CN210624218U - Special lighting device for underground engineering construction measurement - Google Patents

Special lighting device for underground engineering construction measurement Download PDF

Info

Publication number
CN210624218U
CN210624218U CN201921616310.0U CN201921616310U CN210624218U CN 210624218 U CN210624218 U CN 210624218U CN 201921616310 U CN201921616310 U CN 201921616310U CN 210624218 U CN210624218 U CN 210624218U
Authority
CN
China
Prior art keywords
lighting unit
power supply
auxiliary lighting
lamp
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921616310.0U
Other languages
Chinese (zh)
Inventor
和龙斌
任熠
袁光
赵洪军
张浩琦
胡俊亮
胡晓瑜
孙晓辉
赵延风
司英保
郭天平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201921616310.0U priority Critical patent/CN210624218U/en
Application granted granted Critical
Publication of CN210624218U publication Critical patent/CN210624218U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

The utility model discloses a special lighting device for underground engineering construction measurement, which comprises a power supply unit, a main lighting unit and three auxiliary lighting units; the power supply unit consists of a battery box, a storage battery and a power supply distributor, wherein the storage battery and the power supply distributor are arranged in the battery box; the power supply distributor consists of an input interface and three output interfaces, the input interface is connected with the storage battery through a power switch, the first output interface is connected with the main lighting unit and the first auxiliary lighting unit, and the second output interface and the third output interface are respectively connected with the second auxiliary lighting unit and the third auxiliary lighting unit correspondingly; the main lighting unit consists of a main lighting lamp holder arranged at one end of the universal bending lamp neck and a first auxiliary lighting unit at the other end of the universal bending lamp neck; the first, second and third auxiliary lighting units have the same structure and are composed of a lamp housing provided with a plug-in slot, a lamp bead arranged on the wall of the lamp housing and a power input interface. The utility model discloses a construction measurement provides the illumination light of permanent time, stability under low light or no light environment.

Description

Special lighting device for underground engineering construction measurement
Technical Field
The utility model relates to an underground works construction lighting device especially relates to special lighting device of underground works construction survey.
Background
In the process of constructing underground structures such as tunnels, the construction measurement control point position or the plane measurement of the control network plane lead point position is required. When the measuring environment is in a weak light or no light condition, the prism group and the triangular plate installed on the measuring position need to be illuminated normally to complete the measuring work. At present, under the condition of weak light or no light, the constant-brightness illumination of the prism group and the triangular plate mark is mostly finished by holding a strong-light flashlight by a special person; because the illumination duration is longer, the phenomenon of rocking can appear in the light source among the lighting process, lead to department's mirror personnel eye fatigue even cause serious visual disorder, this not only causes the injury for department's mirror personnel's body and mind, because the light source rocks direct influence measurement accuracy and work efficiency.
Disclosure of Invention
An object of the utility model is to provide a special lighting device of underground works construction survey realizes providing stable normal bright light.
In order to achieve the above purpose, the utility model adopts the following technical proposal:
the utility model discloses a special lighting device for underground engineering construction measurement, which comprises a power supply unit, a main lighting unit and three auxiliary lighting units; the power supply unit consists of a battery box, a storage battery and a power supply distributor, wherein the storage battery and the power supply distributor are arranged in the battery box; the power supply distributor consists of an input interface and three output interfaces, the input interface is connected with the storage battery through a power switch, the first output interface is connected with the power supply input interfaces of the main lighting unit and the first auxiliary lighting unit, and the second output interface and the third output interface are respectively correspondingly connected with the power supply input ends of the second auxiliary lighting unit and the third auxiliary lighting unit; the main lighting unit consists of a main lighting lamp holder arranged at one end of the universal bending lamp neck and a first auxiliary lighting unit at the other end of the universal bending lamp neck; the first, second and third auxiliary lighting units have the same structure and are composed of a lamp shell provided with a plug-in groove, a lamp bead arranged on the wall of the lamp shell and a power input interface.
The input interface, the first output interface, the second output interface, the third output interface and the power input interfaces of the main lighting unit, the first auxiliary lighting unit, the second auxiliary lighting unit and the third auxiliary lighting unit on the power distributor are all hole type two-core jacks.
The battery case with power distributor passes through the screw connection as an organic whole, and the battery case lateral wall is equipped with the couple that is used for being connected with prism group chopping block.
The storage battery is a 12-volt rechargeable storage battery, and the lamp beads of the main lighting lamp holder and the auxiliary lighting unit are 12-volt LED lamp beads.
The utility model discloses specially design for underground structure construction measurement, for construction measurement provides permanent time, stable light under low light or no light environmental condition, avoided main department's mirror personnel to aim produced visual fatigue at reading in-process in normal measurement, not only improved measurement accuracy and work efficiency, removed the artificial lighting operation simultaneously from, saved the personnel resource allocation that the special messenger carries out the auxiliary lighting to prism group.
Drawings
Fig. 1 is a schematic structural diagram of the power supply unit of the present invention.
Fig. 2 is a schematic top view of the structure of fig. 1.
Fig. 3 is a schematic structural diagram of the main lighting unit of the present invention.
Fig. 4 is a schematic structural diagram of the auxiliary lighting unit of the present invention.
Fig. 5 is a schematic diagram of the right-side structure of fig. 4.
Fig. 6 is a schematic structural diagram of the two-core power line of the present invention.
Fig. 7 is a schematic view of the structure of the usage state of the present invention.
Detailed Description
The following describes embodiments of the present invention in detail with reference to the drawings, which are implemented on the premise of the technical solution of the present invention, and detailed embodiments and specific operation procedures are provided, but the scope of the present invention is not limited to the following embodiments.
As shown in figures 1-7, the utility model discloses a special lighting device is measured in underground works construction, including electrical unit, main lighting unit and three auxiliary lighting unit.
As shown in fig. 1 and 2, the power supply unit is composed of a battery box 2 with a hook 1, a 12-volt rechargeable battery arranged in the battery box 2 and a power distributor 3, wherein the battery box 2 and the power distributor 3 are connected into a whole through a screw 4. The power supply distributor 3 consists of an input interface 5 and three output interfaces 6.1, 6.2 and 6.3, wherein the input interface 5 is connected with a storage battery through a power switch 7, the first output interface 6.1 is connected with the power supply input interfaces of the main lighting unit and the first auxiliary lighting unit, and the second output interface 6.2 and the third output interface 6.3 are respectively and correspondingly connected with the power supply input ends of the second auxiliary lighting unit and the third auxiliary lighting unit.
As shown in fig. 3, the main lighting unit is composed of a main lighting base 9 disposed at one end of the universal bending light neck 8 and a first auxiliary lighting unit at the other end.
As shown in fig. 4 and 5, the first, second and third auxiliary lighting units have the same structure, and are composed of a lamp housing 11 provided with an insertion groove 10, a row of two LED lamp beads 12 arranged on the wall of the lamp housing 11, and a power input interface.
For the convenience of carrying and dismouting, power supply unit, main lighting unit and three auxiliary lighting unit are independent respectively. The input interface 5, the first, second and third output interfaces 6.1, 6.2 and 6.3 of the power distributor 3 and the power input interfaces of the main lighting unit and the first, second and third auxiliary lighting units all adopt hole-type two-core jacks, and when in use, the two-core jacks are connected through a two-core power line as shown in fig. 6.
The utility model discloses a special lighting device's application method, as shown in FIG. 7, goes on according to the following step:
step 1, during construction measurement, arranging a prism group frame 13 at a position of a measurement point location, and after finishing accurate centering and accurate leveling of the prism group to the point location, respectively inserting and fixing the inserting grooves 10 of the lamp shells 11 of the first, second and third auxiliary lighting units with the top edge, the left edge and the right edge of a prism group chopping board 14; lamp beads of the first, second and third auxiliary lighting units respectively face the triangular marks on the top side, the left side and the right side of the prism group chopping board to provide lighting for the triangular marks;
step 2, adjusting the universal bending lamp neck to enable the main lighting lamp holder to be located at a position where the sight of the total station and the prism group is unobstructed, and enabling the main lighting lamp holder to face the center of the prism to provide lighting for the prism;
and 3, hanging the battery box on the top edge of the prism group chopping block, correspondingly connecting the input interfaces of the main lighting unit and the three auxiliary lighting units with the output interface of the power distributor through power lines and plugs, and finally connecting the output end of the storage battery with the input interface of the power distributor, so that the power switch can be pressed down for construction measurement.

Claims (4)

1. The utility model provides a special lighting device is measured in underground construction, its characterized in that: the lighting device comprises a power supply unit, a main lighting unit and three auxiliary lighting units; the power supply unit consists of a battery box, a storage battery and a power supply distributor, wherein the storage battery and the power supply distributor are arranged in the battery box; the power supply distributor consists of an input interface and three output interfaces, the input interface is connected with the storage battery through a power switch, the first output interface is connected with the power supply input interfaces of the main lighting unit and the first auxiliary lighting unit, and the second output interface and the third output interface are respectively correspondingly connected with the power supply input ends of the second auxiliary lighting unit and the third auxiliary lighting unit; the main lighting unit consists of a main lighting lamp holder arranged at one end of the universal bending lamp neck and a first auxiliary lighting unit at the other end of the universal bending lamp neck; the first, second and third auxiliary lighting units have the same structure and are composed of a lamp shell provided with a plug-in groove, a lamp bead arranged on the wall of the lamp shell and a power input interface.
2. The special lighting device for underground engineering construction measurement according to claim 1, wherein: the input interface, the first output interface, the second output interface, the third output interface and the power input interfaces of the main lighting unit, the first auxiliary lighting unit, the second auxiliary lighting unit and the third auxiliary lighting unit on the power distributor are all hole type two-core jacks.
3. The special lighting device for underground engineering construction measurement according to claim 1 or 2, wherein: the battery case with power distributor passes through the screw connection as an organic whole, and the battery case lateral wall is equipped with the couple that is used for being connected with prism group chopping block.
4. The special lighting device for underground engineering construction measurement according to claim 1 or 2, wherein: the storage battery is a 12-volt rechargeable storage battery, and the lamp beads of the main lighting lamp holder and the auxiliary lighting unit are 12-volt LED lamp beads.
CN201921616310.0U 2019-09-26 2019-09-26 Special lighting device for underground engineering construction measurement Active CN210624218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921616310.0U CN210624218U (en) 2019-09-26 2019-09-26 Special lighting device for underground engineering construction measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921616310.0U CN210624218U (en) 2019-09-26 2019-09-26 Special lighting device for underground engineering construction measurement

Publications (1)

Publication Number Publication Date
CN210624218U true CN210624218U (en) 2020-05-26

Family

ID=70763386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921616310.0U Active CN210624218U (en) 2019-09-26 2019-09-26 Special lighting device for underground engineering construction measurement

Country Status (1)

Country Link
CN (1) CN210624218U (en)

Similar Documents

Publication Publication Date Title
CN210624218U (en) Special lighting device for underground engineering construction measurement
CN204681381U (en) A kind of optical fiber cable tester
CN204439077U (en) Total powerstation monitoring prism
CN110608401A (en) Arrangement and use method of underground engineering construction measurement lighting device
CN203349815U (en) Night lighting level staff
CN208704746U (en) The anti-false sample system of construction engineering quality detection
CN209841038U (en) Total powerstation prism suitable for underground engineering survey
CN204928215U (en) Battery power display device
CN213199261U (en) Multifunctional rechargeable operation ticket folder
CN203327007U (en) Optical fiber card information on-off judgment device
CN205142219U (en) Optical cable on -off device
CN205142218U (en) Optical cable on -off device
CN205014979U (en) Digit levelling staff lighting system at night
CN214121205U (en) Prism assembly with simple lighting device
CN218914655U (en) Detachable measures lighting device
CN218066453U (en) High-precision leveling indicating system in noisy environment
CN203881879U (en) On-off state and polarity test tool
CN205607377U (en) Surveyor's level levelling rod that gives out light; give off light
CN204594453U (en) A kind of Levelling instrument ruler surface illuminator
CN211232178U (en) Mapping instrument positioning device for engineering mapping
CN211696348U (en) Optical leveling plate ruler for night illumination
CN204255357U (en) A kind of mine down-hole prism suspender
CN211923386U (en) Unsmooth angle ware is used to building decoration
CN217980284U (en) Measure infrared device of checking meter of sopwith staff auxiliary lighting
CN204228382U (en) Large-power optical fiber test ruddiness pen

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant