CN210658663U - Arc corridor frame - Google Patents

Arc corridor frame Download PDF

Info

Publication number
CN210658663U
CN210658663U CN201921144835.9U CN201921144835U CN210658663U CN 210658663 U CN210658663 U CN 210658663U CN 201921144835 U CN201921144835 U CN 201921144835U CN 210658663 U CN210658663 U CN 210658663U
Authority
CN
China
Prior art keywords
truss
corridor
arc
frame body
corridor frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921144835.9U
Other languages
Chinese (zh)
Inventor
牛琳
邢至怡
马欣欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Landscape Architecture Design Co ltd
Original Assignee
Beijing Landscape Architecture Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Landscape Architecture Design Co ltd filed Critical Beijing Landscape Architecture Design Co ltd
Priority to CN201921144835.9U priority Critical patent/CN210658663U/en
Application granted granted Critical
Publication of CN210658663U publication Critical patent/CN210658663U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an arc corridor frame, its technical scheme main points are: including curved corridor and corridor frame body, the both ends of corridor frame body all are provided with the base, and the corridor frame body is located the top in corridor and is provided with a plurality ofly and come along curved road surface homogeneous rotation arrangement, is provided with the arc bench the same with the protruding direction of corridor arc between the adjacent corridor frame body bottom, the top of arc bench is provided with the back of being convenient for to lean on. The utility model has the advantages that: the structure is simple, the arrangement is neat, and the ornamental value and the practicability of the gallery frame are improved.

Description

Arc corridor frame
Technical Field
The utility model relates to a building technical field, concretely relates to arc corridor frame.
Background
The corridor frame is an open building provided with a top cover above corridor columns, has the functions of shading the sun and keeping out the rain for pedestrians, having a rest, guiding people flow and sight, and connecting main building or landscape nodes, can be combined with pavilions, galleries, water sheps and the like into a garden building group with attractive appearance, is popular with people, is frequently used during garden modeling, adds dense cultural atmosphere to squares, parks and districts through natural and vivid expression of the corridor frame, and is very harmonious with natural ecological environment matching.
The prior landscape corridor frame structure has some defects, the general corridor frame is complex in shape and not simple enough in structure, and the corridor frame structure is easy to be unstable.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an arc corridor frame, its advantage is simple structure, arranges neatly, improves corridor frame's ornamental value and practicality.
The above technical purpose of the present invention can be achieved by the following technical solutions:
the utility model provides an arc corridor frame, includes curved corridor and corridor frame body, the both ends of corridor frame body all are provided with the base, and the top that corridor frame body is located the corridor is provided with a plurality ofly and comes along curved road surface homogeneous rotation, is provided with the arc bench the same with the protruding direction of corridor arc between the adjacent corridor frame body bottom, and the top of arc bench is provided with the back of being convenient for to lean on.
Through the technical scheme, the plurality of gallery frame bodies are arranged above the arc-shaped aisle, the gallery frame bodies are of an oval structure with a fixed size, the oval center is used as a base point, the gallery frame bodies are rotationally arranged at a fixed angle in the vertical direction to form the visual hierarchy of the house, and the single gallery frames move step by step along with the movement of visitors and are rich in changes. The arc bench and the backrest are convenient for a tourist to have a rest, the connection between the gallery frame bodies is more stable, and the practicability of the gallery frame bodies is improved.
The utility model discloses further set up to: the corridor frame body comprises a first truss and a second truss, the first truss and the second truss are located on the same plane, an interval is formed between the first truss and the second truss, the interval is gradually increased from the base to the highest point of the corridor frame body, the interval between the highest points of the first truss and the second truss is the largest, the two ends, located on the base, of the first truss and the two ends, located on the second truss, of the second truss are fixedly connected with connecting blocks, and the first truss and the second truss are fixed to each other through the connecting blocks.
Through the technical scheme, the gallery frame body adopts the structure, so that the material for saving the gallery frame body can simplify the structure of the gallery frame body on the basis of ensuring the strength of the gallery frame body. The interval between first truss and the second truss increases from the base to the peak of corridor frame body gradually to be convenient for the climbing and the growth of climbing plant, and then make the corridor frame body provide the cool place for the tourist in the summer of inflammation. The corridor frame body with a unique structure is formed by the first truss, the second truss and the connecting block for connecting the first truss and the second truss, so that the corridor frame body is different from other corridor frame structures on the market and has unique appearance.
The utility model discloses further set up to: the lateral wall rigid coupling of second truss has the articulated slab, and the upper surface rigid coupling of articulated slab has a stopper, an avris of arc bench is articulated each other with the articulated slab, and another avris of arc bench is articulated each other with adjacent second truss lateral wall, the arc bench is provided with the balancing weight towards the bellied avris of corridor frame body arc.
Through the technical scheme, the relative both sides wall of arc bench is articulated each other with articulated slab and second truss respectively, when the arc bench does not use, can keep vertical state under the action of gravity of self gravity and balancing weight at the arc bench, keep fold condition when the arc bench does not use promptly, the space that can not only save the arc bench occupies, and can reduce dust or fallen leaves and leave and make the arc bench keep clean and tidy when using on the arc bench, need not too much to clean, high durability and convenient use. The hinged plate is fixedly connected with a limiting block for limiting the arc bench, so that the arc bench can be kept in a horizontal state without deflection after a pedestrian sits on the arc bench, and the arc bench can be normally used.
The utility model discloses further set up to: the top end side wall of each first truss is provided with a pull beam, and the adjacent first trusses are connected with each other through the pull beams.
Through above-mentioned technical scheme, the setting up of straining beam enables between the adjacent corridor frame body that the structure is more stable, and the straining beam also can make and have even interval between the adjacent corridor frame body to it is more neat to make the range between the corridor frame body. The straining beam is located the top of corridor frame body, for climbing the convenient condition of climbing between the adjacent corridor frame body of climbing plant, makes the climbing plant can the efficient cover the top of corridor frame body is complete more, makes corridor frame body form the pleasing to the eye gardens building of appearance, provides the place of having a rest, hiding, enjoying the cool for the tourist, has higher practicality.
The utility model discloses further set up to: the side wall of the pull beam, which is in mutual contact with the first truss, is provided with an angle code, and the angle code fixes the pull beam and the first truss mutually through a plurality of first bolts.
Through above-mentioned technical scheme, the straining beam is fixed through the angle sign indicating number with first truss, and is simple and convenient, and the staff of being convenient for is under construction and is disassembled.
The utility model discloses further set up to: the base comprises solidified concrete, a Pi-shaped embedded part fixedly connected in the concrete and a fixing plate fixedly connected to the top of the embedded part and used for fixing the truss bottom connecting block.
Through above-mentioned technical scheme for the structure of base is more stable, and the setting of fixed plate provides the condition for being connected of corridor frame body and base, and simple structure makes things convenient for the staff to be under construction.
The utility model discloses further set up to: the bottom of connecting block is seted up the holding tank that holds the fixed plate, the fixed plate passes through a plurality of second bolts and connecting block fixed connection.
Through above-mentioned technical scheme, the staff is when the construction, treats the concrete and solidifies the built-in fitting in wherein the back, then inserts the holding tank on the connecting plate with the fixed plate, fixes corridor frame body bottom connecting block and fixed plate through the second bolt after that, and a plurality of second bolts enable the fixed plate more stable with the fixed of connecting block, simultaneously, convenient construction.
The utility model discloses further set up to: the walkways comprise a first walkway and a second walkway, the arc-shaped protruding directions of the first walkway and the second walkway are consistent, and the starting point and the end point of the first walkway and the second walkway are mutually converged; the corridor body is arranged above the junction of the first pavement and the second pavement, and the corridor body is at least arranged above one first pavement or one second pavement.
Through the technical scheme, the corridor frame body has better appearance, the size of the frame of the corridor frame body is reduced, and materials are saved. The setting of first pavement and second pavement can shunt the tourist, and the distance that the tourist walked also can be saved to the inboard second pavement of arc.
To sum up, the utility model discloses following beneficial effect has:
the structure is simple, the arrangement is neat, and the ornamental value and the practicability of the gallery frame are improved. The first truss and the second truss are arranged at intervals, so that the strength is guaranteed, and meanwhile, the materials are saved. The use of the tension beam not only can enable the adjacent gallery frame bodies to be more orderly and convenient to construct, but also is convenient for climbing of climbing plants and covering the top of the gallery frame bodies, thereby shielding sunlight and improving comfort;
secondly, the arc bench of this arc corridor frame is clean and tidy when using, need not too much cleaning, convenient to use.
Drawings
FIG. 1 is a top view of an arcuate gallery shelf;
FIG. 2 is a schematic view of the overall structure between adjacent arcuate gallery bodies;
FIG. 3 is an enlarged schematic view of detail A of FIG. 2;
FIG. 4 is an enlarged schematic view of detail B of FIG. 2;
FIG. 5 is a schematic view showing the connection relationship between the arc bench and the gallery body;
fig. 6 is an enlarged schematic view of detail C of fig. 4.
In the figure, 1, a gallery frame body; 11. a first truss; 12. a second truss; 13. connecting blocks; 131. accommodating grooves; 2. an aisle; 21. a first walkway; 22. a second walkway; 3. drawing a beam; 31. corner connectors; 32. a first bolt; 4. a hinge plate; 41. a limiting block; 5. an arc bench; 51. a balancing weight; 52. a backrest; 6. a base; 61. embedding parts; 62. a fixing plate; 63. and a second bolt.
Detailed Description
Example (b): an arc corridor frame, as shown in figure 1, comprises an arc corridor 2 for pedestrians to walk and a corridor frame body 1. The passageway 2 comprises a first passageway 21 and a second passageway 22 which are communicated with each other, the first passageway 21 and the second passageway 22 are arc-shaped pedestrian passageways with the same length and the arc-shaped convex directions are consistent, the first passageway 21 and the second passageway 22 are converged and communicated at the starting point and the ending point of the first passageway 21 and the second passageway 22, so that the divergers can be shunted, and the second passageway 22 is positioned on the inner side of the arc, so that the walking distance of the divergers can be saved; corridor frame bodies 1 are fixedly connected above the junction of the road surfaces of the first walkway 21 and the second walkway 22, and the corridor frame bodies 1 are arranged above the first walkway 21. In this embodiment, 19 gallery bodies 1 are arranged above the walkways, and the 19 gallery bodies 1 are uniformly and rotatably arranged along the junction of the arc-shaped first walkway 21, the first walkway 21 and the second walkway 22, so as to form an arc-shaped gallery whole. Climbing plants for climbing the corridor frame body 1 are planted on two sides of the corridor 2.
As shown in fig. 2 and 3, the corridor body 1 is arranged vertically to the horizontal plane, the corridor body 1 comprises a first truss 11 and a second truss 12, the first truss 11 and the second truss 12 are located on the same plane and are arranged at intervals between the first truss and the second truss, the interval is gradually increased from the base 6 to the highest point of the corridor body 1, and the interval between the highest points of the first truss 11 and the second truss 12 is the largest, so that climbing and growing of plants in climbing are facilitated. The first truss 11 and the second truss 12 are fixedly connected with connecting blocks 13 at two ends of the base 6, and the connecting blocks 13 connect the first truss 11 and the second truss 12 with each other.
Be provided with straining beam 3 on the relative lateral wall between the adjacent first truss 11 top, the both sides that straining beam 3 and first truss 11 contacted each other are provided with angle sign indicating number 31, and a lateral wall and the first truss 11 of angle sign indicating number 31 contact, and another avris of angle sign indicating number 31 and the avris of straining beam 3 contact each other, and the both sides wall of angle sign indicating number 31 is through a plurality of first bolts 32 with straining beam 3 and first truss 11 reciprocal anchorage, and then makes straining beam 3 with adjacent first truss 11 interconnect. The structure is more stable between straining beam 3 enables adjacent corridor frame body 1, and straining beam 3 also can make and have even interval between adjacent corridor frame body 1 to it is more neat to make the range between the corridor frame body 1. The straining beam 3 is located the top of corridor frame body 1, for climbing the convenient condition of providing between the adjacent corridor frame body 1 of climbing plant, make climbing plant can more the efficient cover corridor frame body 1's top is complete, make corridor frame body 1 form the pleasing to the eye gardens building of appearance, for the tourist provides the place of having a rest, hiding, enjoying the cool, has higher practicality.
As shown in fig. 4 and 5, a hinged plate 4 is fixedly connected to the side wall of the second truss 12, an arc bench 5 is hinged between the hinged plate 4 and the adjacent second truss 12, and a counterweight 51 is arranged on the arc-shaped protruding side of the arc bench 5 facing the gallery frame body 1, so that when the arc bench 5 is not used, the arc bench 5 is kept in a vertical state under the action of self gravity and the gravity of the counterweight 51, and the arc bench 5 is automatically folded when not used, thereby saving the space occupation of the arc bench 5, and enabling the arc bench 5 to be kept neat and convenient to use when used. The upper surface of the hinged plate 4 is fixedly connected with a limiting block 41 for limiting the arc-shaped bench 5, so that the arc-shaped bench 5 can be kept in a horizontal state without deflection after a walker sits on the arc-shaped bench 5, and the normal use of the arc-shaped bench 5 is ensured.
Horizontal rigid coupling has two backrests 52 that are convenient for the pedestrian to lean on between first truss 11 and the second truss 12 of adjacent corridor frame body 1, backrest 52 is rectangular shape cylinder, backrest 52 is located the top of arc bench 5, the setting of arc bench 5 and backrest 52 not only can make things convenient for the tourist to have a rest, and can make the connection between corridor frame body 1 more stable, the practicality of corridor frame body 1 has been improved, and simultaneously, backrest 52 also enables corridor frame body 1 when the construction is under construction, the constructor of being convenient for carries out the adjustment of distance to it, thereby make the interval between the arc corridor frame more unified, arrange neatly.
As shown in fig. 5 and 6, the two ends of the gallery body 1 are provided with bases 6 for supporting the gallery body 1, and each base 6 includes cured concrete, a pi-shaped embedded part 61 fixedly connected in the concrete, and 2 fixing plates 62 fixedly connected to the tops of the embedded parts 61 for fixing the connecting block 13 at the bottom of the gallery body 1. The bottom of the connecting block 13 is provided with 2 accommodating grooves 131 for accommodating the fixing plate 62 in a matching manner, and the fixing plate 62 is fixedly connected with the connecting block 13 through a second bolt 63.
The staff is in the construction, treat that the concrete solidifies built-in fitting 61 after wherein, then insert holding tank 131 on the connecting plate with fixed plate 62, fix corridor frame body 1 bottom connecting block 13 and fixed plate 62 through second bolt 63 after that, a plurality of second bolts 63 (not drawn in the figure) enable fixed plate 62 and connecting block 13 fixed more stable, simple structure makes things convenient for the staff to be under construction simultaneously.
The working process is as follows: this arc corridor frame's structure for the climbing plant to adjacent corridor frame body between 1 condition of facilitating of climbing, make the climbing plant can more the efficient cover corridor frame body 1's top is complete to make corridor frame body 1 form the pleasing to the eye gardens building of appearance, provide the place of having a rest, hiding, enjoying the cool for the tourist. When the pedestrian needs to rest below the arc-shaped gallery frame, the pedestrian can sit on the arc-shaped bench 5 to have rest and entertainment activities only by pressing the side of the arc-shaped bench 5 with hands to enable the arc-shaped bench 5 to rotate to be parallel to the horizontal plane.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides an arc corridor frame which characterized in that: including curved corridor (2) and corridor frame body (1), the both ends of corridor frame body (1) all are provided with base (6), and corridor frame body (1) is located the top in corridor (2) and is provided with a plurality ofly and come along curved road surface uniform rotation, is provided with between adjacent corridor frame body (1) bottom with arc bench (5) that the protruding direction of corridor arc is the same, the top of arc bench (5) is provided with back (52) that are convenient for lean on.
2. The arcuate galley of claim 1, in which: the corridor frame body (1) comprises a first truss (11) and a second truss (12), the first truss (11) and the second truss (12) are located on the same plane and have intervals between the first truss and the second truss, the intervals gradually increase from the base (6) to the highest point of the truss, the intervals between the highest points of the first truss (11) and the second truss (12) are the largest, the two ends, located on the base (6), of the first truss (11) and the second truss (12) are fixedly connected with connecting blocks (13), and the first truss (11) and the second truss (12) are mutually fixed through the connecting blocks (13).
3. The arcuate galley of claim 2, in which: the lateral wall rigid coupling of second truss (12) has articulated slab (4), and the upper surface rigid coupling of articulated slab (4) has a stopper (41), arc bench (5) avris is articulated each other with articulated slab (4), and another avris of arc bench (5) is articulated each other with adjacent second truss (12) lateral wall, arc bench (5) are provided with balancing weight (51) towards corridor frame body (1) arc bellied avris.
4. The arcuate galley of claim 2, in which: the top end side wall of the first truss (11) is provided with a tension beam (3), and the tension beam (3) connects the adjacent first trusses (11) with each other.
5. The arcuate galley of claim 4, in which: the side wall of the tension beam (3) and the side wall of the first truss (11) are in mutual contact is provided with an angle code (31), and the angle code (31) fixes the tension beam (3) and the first truss (11) through a plurality of first bolts (32).
6. The arcuate galley of claim 1, in which: the base (6) comprises solidified concrete, a Pi-shaped embedded part (61) fixedly connected in the concrete, and a fixing plate (62) fixedly connected to the top of the embedded part (61) and used for fixing a connecting block (13) at the bottom of the gallery frame body (1).
7. The arcuate galley of claim 2, in which: the bottom of connecting block (13) is seted up and is held holding tank (131) of fixed plate (62), fixed plate (62) are through a plurality of second bolt (63) and connecting block (13) fixed connection.
8. The arcuate galley of claim 1, in which: the aisle (2) comprises a first aisle (21) and a second aisle (22), the arc-shaped protruding directions of the first aisle (21) and the second aisle (22) are consistent, and the starting points and the end points of the first aisle (21) and the second aisle (22) are mutually converged; the corridor body (1) is arranged above the junction of the road surfaces of the first walkway (21) and the second walkway (22), and the corridor body (1) is arranged at least above one first walkway (21) or second walkway (22).
CN201921144835.9U 2019-07-19 2019-07-19 Arc corridor frame Expired - Fee Related CN210658663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921144835.9U CN210658663U (en) 2019-07-19 2019-07-19 Arc corridor frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921144835.9U CN210658663U (en) 2019-07-19 2019-07-19 Arc corridor frame

Publications (1)

Publication Number Publication Date
CN210658663U true CN210658663U (en) 2020-06-02

Family

ID=70821120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921144835.9U Expired - Fee Related CN210658663U (en) 2019-07-19 2019-07-19 Arc corridor frame

Country Status (1)

Country Link
CN (1) CN210658663U (en)

Similar Documents

Publication Publication Date Title
CN202467276U (en) Three-dimensional greening parking device
CN102277824B (en) Combined type multifunctional corridor bridge
CN210658663U (en) Arc corridor frame
CN208533964U (en) A kind of snap-on suspension type assembled floor
CN101725194B (en) Calcareous tufa ecological waterscape wall
CN205548072U (en) Bench is sat to view
CN201234479Y (en) Leisure plant flower stand
CN207761342U (en) A kind of garden landscape pavilion
CN106577131B (en) Manufacturing method of umbrella tree chair with crown
CN203200951U (en) Plant ecological wall
CN211736546U (en) Landscape corridor frame structure based on garden design
CN202117348U (en) Outdoor solar rest pavilion
CN208363388U (en) A kind of single-pitch type photovoltaic power generation and rain collector
CN212380088U (en) A curved surface top corridor frame device for propaganda
CN208056289U (en) A kind of corridor
CN213509775U (en) Landscape rest pavilion
CN205330219U (en) Swimming pool stretch -draw membrane tent
CN204876665U (en) A open park pavilion corridor of building modelled after an antique for amusement and recreation
CN211776098U (en) Corridor frame structure of mosquito-proof worm of landscape
CN202099718U (en) Combined type multifunctional covered bridge
CN204571106U (en) Multifunction parapet
CN214532140U (en) Corridor frame structure based on landscape design
CN212078827U (en) Ecological landscape storage battery car post house
CN211646699U (en) Three-dimensional balcony garden
CN218076339U (en) Child amusement park in shape of giant sailing boat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200602