CN210689632U - Unwrapping wire spud pile for construction - Google Patents

Unwrapping wire spud pile for construction Download PDF

Info

Publication number
CN210689632U
CN210689632U CN201921239026.6U CN201921239026U CN210689632U CN 210689632 U CN210689632 U CN 210689632U CN 201921239026 U CN201921239026 U CN 201921239026U CN 210689632 U CN210689632 U CN 210689632U
Authority
CN
China
Prior art keywords
pile
fixed mounting
recess
stake
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921239026.6U
Other languages
Chinese (zh)
Inventor
陈金鹏
石玉峰
程洋
王咸丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Zhuzong Mechanical And Electrical Equipment Installation Co ltd
Original Assignee
Tianjin Zhuzong Mechanical And Electrical Equipment Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Zhuzong Mechanical And Electrical Equipment Installation Co ltd filed Critical Tianjin Zhuzong Mechanical And Electrical Equipment Installation Co ltd
Priority to CN201921239026.6U priority Critical patent/CN210689632U/en
Application granted granted Critical
Publication of CN210689632U publication Critical patent/CN210689632U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a unwrapping wire spud pile for construction, including outer stake, the cylinder hole has been seted up to the lower surface of outer stake, the upper end screw hole of cylinder hole, the internally mounted of outer stake has the sighting rod, the surface lower extreme fixed mounting of outer stake has balancing unit, balancing unit includes the tourus of fixed mounting at outer stake surface lower extreme, the upper surface of tourus evenly sets up flutedly, the quantity of recess is four, the inside lower extreme fixed mounting of recess has the bubble spirit level, the inside upper end fixed mounting of recess has transparent guard plate, transparent guard plate lid connects the upper surface at the bubble spirit level. Compared with the prior art, this device can make the adjusting axial deviation when sinking the stake through the outer stake of combination and sighting rod, keeps vertical state, can finely tune the marking position, and positioning accuracy is high.

Description

Unwrapping wire spud pile for construction
Technical Field
The utility model relates to a building appliances technical field specifically is a unwrapping wire spud pile for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like.
At present, in a building construction site, a paying-off positioning pile is the most common construction tool, a leveled construction site needs to be measured and paid off by using the positioning pile, the foundation range of construction is defined, however, the method of driving a wooden pile into the leveled construction site is adopted, the axial positioning error is large, the recycling rate is low, and in order to solve the problems, the paying-off positioning pile for building construction is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a unwrapping wire spud pile for construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a unwrapping wire spud pile for construction, includes the outer stake, the cylinder hole has been seted up to the lower surface of outer stake, the upper end in cylinder hole sets up threaded hole, the internally mounted of outer stake has the sighting rod, the surface lower extreme fixed mounting of outer stake has balancing unit, balancing unit includes the tourus of fixed mounting at outer stake surface lower extreme, the upper surface of tourus evenly sets up flutedly, the quantity of recess is four, the inside lower extreme fixed mounting of recess has the bubble spirit level, the inside upper end fixed mounting of recess has transparent guard plate, transparent guard plate lid connects the upper surface at the bubble spirit level.
Preferably, the marker post comprises a cylindrical rod inserted in the cylindrical hole, a screw rod is fixedly mounted at the upper end of the cylindrical rod and is in threaded connection with the inside of the threaded hole, a pyramid is fixedly mounted at the lower end of the cylindrical rod, and a fine adjustment device is further in threaded connection with the outer surface of the screw rod.
Preferably, the diameter of the cylindrical hole is larger than that of the threaded hole.
Preferably, the fine adjustment device comprises an upper spiral ring and a lower spiral ring which are screwed on the outer surface of the screw rod, the lower spiral ring is positioned on the lower side of the upper spiral ring, and a fine adjustment ring is fixedly installed at the right end of the lower spiral ring.
Preferably, the lower end of the pyramid is provided with a hemisphere.
Compared with the prior art, the beneficial effects of the utility model are that: this unwrapping wire spud pile for construction can adjust axial deviation when making the pile sinking through the outer stake of combination and sighting rod, keeps vertical state, can finely tune the marking position, and positioning accuracy is high.
Drawings
Fig. 1 is a front view of the structure of the present invention.
Fig. 2 is a schematic structural view of the utility model of the marker post.
Fig. 3 is a schematic structural diagram of the fine adjustment device of the present invention.
In the figure: the device comprises an outer pile 1, a threaded hole 2, a cylindrical hole 3, a rod 4, a screw 41, a cylindrical rod 42, a pyramid 43, a balance 5, a transparent protection plate 51, a bubble level 52, a groove 53, a torus 54, a fine adjustment device 6, a lower toroid 61, an upper toroid 62, a fine adjustment ring 63 and a hemisphere 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2 and fig. 3, the present invention provides a technical solution: the utility model provides a unwrapping wire spud pile for construction, including outer stake 1, cylinder hole 3 has been seted up to the lower surface of outer stake 1, threaded hole 2 has been seted up to the upper end of cylinder hole 3, the internally mounted of outer stake 1 has sighting rod 4, the surface lower extreme fixed mounting of outer stake 1 has balancing unit 5, balancing unit 5 includes the tourus 54 of fixed mounting at outer 1 surface lower extreme of outer stake, concave groove 53 has evenly been seted up to the upper surface of tourus 54, the quantity of recess 53 is four, the inside lower extreme fixed mounting of recess 53 has bubble spirit level 52, the inside upper end fixed mounting of recess 53 has transparent guard plate 51, transparent guard plate 51 covers the upper surface at bubble spirit level 52.
By means of the four bubble levels 52 in the balancing device 5, the device can be kept upright by manual observation during pile driving, avoiding axis deviation, and the transparent protection plate 51 can observe and protect the bubble level 52 on the lower side.
The marker post 4 includes the cylinder pole 42 of pegging graft in cylinder hole 3 inside, and the upper end fixed mounting of cylinder pole 42 has screw rod 41, and screw rod 41 spiro union is in the inside of screw hole 2, and the lower extreme fixed mounting of cylinder pole 42 has pyramid 43, and the surface of screw rod 41 still spiro union has micromatic setting 6.
The cooperation of screw rod 41 and screw hole 2 can be fixed sighting rod 4 in the inside of outer stake 1, along with outer stake 1 inserts in soil, pyramid 43 can make things convenient for sinking of sighting rod 4.
The diameter of the cylindrical hole 3 is larger than that of the threaded hole 2. When the outer pile 1 sinks under stress, force can be transmitted to the cylindrical rod 42 through the cylindrical hole 3, and stress deformation of the screw rod 41 and the threaded hole 2 is avoided.
The fine adjustment device 6 comprises an upper spiral ring 62 and a lower spiral ring 61 which are screwed on the outer surface of the screw rod 41, the lower spiral ring 61 is positioned at the lower side of the upper spiral ring 62, and a fine adjustment ring 63 is fixedly arranged at the right end of the lower spiral ring 61.
The position of the fine adjustment ring 63 on the outer surface of the screw rod 41 can be adjusted through the matching of the upper screw ring 62 and the lower screw ring 61, and the position of the marked line on the fine adjustment ring 63 is finely adjusted.
The lower end of the pyramid 43 is open to form a hemisphere 7. The hemisphere 7 can be in smooth transition when the marker post 4 is driven into the soil, so as to avoid damaging the lower end of the pyramid 43.
The working principle is as follows: during the use, install sighting rod 4 in the inside of outer stake 1 earlier, through the upper end of suppressing outer stake 1, observe balancing unit 5 alignment simultaneously, insert ground with the pyramid 43 of sighting rod 4 completely, the external stake 1 of reverse rotation makes screw rod 41 break away from with screw hole 2, takes off outer stake 1 after, at the surface spiro union micromatic setting 6 of screw rod 41, can finely tune and lock fixedly the marking on the fine setting ring 63, accomplish the unwrapping wire location.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should make the description as a whole, and the embodiments may be appropriately combined to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a construction is with unwrapping wire spud pile which characterized in that: the pile comprises an outer pile (1), wherein a cylindrical hole (3) is formed in the lower surface of the outer pile (1), a threaded hole (2) is formed in the upper end of the cylindrical hole (3), a marker post (4) is installed inside the outer pile (1), and a balancing device (5) is fixedly installed at the lower end of the outer surface of the outer pile (1);
balancing unit (5) are including ring body (54) of fixed mounting at outer stake (1) surface lower extreme, the upper surface of ring body (54) evenly sets up recess (53), the quantity of recess (53) is four, the inside lower extreme fixed mounting of recess (53) has bubble spirit level (52), the inside upper end fixed mounting of recess (53) has transparent guard plate (51), transparent guard plate (51) lid connects the upper surface at bubble spirit level (52).
2. The paying-off positioning pile for building construction according to claim 1, characterized in that: the sighting rod (4) comprises a cylindrical rod (42) inserted in the cylindrical hole (3), a screw rod (41) is fixedly mounted at the upper end of the cylindrical rod (42), the screw rod (41) is in threaded connection with the inside of the threaded hole (2), a pyramid (43) is fixedly mounted at the lower end of the cylindrical rod (42), and a fine adjustment device (6) is further in threaded connection with the outer surface of the screw rod (41).
3. The paying-off positioning pile for building construction according to claim 1, characterized in that: the diameter of the cylindrical hole (3) is larger than that of the threaded hole (2).
4. The paying-off positioning pile for building construction as claimed in claim 2, wherein: the fine adjustment device (6) comprises an upper spiral ring (62) and a lower spiral ring (61) which are screwed on the outer surface of the screw rod (41), the lower spiral ring (61) is positioned on the lower side of the upper spiral ring (62), and a fine adjustment ring (63) is fixedly installed at the right end of the lower spiral ring (61).
5. The paying-off positioning pile for building construction as claimed in claim 2, wherein: the lower end of the pyramid (43) is provided with a hemisphere (7).
CN201921239026.6U 2019-08-02 2019-08-02 Unwrapping wire spud pile for construction Active CN210689632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921239026.6U CN210689632U (en) 2019-08-02 2019-08-02 Unwrapping wire spud pile for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921239026.6U CN210689632U (en) 2019-08-02 2019-08-02 Unwrapping wire spud pile for construction

Publications (1)

Publication Number Publication Date
CN210689632U true CN210689632U (en) 2020-06-05

Family

ID=70894254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921239026.6U Active CN210689632U (en) 2019-08-02 2019-08-02 Unwrapping wire spud pile for construction

Country Status (1)

Country Link
CN (1) CN210689632U (en)

Similar Documents

Publication Publication Date Title
CN210689632U (en) Unwrapping wire spud pile for construction
CN202041208U (en) Stable direct-buried GPS (global positioning system) observation sign
CN215803300U (en) Ground leveling auxiliary device for building construction
CN110969809A (en) Portable geological disaster monitoring device
CN211317321U (en) Novel surveying and mapping monument
CN213041212U (en) Precise level gauge based on satellite positioning
CN114526416A (en) Real estate mapping device with assistance-localization real-time structure
CN218263964U (en) Leveling upright rod foundation embedded part for high-wind-speed area
CN213062010U (en) Pile point calibration device for concrete cast-in-place pile
CN209230632U (en) A kind of measurement and positioning and the fixed control stake of elevation
CN210198257U (en) Basic borer of civil engineering construction usefulness
CN220039470U (en) Engineering marker post
CN217848340U (en) A earthing device for desert environment
CN210275062U (en) Digging equipment is planted to astragalus
CN211234430U (en) Survey and drawing sighting rod support
CN212058765U (en) Level gauge for garden engineering
CN204988277U (en) Three -dimensional spirit level in wall ground
CN216976430U (en) Building engineering surveying and mapping device
CN218211336U (en) Portable settlement observation mark
CN212513043U (en) A novel sighting rod for engineering survey and drawing
CN213632127U (en) Combined forced centering measurement mark applied to high-precision deformation monitoring
CN212835475U (en) Photovoltaic support pile foundation leveling structure
CN218713003U (en) Automatic building construction spud pile of rectifying
CN218787411U (en) On-spot mapping equipment of building engineering cost
CN219391038U (en) Farmland water level monitoring equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant