CN210684996U - Assembled superimposed sheet board holds in palm - Google Patents

Assembled superimposed sheet board holds in palm Download PDF

Info

Publication number
CN210684996U
CN210684996U CN201921280349.XU CN201921280349U CN210684996U CN 210684996 U CN210684996 U CN 210684996U CN 201921280349 U CN201921280349 U CN 201921280349U CN 210684996 U CN210684996 U CN 210684996U
Authority
CN
China
Prior art keywords
tripod
block
face
iron plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921280349.XU
Other languages
Chinese (zh)
Inventor
陈金鑫
陈如华
刘俊
张兆勇
华弘宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hongsheng Construction Engineering Group Co ltd
Original Assignee
Jiangsu Hongsheng Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hongsheng Construction Engineering Group Co ltd filed Critical Jiangsu Hongsheng Construction Engineering Group Co ltd
Priority to CN201921280349.XU priority Critical patent/CN210684996U/en
Application granted granted Critical
Publication of CN210684996U publication Critical patent/CN210684996U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses an assembled superimposed sheet board holds in palm belongs to the construction field, including the tripod, the upper end fluting of tripod has embedded down the magnetic path, and inside the opening in left side of tripod has the spout, and iron plate has been hugged closely to the up end of tripod, and the fixed welding of lower terminal surface of iron plate has the fixture block, and the fixed welding of lower extreme of fixture block has last magnetic path, and the lower terminal surface fastening of going up the magnetic path adsorbs down the magnetic path, and when prefabricated superimposed sheet thickness is different, the last butterfly nut of adjusting bolt adjusts, and it is fixed to turn round tight butterfly nut behind the longitudinal movement board support. The butt bolt fastening system is composed of cross rods and opposite pull screws at the bottoms of the tripods, screw holes are reserved on the cross rods at intervals of 200mm, PVC pipes of phi 250 are also reserved at corresponding positions of the beams or the walls, and the column support is fixed on the top surfaces of the frame columns through the screws of phi 22. The magnetic path and the upper magnetic strip are fastened and adsorbed by the upper magnetic block, so that the position of the iron plate can be fixed by the lower magnetic strip, and the design of the rubber block can prevent slurry leakage during floor slab pouring.

Description

Assembled superimposed sheet board holds in palm
Technical Field
The utility model relates to a construction field, more specifically say, relate to an assembled superimposed sheet board holds in palm.
Background
With the development of modern industrial technology, houses can be built by transporting prefabricated components to a construction site for assembly as in the case of machine production. On 14 days 11 and 2015, the Ministry of construction is called "the outline of the modernization development of building industry", and the proportion of the assembled buildings accounts for more than 20% of the newly-built buildings in 2020 and is more than 50% of the assembled buildings in 2025.
When the existing assembled type laminated slab plate support is installed, a steel pipe fastener type scaffold support needs to be erected, the height of the plate support is fixed, and when the thickness of the prefabricated assembled type laminated slab is different, adjustment cannot be carried out; meanwhile, the lap joint position of the laminated slab and the beam or the wall is easy to leak slurry when the floor slab is poured, so that the pouring quality problem is caused. Accordingly, there is a need for improvements in the art.
SUMMERY OF THE UTILITY MODEL
To the problem that exists among the prior art, the utility model aims to provide an assembled superimposed sheet board holds in palm, when prefabricated assembled superimposed sheet thickness is different, the butterfly nut on the adjusting bolt adjusts, and it is fixed to turn round tight butterfly nut behind the longitudinal movement board support. The butt bolt fastening system is composed of cross rods and opposite pull screws at the bottoms of the tripods, screw holes are reserved on the cross rods at intervals of 200mm, PVC pipes of phi 250 are also reserved at corresponding positions of the beams or the walls, and the column support is fixed on the top surfaces of the frame columns through the screws of phi 22. The magnetic path and the upper magnetic strip are fastened and adsorbed by the upper magnetic block, so that the position of the iron plate can be fixed by the lower magnetic strip, and the design of the rubber block can prevent slurry leakage during floor slab pouring.
In order to solve the above problems, the utility model adopts the following technical proposal.
An assembled laminated slab plate support comprises a tripod, wherein a lower magnetic block is embedded in an upper groove of the tripod, a sliding groove is formed in the left side of the tripod, an iron plate is tightly attached to the upper end face of the tripod, a clamping block is fixedly welded on the lower end face of the iron plate, an upper magnetic block is fixedly welded on the lower end face of the clamping block, a lower magnetic block is fixedly adsorbed on the lower end face of the upper magnetic block, a rubber block is fixedly connected to the left end face of the iron plate, an upper magnetic strip is fixedly connected to the lower end face of the rubber block, a lower magnetic strip is adsorbed on the lower end face of the upper magnetic strip, a lower magnetic strip is fixedly welded on the upper end of the left side of the tripod, a cross beam is tightly attached to the inner wall of the left side of the tripod, the cross beam tightly compresses the inner wall of the left side of the tripod through a bolt, and the butterfly nut is screwed tightly to fix after the plate support is moved longitudinally. The butt bolt fastening system is composed of cross rods and opposite pull screws at the bottoms of the tripods, screw holes are reserved on the cross rods at intervals of 200mm, PVC pipes of phi 250 are also reserved at corresponding positions of the beams or the walls, and the column support is fixed on the top surfaces of the frame columns through the screws of phi 22. The magnetic path and the upper magnetic strip are fastened and adsorbed by the upper magnetic block, so that the position of the iron plate can be fixed by the lower magnetic strip, and the design of the rubber block can prevent slurry leakage during floor slab pouring.
Further, the board holds in the palm constitutes the support system by 5 tripods, the inside joint of upper end fluting of tripod has the fixture block, and is different when prefabricated assembled superimposed sheet thickness, and the butterfly nut on the adjusting bolt adjusts, and it is fixed to turn round tight butterfly nut behind the longitudinal movement board support.
Furthermore, the triangular frame is formed by welding 20-20 square pipes, the deflection angles of the square pipes are basically 20 degrees, 70 degrees and 90 degrees, a butt bolt fastening system is composed of cross rods and opposite pulling screw rods at the bottom of the triangular frame, screw rod holes are reserved on the cross rods at intervals of 200mm, PVC pipes of phi 250 are reserved at corresponding positions of the beams or walls, and the column support is fixed on the top surface of the frame column through the screw rods of phi 22.
Furthermore, the inside slip of spout has cup jointed the bolt, the left end fixedly connected with room roof beam of bolt.
Furthermore, the outer side of the right end of the bolt is connected with a butterfly nut through threads, and the magnetic block is fastened and adsorbed by the upper magnetic block, and the position of the iron plate can be fixed by the magnetic strip under the fastening and adsorption of the upper magnetic strip.
Furthermore, the left side of block rubber is hugged closely has the right side upper end of room roof beam, the block rubber adopts polystyrene to make, and the design of block rubber can prevent to leak thick liquid when pouring the floor.
Compared with the prior art, the utility model has the advantages of:
(1) this scheme is different when prefabricated assembled superimposed sheet thickness, and the butterfly nut on the adjusting bolt is adjusted, and it is fixed to turn round tight butterfly nut behind the longitudinal movement board support. The butt bolt fastening system is composed of cross rods and opposite pull screws at the bottoms of the tripods, screw holes are reserved on the cross rods at intervals of 200mm, PVC pipes of phi 250 are also reserved at corresponding positions of the beams or the walls, and the column support is fixed on the top surfaces of the frame columns through the screws of phi 22. The magnetic path and the upper magnetic strip are fastened and adsorbed by the upper magnetic block, so that the position of the iron plate can be fixed by the lower magnetic strip, and the design of the rubber block can prevent slurry leakage during floor slab pouring.
(2) The board holds in the palm constitutes the support system by 5 tripods, and the inside joint of the upper end fluting of tripod has the fixture block, and when prefabricated assembled superimposed sheet thickness is different, the last butterfly nut of adjusting bolt adjusts, and it is fixed to turn round tight butterfly nut behind the longitudinal movement board support.
(3) The triangular frame is formed by welding 20-20 square pipes, the deflection angle of the square pipe is basically 20 degrees, 70 degrees and 90 degrees, a butt bolt fastening system is composed of cross rods and opposite pulling screw rods at the bottom of the triangular frame, screw rod holes are reserved on the cross rods according to 200mm intervals, PVC pipes of phi 250 are also reserved at corresponding positions of the beams or walls, and the column support is fixed on the top surface of the frame column through the screw rods of phi 22.
(4) The inside slip of spout has cup jointed the bolt, and the left end fixedly connected with room beam of bolt, the right-hand member outside of bolt have a butterfly nut through threaded connection, and magnetic path and last magnetic stripe fastening adsorb the position that magnetic stripe can fixed iron plate down through last magnetic path fastening.
(5) The left side of the rubber block is tightly attached to the upper end of the right side of the house beam, the rubber block is made of polystyrene, and slurry leakage during floor slab pouring can be prevented through the design of the rubber block.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a cross-sectional view of the overall structure of the present invention;
fig. 3 is an enlarged view of the position a of the present invention.
The reference numbers in the figures illustrate:
the device comprises a tripod 1, a lower magnetic block 11, a sliding chute 2, an iron plate 3, a clamping block 31, an upper magnetic block 32, a rubber layer 33, an upper magnetic strip 34, a lower magnetic strip 35, a cross beam 4, a bolt 5 and a room beam 6.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-3, an assembled laminated slab support comprises a tripod 1 and referring to fig. 1-3, a lower magnetic block 11 is embedded in a groove formed in the upper end of the tripod 1, a sliding groove 2 is formed in the left side of the tripod 1, an iron plate 3 is tightly attached to the upper end surface of the tripod 1, a clamping block 31 is fixedly welded on the lower end surface of the iron plate 3, an upper magnetic block 32 is fixedly welded on the lower end surface of the clamping block 31, a lower magnetic block 11 is fixedly adsorbed on the lower end surface of the upper magnetic block 32, a rubber block 33 is fixedly connected to the left side of the iron plate 3, an upper magnetic strip 34 is fixedly connected to the lower end surface of the rubber block 33, a lower magnetic strip 35 is adsorbed on the lower end surface of the upper magnetic strip 34, a lower magnetic strip 35 is fixedly welded on the upper end of the left side of the tripod 1, a cross beam 4 is tightly attached to the inner wall.
Referring to fig. 1-2, the plate support is a support system composed of 5 triangular supports, a clamping block 31 is clamped in a groove at the upper end of the triangular support 1, when the thickness of the prefabricated composite slab is different, a butterfly nut on an adjusting bolt 5 is adjusted, the plate support is longitudinally moved and then is fastened by screwing the butterfly nut for fixing, the triangular support 1 is formed by welding 20 × 20 square tubes, the deflection angle of the square tubes is basically 20 °, 70 ° and 90 °, a butt bolt fastening system is composed of a cross rod and a counter screw at the bottom of the triangular support, screw holes are reserved on the cross rod at intervals of 200mm, a pvc tube of phi 250 is also reserved at the corresponding position of a beam or a wall, and the column support is fixed on the top surface of a frame column through a screw of phi 22.
Referring to fig. 1-3, a bolt 5 is sleeved in the sliding groove 2 in a sliding manner, a room beam 6 is fixedly connected to the left end of the bolt 5, a butterfly nut is connected to the outer side of the right end of the bolt 5 through threads, a lower magnetic block 11 is fastened and adsorbed by an upper magnetic block 32, a lower magnetic strip 35 is fastened and adsorbed by an upper magnetic strip 34, the position of an iron plate 3 can be fixed, the upper end of the right side of the room beam 6 is tightly attached to the left side of a rubber block 33, the rubber block 33 is made of polystyrene, and the rubber block 33 is designed to prevent slurry leakage during floor.
When using assembled superimposed sheet board to hold in the palm, insert fixture block 31 in 1 up end fluting of tripod, go up magnetic block 32 fastening and adsorb magnetic block down for magnetic bar 35 under going up magnetic block 34 fastening and adsorbing, magnetic block 11 and last magnetic block 34 fastening adsorb magnetic block 35 can fix iron plate 3's position down through going up magnetic block 32 fastening and adsorbing, and the design of block rubber 33 can prevent to leak thick liquid when pouring the floor. When the thickness of the prefabricated composite slab is different, the butterfly nuts on the adjusting bolts 5 are adjusted, and the butterfly nuts are screwed tightly after the slab supports are moved longitudinally and fixed, so that the installation can be completed.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (6)

1. The utility model provides an assembled superimposed sheet board holds in palm, includes tripod (1), its characterized in that: the upper end of the tripod (1) is grooved and internally embedded with a lower magnetic block (11), a chute (2) is arranged inside the left side of the tripod (1), an iron plate (3) is tightly attached to the upper end face of the tripod (1), a clamping block (31) is fixedly welded to the lower end face of the iron plate (3), an upper magnetic block (32) is fixedly welded to the lower end face of the clamping block (31), the lower magnetic block (11) is fixedly adsorbed to the lower end face of the upper magnetic block (32), a rubber block (33) is fixedly connected to the left end face of the iron plate (3), an upper magnetic strip (34) is fixedly connected to the lower end face of the rubber block (33), a lower magnetic strip (35) is adsorbed to the lower end face of the upper magnetic strip (34), a lower magnetic strip (35) is fixedly welded to the upper end of the left side of the tripod (1), a cross beam (4) is tightly attached to the inner wall of the left side of the tripod (1, the left side of the tripod (1) is tightly attached with a beam (6).
2. A fabricated composite board pallet according to claim 1, wherein: the plate support comprises 5 tripods to form a support system, and a clamping block (31) is clamped in the groove formed in the upper end of the tripod (1).
3. A fabricated composite board pallet according to claim 1, wherein: the tripod (1) is formed by welding 20-by-20 square pipes, and the deflection angles of the square pipes are basically 20 degrees, 70 degrees and 90 degrees.
4. A fabricated composite board pallet according to claim 1, wherein: the inside slip of spout (2) has cup jointed bolt (5), the left end fixedly connected with room roof beam (6) of bolt (5).
5. A fabricated composite board pallet according to claim 1, wherein: and the outer side of the right end of the bolt (5) is connected with a butterfly nut through threads.
6. A fabricated composite board pallet according to claim 1, wherein: the left side of block rubber (33) is hugged closely has the right side upper end of roof beam (6), block rubber (33) adopt polystyrene to make.
CN201921280349.XU 2019-08-08 2019-08-08 Assembled superimposed sheet board holds in palm Expired - Fee Related CN210684996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921280349.XU CN210684996U (en) 2019-08-08 2019-08-08 Assembled superimposed sheet board holds in palm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921280349.XU CN210684996U (en) 2019-08-08 2019-08-08 Assembled superimposed sheet board holds in palm

Publications (1)

Publication Number Publication Date
CN210684996U true CN210684996U (en) 2020-06-05

Family

ID=70885491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921280349.XU Expired - Fee Related CN210684996U (en) 2019-08-08 2019-08-08 Assembled superimposed sheet board holds in palm

Country Status (1)

Country Link
CN (1) CN210684996U (en)

Similar Documents

Publication Publication Date Title
WO2015043310A1 (en) Floorslab system
CN211899145U (en) Open type ceramic plate curtain wall with internal water resistance and three-dimensional adjustment
CN110565806A (en) z-shaped bearing beam and beam column composite structure and fire prevention method thereof
CN111287366A (en) Assembly process of sleeve type stone curtain wall without vertical keels
CN210684996U (en) Assembled superimposed sheet board holds in palm
CN211666180U (en) Passive ultralow energy consumption window installation is with supplementary fixing device
CN210316009U (en) Adjustable rotary type bearing node structure for connecting precast concrete external wall panel and steel beam
CN114737706B (en) Large-area curtain wall keel structure and installation method thereof
CN202731296U (en) Deformation joint prefabricated formwork and installation structure thereof
CN214034226U (en) Encapsulation structure of steel structure house outer wall girder steel
CN214833994U (en) Composite external wall panel for hiding steel frame beam column
CN209799375U (en) Wear floor drain built-in fitting fixing device
CN210978735U (en) Pipeline installation adjusting device for construction
CN210177807U (en) Corner constructional column reinforcing device
CN208063099U (en) The adjustable flat uniaxial photovoltaic bracket column of one kind
CN207776276U (en) Standing-seam roofing adapting system
CN105089291B (en) For installing the reinforcing steel structural roof of solar panel
CN216788909U (en) Fixing piece and support hanger
CN214615016U (en) Prefabricated wall's assembled water supply pipe structure
CN207960328U (en) A kind of keel luffer boards float window
CN212455778U (en) double-T-plate combined support hanger
CN213626077U (en) Steel structure building construction member
CN211193656U (en) Steel construction building positioner based on BIM
CN215635704U (en) Anti-seismic support connecting mechanism for air pipe
CN216894002U (en) Pre-buried formula window frame mounting and window frame structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200605

Termination date: 20210808