CN210632884U - Forging cooling device for metal forging - Google Patents

Forging cooling device for metal forging Download PDF

Info

Publication number
CN210632884U
CN210632884U CN201921730705.3U CN201921730705U CN210632884U CN 210632884 U CN210632884 U CN 210632884U CN 201921730705 U CN201921730705 U CN 201921730705U CN 210632884 U CN210632884 U CN 210632884U
Authority
CN
China
Prior art keywords
water
forging
base
wall
cooling bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921730705.3U
Other languages
Chinese (zh)
Inventor
陈刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Yonghao Machinery Co Ltd
Original Assignee
Jining Yonghao Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jining Yonghao Machinery Co Ltd filed Critical Jining Yonghao Machinery Co Ltd
Priority to CN201921730705.3U priority Critical patent/CN210632884U/en
Application granted granted Critical
Publication of CN210632884U publication Critical patent/CN210632884U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The utility model discloses a forging cooling device for metal forging, the on-line screen storage device comprises a base, the cavity has been seted up to the inside of base, first through-hole has been seted up on the top inner wall of base, fixedly connected with cooling bin on the outer wall of base top, first through-hole is linked together with cooling bin, fixedly connected with shower nozzle on the top inner wall of cooling bin, the second through-hole has been seted up on the top inner wall of shower nozzle, fixedly connected with water delivery board on the top outer wall of cooling bin, the cavity has been seted up to water delivery board inside, the second through-hole is linked together with the inside cavity of water delivery board, the both sides fixedly connected with water tank of cooling bin. The utility model discloses in, when needs cool off the forging, can be through placing the forging on the conveyer belt, through the rotation of runner, the forging enters into the cooling bin, through opening the water pump, with the water extraction in the water tank in advance the water delivery board, then the rethread shower nozzle sprays and cools off the forging, causes the scald when preventing manual work.

Description

Forging cooling device for metal forging
Technical Field
The utility model relates to a metal forging technical field especially relates to a forging cooling device for metal forging.
Background
The forging is a processing method which applies pressure to a metal blank by using a forging machine to enable the metal blank to generate plastic deformation so as to obtain a forging with certain mechanical property, certain shape and certain size, one of two major components of the forging (forging and stamping) can eliminate the defects of casting-state looseness and the like generated in the smelting process of metal through forging, optimize a microstructure, and meanwhile, as a complete metal streamline is saved, the mechanical property of the forging is generally superior to that of a casting made of the same material, important parts with high load and severe working conditions in related machinery are important, and except for a plate, a section or a welding piece which has a simple shape and can be rolled, the forging is mostly adopted.
In the present metal forging flow, do not have special cooling device behind the forging demolding, stack the cooling at will, to the unable control of tissue of forging to owing to stack improperly, very easily cause the bruise of forging, influence the appearance quality and cause the forging to scrap even, need the manual work to carry out the clamping to the metal of high temperature in the refrigerated time and cause bodily injury easily, and the water that flows to the ground when the water cools off is extravagant easily.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art, and provides a forging cooling device for metal forging.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a forge piece cooling device for metal forging comprises a base, wherein a cavity is formed in the base, a first through hole is formed in the inner wall of the top end of the base, a cooling bin is fixedly connected to the outer wall of the top end of the base, the first through hole is communicated with the cooling bin, a spray head is fixedly connected to the inner wall of the top end of the cooling bin, a second through hole is formed in the inner wall above the spray head, a water delivery plate is fixedly connected to the outer wall of the top end of the cooling bin, a cavity is formed in the water delivery plate, the second through hole is communicated with the cavity in the water delivery plate, water tanks are fixedly connected to two sides of the cooling bin and the water delivery plate, a partition plate is arranged on the inner wall of each water tank, two ends of the partition plate are fixedly connected with the inner wall of each water tank, a water pump is arranged at the top end of the partition plate, a water outlet of the water pump is connected, the utility model discloses a cooling device, including base, water pump, baffle, water tank, water inlet, water pump, water inlet, water outlet, water inlet, water pump, water tank, runner surface mounting has a conveyer belt, the both sides fixedly connected with cold water machine of base, water inlet department is connected with the inlet tube to the water pump, one side that the cooling storehouse was kept away from to the water tank is equipped with the runner, the water tank is equipped with the conveyer belt, the both sides fixedly connected with cold water machine of base, cold water machine water inlet department is connected with the inlet tube, the outer wall that cold water machine one end runs through the base is kept away from to the inlet tube is linked together with.
As a further description of the above technical solution:
the quantity of shower nozzle is the multiunit, and the quantity of multiunit shower nozzle is sharp equidistance and distributes.
As a further description of the above technical solution:
the quantity of runner is two sets ofly, and two sets of runners are axis-symmetric installation with the horizontal center line of base.
As a further description of the above technical solution:
the water tank surface is seted up the opening, and the conveyer belt runs through the water tank and the cooling bin is connected with two sets of runners.
As a further description of the above technical solution:
the number of the water tanks, the water pumps and the water coolers is two, and the two water tanks, the water pumps and the water coolers are installed in an axisymmetric mode by using the horizontal center line of the base.
As a further description of the above technical solution:
the water delivery plate is cuboid, and the surface of the water delivery plate is a smooth plane.
As a further description of the above technical solution:
the base, the cooling bin, the water delivery plate and the water tank are all made of stainless steel materials, and the surfaces of the base, the cooling bin, the water delivery plate and the water tank are all smooth planes.
The utility model discloses following beneficial effect has:
1. when needs cool off the forging, can be through placing the forging on the conveyer belt, through the rotation of runner, the forging enters into the cooling bin, through opening the water pump, with the water extraction in the water tank into the water delivery board, then the rethread shower nozzle sprays and cools off the forging, causes the scald when preventing manual operation.
2. When the water of the cooling forging absorbs heat, the water flows into the base through the first through hole, and then enters the water tank after being cooled by the water cooler, so that the effect of water resource recycling is achieved.
Drawings
FIG. 1 is a front view of a forging cooling device for metal forging in accordance with the present invention;
FIG. 2 is a cross-sectional view of a forging cooling device for metal forging in accordance with the present invention;
fig. 3 is a side view of the forging cooling device for metal forging according to the present invention.
Illustration of the drawings:
1. a base; 2. a first through hole; 3. a cooling bin; 4. a spray head; 5. a second through hole; 6. a water conveyance board; 7. a water tank; 8. a partition plate; 9. a water pump; 10. a water outlet pipe; 11. a water pumping pipe; 12. a rotating wheel; 13. a conveyor belt; 14. a water chiller; 15. a water inlet pipe; 16. and a water supply pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the present invention, it should be noted that.
Referring to fig. 1-3, the present invention provides an embodiment: a forging cooling device for metal forging comprises a base 1, a cavity is arranged inside the base 1, a first through hole 2 is arranged on the inner wall of the top end of the base 1, a cooling bin 3 is fixedly connected to the outer wall of the top end of the base 1, the first through hole 2 is communicated with the cooling bin 3, a spray head 4 is fixedly connected to the inner wall of the top end of the cooling bin 3, a second through hole 5 is arranged on the inner wall above the spray head 4, a water delivery plate 6 is fixedly connected to the outer wall of the top end of the cooling bin 3, a cavity is arranged inside the water delivery plate 6, the second through hole 5 is communicated with the cavity inside the water delivery plate 6, water tanks 7 are fixedly connected to two sides of the cooling bin 3 and the water delivery plate 6, partition plates 8 are arranged on the inner walls of the water tanks 7, two ends of the partition plates 8 are fixedly connected with the inner walls of the water tanks 7, a water pump 9 is arranged at the, the inner wall that the one end of outlet pipe 10 far away from water pump 9 delivery port runs through water tank 7 is linked together with the inside cavity of water delivery plate 6, the water inlet department of water pump 9 is connected with drinking-water pipe 11, the one end that water pump 9 water inlet was kept away from to drinking-water pipe 11 runs through baffle 8 and is linked together with the bottom of water tank 7, one side that cooling bin 3 was kept away from to water tank 7 is equipped with runner 12, runner 12 surface mounting has conveyer belt 13, base 1's both sides fixedly connected with cold water machine 14, the model is "BIC-W/A", cold water machine 14 water inlet department is connected with inlet tube 15, inlet tube 15 keeps away from the outer wall that cold water machine 14 one end runs through base 1 and is linked together with the inside cavity of base 1, cold water machine 14 water outlet department is connected with flow pipe 16.
The number of the spray heads 4 is multiple groups, the number of the multiple groups of spray heads 4 is linearly and equidistantly distributed, the spraying range is increased, the number of the rotating wheels 12 is two, the two groups of rotating wheels 12 are arranged in an axisymmetric manner by taking the horizontal central line of the base 1, the conveying efficiency is more convenient, the surface of the water tank 7 is provided with an opening, the conveying belt 13 penetrates through the water tank 7 and the cooling bin 3 to be connected with the two groups of rotating wheels 12, the water tank 7 is prevented from being collided by a forge piece, the number of the water tank 7, the water pump 9 and the water cooler 14 is two groups, the two groups of water tank 7, the water pump 9 and the water cooler 14 are arranged in an axisymmetric manner by taking the horizontal central line of the base 1, the cooling effect is increased, the water conveying plate 6 is cuboid in shape, the surface of the water conveying plate 6 is a smooth plane, the water accumulation amount is increased, the, and the surfaces of the base 1, the cooling bin 3, the water delivery plate 6 and the water tank 7 are smooth planes.
The working principle is as follows: the utility model discloses in, at first place the forging on conveyer belt 13, rotation through runner 12, the forging enters into cooling chamber 3, through opening water pump 9, in water extraction into water delivery board 6 in the water tank 7, water enters into in shower nozzle 4 through second through-hole 5, then spray through shower nozzle 4 and cool off the forging, cause the scald when preventing manual work, endothermic water flows into base 1 through first through-hole 2 on the forging, then cool off in extracting to machine 14 through inlet tube 15 again, water rethread water supply pipe 16 after the cooling enters into water tank 7, rethread water pump 9 extraction cools off the forging, come and go, thereby reach the effect of recycling, thereby reach the waste of reduction water resource.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. A forging cooling device for metal forging, including base (1), its characterized in that: the water cooling device is characterized in that a cavity is formed in the base (1), a first through hole (2) is formed in the inner wall of the top end of the base (1), a cooling bin (3) is fixedly connected to the outer wall of the top end of the base (1), the first through hole (2) is communicated with the cooling bin (3), a spray head (4) is fixedly connected to the inner wall of the top end of the cooling bin (3), a second through hole (5) is formed in the inner wall above the spray head (4), a water conveying plate (6) is fixedly connected to the outer wall of the top end of the cooling bin (3), a cavity is formed in the water conveying plate (6), the second through hole (5) is communicated with the cavity in the water conveying plate (6), water tanks (7) are fixedly connected to the two sides of the cooling bin (3) and the water conveying plate (6), partition plates (8) are arranged on the inner walls of the water tanks (7), and the two ends of the partition plates (8, the water pump is characterized in that a water pump (9) is arranged at the top end of the partition plate (8), a water outlet pipe (10) is connected to the water outlet of the water pump (9), one end, far away from the water outlet of the water pump (9), of the water outlet pipe (10) is communicated with the inner wall of the water tank (7) in a penetrating mode, and the inner cavity of the water delivery plate (6), the water inlet of the water pump (9) is connected with a water pumping pipe (11), one end, far away from the water outlet of the water pump (9), of the water pumping pipe (11) is communicated with the bottom of the water tank (7) in a penetrating mode through the partition plate (8), one side, far away from the cooling bin (3), of the water tank (7) is provided with a rotating wheel (12), a conveying belt (13) is arranged on the surface of the rotating wheel (12), cold water machines (14) are fixedly connected to the two sides of the base (1), a water outlet of the water cooler (14) is connected with a water supply pipe (16), and one end, far away from the water cooler (14), of the water supply pipe (16) penetrates through the outer wall of the water tank (7) and is communicated with the inside of the water tank (7).
2. The forging cooling device for metal forging of claim 1, wherein: the number of the spray heads (4) is multiple groups, and the number of the spray heads (4) is distributed in a straight line and at equal intervals.
3. The forging cooling device for metal forging of claim 1, wherein: the quantity of the rotating wheels (12) is two, and the two groups of rotating wheels (12) are arranged in axial symmetry with the horizontal center line of the base (1).
4. The forging cooling device for metal forging of claim 1, wherein: the surface of the water tank (7) is provided with an opening, and the conveying belt (13) penetrates through the water tank (7) and the cooling bin (3) to be connected with the two groups of rotating wheels (12).
5. The forging cooling device for metal forging of claim 1, wherein: the water tanks (7), the water pumps (9) and the water coolers (14) are arranged in two groups, and the two groups of water tanks (7), the water pumps (9) and the water coolers (14) are installed in an axisymmetric mode by using the horizontal center line of the base (1).
6. The forging cooling device for metal forging of claim 1, wherein: the water delivery plate (6) is cuboid, and the surface of the water delivery plate (6) is a smooth plane.
7. The forging cooling device for metal forging of claim 1, wherein: the base (1), the cooling bin (3), the water delivery plate (6) and the water tank (7) are made of stainless steel materials, and the surfaces of the base (1), the cooling bin (3), the water delivery plate (6) and the water tank (7) are smooth planes.
CN201921730705.3U 2019-10-16 2019-10-16 Forging cooling device for metal forging Expired - Fee Related CN210632884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921730705.3U CN210632884U (en) 2019-10-16 2019-10-16 Forging cooling device for metal forging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921730705.3U CN210632884U (en) 2019-10-16 2019-10-16 Forging cooling device for metal forging

Publications (1)

Publication Number Publication Date
CN210632884U true CN210632884U (en) 2020-05-29

Family

ID=70793998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921730705.3U Expired - Fee Related CN210632884U (en) 2019-10-16 2019-10-16 Forging cooling device for metal forging

Country Status (1)

Country Link
CN (1) CN210632884U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111570716A (en) * 2020-06-03 2020-08-25 马鞍山市福德机械制造有限公司 Forging heat treatment cooling device and working method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111570716A (en) * 2020-06-03 2020-08-25 马鞍山市福德机械制造有限公司 Forging heat treatment cooling device and working method thereof

Similar Documents

Publication Publication Date Title
CN208555948U (en) A kind of Mechanical processing of casting rapid cooling casting device
CN210632884U (en) Forging cooling device for metal forging
CN104275434A (en) Rapid cooling equipment for forged gear
CN209669326U (en) The aluminium alloy extruded online water cooling plant of production line
CN215825119U (en) Cooling device for grinding machine
CN208232270U (en) A kind of cooling device of injection mold
CN212469730U (en) Rapid cooling device for casting metal fittings
CN207170084U (en) A kind of surface of steel plate processing equipment
CN218926661U (en) Welding water cooling device of stainless steel automatic welded pipe production line
CN210907415U (en) Steel rolling workpiece cooling device
CN210023734U (en) Circulating cooling device for pig iron casting processing
CN207170110U (en) A kind of Corrosion-proof steel productses spraying equipment
CN215786227U (en) Cooling device of mechanical stamping die
CN213542975U (en) Cooling device of rubber production
CN214720416U (en) Die casting circulative cooling mechanism
CN202322929U (en) Online water cooling or air cooling quenching device for accurate aluminum profiles
CN214735912U (en) Blanking structure and quenching cooling mechanism
CN211990287U (en) Atomizing water cooling equipment for steel pipe production
CN214263828U (en) Centrifugal casting mould
CN221312441U (en) Anti-blocking vacuumizing exhaust block
CN220269802U (en) Aluminum alloy profile machining cooler
CN206048641U (en) A kind of rustless steel belt cools down tablet machine
CN206367125U (en) A kind of modified plastics production high-efficiency energy-saving cooling device
CN210679332U (en) Cooling device is used in mould production
CN213797667U (en) Quick cooling and shaping device for plastic molding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Forging cooling device for metal forging

Effective date of registration: 20210402

Granted publication date: 20200529

Pledgee: Bank of China Limited Wenshang sub branch

Pledgor: Jining Yonghao Machinery Co.,Ltd.

Registration number: Y2021980002399

PE01 Entry into force of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200529