards, the inserting rod is separated from an inserting hole in the top of the sliding block, the sliding block can move, the second return spring compresses at the same time, then the right clamping ring moves rightwards, the right clamping ring is fixedly connected with the two sliding blocks through the second supporting rod, therefore, the right clamping ring moves rightwards to drive the two sliding blocks to move rightwards on the surface of the sliding rod, the first return spring is compressed, a cable is arranged between the left clamping ring and the right clamping ring in a penetrating manner, and the right clamping ring is combined with the left clamping ring through the, the inserted bar is reset and inserted in the jack at the top of the sliding block under the elastic action of the second reset spring, so that the sliding block cannot move, the fixing effect on the cable is achieved, and the cable fixing device is convenient to use and high in practicability.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural diagram of the groove of the present invention.
[ description of reference ]
In the figure: the device comprises a first fixing plate 1, a second fixing plate 2, a connecting rod 3, a first supporting rod 4, a left clamping ring 5, a groove 6, a sliding rod 7, a sliding block 8, a second supporting rod 9, a right clamping ring 10, a sleeve 11, an inserted rod 12, a handle 13, a first return spring 14, a stop ring 15, a second return spring 16 and a sliding groove 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-2, the utility model provides a technical solution: a hydraulic engineering construction pipe laying and line fixing device comprises:
a first fixing plate 1 and a second fixing plate 2;
the two connecting rods 3 are fixedly connected between the first fixing plate 1 and the second fixing plate 2;
the first supporting rods 4 are fixedly connected to one side of the first fixing plate 1 opposite to the first fixing plate 1;
the left clamping ring 5 is fixedly connected to one end of each of the two first supporting rods 4;
the grooves 6 are uniformly arranged in the first fixing plate 1 and the second fixing plate 2 at equal intervals;
the sliding rod 7 is fixedly connected inside the groove 6;
the sliding block 8 is arranged inside the groove 6, and the sliding block 8 is sleeved on the surface of the sliding rod 7;
the second supporting rod 9, the second supporting rod 9 is fixedly connected to one side of the slide block 8 in the groove 6 on the surface of the first fixing plate 1, which is opposite to the slide block 8 in the groove 6 on the surface of the second fixing plate 2;
the right clamping ring 10 is fixedly connected to one end of each of the two second supporting rods 9;
the sleeves 11 are uniformly embedded at the top of the first fixing plate 1 at equal intervals;
the inserted bar 12 is arranged in the sleeve 11 in a penetrating mode, and the bottom end of the inserted bar 12 is inserted into the sliding block 8;
and the handle 13 is fixedly connected to the top end of the inserted rod 12.
In this embodiment, a first return spring 14 is fixedly connected between the right side surface of the slider 8 and the right side wall of the groove 6, and the first return spring 14 is sleeved on the surface of the sliding rod 7 for returning after the slider 8 moves, and keeping the right clamping ring 10 and the left clamping ring 5 in a combined state all the time.
In this embodiment, a stop ring 15 is fixedly sleeved on the bottom of the surface of the inserted link 12, a second return spring 16 is fixedly connected between the stop ring 15 and the top of the inner wall of the groove 6, and the second return spring 16 is sleeved on the surface of the inserted link 12 and used for returning after the inserted link 12 moves, so that the inserted link 12 can be always inserted into the slider 8.
In this embodiment, the top of the slider 8 is provided with a jack, and the insertion rod 12 is inserted into the jack, for cooperating with the insertion rod 12 to fix the slider 8.
In this embodiment, the opposite sides of the first fixing plate 1 and the second fixing plate 2 are both provided with a sliding groove 17, the sliding groove 17 is communicated with the groove 6, and the second supporting rod 9 is inserted into the sliding groove 17 for the second supporting rod 9 to slide left and right.
The working principle is as follows: pulling inserted bar 12 through handle 13 and upwards moving, inserted bar 12 and the jack separation at slider 8 top, make slider 8 can remove, second reset spring 16 compresses simultaneously, then move right clamp ring 10 rightly, because right clamp ring 10 passes through second bracing piece 9 and two slider 8 fixed connection, consequently right clamp ring 10 moves right and drives two slider 8 and move right on slide bar 7 surface, compress first reset spring 14, then wear to establish the cable between left clamp ring 5 and right clamp ring 10, through the elastic action of first reset spring 14, right clamp ring 10 resets and merges with left clamp ring 5, rethread second reset spring 16's elastic action, inserted bar 12 resets and plug connects in the jack at slider 8 top, make slider 8 unable removal, thereby reach the fixed action to the cable.
To sum up, the hydraulic engineering construction pipe burying and wire fixing device comprises a first fixing plate 1, a second fixing plate 2, a connecting rod 3, a first supporting rod 4, a left clamping ring 5, a groove 6, a sliding rod 7, a sliding block 8, a second supporting rod 9, a right clamping ring 10, a sleeve 11, an inserting rod 12, a handle 13, a first return spring 14, a baffle ring 15, a second return spring 16 and a sliding groove 17, wherein the inserting rod 12 is pulled by the handle 13 to move upwards, the inserting rod 12 is separated from an inserting hole at the top of the sliding block 8, so that the sliding block 8 can move, the second return spring 16 compresses, the right clamping ring 10 moves rightwards, the right clamping ring 10 is fixedly connected with the two sliding blocks 8 through the second supporting rod 9, the right clamping ring 10 moves rightwards to drive the two sliding blocks 8 to be arranged on the surface of the sliding rod 7, the first return spring 14 is compressed, a cable penetrates between the left clamping ring 5 and the right clamping ring 10, through the elastic action of first reset spring 14, right clamp ring 10 resets and merges with left clamp ring 5, and rethread second reset spring 16's elastic action, inserted bar 12 resets and inserts in the jack at slider 8 top for slider 8 can't be removed, thereby reaches the fixed action to the cable, therefore convenient to use, and the practicality is strong.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a reference structure" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a hydraulic engineering construction pipe laying solidus device which characterized in that includes:
a first fixing plate (1) and a second fixing plate (2);
the two connecting rods (3) are fixedly connected between the first fixing plate (1) and the second fixing plate (2);
the first supporting rods (4) are fixedly connected to one side, opposite to the first fixing plate (1), of the first fixing plate (1);
the left clamping ring (5) is fixedly connected to one end, opposite to the two first supporting rods (4), of the left clamping ring (5);
the grooves (6) are uniformly formed in the first fixing plate (1) and the second fixing plate (2) at equal intervals;
the sliding rod (7), the sliding rod (7) is fixedly connected to the inside of the groove (6);
the sliding block (8) is arranged inside the groove (6), and the sliding block (8) is sleeved on the surface of the sliding rod (7);
the second supporting rod (9), the second supporting rod (9) is fixedly connected to one side, opposite to the sliding block (8) in the groove (6) on the surface of the first fixing plate (1) and the sliding block (8) in the groove (6) on the surface of the second fixing plate (2);
the right clamping ring (10) is fixedly connected to one end, opposite to the two second supporting rods (9), of the right clamping ring (10);
the sleeves (11) are uniformly embedded in the top of the first fixing plate (1) at equal intervals;
the insertion rod (12) penetrates through the sleeve (11), and the bottom end of the insertion rod (12) is inserted into the sliding block (8);
the handle (13), handle (13) fixed connection is in the top of inserted bar (12).
2. The hydraulic engineering construction pipe burying and line fixing device of claim 1, wherein: a first return spring (14) is fixedly connected between the right side surface of the sliding block (8) and the right side wall of the groove (6), and the first return spring (14) is sleeved on the surface of the sliding rod (7).
3. The hydraulic engineering construction pipe burying and line fixing device of claim 1, wherein: the bottom of the surface of the inserted bar (12) is fixedly sleeved with a baffle ring (15), a second return spring (16) is fixedly connected between the baffle ring (15) and the top of the inner wall of the groove (6), and the second return spring (16) is sleeved on the surface of the inserted bar (12).
4. The hydraulic engineering construction pipe burying and line fixing device of claim 1, wherein: the top of the sliding block (8) is provided with a jack, and the inserted bar (12) is inserted in the jack.
5. The hydraulic engineering construction pipe burying and line fixing device of claim 1, wherein: spout (17) have all been seted up to one side that first fixed plate (1) and second fixed plate (2) are relative, spout (17) and recess (6) intercommunication, just second bracing piece (9) are worn to locate the inside of spout (17).
CN201922201071.9U 2019-12-10 2019-12-10 Hydraulic engineering construction pipe laying and line fixing device Active CN210693409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922201071.9U CN210693409U (en) 2019-12-10 2019-12-10 Hydraulic engineering construction pipe laying and line fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922201071.9U CN210693409U (en) 2019-12-10 2019-12-10 Hydraulic engineering construction pipe laying and line fixing device

Publications (1)

Publication Number Publication Date
CN210693409U true CN210693409U (en) 2020-06-05

Family

ID=70887847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922201071.9U Active CN210693409U (en) 2019-12-10 2019-12-10 Hydraulic engineering construction pipe laying and line fixing device

Country Status (1)

Country Link
CN (1) CN210693409U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112072598A (en) * 2020-09-11 2020-12-11 江苏华世远电力技术有限公司 Modularization cable pit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112072598A (en) * 2020-09-11 2020-12-11 江苏华世远电力技术有限公司 Modularization cable pit

Similar Documents

Publication Publication Date Title
CN205776339U (en) Both arms Retaining Wall
CN210693409U (en) Hydraulic engineering construction pipe laying and line fixing device
CN210623892U (en) PE pipe convenient to connect
CN211063244U (en) Power cable protection pipe convenient for threading
CN217786635U (en) Multilayer sampling device for water quality testing
CN212026120U (en) Protective device for hydroelectric engineering
CN210920373U (en) Farmland hydraulic engineering construction pipe laying and line fixing device
CN212316830U (en) Hydraulic engineering is with ecological slope protection brick of concatenation formula
CN211498787U (en) Corrosion-resistant river course is synthesized and is administered and use garbage collection device
CN209740534U (en) telescopic cross frame and pipe discharging device
CN209323504U (en) A kind of continuous underground wall structure
CN218597185U (en) Combined ecological slope protection structure
CN213982299U (en) Fixing device is laid to building water conservancy pipeline
CN211818547U (en) Firm type is photoelectricity rail under water
CN111549840A (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN211898144U (en) Water retaining device is used in hydraulic engineering construction
CN217927804U (en) Municipal drainage is extrusion protector for pipe
CN211872997U (en) Pile pulling device for hydraulic engineering
CN216483079U (en) Slope measuring instrument for hydraulic engineering civil engineering
CN214889388U (en) Fixing device for sluice buried pipe
CN216712981U (en) Soil and water conservation net that hydraulic engineering used
CN212723489U (en) Intelligent building communication pipeline laying device
CN216304567U (en) Ecological bank protection for hydraulic engineering
CN217108685U (en) Municipal administration drainage sewage pipes
CN216277082U (en) Whole displacement device of building steel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200819

Address after: 710065 China water power building, No. 16 science and technology road, Shaanxi, Xi'an

Patentee after: SINOHYDRO CORPORATION ENGINEERING BUREAU 15 Co.,Ltd.

Address before: 712000 No. 1 Jinxu Road, Weicheng District, Xianyang City, Shaanxi Province

Patentee before: Zhao Wangfeng