CN210622273U - Movable springboard on climbing frame - Google Patents
Movable springboard on climbing frame Download PDFInfo
- Publication number
- CN210622273U CN210622273U CN201921256528.XU CN201921256528U CN210622273U CN 210622273 U CN210622273 U CN 210622273U CN 201921256528 U CN201921256528 U CN 201921256528U CN 210622273 U CN210622273 U CN 210622273U
- Authority
- CN
- China
- Prior art keywords
- springboard
- nut
- guidance tape
- walk
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a climb activity springboard on frame, including walk the guidance tape and with walk the guidance tape and pass through the inner springboard that flip structure is connected, flip structure includes that 2 at least welding weld the nut and the welding of walking on the guidance tape are at the edge of inner springboard piece of bending, and the screw central line of nut is located same straight line, and the piece of bending includes two mutually perpendicular connecting rods, and a connecting rod welding is at the edge of inner springboard, and inside another connecting rod stretched into the nut. This climb movable springboard on frame and connect and walk guidance tape and interior springboard through flip structure, and flip structure mainly includes the nut and bends, and the nut with bend all be common spare part, low price and sound construction, the straight face of nut outward flange can be fine with walk the guidance tape face laminating, the welding operation of being convenient for, flip structure replaces the connected mode of traditional bolt locking, the installation is used more simply.
Description
Technical Field
The utility model relates to a climb a technical field of part, concretely relates to movable springboard on climbing frame.
Background
The climbing frame is called a lifting frame, the climbing frame uses a fixed inner springboard to seal a gap between the climbing frame and a building body, the existing inner springboard connection is the traditional hinge connection, and the climbing frame is assembled by locking screws or bolts during installation, so that the installation efficiency is influenced; the nut is a common connecting part, is almost ubiquitous in the mechanical field, and has the advantages of low price and high strength.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a climb movable springboard on frame, saved the use of hinge and the step of lock screw assembly, it is reasonable to have a simple structure, and the practicality is strong, simple to operate swift advantage.
(II) technical scheme
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides a climb activity springboard on frame, includes walk the guidance tape and with walk the guidance tape and pass through the inner springboard that flip structure is connected, flip structure includes 2 at least welding nuts and the welding piece of bending on the guidance tape edge of walking, and the screw central line of nut is located same straight line, the piece of bending includes two mutually perpendicular connecting rods, and a connecting rod welding is on the inner springboard edge, and inside another connecting rod stretched into the nut.
And further setting, the number of the inner springboards is at least 2, the inner springboards are connected to the same side face of the walkway plate, and the side face of the walkway plate and the end face of at least one inner springboard departing from the direction of the walkway plate are provided with connecting holes.
So set up, other spare parts can be connected through the connecting hole of terminal surface to interior springboard and connecting plate, have reduced the weight of interior springboard and guidance tape simultaneously.
Further, at least one inner springboard is provided with a gap at the connecting end with the walkway board.
So set up, silt and ponding on walkways board and the inner springboard can be followed the breach and flowed out, avoid walkways board and inner springboard to go up ponding and gathering silt.
Further, the nuts are arranged at equal intervals.
So set up, the quantity of flip structure is directly proportional with the length of inner springboard between inner springboard and the guidance tape, and longer inner springboard corresponds more flip structure, guarantees inner springboard's joint strength.
Further, the bending piece is an integrally formed metal piece.
Further set up, so set up, improve the intensity of the piece of bending, guarantee the connection stability of springboard and guidance tape.
The nut has no internal threads.
So set up, the cooperation of the piece of bending and nut is more smooth and easy, adapts to the less service environment of silt.
(III) advantageous effects
Compared with the prior art, the utility model provides a climb activity springboard on frame possesses following beneficial effect:
the movable gangplank on the climbing frame is connected with the walkway plate and the inner gangplank through the turnover structure, the turnover structure mainly comprises a nut and a bending piece, the nut and the bending piece are common parts, the price is low, the structure is firm, the flat surface of the outer edge of the nut can be well attached to the surface of the walkway plate, the welding operation is convenient, the turnover structure replaces the traditional bolt locking connection mode, and the installation and the use are simpler; the inner springboard is mutually limited and cannot move automatically when being in the horizontal direction, and the inner springboard can be taken out only after being turned up by a proper angle, so that the link mode is safe, firm and reliable.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the channel steel on the end face of the inner springboard of the present invention;
FIG. 3 is a schematic view of a channel steel on the side of the walkway plate of the present invention;
fig. 4 is a schematic cross-sectional view of the channel steel of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1, wherein fig. 1 is a schematic structural diagram of the present invention.
The utility model provides a pair of climb activity springboard on frame, including walking guidance tape 1 and interior springboard 2, walk guidance tape 1 and interior springboard 2 and connect through flip structure 3, flip structure 3 includes that 2 at least welding is in walking the nut 31 on guidance tape 1 and the piece 32 of bending of welding on interior springboard 2 edge, the screw center line position of nut 31 is on a parallel with walk guidance tape 1 and interior springboard 2's the connection terminal surface and on same straight line, the piece 32 of bending is integrated into one piece's metalwork, the preferred reinforcing bar that bends that uses, including two mutually perpendicular connecting rods, a connecting rod 321 welds on interior springboard 2 edge, inside another connecting rod 322 stretched into nut 31, make it rotate around the screw center line, for the rotation is convenient, wherein the inside screw thread of nut 31 can be detached.
Combine fig. 2, fig. 3 and fig. 4 to show, fig. 2 is the utility model discloses interior springboard terminal surface channel-section steel sketch map, fig. 3 is the utility model discloses walk guidance tape side channel-section steel sketch map, fig. 4 is the utility model discloses the cross section sketch map of channel-section steel, interior springboard 2's quantity is two at least, to take three as an example, three interior springboard 2 is connected on walking guidance tape 1's same side, walk guidance tape 1's side and at least one interior springboard 2 fixed connection channel-section steel on deviating from the terminal surface of guidance tape 1 direction, seted up connecting hole 100 on the channel-section steel, interior springboard 2 and connecting plate can connect other spare parts through connecting hole 100 of terminal surface, reduce interior springboard 2 and walk guidance tape 1's weight simultaneously.
At least one inner springboard 2 is seted up jaggedly 200 on the connecting end with guidance tape 1, and breach 200 is preferred to be seted up on guidance tape 1 that is in the low side, and silt and ponding on guidance tape 1 and the inner springboard 2 can flow out from breach 200, avoid guidance tape 1 and inner springboard 2 to go up ponding and gather silt.
Equidistant setting between nut 31, so, the quantity of inner springboard 2 and walk flip structure 3 between guidance tape 1 is directly proportional with inner springboard 2's length, and longer inner springboard 2 corresponds more flip structure 3, guarantees inner springboard 2's joint strength.
The utility model discloses during installation use, at first with nut 31 and the connecting rod of 32 of bending respectively the welding walk on guidance tape 1 and interior springboard 2, during the welding, the straight face of nut 31 side with walk the 1 laminating of guidance tape, a another connecting rod that 32 will bend is perpendicularly after that for welded connecting rod and interior springboard 2 inserts corresponding nut 31 respectively, make interior springboard 2 can rotate around walking guidance tape 1, accomplish the connection, the installation is accomplished the back, it is spacing mutually between interior springboard 2, can not remove by oneself when being in the horizontal direction, only after having turned up a suitable angle, just can take out interior springboard 2, this kind of connected mode safe and firm is reliable.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a climb activity springboard on frame, its characterized in that, includes walk the guidance tape and with walk the interior springboard that the guidance tape is connected through flip structure, flip structure includes 2 at least welding and welds the nut on walking the guidance tape and the piece of bending of welding on interior springboard edge, and the screw central line of nut is located same straight line, the piece of bending includes two mutually perpendicular connecting rods, and a connecting rod welding is on interior springboard edge, and inside another connecting rod stretched into the nut.
2. A movable gangboard on a climbing frame according to claim 1, characterized in that: the quantity of the inner springboards is at least 2 and the inner springboards are connected to the same side face of the walkway plate, and connecting holes are formed in the side face of the walkway plate and the end face of at least one inner springboard, which deviates from the direction of the walkway plate.
3. A movable gangboard on a climbing frame according to claim 2, characterized in that: at least one inner springboard is provided with a gap at the connecting end with the walkway plate.
4. A movable gangboard on a climbing frame according to claim 2, characterized in that: the nuts are arranged at equal intervals.
5. A movable gangboard on a climbing frame according to claim 1, characterized in that: the bending piece is an integrally formed metal piece.
6. A movable gangboard on a climbing frame according to claim 1, characterized in that: the nut has no internal threads.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921256528.XU CN210622273U (en) | 2019-08-05 | 2019-08-05 | Movable springboard on climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921256528.XU CN210622273U (en) | 2019-08-05 | 2019-08-05 | Movable springboard on climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210622273U true CN210622273U (en) | 2020-05-26 |
Family
ID=70766194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921256528.XU Active CN210622273U (en) | 2019-08-05 | 2019-08-05 | Movable springboard on climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210622273U (en) |
-
2019
- 2019-08-05 CN CN201921256528.XU patent/CN210622273U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210622273U (en) | Movable springboard on climbing frame | |
CN210918185U (en) | A turn over board connection structure for scaffold frame protection | |
CN218969809U (en) | Quick assembled closed box culvert structure | |
CN210918186U (en) | Turning plate mounting structure for scaffold | |
CN210369839U (en) | Movable turning plate for climbing frame protection | |
CN211774540U (en) | Steel structure beam convenient to disassemble | |
CN208202564U (en) | Ironware back cord corner connector | |
CN210369877U (en) | Building template system | |
CN209538392U (en) | A kind of clamping plate type support of the aluminium alloy hub type joint net frame based on channel steel | |
CN209194725U (en) | A kind of construction steel structure and connecting structure of wall | |
CN217027513U (en) | Steel truss structure capable of achieving segmented high-altitude butt joint | |
CN210369840U (en) | Board connection structure turns over that climbs frame usefulness | |
CN206581502U (en) | A kind of reinforcing bar couples fastener | |
CN212582884U (en) | Assembled steel construction truss girder with high bearing capacity | |
CN205806902U (en) | Tubular truss | |
CN212295604U (en) | Protective device for climbing frame body | |
CN210530129U (en) | Building girder steel trompil reinforcing apparatus | |
CN218437468U (en) | Novel steel construction prefabricated building | |
CN216238957U (en) | Building steel structure with good corrosion resistance effect | |
CN109914797A (en) | The bracing means of aluminum alloy mould plate system vertical adjustment back cord | |
CN217419949U (en) | Steel construction connection structure that fastness is strong | |
CN208718088U (en) | A kind of light steel using plug-in type and weight steel seam connection structure | |
CN210947312U (en) | Steel structure supporting frame for building curtain wall | |
CN216007322U (en) | C-shaped steel assembly for building convenient to connect | |
CN211114129U (en) | Steel structure connecting joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210425 Address after: 362400 Lianfeng Science and Technology Industrial Park, Guanqiao Town, Anxi County, Quanzhou City, Fujian Province Patentee after: Quanzhou Yuntai Technology Co.,Ltd. Address before: 361000 Fujian province Zhong Huli District of Xiamen City Road No. 1-3 building 702 higheasy Patentee before: XIAMEN ANKE TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right |