CN210674605U - Dust device for construction site - Google Patents

Dust device for construction site Download PDF

Info

Publication number
CN210674605U
CN210674605U CN201920987113.3U CN201920987113U CN210674605U CN 210674605 U CN210674605 U CN 210674605U CN 201920987113 U CN201920987113 U CN 201920987113U CN 210674605 U CN210674605 U CN 210674605U
Authority
CN
China
Prior art keywords
water tank
fixedly connected
water
wall
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920987113.3U
Other languages
Chinese (zh)
Inventor
周泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Xingyuan Engineering Co ltd
Original Assignee
Shenzhen Xingyuan Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Xingyuan Engineering Co ltd filed Critical Shenzhen Xingyuan Engineering Co ltd
Priority to CN201920987113.3U priority Critical patent/CN210674605U/en
Application granted granted Critical
Publication of CN210674605U publication Critical patent/CN210674605U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Nozzles (AREA)

Abstract

The utility model provides a dust device for building construction site relates to building dust fall technical field. This dust device for building construction site, including the diaphragm, the lower fixed surface of diaphragm installs moving mechanism, and the upper surface of diaphragm from left to right in proper order fixed mounting has the upper surface of first water tank, second water tank and box, first water tank to seted up the water inlet. This dust device for building construction site, through setting up the motor, can make the rotation axis rotate, thereby can the U type pole rotate, thereby can make the push rod reciprocate on a left side, thereby can make the push pedal do and reciprocate, through setting up the sealing washer, thereby when the push pedal lapse, can inhale the second water tank to the water in the first water tank, when the push pedal rebound, can push into the water in the second water tank in the second outlet pipe then reach the shower nozzle through communicating pipe, anticipate the building site sky through the shower nozzle, the realization is clear away the dust of the sky.

Description

Dust device for construction site
Technical Field
The utility model relates to a building dust fall technical field specifically is a dust device for building construction site.
Background
Along with the rapid development of the urbanization process, the city range is gradually enlarged, which means that more buildings, cells and other facilities are waiting for construction, and along with the acceleration of the urbanization process, people are gradually aware of the gradual pollution of the environment, the quality of the atmosphere becomes poor, so that people pay more and more attention to the environmental protection and the environmental construction, and the environmental protection problem is more and more paid more attention.
However, the dust is treated in the building construction, most of the dust is sprinkled regularly by a sprinkler, the efficiency of the measure is very low, the utilization rate of water is also low due to the fact that the dust cannot be sprinkled evenly, and great waste is caused and the dust removal effect is not obvious.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a dust device for building construction site has solved the problem mentioned in the above background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a dust device for building construction site, includes the diaphragm, the lower fixed surface of diaphragm installs moving mechanism, the upper surface of diaphragm from left to right in proper order fixed mounting have first water tank, second water tank and box the water inlet has been seted up to the upper surface of first water tank.
The water inlet device is characterized in that a first water outlet pipe is inserted into the upper surface of the first water tank at the left side of the water inlet, a first valve mechanism fixedly connected with one end of the first water tank is far away from the first water outlet pipe, a water inlet pipe fixedly connected with one end of the first valve mechanism is far away from the first valve mechanism is arranged on the first water outlet pipe, one end of the water inlet pipe far away from the first valve mechanism is communicated with a second water tank, a second water outlet pipe is inserted into the upper surface of the second water tank at the right side of the water inlet pipe, a second valve mechanism fixedly connected with one end of the second water tank is far away from the second water outlet pipe, a communicating pipe is fixedly connected with one end of the second valve mechanism, and a.
The upper surface fixed connection of box has the bracing piece, the upper surface of bracing piece and the outer wall fixed connection of communicating pipe, the inner wall fixed mounting on box right side has the motor, the output shaft fixedly connected with transmission shaft of motor, the transmission shaft runs through box to the inside one end fixedly connected with U type pole of second water tank, the sleeve has been cup jointed to the middle-end of U type pole, telescopic surface fixed connection has the push rod, telescopic one end has been cup jointed the fixed column to the push rod is kept away from, the spliced pole has been cup jointed at the both ends of fixed column, the upper surface fixed connection push pedal of spliced pole, the side fixed mounting of push pedal has the sealing washer. And the sealing ring is connected with the side wall of the second water tank in a sliding manner.
Preferably, the second valve mechanism includes valve wall, column spinner, baffle and fixed block, and the left surface and the valve wall fixed connection of fixed block, and the one end and the baffle that the valve wall was kept away from to the fixed block pass through the column spinner and rotate to be connected, and the right side wall of fixed block and the left side wall contact of baffle but not be connected, and the left side wall of baffle and the contact of valve wall but not be connected.
Preferably, the first water outlet pipe penetrates through the upper wall of the first water tank to the inner bottom wall of the first water tank, but is not in contact with the inner bottom wall of the first water tank.
Preferably, the bearing is embedded in the position, located on the U-shaped rod, of the second water tank, and the bearing is sleeved on the outer surface of the U-shaped rod.
Preferably, the position of the box body on the transmission shaft is inlaid with a sealing gasket, and the sealing gasket is sleeved on the outer surface of the transmission shaft.
Preferably, the up-and-down movement distance of the push plate is equal to the up-and-down movement distance of the push rod and equal to the diameter of the motion track of the U-shaped rod.
(I) advantageous effects
The utility model provides a dust device for construction site. The method has the following beneficial effects:
1. this dust device for building construction site, through setting up the motor, can make the rotation axis rotate, thereby can the U type pole rotate, thereby can make the push rod reciprocate on a left side, thereby can make the push pedal do and reciprocate, through setting up the sealing washer, thereby when the push pedal lapse, can inhale the second water tank to the water in the first water tank, when the push pedal rebound, can push into the water in the second water tank in the second outlet pipe then reach the shower nozzle through communicating pipe, anticipate the building site sky through the shower nozzle, the realization is clear away the dust of the sky.
2. This dust device for building construction site through setting up first valve mechanism, can prevent that the push pedal from making water release the second water tank at the in-process that rises, and water gets back to first water tank once more, through setting up the sealing washer, can prevent that rivers in the second water tank from to the U type pole on to reach water and spout away through the shower nozzle, through setting up the box, can effectually protect the motor, prevent that the motor from touchhing water and life-span is shortened.
Drawings
FIG. 1 is a schematic front cross-sectional view of the present invention;
FIG. 2 is an enlarged schematic view of A in FIG. 1 according to the present invention;
FIG. 3 is an enlarged schematic view of B in FIG. 1 according to the present invention;
fig. 4 is an enlarged schematic view of C in fig. 1 according to the present invention.
The water pump comprises a transverse plate 1, a moving mechanism 2, a first water tank 3, a second water tank 4, a box body 5, a water inlet 6, a first water outlet pipe 7, a motor 8, a supporting rod 9, a push plate 10, a sealing ring 11, a push rod 12, a transmission shaft 13, a U-shaped rod 14, a communicating pipe 15, a high-pressure spray head 16, a second water outlet pipe 17, a water inlet pipe 18, a first valve mechanism 19, a sleeve 20, a connecting column 21, a fixing column 22, a second valve mechanism 23, a valve wall 231, a rotating column 232, a baffle 233 and a fixing block 234.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a dust-settling device for building construction sites, as shown in figures 1-4, comprising a transverse plate 1, a moving mechanism 2 is fixedly arranged on the lower surface of the transverse plate 1, a first water tank 3, a second water tank 4 and a box body 5 are fixedly arranged on the upper surface of the transverse plate 1 from left to right, a water inlet 6 is arranged on the upper surface of the first water tank 3, which belongs to the prior art, a first water outlet pipe 7 is inserted into the upper surface of the first water tank 3 at the left side of the water inlet 6, a second water outlet pipe 17 is arranged, water in the first water tank 3 can flow into the second water tank 4, a first valve mechanism 19 is fixedly connected at one end of the first water outlet pipe 7 far away from the first water tank 3, a first valve mechanism 19 is arranged, water in the second water tank 4 can be prevented from flowing into the first water tank 3, a water inlet pipe 18 is fixedly connected at one end of the first valve, the water flows into the second water tank 4 from the first water tank 3, one end of the water inlet pipe 18 far away from the first valve mechanism 19 is communicated with the second water tank 4, the upper surface of the second water tank 4 on the right side of the water inlet pipe 18 is spliced with a second water outlet pipe 17, one end of the second water outlet pipe 17 far away from the second water tank 4 is fixedly connected with a second valve mechanism 23, the second valve mechanism 23 is arranged to prevent water from flowing backwards, one end of the second valve mechanism 23 far away from the second water outlet pipe 17 is fixedly connected with a communicating pipe 15, one end of the communicating pipe 15 far away from the second valve mechanism 23 is fixedly connected with a high-pressure nozzle 16, the communicating pipe 15 is arranged to enable the water to flow to the high-pressure nozzle 16 from the second water tank 4, then the high-pressure nozzle 16 sprays the water into the air, the upper surface of the box body 5 is fixedly connected with a support rod 9, the upper surface, the high-pressure spray head 16 can be supported, the inner wall on the right side of the box body 5 is fixedly provided with the motor 8, the output shaft end of the motor 8 is fixedly connected with the transmission shaft 13, one end of the transmission shaft 13 penetrating through the box body 5 to the inside of the second water tank 4 is fixedly connected with the U-shaped rod 14, the transmission shaft 13 is arranged and can drive the U-shaped rod 14 to rotate, the middle end of the U-shaped rod 14 is sleeved with the sleeve 20, the outer surface of the sleeve 20 is fixedly connected with the push rod 12, one end of the push rod 12 far away from the sleeve 20 is sleeved with the fixed column 22, two ends of the fixed column 22 are sleeved with the connecting column 21, the upper surface of the connecting column 21 is fixedly connected with the push plate 10, the push plate 10 is arranged and can move up and down under the action of the push rod 12, the side surface of the push plate 10 is, the second valve mechanism 23 includes a valve wall 231, a rotary column 232, a baffle plate 233 and a fixed block 234, the left side of the fixed block 234 is fixedly connected with the valve wall 231, one end of the fixed block 234 far away from the valve wall 231 is rotatably connected with the baffle plate 233 through the rotary column 232, the right side wall of the fixed block 234 is in contact with but not connected with the left side wall of the baffle plate 233, and the left side wall of the baffle plate 233 is in contact with but not connected with the valve wall 231, so that air can be effectively prevented from being sucked into the second water tank 4 when the push plate 10 moves downwards, and water in the first water tank 3 cannot be sucked, the first water outlet pipe 7 penetrates through the upper wall of the first water tank 3 to the inner bottom wall of the first water tank 3 but is not in contact with the inner bottom wall of the first water tank 3, water in the first water tank 3 can be washed cleanly, a bearing is embedded in the position of the U-shaped rod 14 of the second water tank 4, and is sleeved on the, make U type pole 14 rotate more conveniently, the position that box 5 is located transmission shaft 13 is inlayed and is had sealed the pad, and sealed pad cup joints on the surface of transmission shaft 13, can prevent that water from getting into in the box 5 and causing the destruction to motor 8, and the distance that push pedal 10 reciprocated equals the distance that push rod 12 reciprocated, and equals the diameter of U type pole 14 movement track, the moving range of push pedal 10.
The working principle is as follows: when dust device for building construction site begins work, motor 8 is opened, drive transmission shaft 13 and rotate, then transmission shaft 13 can drive U type pole 14 and rotate, U type pole 14 can drive push rod 12 and reciprocate under the effect of sleeve 20, and push rod 12 can drive push pedal 10 and do and reciprocate under the effect of spliced pole 21, when push pedal 10 moves down and makes, can be to the water in first water tank 3 through first outlet pipe 7, first valve mechanism 19 and inlet tube 18 inhale in the second water tank 4, when push pedal 10 moves up, can make the water in the second water tank 4 flow to high pressure nozzle 16 department through second delivery port 17, second valve mechanism 23 and communicating pipe 15, spout the air by high pressure nozzle 16, play the effect of dust fall.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a dust device for building construction site, includes diaphragm (1), its characterized in that: the lower surface of the transverse plate (1) is fixedly provided with a moving mechanism (2), the upper surface of the transverse plate (1) is sequentially and fixedly provided with a first water tank (3), a second water tank (4) and a box body (5) from left to right, and the upper surface of the first water tank (3) is provided with a water inlet (6);
a first water outlet pipe (7) is inserted in the upper surface of the first water tank (3) at the left side of the water inlet (6), one end of the first water outlet pipe (7) far away from the first water tank (3) is fixedly connected with a first valve mechanism (19), one end of the first valve mechanism (19) far away from the first water outlet pipe (7) is fixedly connected with a water inlet pipe (18), one end of the water inlet pipe (18) far away from the first valve mechanism (19) is communicated with the second water tank (4), the upper surface of the second water tank (4) on the right side of the water inlet pipe (18) is inserted with a second water outlet pipe (17), one end of the second water outlet pipe (17) far away from the second water tank (4) is fixedly connected with a second valve mechanism (23), one end of the second valve mechanism (23) far away from the second water outlet pipe (17) is fixedly connected with a communicating pipe (15), one end of the communicating pipe (15) far away from the second valve mechanism (23) is fixedly connected with a high-pressure nozzle (16);
the upper surface of the box body (5) is fixedly connected with a supporting rod (9), the upper surface of the supporting rod (9) is fixedly connected with the outer wall of a communicating pipe (15), the inner wall on the right side of the box body (5) is fixedly provided with a motor (8), the output shaft end of the motor (8) is fixedly connected with a transmission shaft (13), one end of the transmission shaft (13) penetrating through the box body (5) to the inside of the second water tank (4) is fixedly connected with a U-shaped rod (14), the middle end of the U-shaped rod (14) is sleeved with a sleeve (20), the outer surface of the sleeve (20) is fixedly connected with a push rod (12), one end of the push rod (12) far away from the sleeve (20) is sleeved with a fixing column (22), two ends of the fixing column (22) are sleeved with connecting columns (21), the upper surface of the connecting column (21) is fixedly connected with a, and the sealing ring (11) is in sliding connection with the side wall of the second water tank (4).
2. The dust falling device for the building construction site according to claim 1, characterized in that: the second valve mechanism (23) comprises a valve wall (231), a rotary column (232), a baffle (233) and a fixing block (234), the left side face of the fixing block (234) is fixedly connected with the valve wall (231), one end, far away from the valve wall (231), of the fixing block (234) is rotatably connected with the baffle (233) through the rotary column (232), the right side wall of the fixing block (234) is in contact with the left side wall of the baffle (233) but not connected with the left side wall of the baffle (233), and the left side wall of the baffle (233) is in contact with the valve wall (231) but not connected with the left side wall of the baffle (233).
3. The dust falling device for the building construction site according to claim 1, characterized in that: the first water outlet pipe (7) penetrates through the upper wall of the first water tank (3) to the inner bottom wall of the first water tank (3), but is not in contact with the inner bottom wall of the first water tank (3).
4. The dust falling device for the building construction site according to claim 1, characterized in that: the bearing is embedded in the position, located on the U-shaped rod (14), of the second water tank (4), and the bearing is sleeved on the outer surface of the U-shaped rod (14).
5. The dust falling device for the building construction site according to claim 1, characterized in that: the position that box (5) are located transmission shaft (13) is inlayed and is had sealed the pad, and sealed pad cup joints on the surface of transmission shaft (13).
6. The dust falling device for the building construction site according to claim 1, characterized in that: the up-and-down movement distance of the push plate (10) is equal to the up-and-down movement distance of the push rod (12) and the diameter of the motion trail of the U-shaped rod (14).
CN201920987113.3U 2019-06-25 2019-06-25 Dust device for construction site Expired - Fee Related CN210674605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920987113.3U CN210674605U (en) 2019-06-25 2019-06-25 Dust device for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920987113.3U CN210674605U (en) 2019-06-25 2019-06-25 Dust device for construction site

Publications (1)

Publication Number Publication Date
CN210674605U true CN210674605U (en) 2020-06-05

Family

ID=70890176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920987113.3U Expired - Fee Related CN210674605U (en) 2019-06-25 2019-06-25 Dust device for construction site

Country Status (1)

Country Link
CN (1) CN210674605U (en)

Similar Documents

Publication Publication Date Title
CN207646675U (en) A kind of multidirectional watering dust collecting device in construction site
CN210874309U (en) Wastewater treatment device for lithium battery production
CN215388422U (en) Dust spraying and dust falling device for municipal construction
CN210674605U (en) Dust device for construction site
CN211011832U (en) Ventilation pipe convenient to clearance
CN211411431U (en) Fog gun machine
CN210474856U (en) Ventilation pipe convenient to clearance
CN205242500U (en) System of recycling that handles is collected to rainwater
CN112495954A (en) Towed pipeline self-cleaning device
CN209722672U (en) A kind of highway maintenance cementation of fissures device
CN207612829U (en) A kind of agricultural water-saving irrigation device
CN210613200U (en) Watering dust collector for building engineering
CN206910886U (en) A kind of second pond with accurate addition medicament function inhales mud scraper
CN210869152U (en) Novel irrigation device
CN111972295A (en) Water sprayer capable of saving water resource for cultivation
CN207411074U (en) A kind of agricultural water conservancy irrigation rig
CN205727389U (en) A kind of rail mounted for large area farmland automatically moves sprinkling irrigation equipment
CN111973050A (en) Household magnetic suction type double-sided glass cleaner
CN111887130A (en) Automatic irrigation equipment of irrigation and water conservancy
CN217601383U (en) Water supply system for community landscape
CN219527923U (en) Feeding device of sewer oil removal agent
CN219808470U (en) Integrated pump station with self-cleaning function
CN211340629U (en) Spray dust removal device is used in road bridge construction
CN213287789U (en) Hydraulic engineering sluice belt cleaning device
CN219205474U (en) Urban afforestation spraying equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200605

Termination date: 20210625