CN210654607U - Novel fluidization of ore dressing feed bin device - Google Patents

Novel fluidization of ore dressing feed bin device Download PDF

Info

Publication number
CN210654607U
CN210654607U CN201921483124.4U CN201921483124U CN210654607U CN 210654607 U CN210654607 U CN 210654607U CN 201921483124 U CN201921483124 U CN 201921483124U CN 210654607 U CN210654607 U CN 210654607U
Authority
CN
China
Prior art keywords
frame
feed bin
bin
bin body
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921483124.4U
Other languages
Chinese (zh)
Inventor
温世忠
熊楚侨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Well Tech International Mining Equipment Co ltd
Original Assignee
Jiangxi Well Tech International Mining Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Well Tech International Mining Equipment Co ltd filed Critical Jiangxi Well Tech International Mining Equipment Co ltd
Priority to CN201921483124.4U priority Critical patent/CN210654607U/en
Application granted granted Critical
Publication of CN210654607U publication Critical patent/CN210654607U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a novel fluidization of ore dressing feed bin device, including feed bin skeleton, feed bin body and closing plate, there is the feed bin body feed bin skeleton bottom through bolt fixed mounting, and there is the closing plate feed bin body bottom through bolt fixed mounting, and there is the welded pipe closing plate one side through bolt fixed mounting, fixes being provided with the bolt between closing plate and the feed bin body, and feed bin body bottom mounting is provided with the fluidization plate. This kind of novel ore dressing feed bin's fluidization device's dustproof effect is better, can use the novel ore dressing feed bin of different diameters size to install simultaneously to can blow and break up the grit in the frame, add the fluidization subassembly at easy jam position and can arrange stifled, promote the material and advance.

Description

Novel fluidization of ore dressing feed bin device
Technical Field
The utility model relates to a mining equipment technical field specifically is a novel fluidization of ore dressing feed bin device.
Background
At present, in the domestic metallurgical industry, metallurgical plants in various industries are rapidly developed and reach the advanced level of the world, but the technology of a production and processing method of metal mineral powder which is one of metal raw materials is relatively laggard.
The sandstone conveying pipe of the existing ore dressing bin is easy to block, and the main reason of pipeline blocking is that the long-distance conveying pipeline system is low in conveying pressure, slow in material conveying and easy to accumulate. Secondly, some sand is attached to the inner wall of the ash conveying pipeline, and the more sand is accumulated, the problem of pipeline blockage failure is easy to occur; and the fluidizing device of the existing ore dressing bin is usually installed in an unadjustable manner by an integral type and is assembled by fastening parts such as bolts and the like, the installation diameter can not be changed, and the problems of difficulty in installation and disassembly of the device and difficult application and popularization are solved.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the shortcoming that exists among the prior art, provide a novel fluidization of ore dressing feed bin device.
In order to achieve the purpose, the utility model provides a following technical scheme, a novel fluidization of ore dressing feed bin device, including feed bin skeleton, feed bin body and closing plate, there is the feed bin body feed bin skeleton bottom through bolt fixed mounting, there is the closing plate feed bin body bottom through bolt fixed mounting, there is the welded pipe closing plate one side through bolt fixed mounting, the fixed bolt that is provided with between closing plate and the feed bin body, feed bin body bottom mounting is provided with the fluidization plate.
The fluidization assembly comprises a frame, a baffle, a leather layer, mounting holes, a fan, an opening, spoilers, chutes, nozzles, a bracket and balls, the frame is fixedly mounted at the bottom end of the stock bin body through bolts, the four sides above the frame are rotatably connected with the baffle through hinges, the leather layer is arranged between every two adjacent baffles through rivet fixation, the mounting holes are formed in the inner holes of the baffles, the fan is fixedly mounted on the left side of the frame through bolts, the opening in the left side of the frame is provided with the opening, the spoilers are movably connected inside the opening, the nozzles are fixedly mounted on the right side of the spoilers through bolts, the bracket is fixedly mounted inside the frame through bolts, and the balls are fixedly arranged above the bracket.
Furthermore, the nozzles are uniformly arranged on the right side of the spoiler in a shape, and the nozzles are connected with the fan through hoses.
Further, the baffle is fixedly connected with the bin body through the mounting hole and the bolt in a matched mode.
Furthermore, a limiting block matched with the opening is arranged above the right side of the flow blocking plate, and the flow blocking plate is matched with the opening.
Further, the rotation angle between the frame and the baffle is 0-60 degrees, and the frame can be detached and replaced through bolts.
Furthermore, the front surface of the frame is provided with a control switch which is matched with the fan for use, and the fan is electrically connected with an external power supply.
The utility model provides a novel fluidization of ore dressing feed bin device has following beneficial effect:
1. the utility model has the advantages of, the user controls the debris flow velocity horizontal slip to the spoiler of opening inside swing joint in the frame, and the wind-force that the fan produced this moment is a form align to grid nozzle that sets up through hose transfer to the spoiler right side, and the grit in the frame is blown and is broken up to the nozzle, adds the fluidization subassembly at easy jam position and can arrange stifled, promotes the material and gos forward.
2. Secondly, because the leather layer that sets up through rivet fixation between two adjacent baffles and the turned angle between frame and the baffle are 0-60, make inside this kind of fluidization subassembly of its can effectively prevent that the dust from getting into the frame to and the leakproofness is better, it is better to the dustproof effect of this kind of novel ore dressing feed bin, can use the novel ore dressing feed bin of different diameters size to install simultaneously.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an overall schematic view of the fluidization assembly of the present invention.
Fig. 3 is a schematic sectional view of the fluidization plate according to the present invention.
FIG. 4 is a schematic view of a partial section of the bracket of the present invention
In FIGS. 1-4: the device comprises a bin skeleton 1, a bin body 2, a sealing plate 3, a welding pipe 4, bolts 5, a fluidization plate 6, a frame 601, a baffle 602, a leather layer 603, a mounting hole 604, a fan 605, an opening 606, a spoiler 607, a chute 6071, a nozzle 608, a bracket 609 and balls 6091.
Detailed Description
Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example (b):
referring to figures 1-3 of the drawings,
the embodiment provides a novel fluidization of ore dressing feed bin device, including feed bin skeleton 1, feed bin body 2 and closing plate 3, there is feed bin body 2 feed bin skeleton 1 bottom through bolt fixed mounting, and there is closing plate 3 feed bin body 2 bottom through bolt fixed mounting, and there is welded pipe 4 closing plate 3 one side through bolt fixed mounting, fixes being provided with bolt 5 between closing plate 3 and the feed bin body 2, and 2 bottom mounting of feed bin body are provided with fluidization plate 6.
Fluidization subassembly includes frame 601, baffle 602, leather layer 603, mounting hole 604, fan 605, opening 606, spoiler 607, spout 6071, nozzle 608, bracket 609 and ball 6091, there is frame 601 bottom 2 of feed bin body through bolt fixed mounting, frame 601 top four sides all is connected with baffle 602 through hinge rotation, be provided with leather layer 603 through fix with rivet between two adjacent baffles 602, the inside trompil of baffle 602 is provided with mounting hole 604, there is fan 605 frame 601 left side through bolt fixed mounting, frame 601 left side opening is provided with opening 606, the inside swing joint of opening 606 has spoiler 607, spoiler 607 right side has a plurality of nozzle 608 through bolt fixed mounting, the inside bracket 609 of passing through bolt fixed mounting of frame 601, the fixed ball 6091 that is provided with in bracket 609 top.
Furthermore, the nozzles 608 are uniformly arranged on the right side of the spoiler 607 in a shape of a line, the nozzles 608 are connected with the fan 605 through hoses, wind power generated by the fan 605 is transmitted to the nozzles 608 uniformly arranged on the right side of the spoiler 607 in a shape of a line through the hoses, and the nozzles 608 blow and scatter sand in the frame 601.
Further, baffle 602 and feed bin body 2 between through mounting hole 604 and bolt cooperation fixed connection, make it can use the novel ore dressing feed bin of different diameters size to install.
Further, spoiler 607 right side top is equipped with the stopper of using with opening 606 is supporting, and spoiler 607 agrees with each other with opening 606, according to actual conditions to passing through mounting hole 604 and bolt cooperation fixed connection between baffle 602 and the feed bin body 2, and is better to the dustproof effect of this kind of novel ore dressing feed bin.
Further, the rotation angle between the frame 601 and the baffle 602 is 0-60 °, and the frame 601 can be detached and replaced by bolts, and because the leather layer 603 fixed between two adjacent baffles 602 by rivets and the rotation angle between the frame 601 and the baffle 602 is 0-60 °, the fluidization assembly can effectively prevent dust from entering the inside of the frame 601.
Further, a control switch matched with the fan 605 is arranged on the front surface of the frame 601, and the fan 605 is electrically connected with an external power supply, so that the fan 605 provides wind power to add the fluidization component to the position easy to block to remove the block, and the material is pushed to move forward.
The working principle is as follows:
when the novel fluidization device for the mineral separation bin provided by the embodiment is used, firstly, the baffle 602 is fixedly connected with the bin body 2 through the mounting hole 604 in a matched manner with the bolt, then, sand is poured into the bin framework 1, the sand in the bin framework 1 flows to the frame 601 from the bin body 2, then, a user controls the flow rate of the sand to slide left and right in the frame 601 through the baffle 607 movably connected with the inside of the opening 606, the sand in the bin framework 1 descends layer by layer through the frame 601, fluid enters the fluidization plate 6 through the bin body 2 and descends layer by layer to fluidize particles of each layer, at the moment, wind power generated by the fan 605 is transmitted to the nozzles 608 uniformly arranged on the right side of the baffle 607 through the hose, the nozzles 608 blow and scatter the sand in the frame 601 to fluidize dust of the sand, gas-solid graded countercurrent contact is carried out, and a fluidization component is added at a position easy to block, promote the material and advance, in the in-service use in-process, through mounting hole 604 and bolt cooperation fixed connection between baffle 602 and the feed bin body 2, to through mounting hole 604 and bolt cooperation fixed connection between baffle 602 and the feed bin body 2 according to actual conditions, and because the leather layer 603 that sets up through rivet fixation between two adjacent baffles 602 and the turned angle between frame 601 and the baffle 602 are 0-60 to and the leakproofness is better.
To sum up, this kind of novel ore dressing feed bin's fluidization device's dustproof effect is better, can use the novel ore dressing feed bin of different diameters size to install simultaneously to can blow and break up its dust fluidization with the grit in the frame, carry out the gas-solid and contact in grades against the current, add the fluidization subassembly at the easy position that blocks up and can arrange stifled, promote the material and advance.

Claims (6)

1. A novel fluidization device of a mineral separation bin comprises a bin framework (1), a bin body (2) and a sealing plate (3), wherein the bin framework (1) is fixedly provided with the bin body (2) through a bolt, the bottom of the bin body (2) is fixedly provided with the sealing plate (3) through a bolt, and the novel fluidization device is characterized in that one side of the sealing plate (3) is fixedly provided with a welding pipe (4) through a bolt, a bolt (5) is fixedly arranged between the sealing plate (3) and the bin body (2), the bottom of the bin body (2) is fixedly provided with a fluidization plate (6),
the fluidization assembly comprises a frame (601), baffles (602), leather layers (603), mounting holes (604), fans (605), openings (606), spoilers (607), chutes (6071), nozzles (608), brackets (609) and balls (6091), wherein the frame (601) is fixedly mounted at the bottom end of the bin body (2) through bolts, the baffles (602) are rotatably connected to four sides above the frame (601) through hinges, the leather layers (603) are fixedly arranged between every two adjacent baffles (602) through rivets, the mounting holes (604) are formed in internal holes of the baffles (602), the fans (605) are fixedly mounted on the left side of the frame (601) through bolts, the openings (606) are formed in the left side of the frame (601), the spoilers (607) are movably connected to the interiors of the openings (606), and a plurality of nozzles (608) are fixedly mounted on the right side of the spoilers (607) through bolts, a bracket (609) is fixedly installed inside the frame (601) through a bolt, and a ball (6091) is fixedly arranged above the bracket (609).
2. The novel fluidization device for the ore dressing bin according to claim 1, wherein the nozzles (608) are uniformly arranged on the right side of the spoiler (607) in a straight shape, and the nozzles (608) are connected with the fan (605) through hoses.
3. The novel fluidization device for the mineral processing bin, according to claim 1, is characterized in that the baffle (602) is fixedly connected with the bin body (2) through a mounting hole (604) in a bolt fit manner.
4. The novel fluidization device for the mineral processing bin as claimed in claim 1, wherein a limiting block matched with the opening (606) is arranged above the right side of the flow blocking plate (607), and the flow blocking plate (607) is matched with the opening (606).
5. The novel fluidization device for the mineral processing bin is characterized in that the rotation angle between the frame (601) and the baffle (602) is 0-60 degrees, and the frame (601) can be detached and replaced through bolts.
6. The novel fluidization device for the mineral processing bin as defined in claim 1, wherein a control switch used in cooperation with the fan (605) is disposed on a front surface of the frame (601), and the fan (605) is electrically connected to an external power source.
CN201921483124.4U 2019-09-07 2019-09-07 Novel fluidization of ore dressing feed bin device Expired - Fee Related CN210654607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921483124.4U CN210654607U (en) 2019-09-07 2019-09-07 Novel fluidization of ore dressing feed bin device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921483124.4U CN210654607U (en) 2019-09-07 2019-09-07 Novel fluidization of ore dressing feed bin device

Publications (1)

Publication Number Publication Date
CN210654607U true CN210654607U (en) 2020-06-02

Family

ID=70820363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921483124.4U Expired - Fee Related CN210654607U (en) 2019-09-07 2019-09-07 Novel fluidization of ore dressing feed bin device

Country Status (1)

Country Link
CN (1) CN210654607U (en)

Similar Documents

Publication Publication Date Title
CN201245373Y (en) Flexible vibration block-resistant coal conduit
CN202697692U (en) Blanking device of cigarette making machine
CN205169714U (en) Unpowered dust removal baffle box dust collecting system
CN102491016A (en) Integrated automatic dredging hopper
CN203237759U (en) Coal-conveying transfer station square curve flow guidance dust suppression device
CN210654607U (en) Novel fluidization of ore dressing feed bin device
CN201190013Y (en) Three-dimensional disperse material collecting coal dropping pipe
CN209325417U (en) Chute device
CN208883041U (en) A kind of dump skip with dedusting function
CN203173185U (en) Down-stream type bin pump
CN201263935Y (en) Ash bucket
CN203469669U (en) High-efficiency and wear-resistant inertial dust collector
CN202935946U (en) Efficient positive-pressure pneumatic conveying system of pebble coal
CN112879068B (en) Fully-mechanized excavating face large vortex dust collection-cyclone wind distribution domain division system and domain division ventilation dust control method
CN208879242U (en) A kind of conveying type dust removal machine
CN208979933U (en) A kind of tube mill charging dust prevention system
CN210393015U (en) Belt conveying device with blanking dustproof mechanism
CN202542315U (en) Anti-blockage and dust suppressing material falling pipe
CN207774084U (en) A kind of multi-pipeline Coal Cake Falling Device
CN220222223U (en) Research design and practical application device for curve chute member
CN111891780A (en) Totally-enclosed coal conveying system for thermal power plant
CN206013891U (en) A kind of strength stone coal delivery system
CN217147512U (en) Conveyer belt jetting device
CN207293067U (en) A kind of self-cleaning type grain elephant trunk vertical pipe buffer unit
CN109482332A (en) A kind of heavy medium cyclone device of coal engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200602

Termination date: 20210907