CN210684854U - Improved water intake device for river channel of concentrating mill - Google Patents
Improved water intake device for river channel of concentrating mill Download PDFInfo
- Publication number
- CN210684854U CN210684854U CN201921467318.5U CN201921467318U CN210684854U CN 210684854 U CN210684854 U CN 210684854U CN 201921467318 U CN201921467318 U CN 201921467318U CN 210684854 U CN210684854 U CN 210684854U
- Authority
- CN
- China
- Prior art keywords
- water
- fine sand
- meters
- river course
- seepage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a modified ore dressing plant river course water intaking device, including main river course, the catch basin, a water pump, set up the infiltration hole between main river course and catch basin, infiltration hole upper portion is linked together through diversion open channel and main river course perpendicularly, mixed stone bed and fine sand layer are being laid by from top to bottom in proper order in the infiltration hole, the reinforced concrete infiltration pipe of 5 phi 500mm x 6000mm is buried underground in the fine sand layer lower part, the infiltration pipe centre-to-centre spacing is 2 meters, wherein the fine sand layer comprises the fine sand that thickness is 1.5 meters, the granularity is 1-3mm, mixed stone bed is 1.5 meters by thickness, the granularity is 5-60 mm's stone component, the infiltration pipe other end is linked together with the catch basin, the water pump is installed on the outlet pipe of catch basin lower part. The utility model discloses it is rational in infrastructure, can ensure that river course water intaking can satisfy the ore dressing plant and use.
Description
Technical Field
The utility model relates to a modified ore dressing plant river course water intaking device.
Background
Because the river course water intake has the advantages of stable water quantity, small investment, low water supply cost and the like, the mine enterprises, especially the mine concentrating mills, can take water in nearby river courses for wide production of enterprises. However, in the Xinjiang area, the river turbidity is obviously influenced by seasons and weather changes, most of river turbidity is rapidly increased in spring beginning and rainfall seasons, high-turbidity river water taken by a river water taking device consisting of a submersible pump and a water pump can seriously influence the production of a concentrating mill during the period, mainly blocks a water supply pipeline, a water channel valve, a spray nozzle on water using equipment and the like, the production process of the concentrating mill is rapidly deteriorated under the influence of bad water quality, the quality of a produced product is obviously reduced, and the whole line of the concentrating mill is stopped in serious cases.
Disclosure of Invention
An object of the utility model is to provide a modified ore dressing plant river course water intaking device can ensure that river course water intaking can satisfy ore dressing plant use in production.
The purpose of the utility model is realized like this: an improved water intake device for a river channel of a concentrating mill comprises a main river channel, a water collecting tank and a water pump, wherein a water seepage pit is arranged between the main river channel and the water collecting tank, the upper part of the water seepage pit is vertically communicated with the main river channel through a water diversion open channel, a mixed stone layer and a fine sand layer are sequentially laid from top to bottom in the water seepage pit, 5 reinforced concrete seepage pipes with the diameter of 500mm multiplied by 6000mm are buried in the lower part of the fine sand layer, the center distance of the seepage pipes is 2 meters, the fine sand layer is formed by fine sand with the thickness of 1.5 meters and the granularity of 1-3mm, the mixed stone layer is formed by stones with the thickness of 1.5 meters and the granularity of 5-60mm, the other end of the seepage pipes is communicated with the water collecting tank, and the water pump is arranged on a water outlet pipe at the.
5 reinforced concrete infiltration pipes with the depth of phi 500mm multiplied by 6000mm are buried in the vertical direction of the river channel and dug at the position 5 m away from the edge of the river channel, and the center distance of the infiltration pipes is 2 m. Fine sand with the thickness of 1.5 m and the granularity of 1-3mm is paved on the infiltration pipe, and mixed stone with the thickness of 1.5 m and the granularity of 5-60mm is paved on the upper part of the fine sand. And excavating an open channel to introduce part of river water to the upper part of the buried infiltration pipe area to pass through. A rectangular cement water collecting tank with the length of 12 meters, the width of 6 meters and the depth of 5 meters is built at a water outlet of the seepage pipe, and a submersible pump is arranged in the water collecting tank. Through detection, the water quality of the river water taken by the improved device is obviously improved, particularly in the flood season, the taken river water still keeps clear, the content of suspended matters is not more than 20 mg/L, and the requirement of the production of a concentrating mill on the water quality is completely met.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Figure 1 is the river course water intaking device after the improvement.
Detailed Description
An improved water intake device for a river channel of a concentrating mill comprises a main river channel 1, a water collecting tank 3 and a water pump 5, wherein a water seepage pit 10 is arranged between the main river channel 1 and the water collecting tank 3, the upper part of the water seepage pit 10 is vertically communicated with the main river channel 1 through a water diversion open channel 2, a mixed stone layer 9 and a fine sand layer 8 are sequentially laid in the water seepage pit 10 from top to bottom, 5 reinforced concrete seepage pipes 6 with the diameter of 500mm multiplied by 6000mm are buried in the lower part 7 of the fine sand layer 8, the center distance of the seepage pipes 6 is 2 meters, the fine sand layer 8 is composed of fine sand with the thickness of 1.5 meters and the granularity of 1-3mm, the mixed stone layer 9 is composed of stones with the thickness of 1.5 meters and the granularity of 5-60mm, the other end of each seepage pipe 6 is communicated with the water collecting tank 3, and the water pump 5 is arranged on a water outlet pipe 4 at the lower part of the water.
Claims (1)
1. The utility model provides a modified ore dressing plant river course water intaking device, includes main river course, catch basin, water pump, characterized by: a water seepage pit is arranged between a main river channel and a water collecting tank, the upper part of the water seepage pit is vertically communicated with the main river channel through a water diversion open channel, a mixed stone layer and a fine sand layer are sequentially paved in the water seepage pit from top to bottom, 5 reinforced concrete seepage pipes with the diameter of 500mm multiplied by 6000mm are buried in the lower part of the fine sand layer, the center distance of the seepage pipes is 2 meters, the fine sand layer is composed of fine sand with the thickness of 1.5 meters and the granularity of 1-3mm, the mixed stone layer is composed of stones with the thickness of 1.5 meters and the granularity of 5-60mm, the other end of the seepage pipe is communicated with the water collecting tank, and a water pump is installed on a water outlet pipe at the lower part of the water collecting tank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921467318.5U CN210684854U (en) | 2019-09-05 | 2019-09-05 | Improved water intake device for river channel of concentrating mill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921467318.5U CN210684854U (en) | 2019-09-05 | 2019-09-05 | Improved water intake device for river channel of concentrating mill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210684854U true CN210684854U (en) | 2020-06-05 |
Family
ID=70898782
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921467318.5U Active CN210684854U (en) | 2019-09-05 | 2019-09-05 | Improved water intake device for river channel of concentrating mill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210684854U (en) |
-
2019
- 2019-09-05 CN CN201921467318.5U patent/CN210684854U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100412275C (en) | Waterproof and plugging construction method for precipitation well in foundation pit | |
CN203213095U (en) | Underground water supply and drainage building anti-floating structure | |
CN104174191A (en) | Integral grit chamber for treating rainwater and treating method | |
CN104358302A (en) | Treatment method for initial rainwater of separate system | |
CN203701255U (en) | Device for collecting rainwater on road to supplement underground water | |
CN203684373U (en) | Equipment for improving urban waterlogging prevention standard and controlling water pollution | |
CN111364469B (en) | Underwater concrete pouring device, construction method and application of underwater concrete pouring device in ultra-large deepwater open caisson foundation | |
CN210684854U (en) | Improved water intake device for river channel of concentrating mill | |
CN203989972U (en) | A kind of integrated setting pot of processing rainwater | |
CN105133549A (en) | Triangular measurement weir | |
CN103485387B (en) | Canal-irrigation-area pipe water delivery irrigation system | |
CN110777829A (en) | Method for treating fixed-point water burst on substrate | |
CN110206062A (en) | The dark construction method of underground river shallow embedding is worn under a kind of Urban Underground pipe gallery | |
CN104088352A (en) | Ground rainwater comprehensive utilization structure | |
CN205399343U (en) | Reinforcement type waterproof and anti -seepage bank protection | |
CN205637044U (en) | Precast concrete assembled part of lower open gate | |
CN204543668U (en) | One under water gas rushes soil discharging facility | |
CN108374468B (en) | Method for blocking damage of old flood drainage system of tailing pond | |
CN204940483U (en) | Drainage type rainwater inspection well | |
CN206600524U (en) | A kind of modularization assembling steel backrest | |
CN208105440U (en) | Separate type rain sewage conduct drainage inspection well | |
CN205062993U (en) | Prevent sewage inspection shaft that road surface sinks | |
CN204825633U (en) | Structure that precast beam bay formula overpass expansion joint percolating water was dredged in an organized way | |
CN219059631U (en) | Concrete grass planting brick | |
CN102995644B (en) | What Whirlwind tank connect rock section goes along with sb. to guard him enclosed construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |