CN210658864U - Quick erection joint device of curtain wall beam - Google Patents
Quick erection joint device of curtain wall beam Download PDFInfo
- Publication number
- CN210658864U CN210658864U CN201920959723.2U CN201920959723U CN210658864U CN 210658864 U CN210658864 U CN 210658864U CN 201920959723 U CN201920959723 U CN 201920959723U CN 210658864 U CN210658864 U CN 210658864U
- Authority
- CN
- China
- Prior art keywords
- gear
- sleeve
- pin
- fixing plate
- ferrule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及幕墙安装技术领域,尤其涉及一种幕墙横梁快速安装连接装置。The utility model relates to the technical field of curtain wall installation, in particular to a fast installation and connection device for curtain wall beams.
背景技术Background technique
随着人们对建筑外观的要求越来越高,幕墙得到越来越多的使用,其中构件式幕墙是最常见的一种幕墙结构形式。构件式幕墙横梁一般为开口型材或闭腔型材,闭腔横梁材料用量较少,结构受力较好,但施工难度较大。构件式幕墙立柱、横梁的连接是幕墙施工中的难点和重点,构件式幕墙立柱、横梁一般采用角码连接、销钉连接方式。构件式幕墙立柱、横梁采用角码连接,角码、螺栓外露,影响幕墙整体美观。销钉连接虽然不外露,但是若为闭腔横梁则施工难度较大,不易安装。提高幕墙横梁连接的快捷性、简便性是很有必要的。As people's requirements for the appearance of buildings are getting higher and higher, curtain walls are used more and more, and the component curtain wall is the most common type of curtain wall structure. Component curtain wall beams are generally open profiles or closed-cavity profiles. Closed-cavity beams use less material and have better structural stress, but the construction is difficult. The connection of the column and beam of the component curtain wall is the difficulty and key point in the construction of the curtain wall. The columns and beams of the component curtain wall are connected by corner codes, and the corner codes and bolts are exposed, which affects the overall appearance of the curtain wall. Although the pin connection is not exposed, if it is a closed-cavity beam, the construction is difficult and it is not easy to install. It is necessary to improve the quickness and simplicity of the curtain wall beam connection.
如何解决上述技术问题为本实用新型面临的课题。How to solve the above technical problems is the subject of the present invention.
实用新型内容Utility model content
为了解决现有技术的不足,本实用新型提供了一种设计合理,结构简单,安全可靠,可方便幕墙横梁安装并可有效缩短施工工期的幕墙横梁快速安装连接装置。In order to solve the deficiencies of the prior art, the utility model provides a curtain wall beam quick installation connecting device with reasonable design, simple structure, safety and reliability, which can facilitate the installation of the curtain wall beam and effectively shorten the construction period.
本实用新型解决其技术问题所采用的技术方案是:本实用新型提供了一种幕墙横梁快速安装连接装置,包括幕墙横梁与立柱之间连接的若干销钉,所述横梁内部为中空结构,包括并列设置在横梁一端内腔中的插芯与套筒,所述插芯与所述套筒的外壁均与所述横梁内壁配合;插芯位于所述套筒朝向待连接的立柱一侧;The technical solution adopted by the utility model to solve the technical problem is as follows: the utility model provides a quick installation and connection device for a curtain wall beam, which includes a plurality of pins connecting the curtain wall beam and the upright column, and the interior of the beam is a hollow structure, including parallel The ferrule and the sleeve are arranged in the inner cavity of one end of the beam, and the outer walls of the ferrule and the sleeve are matched with the inner wall of the beam; the ferrule is located on the side of the sleeve facing the column to be connected;
所述套筒为中空结构且内腔设置有安装组件,所述安装组件包括锥齿轮组,所述锥齿轮组包括相互啮合的主动锥齿轮与从动锥齿轮,所述主动锥齿轮与从动锥齿轮分别对称设置有两个,四个锥齿轮均啮合,两个所述主动锥齿轮的齿轮轴贯穿所述套筒并延伸至所述套筒外表面;The sleeve is a hollow structure and the inner cavity is provided with a mounting assembly, the mounting assembly includes a bevel gear set, and the bevel gear set includes a driving bevel gear and a driven bevel gear that mesh with each other, the driving bevel gear and the driven bevel gear. Two bevel gears are symmetrically arranged respectively, all four bevel gears are meshed, and the gear shafts of the two driving bevel gears penetrate through the sleeve and extend to the outer surface of the sleeve;
靠近所述插芯一侧的所述从动锥齿轮的齿轮轴端部通过第一连接杆转动连接有等边三角形的三角板,所述齿轮轴固定连接所述第一连接杆的一端,第一连接杆的另一端转动连接在所述三角板的中心处;所述三角板靠近所述插芯一侧的三个角部分别转动连接有一个第二连接杆的一端,每个所述第二连接杆的另一端均固定连接有一个主齿轮,每个所述主齿轮均啮合有一个齿轮环,所述齿轮环转动连接于所述插芯上,所述齿轮环内部设置有内螺纹,且所述内螺纹与所述销钉外部的外螺纹配合;The end of the gear shaft of the driven bevel gear on the side of the ferrule is rotatably connected with a triangular plate of an equilateral triangle through a first connecting rod, the gear shaft is fixedly connected to one end of the first connecting rod, and the first The other end of the connecting rod is rotatably connected to the center of the triangular plate; the three corners of the triangular plate on the side close to the ferrule are respectively rotatably connected with one end of a second connecting rod, each of the second connecting rods The other end is fixedly connected with a main gear, each of the main gears is meshed with a gear ring, the gear ring is rotatably connected to the ferrule, the gear ring is internally provided with an internal thread, and the The inner thread is matched with the outer thread outside the pin;
所述插芯也为中空结构且内腔设置有三个销钉槽,所述销钉槽一端转动连接所述齿轮环且所述销钉槽内滑动连接所述销钉,所述销钉槽内设置有限位条,所述销钉没有外螺纹的钉体上设置有限位槽,所述限位条与所述限位槽配合;The ferrule is also a hollow structure and three pin grooves are arranged in the inner cavity, one end of the pin groove is rotatably connected to the gear ring, and the pin groove is slidably connected to the pin, and a limit bar is arranged in the pin groove, The pin body without external thread is provided with a limit groove, and the limit bar is matched with the limit groove;
所述立柱与所述横梁连接处设置有三个销钉孔。Three pin holes are arranged at the connection between the column and the beam.
所述横梁两侧对称设置有通孔,所述套筒两侧也设置有通孔,所述套筒与所述横梁的所述通孔对应设置且直径相同,所述通孔直径与所述主动锥齿轮的齿轮轴配合;Through holes are arranged symmetrically on both sides of the beam, and through holes are also arranged on both sides of the sleeve. The sleeve and the through holes of the beam are correspondingly arranged and have the same diameter. The gear shaft of the driving bevel gear is matched;
所述主动锥齿轮的齿轮轴端部位于所述横梁外壁内侧,且所述主动锥齿轮的齿轮轴与所述横梁的通孔的轴心重合。The end of the gear shaft of the driving bevel gear is located inside the outer wall of the beam, and the gear shaft of the driving bevel gear coincides with the axis of the through hole of the beam.
所述套筒内固定设置有若干固定板,所述固定板为矩形板且竖直设置,所述固定板包括第一固定板,所述第一固定板中部转动连接所述从动锥齿轮的齿轮轴;Several fixing plates are fixedly arranged in the sleeve. The fixing plates are rectangular plates and are arranged vertically. The fixing plates include a first fixing plate, and the middle part of the first fixing plate is rotatably connected to the driven bevel gear. gear shaft;
所述固定板包括第二固定板,所述第二固定板中部分别与三个所述第二连接杆转动连接,所述第二固定板靠近所述插芯的一侧设置所述主齿轮,每个所述主齿轮的齿轮轴均固定连接所述第二连接杆的端部。The fixing plate includes a second fixing plate, the middle part of the second fixing plate is respectively rotatably connected with the three second connecting rods, and the main gear is arranged on the side of the second fixing plate close to the ferrule, The gear shaft of each of the main gears is fixedly connected to the end of the second connecting rod.
所述主齿轮与所述齿轮环之间通过过渡齿轮啮合,所述过渡齿轮转动连接所述于第二固定板上。The main gear is meshed with the gear ring through a transition gear, and the transition gear is rotatably connected to the second fixing plate.
所述套筒内设置有第三固定板,所述第三固定板位于所述套筒远离所述插芯的一端;A third fixing plate is arranged in the sleeve, and the third fixing plate is located at the end of the sleeve away from the ferrule;
所述第一固定板、第二固定板与第三固定板上均设置有三个圆孔,每个所述固定板上的所述圆孔均对应所述销钉的位置且所述圆孔直径与所述销钉外径配合。The first fixing plate, the second fixing plate and the third fixing plate are all provided with three circular holes, the circular holes on each of the fixing plates correspond to the positions of the pins, and the diameter of the circular holes is the same as the diameter of the circular holes. The outer diameters of the pins are matched.
所述主动锥齿轮齿轮轴的端部设置有六角楞孔;The end of the drive bevel gear shaft is provided with a hexagonal corrugated hole;
所述横梁通孔外部设置有孔帽。A hole cap is provided outside the beam through hole.
本实用新型实际使用时:在幕墙施工中,首先安装立柱。在立柱上与横梁连接的位置加工三个销钉孔,销钉孔的间距与横梁插芯的销钉槽对应。套筒两侧开有中心线重合的通孔,横梁两侧也开有对应的通孔,将套筒放置到横梁内使横梁的通孔与套筒的通孔中心线重合。然后将销钉的外螺纹端套在齿轮环上,再将销钉的另一端对准限位条插入到插芯的销钉槽内,并通过销钉将插芯和套筒连接在一起。将插芯和套筒紧贴并放置到横梁内,并使销钉的端部与横梁端部平齐,并且保证套筒上的通孔与横梁的通孔在同一中心线上,然后此时,对准立柱上的三个销钉孔,将横梁放置到两个立柱之间,再使用内六角扳手转动主动锥齿轮的齿轮轴,主动锥齿轮带动从动锥齿轮转动,从动锥齿轮通过第一连接杆转动三角板,三角板带动三个第二连接杆在第二固定板上转动,三个第二连接杆带动三个主齿轮向同一方向转动,最后通过与主齿轮啮合的过渡齿轮使齿轮环转动。齿轮环内的螺纹使与其螺纹连接的销钉向立柱一侧滑动,销钉逐渐顶出到立柱的销钉孔内,实现横梁和立柱的有效连接。安装完成之后,将孔帽安装到横梁的通孔上,起装饰和保护作用。When the utility model is actually used: in the construction of the curtain wall, the upright column is first installed. Three pin holes are machined at the position where the column is connected to the beam, and the spacing of the pin holes corresponds to the pin grooves of the beam insert. The two sides of the sleeve are provided with through holes with overlapping center lines, and the two sides of the beam are also provided with corresponding through holes. The sleeve is placed in the beam so that the center lines of the through holes of the beam and the through holes of the sleeve coincide. Then put the external thread end of the pin on the gear ring, then align the other end of the pin with the limit bar and insert it into the pin groove of the ferrule, and connect the ferrule and the sleeve together by the pin. Fit the ferrule and the sleeve into the beam, make the end of the pin flush with the end of the beam, and ensure that the through hole on the sleeve and the through hole of the beam are on the same centerline, then at this time, Align the three pin holes on the column, place the beam between the two columns, and then use the Allen wrench to turn the gear shaft of the driving bevel gear, the driving bevel gear drives the driven bevel gear to rotate, and the driven bevel gear passes through the first bevel gear. The connecting rod rotates the triangular plate, the triangular plate drives the three second connecting rods to rotate on the second fixed plate, the three second connecting rods drive the three main gears to rotate in the same direction, and finally the gear ring rotates through the transition gear that meshes with the main gear . The thread in the gear ring makes the pin threadedly connected with it slide to the side of the column, and the pin is gradually pushed out into the pin hole of the column to realize the effective connection between the beam and the column. After the installation is completed, the hole cap is installed on the through hole of the beam for decoration and protection.
本实用新型的有益效果为:结构简单,设计合理,可方便幕墙横梁安装并可有效缩短施工工期。构件式幕墙横梁、立柱的连接采用销钉连接,外形美观不外露。本装置能够提高闭腔横梁与立柱销钉连接的效率,安装简便、高效。闭腔横梁型材截面力学性能良好。采用本装置,只需在立柱上开相应的销钉孔、套筒上两侧开通孔、横梁上开通孔即可,结构加工量较少,结构加工简单方便。采用本装置可以实现先安装立柱再安装横梁的目的,横梁安装简单方便,可以有效缩短施工工期。The beneficial effects of the utility model are as follows: the structure is simple, the design is reasonable, the installation of the curtain wall beams is convenient, and the construction period is effectively shortened. The beams and columns of the component curtain wall are connected by pins, and the appearance is beautiful and not exposed. The device can improve the efficiency of the connection between the closed-cavity beam and the upright pin, and the installation is simple and efficient. The section of the closed-cavity beam section has good mechanical properties. By adopting the device, it is only necessary to open the corresponding pin holes on the column, the holes on both sides of the sleeve, and the holes on the beam, the structural processing quantity is small, and the structural processing is simple and convenient. By adopting the device, the purpose of installing the column first and then installing the beam can be realized, the installation of the beam is simple and convenient, and the construction period can be effectively shortened.
本装置在横梁内部设置有套筒与插芯,套筒内设置有安装组件,安装组件可实现同时将销钉移动至立柱内部,作业人员只需在横梁外部扭动锥齿轮的齿轮轴即可,三角板三角处分别连接三个第二连接杆,第二连接杆又连接有主齿轮,主齿轮通过过渡齿轮啮合齿轮环,可对应三个销钉,销钉与齿轮环之间通过螺纹连接,二销钉钉体设置有限位槽,限位槽与销钉槽内的限位条配合限位,使销钉只可平移,不能旋转,二齿轮环转动连接于销钉槽端部,齿轮环在旋转时,通过螺纹的作用可使销钉进行移动,以实现横梁与立柱的固定连接。主动锥齿轮的齿轮轴内设置有六角棱孔,作业人员可使用内六角扳手拧动锥齿轮,横梁的通孔处设置有孔帽,起装饰和保护作用。The device is provided with a sleeve and a ferrule inside the beam, and an installation component is arranged in the sleeve. The installation component can move the pin to the inside of the column at the same time. The operator only needs to twist the gear shaft of the bevel gear outside the beam. The triangles of the triangular plate are respectively connected with three second connecting rods, and the second connecting rods are connected with the main gear. The main gear meshes with the gear ring through the transition gear, which can correspond to three pins. The pins and the gear ring are connected by threads. The body is provided with a limit slot, and the limit slot cooperates with the limit bar in the pin slot to limit the position, so that the pin can only translate but not rotate, and the second gear ring is rotatably connected to the end of the pin slot. The action can make the pin move to realize the fixed connection between the beam and the column. The gear shaft of the driving bevel gear is provided with a hexagonal edge hole, and the operator can use an Allen wrench to screw the bevel gear. The through hole of the beam is provided with a hole cap for decoration and protection.
附图说明Description of drawings
图1 为本实用新型的安装示意图。FIG. 1 is a schematic diagram of the installation of the utility model.
图2 为本实用新型立柱的结构示意图。FIG. 2 is a schematic structural diagram of a column of the present invention.
图3 为本实用新型销钉的结构示意图。FIG. 3 is a schematic diagram of the structure of the pin of the present invention.
图4为本实用新型的横梁内部结构爆炸示意图。FIG. 4 is a schematic exploded view of the internal structure of the beam of the present invention.
图5为本实用新型的横梁内部爆炸立体结构示意图一。FIG. 5 is a schematic diagram 1 of the three-dimensional structure of the internal explosion of the beam of the present invention.
图6为图5的A区局部放大示意图。FIG. 6 is a partial enlarged schematic diagram of the area A of FIG. 5 .
图7为本实用新型的横梁内部隐藏第一固定板的爆炸立体结构示意图一。FIG. 7 is a schematic diagram 1 of an exploded three-dimensional structure in which the first fixing plate is hidden inside the beam of the present invention.
其中,附图标记为:1、横梁;101、孔帽;2、立柱;201、销钉孔;3、销钉;301、限位槽;4、插芯;401、销钉槽;402、限位条;5、套筒;501、第一固定板;502、第二固定板;503、第三固定板;6、主动锥齿轮;601、从动锥齿轮;7、第一连接杆;8、三角板;9、第二连接杆;10、主齿轮;11、齿轮环;12、过渡齿轮。Among them, the reference signs are: 1, beam; 101, hole cap; 2, column; 201, pin hole; 3, pin; 301, limit slot; 4, ferrule; 401, pin slot; 402, limit bar 5, sleeve; 501, the first fixed plate; 502, the second fixed plate; 503, the third fixed plate; 6, driving bevel gear; 601, driven bevel gear; 7, the first connecting rod; 8, triangle plate ; 9, the second connecting rod; 10, the main gear; 11, the gear ring; 12, the transition gear.
具体实施方式Detailed ways
能清楚说明本方案的技术特点,下面通过具体实施方式,对本方案进行阐述。The technical features of this solution can be clearly described, and the solution will be described below through specific implementations.
参见图1至图7所示,本实施例是一种幕墙横梁快速安装连接装置,包括幕墙横梁1与立柱2之间连接的若干销钉3,横梁1内部为中空结构,包括并列设置在横梁1一端内腔中的插芯4与套筒5,插芯4与套筒5的外壁均与横梁1内壁配合;插芯4位于套筒5朝向待连接的立柱2一侧;立柱2与横梁1连接处设置有三个销钉孔201。Referring to FIGS. 1 to 7 , the present embodiment is a quick installation and connection device for curtain wall beams, including
套筒5为中空结构且内腔设置有安装组件,安装组件包括锥齿轮组,锥齿轮组包括相互啮合的主动锥齿轮6与从动锥齿轮601,主动锥齿轮6与从动锥齿轮601分别对称设置有两个,四个锥齿轮均啮合,两个主动锥齿轮6的齿轮轴贯穿套筒5并延伸至套筒5外表面;主动锥齿轮6的齿轮轴端部位于横梁1外壁内侧,且主动锥齿轮6的齿轮轴与横梁1的通孔的轴心重合。The sleeve 5 is a hollow structure and the inner cavity is provided with a mounting assembly. The mounting assembly includes a bevel gear set. The bevel gear set includes a driving bevel gear 6 and a driven
横梁1两侧对称设置有通孔,横梁1通孔外部设置有孔帽101;套筒5两侧也设置有通孔,套筒5与横梁1的通孔对应设置且直径相同,通孔直径与主动锥齿轮6的齿轮轴配合,主动锥齿轮6齿轮轴的端部设置有六角楞孔。Through holes are symmetrically arranged on both sides of the beam 1, and hole caps 101 are arranged outside the through holes of the beam 1; through holes are also arranged on both sides of the sleeve 5, and the sleeve 5 and the through holes of the beam 1 are correspondingly arranged and have the same diameter, and the diameter of the through hole is the same. In cooperation with the gear shaft of the driving bevel gear 6, the end of the gear shaft of the driving bevel gear 6 is provided with a hexagonal corrugated hole.
靠近插芯4一侧的从动锥齿轮601的齿轮轴端部通过第一连接杆7转动连接有等边三角形的三角板8,齿轮轴固定连接第一连接杆7的一端,第一连接杆7的另一端转动连接在三角板8的中心处;三角板8靠近插芯4一侧的三个角部分别转动连接有一个第二连接杆9的一端,每个第二连接杆9的另一端均固定连接有一个主齿轮10,每个主齿轮10均啮合有一个齿轮环11,齿轮环11转动连接于插芯4上,齿轮环11内部设置有内螺纹,且内螺纹与销钉3外部的外螺纹配合;The end of the gear shaft of the driven
套筒5内固定设置有若干固定板,固定板为矩形板且竖直设置,固定板包括第一固定板501,第一固定板501中部转动连接从动锥齿轮601的齿轮轴;固定板包括第二固定板502,第二固定板502中部分别与三个第二连接杆9转动连接,第二固定板502靠近插芯4的一侧设置主齿轮10,每个主齿轮10的齿轮轴均固定连接第二连接杆9的端部;套筒5内设置有第三固定板503,第三固定板503位于套筒5远离插芯4的一端;第一固定板501、第二固定板502与第三固定板503上均设置有三个圆孔504,每个固定板上的圆孔504均对应销钉3的位置且圆孔504直径与销钉3外径配合。Several fixing plates are fixedly arranged in the sleeve 5. The fixing plates are rectangular plates and are arranged vertically. The fixing plate includes a
插芯4也为中空结构且内腔设置有三个销钉槽401,销钉槽401一端转动连接齿轮环11且销钉槽401内滑动连接销钉3,销钉槽401内设置有限位条402,销钉3没有外螺纹的钉体上设置有限位槽301,限位条402与限位槽301配合;主齿轮10与齿轮环11之间通过过渡齿轮12啮合,过渡齿轮12转动连接于第二固定板502上。The ferrule 4 is also a hollow structure with three
本实用新型实际使用时:在幕墙施工中,首先安装立柱2。在立柱2上与横梁1连接的位置加工三个销钉孔201,销钉孔201的间距与横梁1插芯4的销钉槽401对应。套筒5两侧开有中心线重合的通孔,横梁1两侧也开有对应的通孔,将套筒5放置到横梁1内使横梁1的通孔与套筒5的通孔中心线重合。然后将销钉3的外螺纹端套在齿轮环11上,再将销钉3的另一端对准限位条402插入到插芯4的销钉槽401内,并通过销钉3将插芯4和套筒5连接在一起。将插芯4和套筒5紧贴并放置到横梁1内,并使销钉3的端部与横梁1端部平齐,并且保证套筒5上的通孔与横梁1的通孔在同一中心线上,然后此时,对准立柱上的三个销钉孔201,将横梁1放置到两个立柱2之间,再使用内六角扳手转动主动锥齿轮6的齿轮轴,主动锥齿轮6带动从动锥齿轮601转动,从动锥齿轮601通过第一连接杆7转动三角板8,三角板8带动三个第二连接杆9在第二固定板502上转动,三个第二连接杆9带动三个主齿轮10向同一方向转动,最后通过与主齿轮10啮合的过渡齿轮12使齿轮环11转动。齿轮环11内的螺纹使与其螺纹连接的销钉3向立柱2一侧滑动,销钉3逐渐顶出到立柱2的销钉孔201内,实现横梁1和立柱2的有效连接。安装完成之后,将孔帽101安装到横梁1的通孔上,起装饰和保护作用。When the utility model is actually used: in the construction of the curtain wall, the
本实用新型未经描述的技术特征可以通过或采用现有技术实现,在此不再赘述,当然,上述说明并非是对本实用新型的限制,本实用新型也并不仅限于上述举例,本技术领域的普通技术人员在本实用新型的实质范围内所做出的变化、改型、添加或替换,也应属于本实用新型的保护范围。The undescribed technical features of the present invention can be realized by or using the prior art, and will not be repeated here. Of course, the above descriptions are not intended to limit the present invention, and the present invention is not limited to Changes, modifications, additions or substitutions made by those of ordinary skill within the essential scope of the present invention should also belong to the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920959723.2U CN210658864U (en) | 2019-06-25 | 2019-06-25 | Quick erection joint device of curtain wall beam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920959723.2U CN210658864U (en) | 2019-06-25 | 2019-06-25 | Quick erection joint device of curtain wall beam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210658864U true CN210658864U (en) | 2020-06-02 |
Family
ID=70844258
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920959723.2U Expired - Fee Related CN210658864U (en) | 2019-06-25 | 2019-06-25 | Quick erection joint device of curtain wall beam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210658864U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110206205A (en) * | 2019-06-25 | 2019-09-06 | 中建八局第一建设有限公司 | A kind of curtain wall cross beam Fast Installation attachment device |
| CN111677105A (en) * | 2020-07-09 | 2020-09-18 | 南京工业大学 | A wooden house that is easy to disassemble and assemble |
| CN111677104A (en) * | 2020-07-09 | 2020-09-18 | 南京工业大学 | An energy-saving quick-demolition wooden building |
-
2019
- 2019-06-25 CN CN201920959723.2U patent/CN210658864U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110206205A (en) * | 2019-06-25 | 2019-09-06 | 中建八局第一建设有限公司 | A kind of curtain wall cross beam Fast Installation attachment device |
| CN110206205B (en) * | 2019-06-25 | 2024-03-22 | 中建八局第一建设有限公司 | Curtain wall beam quick installation connecting device |
| CN111677105A (en) * | 2020-07-09 | 2020-09-18 | 南京工业大学 | A wooden house that is easy to disassemble and assemble |
| CN111677104A (en) * | 2020-07-09 | 2020-09-18 | 南京工业大学 | An energy-saving quick-demolition wooden building |
| US11105086B1 (en) * | 2020-07-09 | 2021-08-31 | Nanjing Tech University | Easily mounted and dismounted wooden house |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108316547B (en) | Combined Composite Insulation Wall Panel | |
| CN110206205B (en) | Curtain wall beam quick installation connecting device | |
| CN204552143U (en) | Sloping core bracing or strutting arrangement for building | |
| CN212406120U (en) | Limiting structure and fixing device for penetrating through steel sleeve of floor slab | |
| CN209243962U (en) | A connection structure between fabricated steel pipe concrete columns and steel beams | |
| CN211113120U (en) | A Bailey sheet combined tower | |
| CN113463952B (en) | Assembled spliced clean room | |
| CN209760988U (en) | Rail guard for construction convenient to dismouting | |
| CN209958561U (en) | Crack structure is prevented to building wall | |
| CN205935327U (en) | Installation fixture for double glazed curtain wall | |
| CN216516897U (en) | Indent aluminum mould for building | |
| CN211973847U (en) | A prefabricated building connector | |
| CN212690526U (en) | Light concatenation formula template | |
| CN215859039U (en) | Building template for supporting | |
| CN218991130U (en) | Rail guard for civil construction | |
| CN213897648U (en) | Prefabricated wall structure of assembled of industrialization house | |
| CN115928917A (en) | Inner buckle assembly and installation structure and installation method of a glass curtain wall | |
| CN211340383U (en) | Assembled concrete beam column connected node | |
| CN209959084U (en) | A multifunctional landscape wall for landscape gardening | |
| CN115538648A (en) | Assembly type structure for building and use method | |
| CN215830084U (en) | A cross-section repairing support device for construction engineering | |
| CN213868886U (en) | Scaffold connecting piece for construction engineering construction | |
| CN224259705U (en) | Composite long-span cement pre-member | |
| CN221052956U (en) | Anti-drop structure of building curtain | |
| CN218970273U (en) | Assembled prefabricated member |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200602 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |