CN210659213U - Scaffold fastener capable of being assembled quickly during high-altitude operation - Google Patents

Scaffold fastener capable of being assembled quickly during high-altitude operation Download PDF

Info

Publication number
CN210659213U
CN210659213U CN201920664945.1U CN201920664945U CN210659213U CN 210659213 U CN210659213 U CN 210659213U CN 201920664945 U CN201920664945 U CN 201920664945U CN 210659213 U CN210659213 U CN 210659213U
Authority
CN
China
Prior art keywords
cardboard
clamping plate
during high
buckle
scaffold fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920664945.1U
Other languages
Chinese (zh)
Inventor
杨养贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honglihao Mold Base Tianjin Co Ltd
Original Assignee
Honglihao Mold Base Tianjin Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honglihao Mold Base Tianjin Co Ltd filed Critical Honglihao Mold Base Tianjin Co Ltd
Priority to CN201920664945.1U priority Critical patent/CN210659213U/en
Application granted granted Critical
Publication of CN210659213U publication Critical patent/CN210659213U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a scaffold fastener of fast assembly during high altitude construction, including first cardboard and second cardboard, the one end of first cardboard is rotated and is connected with the second cardboard, and the bottom of second cardboard is provided with third cardboard and fourth cardboard to rotate between third cardboard and the fourth cardboard and connect, the bottom intermediate position department of second cardboard rotates through pivot and third cardboard and is connected. The utility model discloses in, through rotating first cardboard around round pin axle to second cardboard one side, the top of buckle is worn out from the top of U-shaped groove, under the effect of torsional spring pivot, two buckles rotate to relative one side, and the bottom recess of buckle carries out the position restriction to first cardboard, prevents that it from upwards overturning, under the instrument such as not using the spanner carries out the auxiliary condition, realizes promoting work efficiency to the convenient quick installation of fastener.

Description

Scaffold fastener capable of being assembled quickly during high-altitude operation
Technical Field
The utility model relates to a building engineering technical field especially relates to a scaffold frame fastener of fast assembly during high altitude construction.
Background
The fastener generally refers to the intermediate junction part of connecting two components, is used for the fixed of the steel pipe scaffold that the external diameter is 48mm in building engineering mostly, and the fastener divide into right angle fastener (cross fastener and directional fastener), rotatory fastener (activity fastener and universal fastener), butt joint fastener (a word fastener and direct fastener) etc..
However, the existing scaffold fastener still has defects in the using process; the existing scaffold fastener is connected in a bolt fixed connection mode, so that the scaffold fastener is inconvenient to install and remove, the working efficiency is reduced, and the existing fastener occupies a large space and is inconvenient to transport.
Disclosure of Invention
The utility model aims to provide a: in order to solve the problems that the existing fastener is inconvenient to install and remove and inconvenient to transport, the scaffold fastener is quickly assembled during high-altitude operation.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a scaffold fastener of fast assembly during high altitude construction, includes first cardboard and second cardboard, the one end of first cardboard is rotated and is connected with the second cardboard, and the bottom of second cardboard is provided with third cardboard and fourth cardboard to rotate between third cardboard and the fourth cardboard and be connected, the bottom intermediate position department of second cardboard rotates through pivot and third cardboard and is connected, the one end that rotation end was kept away from to second cardboard and fourth cardboard all is provided with two buckles, and the orientation of two buckles is opposite, and the vertical end of two buckles is located same water flat line.
As a further description of the above technical solution:
the middle positions of the first clamping plate, the second clamping plate, the third clamping plate and the fourth clamping plate are all bent towards one side, two clamping plates are symmetrically arranged at the top of the first clamping plate along a vertical central line, and the longitudinal section of each clamping plate is of an L-shaped structure.
As a further description of the above technical solution:
the rotation link of first cardboard and second cardboard is pegged graft and is had the round pin axle, the rotation link of third cardboard and fourth cardboard is pegged graft and is had the round pin axle.
As a further description of the above technical solution:
the longitudinal sections of the two buckles are of J-shaped structures, and the vertical ends of the two buckles are rotatably connected with the second clamping plate and the fourth clamping plate through torsion spring rotating shafts.
As a further description of the above technical solution:
the second cardboard and the fourth cardboard keep away from rotation end one end and all seted up the activity groove, and the inside in activity groove inlays and is equipped with the torsional spring pivot.
As a further description of the above technical solution:
and one ends of the first clamping plate and the third clamping plate, which are far away from the rotating end, are provided with U-shaped grooves.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, through rotating first cardboard around round pin axle to second cardboard one side, the top of buckle is worn out from the top of U-shaped groove, under the effect of torsional spring pivot, two buckles rotate to relative one side, the bottom recess of buckle carries out the position restriction to first cardboard, prevent that it from upwards overturning, because the buckle can not move in the direction perpendicular with the round pin axle, make the buckle can not empty to the outside, thereby lose the joint to first cardboard, it is unexpected, use same method to carry out the joint with the third cardboard and the fourth cardboard of bottom, because instrument such as wrench do not use is assisted, be convenient for install the fastener fast, and the work efficiency is improved.
2. The utility model discloses in, through pressing two buckles to the inboard, when the top horizontal position of two buckles is coincide, upwards overturn first cardboard, the U-shaped groove passes the top of buckle after, continues the upset, at 270 backs of upset, the joint board on the first cardboard carries out the joint with the edge of fourth cardboard for the whole shrink of fastener reduces its area occupied, portable and deposit, it is convenient for the installation provides.
Drawings
Fig. 1 is a schematic side view of a scaffold fastener for rapid assembly during high-altitude operation according to the present invention;
fig. 2 is a schematic top view of the scaffold fastener for fast assembly during high-altitude operation according to the present invention;
fig. 3 is the utility model provides a buckle connection structure schematic diagram of scaffold fastener of fast assembly during high altitude construction.
Illustration of the drawings:
1. a first clamping plate; 2. a second clamping plate; 3. a third clamping plate; 4. a fourth clamping plate; 5. buckling; 6. a pin shaft; 7. a clamping and connecting plate; 8. a torsion spring shaft; 9. a movable groove; 10. a rotating shaft; 11. a U-shaped groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a scaffold fastener of fast assembly during high altitude construction, including first cardboard 1 and second cardboard 2, the one end of first cardboard 1 is rotated and is connected with second cardboard 2, and the bottom of second cardboard 2 is provided with third cardboard 3 and fourth cardboard 4, and rotate between third cardboard 3 and the fourth cardboard 4 and connect, the bottom intermediate position department of second cardboard 2 rotates through pivot 10 and third cardboard 3 and is connected, the one end of keeping away from the rotation end of second cardboard 2 and fourth cardboard 4 all is provided with two buckles 5, and the orientation of two buckles 5 is opposite, and the vertical end of two buckles 5 is located same water flat line, buckle 5's horizontal end length is less than 11 widths in U-shaped groove.
Specifically, as shown in fig. 1 and 2, first cardboard 1, second cardboard 2, the intermediate position department of third cardboard 3 and fourth cardboard 4 all is to a lateral bend, a connection for the steel pipe, vertical central line symmetry is provided with two joint boards 7 at the top of first cardboard 1, and the longitudinal section of joint board 7 is L shape structure, the interval equals with cardboard thickness between two joint boards 7, the rotation link of first cardboard 1 and second cardboard 2 is pegged graft and is had round pin axle 6, the rotation link of third cardboard 3 and fourth cardboard 4 is pegged graft and is had round pin axle 6.
Specifically, as shown in fig. 1-3, the longitudinal section of two buckles 5 is the J-shaped structure, and the vertical end of two buckles 5 all rotates through torsional spring pivot 8 and second cardboard 2 and fourth cardboard 4 to be connected, and second cardboard 2 and fourth cardboard 4 are kept away from rotation end one end and are all seted up movable groove 9, and the inside of movable groove 9 inlays and is equipped with torsional spring pivot 8, and first cardboard 1 and third cardboard 3 are kept away from rotation end one end and are all seted up U-shaped groove 11.
The working principle is as follows: when the fastener is used, when the fastener is required to be assembled, the first clamping plate 1 is rotated towards one side of the second clamping plate 2 around the pin shaft 6, the first clamping plate 1 pushes the tops of the two buckles 5 away from the U-shaped groove 11 at one side of the pin shaft 6, so that the two buckles 5 rotate towards the inner side, after the two buckles 5 rotate at a proper angle, the top ends of the buckles 5 penetrate out of the top ends of the U-shaped groove 11, the two buckles 5 rotate towards the opposite side under the action of the torsion spring rotating shaft 8, the bottom groove of the buckle 5 limits the position of the first clamping plate 1 to prevent the first clamping plate 1 from turning upwards, as the buckle 5 cannot move in the direction vertical to the pin shaft 6, the buckle 5 cannot tilt towards the outer side, the loss of clamping connection of the first clamping plate 1 is avoided, accidents are prevented, the third clamping plate 3 and the fourth clamping plate 4 at the bottom are clamped by using the same method, and as the aid is not, the fastener is convenient to mount quickly, and the working efficiency is improved; when the fastener is demolishd in needs, press two buckles 5 to the inboard, when the top horizontal position of two buckles 5 is coincided, upwards overturn first cardboard 1, U-shaped groove 11 passes behind buckle 5's the top, continue the upset, 270 backs in the upset, joint board 7 on the first cardboard 1 carries out the joint with the edge of fourth cardboard 4 for the whole shrink of fastener reduces its area occupied, portable and deposit, it is convenient for the installation provides.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a scaffold fastener of fast assembly during high altitude construction, includes first cardboard (1) and second cardboard (2), its characterized in that, the one end of first cardboard (1) is rotated and is connected with second cardboard (2), and the bottom of second cardboard (2) is provided with third cardboard (3) and fourth cardboard (4) to rotate between third cardboard (3) and the fourth cardboard (4) and be connected, the bottom intermediate position department of second cardboard (2) rotates through pivot (10) and third cardboard (3) and is connected, the one end of keeping away from the rotation end of second cardboard (2) and fourth cardboard (4) all is provided with two buckle (5), and the orientation of two buckle (5) is opposite to the vertical end of two buckle (5) is located same water flat line.
2. The scaffold fastener capable of being quickly assembled during aloft work according to claim 1, wherein the middle positions of the first clamping plate (1), the second clamping plate (2), the third clamping plate (3) and the fourth clamping plate (4) are bent towards one side, the top of the first clamping plate (1) is symmetrically provided with two clamping plates (7) along a vertical center line, and the longitudinal section of each clamping plate (7) is of an L-shaped structure.
3. The scaffold fastener capable of being quickly assembled during high-altitude operation according to claim 1, wherein a pin (6) is inserted into the rotary connecting end of the first clamping plate (1) and the second clamping plate (2), and a pin (6) is inserted into the rotary connecting end of the third clamping plate (3) and the fourth clamping plate (4).
4. The scaffold fastener capable of being quickly assembled during high-altitude operation according to claim 1, wherein the longitudinal sections of the two buckles (5) are in a J-shaped structure, and the vertical ends of the two buckles (5) are rotatably connected with the second clamping plate (2) and the fourth clamping plate (4) through torsion spring rotating shafts (8).
5. The scaffold fastener capable of being quickly assembled during aloft work according to claim 1, wherein the ends of the second clamping plate (2) and the fourth clamping plate (4) far away from the rotating ends are both provided with movable grooves (9), and torsion spring rotating shafts (8) are embedded in the movable grooves (9).
6. The scaffold fastener capable of being quickly assembled during high-altitude operation according to claim 1, wherein the ends, away from the rotating end, of the first clamping plate (1) and the third clamping plate (3) are both provided with a U-shaped groove (11).
CN201920664945.1U 2019-05-10 2019-05-10 Scaffold fastener capable of being assembled quickly during high-altitude operation Expired - Fee Related CN210659213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920664945.1U CN210659213U (en) 2019-05-10 2019-05-10 Scaffold fastener capable of being assembled quickly during high-altitude operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920664945.1U CN210659213U (en) 2019-05-10 2019-05-10 Scaffold fastener capable of being assembled quickly during high-altitude operation

Publications (1)

Publication Number Publication Date
CN210659213U true CN210659213U (en) 2020-06-02

Family

ID=70840550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920664945.1U Expired - Fee Related CN210659213U (en) 2019-05-10 2019-05-10 Scaffold fastener capable of being assembled quickly during high-altitude operation

Country Status (1)

Country Link
CN (1) CN210659213U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942871A (en) * 2021-02-02 2021-06-11 广州亿新建设集团有限公司 Dustproof heat sink is used in high-rise building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942871A (en) * 2021-02-02 2021-06-11 广州亿新建设集团有限公司 Dustproof heat sink is used in high-rise building construction

Similar Documents

Publication Publication Date Title
CN210659213U (en) Scaffold fastener capable of being assembled quickly during high-altitude operation
CN211731547U (en) Auxiliary frame of automobile
CN209958569U (en) Environment-friendly plate body joint structure for building
CN111377367A (en) Truss arm and crane
CN210995898U (en) Angle steel straightening and matching clamping device
CN203175029U (en) Scaffold inclined strut buckle and sliding sleeve thereof
CN211569709U (en) Cable rolling frame for electric power
CN208763410U (en) A kind of adjustable back cord
CN208899872U (en) A kind of aluminum alloy mould plate making regular polygon concrete component
CN210598141U (en) Beam type stair turnover side form
CN214558664U (en) Support is used in welding of reinforcing bar cross
CN212836721U (en) Aluminum template back edge connecting mechanism
CN211599184U (en) Dysmorphism building fastener suitable for ground pipeline
CN210828307U (en) Steel pipe connecting and positioning device
CN217027513U (en) Steel truss structure capable of achieving segmented high-altitude butt joint
CN221001921U (en) Can have enough to meet need pre-buried wall spare device that links of outer frame
CN216640953U (en) Connecting piece for beam of steel building structure
CN212897530U (en) Fastener for steel structure connection
CN214942302U (en) Self-locking multipurpose steel pipe scaffold buckle convenient to disassemble and assemble
CN209876226U (en) Rotary joint extension structure
CN220622455U (en) Pin shaft system capable of realizing bidirectional rotation
CN216583917U (en) Tower crane is fixed with attaching wall
CN220978439U (en) Assembled wall with sound insulation effect
CN216516431U (en) Steel construction is fixed to triangular keel
CN217871837U (en) Adjusting bolt assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200602