CN210687543U - Real-time monitoring device for electric power engineering - Google Patents

Real-time monitoring device for electric power engineering Download PDF

Info

Publication number
CN210687543U
CN210687543U CN201921279308.9U CN201921279308U CN210687543U CN 210687543 U CN210687543 U CN 210687543U CN 201921279308 U CN201921279308 U CN 201921279308U CN 210687543 U CN210687543 U CN 210687543U
Authority
CN
China
Prior art keywords
connecting plate
mounting
mobile jib
plate
power engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921279308.9U
Other languages
Chinese (zh)
Inventor
王思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Chengfeng Power Engineering Co Ltd
Original Assignee
Fujian Chengfeng Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Chengfeng Power Engineering Co Ltd filed Critical Fujian Chengfeng Power Engineering Co Ltd
Priority to CN201921279308.9U priority Critical patent/CN210687543U/en
Application granted granted Critical
Publication of CN210687543U publication Critical patent/CN210687543U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an electric power engineering technical field just discloses an electric power engineering real-time supervision device, including the mobile jib, the right side fixed mounting of mobile jib has two curb plates, two movable mounting has the rack between the curb plate. This electric power engineering real-time supervision device, when installing monitoring devices, the staff rotates the runner earlier, drive gear revolve, through the meshing, make rack rebound, under the action of gravity of balance plate and mounting panel is supplementary, the second connecting plate moves down along the guide pulley, and first connecting plate is pushed up slowly along the guide pulley, the mounting panel descends along the spout at the buffer board like this, after descending a certain distance, stall, install the camera on the mounting bracket, then rotate the runner again, rotate the camera to the supporting seat peak, push into the mobile jib with the picture peg again in, make picture peg and gear block, thereby indirectly restrict the camera, through such a mode, the mesh of being convenient for the installation has been reached.

Description

Real-time monitoring device for electric power engineering
Technical Field
The utility model relates to an electric power engineering technical field specifically is an electric power engineering real-time supervision device.
Background
Electric power engineering, i.e. engineering related to the production, transmission and distribution of electric energy, also broadly includes engineering of applying electricity as power and energy in various fields, and it is also understood that the engineering of transmitting and transforming electricity is extended, and electric energy has gradually replaced steam power since the 19 th century and 80 th century, and becomes the technical basis of material civilization and mental civilization in modern society, and after the 20 th century, the production of electric energy mainly depends on thermal power plants, hydroelectric power plants and nuclear power plants, and conditional places also utilize tide, geothermal energy and wind energy to generate electricity.
At present, the real-time monitoring during the construction period of the power engineering is implemented by the cooperation of human observation and a camera, but the installation of the camera during the period is very troublesome, and the real-time monitoring device for the power engineering is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides an electric power engineering real-time supervision device possesses advantages such as the installation of being convenient for, and the control often of having solved present electric power engineering during construction is observed by the manpower and the camera is cooperated jointly and is implemented, but the camera installation during this period is very troublesome problem.
(II) technical scheme
In order to realize the installation purpose of being convenient for, the utility model provides a following technical scheme: the utility model provides an electric power engineering real-time monitoring device, includes the mobile jib, the right side fixed mounting of mobile jib has two curb plates, movable mounting has the rack between two the curb plates, the inside movable mounting of mobile jib has the gear with rack toothing, the front of mobile jib is provided with the runner with gear fixed connection, the left side of mobile jib is pegged graft and is had the picture peg, the top fixed mounting of rack has first connecting plate, the top fixed mounting of mobile jib has the supporting seat, the lateral wall movable mounting of supporting seat has the guide pulley, the one end fixed mounting that the first connecting plate kept away from the rack has the hinge, the one end fixed mounting that the hinge kept away from first connecting plate has the second connecting plate, the one end fixed mounting that the second connecting plate kept away from the hinge has the mounting panel, the one side fixed mounting that the mounting panel carried on the back with the mobile jib has, the spout has been seted up in the left side of mobile jib, the inside fixed mounting of mounting bracket has the camera, the one end fixed mounting that the second connecting plate was kept away from to the mounting panel has one end to extend to the inside buffer board of spout.
Preferably, the inserting plate is a Y-shaped connecting fork, and the inserting plate is matched with the gear.
Preferably, the first connecting plate comprises a base plate and a hinge shaft, the base plate is not less than six, and the hinge shaft is fixedly installed between two adjacent base plates.
Preferably, the number of the guide wheels is not less than seven, and the guide wheels are distributed in a centrosymmetric manner.
Preferably, the second connecting plate and the first connecting plate are both arc-shaped, and the first connecting plate and the second connecting plate are matched with the guide wheel.
Preferably, the balance plate is matched with the camera, and the buffer plate is matched with the sliding groove.
(III) advantageous effects
Compared with the prior art, the utility model provides an electric power engineering real-time supervision device possesses following beneficial effect:
this electric power engineering real-time supervision device, through setting up the mobile jib, when installation monitoring devices, the staff rotates the runner earlier, drive gear revolve, through the meshing, make rack rebound, under the action of gravity of balance plate and mounting panel is supplementary, the second connecting plate is along guide pulley downwardly moving, and first connecting plate is by slow upwards promotion along the guide pulley, the mounting panel descends along the spout at the buffer board like this, descend to a certain distance after, stall, install the camera on the mounting bracket, then rotate the runner again, rotate the camera to the supporting seat peak, push into the mobile jib with the picture peg again in, make picture peg and gear block, thereby it is indirect to restrict the camera, and through such a mode, the purpose of being convenient for the installation has been reached.
Drawings
FIG. 1 is a front view of the structure of the present invention;
fig. 2 is an enlarged view of the structure at a position of the present invention.
In the figure: 1 mobile jib, 2 curb plates, 3 racks, 4 gears, 5 runners, 6 picture pegs, 7 first connecting plates, 8 supporting seats, 9 guide pulleys, 10 hinges, 11 second connecting plates, 12 mounting panels, 13 mounting brackets, 14 balance plates, 15 spout, 16 cameras, 17 buffer boards.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a real-time monitoring device for electric power engineering comprises a main rod 1, two side plates 2 are fixedly mounted on the right side of the main rod 1, a rack 3 is movably mounted between the two side plates 2, a gear 4 meshed with the rack 3 is movably mounted inside the main rod 1, a rotating wheel 5 fixedly connected with the gear 4 is arranged on the front side of the main rod 1, an inserting plate 6 is inserted into the left side of the main rod 1, the inserting plate 6 is a Y-shaped connecting fork, the inserting plate 6 is matched with the gear 4, a first connecting plate 7 is fixedly mounted on the top of the rack 3, the first connecting plate 7 comprises a base plate and a hinge shaft, the number of the base plate is not less than six, the hinge shaft is fixedly mounted between two adjacent base plates, a supporting seat 8 is fixedly mounted on the top of the main rod 1, guide wheels 9 are movably mounted on the outer side wall of the supporting seat 8, the guide wheels, a second connecting plate 11 is fixedly installed at one end of the hinge 10 far away from the first connecting plate 7, the second connecting plate 11 and the first connecting plate 7 are both arc-shaped, the first connecting plate 7 and the second connecting plate 11 are matched with the guide wheel 9, a mounting plate 12 is fixedly installed at one end of the second connecting plate 11 far away from the hinge 10, a mounting frame 13 is fixedly installed at one side of the mounting plate 12 opposite to the main rod 1, a balance plate 14 positioned above the mounting frame 13 is fixedly installed at one side of the mounting plate 12 opposite to the main rod 1, a chute 15 is arranged at the left side of the main rod 1, a camera 16 is fixedly installed inside the mounting frame 13, a buffer plate 17 with one end extending to the inside of the chute 15 is fixedly installed at one end of the mounting plate 12 far away from the second connecting plate 11, the balance plate 14 is matched with the camera 16, the buffer plate 17 is matched with the chute 15, by arranging, the gear 4 is driven to rotate, the rack 3 moves upwards through meshing, under the assistance of the gravity action of the balance plate 14 and the mounting plate 12, the second connecting plate 11 moves downwards along the guide wheel 9, the first connecting plate 7 is slowly pushed upwards along the guide wheel 9, the mounting plate 12 descends along the sliding groove 15 on the buffer plate 17 and stops rotating after descending to a certain distance, the camera 16 is mounted on the mounting frame 13, then the rotating wheel 5 is rotated again, the camera 16 is rotated to the highest point of the supporting seat 8, the inserting plate 6 is pushed into the main rod 1, the inserting plate 6 is clamped with the gear 4, and therefore the camera 16 is indirectly limited, and the purpose of facilitating mounting is achieved through the mode.
To sum up, the real-time monitoring device for the power engineering is characterized in that the main rod 1 is arranged, when the monitoring device is installed, a worker firstly rotates the rotating wheel 5 to drive the gear 4 to rotate, the rack 3 moves upwards through meshing, the second connecting plate 11 moves downwards along the guide wheel 9 under the assistance of the gravity action of the balance plate 14 and the mounting plate 12, the first connecting plate 7 is slowly pushed upwards along the guide wheel 9, the mounting plate 12 descends along the sliding groove 15 after the buffer plate 17 descends to a certain distance, the rotation is stopped, the camera 16 is mounted on the mounting frame 13, then the rotating wheel 5 is rotated again, the camera 16 rotates to the highest point of the supporting seat 8, the inserting plate 6 is pushed into the main rod 1, the inserting plate 6 is clamped with the gear 4, and the camera 16 is indirectly limited, the purpose of convenient installation is achieved through the manner, the problem that the real-time monitoring during the current power engineering construction is implemented through the cooperation of human observation and the camera is solved, but camera mounting during this time is a very cumbersome problem.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an electric power engineering real-time supervision device, includes mobile jib (1), its characterized in that: the right side fixed mounting of mobile jib (1) has two curb plates (2), two movable mounting has rack (3) between curb plate (2), the inside movable mounting of mobile jib (1) has gear (4) with rack (3) meshing, the front of mobile jib (1) is provided with runner (5) with gear (4) fixed connection, peg graft in the left side of mobile jib (1) has picture peg (6), the top fixed mounting of rack (3) has first connecting plate (7), the top fixed mounting of mobile jib (1) has supporting seat (8), the lateral wall movable mounting of supporting seat (8) has guide pulley (9), the one end fixed mounting that rack (3) were kept away from in first connecting plate (7) has hinge (10), the one end fixed mounting that first connecting plate (7) were kept away from in hinge (10) has second connecting plate (11), one end fixed mounting that hinge (10) were kept away from in second connecting plate (11) has mounting panel (12), one side fixed mounting that mounting panel (12) and mobile jib (1) carried on the back mutually has mounting bracket (13), one side fixed mounting that mounting panel (12) and mobile jib (1) carried on the back mutually has balance plate (14) that is located mounting bracket (13) top, spout (15) have been seted up in the left side of mobile jib (1), the inside fixed mounting of mounting bracket (13) has camera (16), the one end fixed mounting that second connecting plate (11) were kept away from in mounting panel (12) has one end to extend to inside buffer board (17) of spout (15).
2. The real-time monitoring device for power engineering according to claim 1, characterized in that: the inserting plate (6) is a Y-shaped connecting fork, and the inserting plate (6) is matched with the gear (4).
3. The real-time monitoring device for power engineering according to claim 1, characterized in that: the first connecting plate (7) comprises a base plate and a hinge shaft, the base plate is not less than six, and the hinge shaft is fixedly mounted between every two adjacent base plates.
4. The real-time monitoring device for power engineering according to claim 1, characterized in that: the number of the guide wheels (9) is not less than seven, and the guide wheels (9) are distributed in a centrosymmetric manner.
5. The real-time monitoring device for power engineering according to claim 1, characterized in that: the second connecting plate (11) and the first connecting plate (7) are both arc-shaped, and the first connecting plate (7) and the second connecting plate (11) are matched with the guide wheel (9).
6. The real-time monitoring device for power engineering according to claim 1, characterized in that: the balance plate (14) is matched with the camera (16), and the buffer plate (17) is matched with the sliding groove (15).
CN201921279308.9U 2019-08-08 2019-08-08 Real-time monitoring device for electric power engineering Active CN210687543U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921279308.9U CN210687543U (en) 2019-08-08 2019-08-08 Real-time monitoring device for electric power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921279308.9U CN210687543U (en) 2019-08-08 2019-08-08 Real-time monitoring device for electric power engineering

Publications (1)

Publication Number Publication Date
CN210687543U true CN210687543U (en) 2020-06-05

Family

ID=70896217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921279308.9U Active CN210687543U (en) 2019-08-08 2019-08-08 Real-time monitoring device for electric power engineering

Country Status (1)

Country Link
CN (1) CN210687543U (en)

Similar Documents

Publication Publication Date Title
CN108023541A (en) A kind of solar energy photovoltaic panel with automatic cleaning function
CN110868144A (en) Adjustable photovoltaic panel mounting bracket for distributed photovoltaic power station
CN112511079A (en) Automatic protection and cleaning device for solar photovoltaic cell panel
CN210687543U (en) Real-time monitoring device for electric power engineering
CN215682203U (en) Photovoltaic power generation board that charges with multi-angle installation function
CN215120666U (en) Photovoltaic power generation equipment convenient to adjust
KR101101305B1 (en) Using solar cell for signboard
CN210807155U (en) Environment-friendly intelligent elevation photovoltaic curtain wall
CN209805763U (en) crystalline silicon solar photovoltaic panel convenient to clean
CN206922707U (en) Photovoltaic generation cell panel clearing apparatus
CN204361981U (en) A kind of photovoltaic module automatic cleaning apparatus
CN116242488A (en) Temperature acquisition's infrared adjustment mechanism
CN209819407U (en) Intelligent emission reduction lighting device in stadium
CN216649585U (en) Various steel tile roof photovoltaic power plant mounting structure
CN209805733U (en) photovoltaic power generation solar panel adjusts seat
CN208052178U (en) New-type grassland fences work out machine
CN220564696U (en) Photovoltaic support surface hot galvanizing device
CN218243408U (en) Integrated photovoltaic installation device
CN218035803U (en) Sampling device for hydraulic engineering
CN217335509U (en) Energy-concerving and environment-protective new forms of energy solar panel with regulatory function
CN215646697U (en) Photovoltaic power generation equipment based on solar energy is from net
CN215222072U (en) Photovoltaic power generation device convenient to dismantle
CN212841210U (en) Wisdom is modularization street lamp for city
CN218091551U (en) Auxiliary component for indoor integrated ceiling installation
CN111519120B (en) Steel pipe galvanizing machine capable of achieving multistage speed regulation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant