CN210620410U - Construction management is with on-spot sewage treatment plant - Google Patents

Construction management is with on-spot sewage treatment plant Download PDF

Info

Publication number
CN210620410U
CN210620410U CN201820044366.2U CN201820044366U CN210620410U CN 210620410 U CN210620410 U CN 210620410U CN 201820044366 U CN201820044366 U CN 201820044366U CN 210620410 U CN210620410 U CN 210620410U
Authority
CN
China
Prior art keywords
bottom plate
filter screen
fixedly connected
construction management
sewage treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820044366.2U
Other languages
Chinese (zh)
Inventor
赵长杰
张耀伟
陈一静
王继辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820044366.2U priority Critical patent/CN210620410U/en
Application granted granted Critical
Publication of CN210620410U publication Critical patent/CN210620410U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an on-spot sewage treatment plant is used in construction management, including handling the bottom plate, handle bottom plate left side fixedly connected with and handle the lateral wall, and handle the lateral wall bottom and be provided with the stagnant water stopper, handle bottom plate right side fixedly connected with third filter screen, and third filter screen top and walking board fixed connection, the inside second filter screen that is provided with of rotating fan blade, walking board left side fixedly connected with bracing piece, and bracing piece top fixedly connected with fixed column, loose axle bottom and activity card fixed connection, and the inside first filter screen that is provided with of activity card, activity card right side swing joint has the axis of rotation, and is provided with the water inlet on the left of the activity card. This on-spot sewage treatment plant for construction management combines U type activity card, L type rotating fan blade and slope smooth processing bottom plate, realizes that this sewage treatment plant for construction management handles the effect of three kinds of impurity of floating, suspension and sediment.

Description

Construction management is with on-spot sewage treatment plant
Technical Field
The utility model relates to a construction management technical field specifically is a construction management is with on-spot sewage treatment plant.
Background
Building construction management specialty is with "project drive formula" for the main mode that just cultivates, at the implementation in-process, the key is scientific selection project and carries out optimal design to the project, and this specialty core teaching mainly has with the training project: the method comprises the following steps of building engineering project management, engineering financial management, building engineering bid and tender, building engineering supervision, engineering quantity list pricing and the like.
In the construction management process, the sewage that produces when constructing the building need carry out certain management, avoids the waste of water source, and the sewage treatment plant that present construction management used can only be simple carries out centralized processing with the impurity of sediment, can not handle floating or suspended impurity, leads to the sewage after handling still to have a lot of impurity.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction management is with on-spot sewage treatment plant to solve the problem that the sewage treatment plant that the sewage treatment that the construction management that proposes in the above-mentioned background art used can not effectual processing float impurity and suspension impurity.
In order to achieve the above object, the utility model provides a following technical scheme: an on-site sewage treatment device for building construction management comprises a treatment bottom plate, wherein the left side of the treatment bottom plate is fixedly connected with a treatment side wall, the bottom of the treatment side wall is provided with a water stop plug, the right side of the treatment bottom plate is fixedly connected with a third filter screen, the top of the third filter screen is fixedly connected with a walking plate, the top of the walking plate is provided with a rotating motor, the left side and the right side of the rotating motor are movably connected with rotating fan blades, a second filter screen is arranged inside the rotating fan blades, the left side of the walking plate is fixedly connected with a support rod, the top of the support rod is fixedly connected with a fixed column, the top of the fixed column is movably connected with a fixed buckle, the left side and the right side of the fixed buckle are fixedly connected with a movable rod, the top of the movable rod is fixedly connected with a handrail, the bottom of the movable, the activity card right side swing joint has the axis of rotation, and activity card left side is provided with the water inlet.
Preferably, the fixing buckle is of a semi-ring structure, the angle of the fixing buckle is larger than 180 degrees, the radius of the fixing buckle is larger than that of the fixing column, and the fixing buckle and the fixing column form a fixing structure.
Preferably, the movable card is of a U-shaped structure, the length of the movable card is the same as that of the left side of the walking board, and the height of the top of the movable card is larger than that of the walking board.
Preferably, the right side of the treatment bottom plate is a smooth inclined plane, and the top of the right side of the treatment bottom plate is flush with the bottom of the third filter screen.
Preferably, the rotating fan blades are of an L-shaped structure, the length of each rotating fan blade is smaller than the distance from the center of the rotating motor to the processing bottom plate in the vertical direction, the number of the rotating fan blades is four, and every two of the rotating fan blades are perpendicular.
Compared with the prior art, the beneficial effects of the utility model are that: this on-spot sewage treatment plant for construction management combines U type activity card, L type rotating fan blade and slope smooth processing bottom plate, realizes that this sewage treatment plant for construction management handles the effect of three kinds of impurity of floating, suspension and sediment. The fixed buckle is in a semi-ring structure, the angle of the fixed buckle is larger than 180 degrees, the radius of the fixed buckle is larger than the radius of the fixed column, the fixed buckle and the fixed column form a fixed structure, the fixed buckle and the fixed column are effectively fixed by the structure, so that the effect of fixing the movable clamp is achieved, the movable clamp is in a U-shaped structure, the length of the movable clamp is the same as that of the left side edge of the walking board, the height of the top of the movable clamp is larger than that of the walking board, the structure effectively carries out centralized treatment on floating impurities in sewage, the right side of the treatment bottom board is a smooth inclined plane, the top of the right side of the treatment bottom board is flush with the bottom of the third filter screen, the structure ensures that heavier impurities in the sewage are precipitated and accumulated, the rotating fan blades are in an L-shaped structure, the length of the rotating fan blades, two liang of verticals of rotating fan blade, the effectual impurity with the suspension of this structure is collected and is handled to guarantee that rotating fan blade does not receive the harm.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic view of the connection structure between the movable rod and the movable card of the present invention;
fig. 4 is an enlarged schematic structural view of a portion a in fig. 1 according to the present invention.
In the figure: 1. the water-stop device comprises a movable rod, 2, a fixing buckle, 3, a rotating shaft, 4, a supporting rod, 5, a water inlet, 6, a movable shaft, 7, a first filter screen, 8, a movable clamp, 9, a water-stop plug, 10, a processing side wall, 11, a processing bottom plate, 12, a second filter screen, 13, a rotating motor, 14, a walking plate, 15, a third filter screen, 16, a rotating fan blade, 17, a handrail, 18 and a fixing column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an on-site sewage treatment device for building construction management comprises a treatment bottom plate 11, wherein the left side of the treatment bottom plate 11 is fixedly connected with a treatment side wall 10, a water stop plug 9 is arranged at the bottom of the treatment side wall 10, the right side of the treatment bottom plate 11 is a smooth inclined plane, the top of the right side of the treatment bottom plate 11 is flush with the bottom of a third filter screen 15, the structure ensures that heavier impurities in sewage are precipitated and accumulated, the right side of the treatment bottom plate 11 is fixedly connected with the third filter screen 15, the top of the third filter screen 15 is fixedly connected with a walking plate 14, the top of the walking plate 14 is provided with a rotating motor 13, the left side and the right side of the rotating motor 13 are movably connected with rotating fan blades 16, the rotating fan blades 16 are of an L-shaped structure, the length of the rotating fan blades 16 is smaller than the distance from the center of the rotating motor 13 to the treatment bottom plate 11 in the vertical, and it is ensured that the rotating fan blade 16 is not damaged, a second filter screen 12 is arranged inside the rotating fan blade 16, a support rod 4 is fixedly connected to the left side of the walking plate 14, a fixed column 18 is fixedly connected to the top of the support rod 4, a fixed buckle 2 is movably connected to the top of the fixed column 18, the left side and the right side of the fixed buckle 2 are fixedly connected with the movable rod 1, the fixed buckle 2 is of a semi-ring structure, the angle of the fixed buckle 2 is larger than 180 degrees, the radius of the fixed buckle 2 is larger than that of the fixed column 18, and the fixed buckle 2 and the fixed column 18 form a fixed structure, the fixed buckle 2 and the fixed column 18 are effectively fixed by the structure, so as to achieve the effect of fixing the movable clamp 8, a handrail 17 is fixedly connected to the top of the movable clamp 8, the bottom of the movable rod 1 is movably connected with the movable shaft 6, activity card 8 is U style of calligraphy structure, and 8 length of activity card are the same with 14 left sides of walking board to 8 top heights of activity card are greater than 14 heights of walking board, and this structure is effectual carries out centralized processing with showy impurity in the sewage, and 8 right side swing joint of activity card have axis of rotation 3, and 8 left sides of activity card are provided with water inlet 5.
The working principle is as follows: when the on-site sewage treatment device for building construction management is used, whether parts of the on-site sewage treatment device for building construction management are damaged or not or the connection is not firm is checked, after the check is correct, sewage for building construction enters the device through the water inlet 5, the heavier impurity part of the sewage falls on the treatment bottom plate 11 along the treatment side wall 10, the sediment slides to the bottom end along the treatment bottom plate 11, when the sediment is accumulated to a certain degree, the water stop plug 9 is taken down to discharge the sediment, the floating impurity in the sewage flows to the right side of the device under the action of sewage flow and enters the movable clamp 8, the floating impurity is concentrated in the movable clamp 8 under the action of the first filter screen 7, when the floating impurity is accumulated to a certain degree, the movable rod 1 is dragged through the handrail 17 to separate the fixed buckle 2 from the fixed column 18, the utility model discloses a waste water treatment device, including activity card 8, the activity card 8 opening, staff's removal 14 leftmost end is cleared up the inside floating impurity of activity card 8, the start power, rotation motor 13 starts, it rotates to drive rotating fan blade 16, the inside second filter screen 12 of rotating fan blade 16 rotates the position of convenient processing to the impurity of suspension in sewage, the staff clears up the rubbish that suspends again, finally, sewage discharges through third filter screen 15, realize sewage reutilization's effect, this is exactly this construction management uses on-the-spot sewage treatment device's theory of operation.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a construction management is with on-spot sewage treatment plant, includes treatment bottom plate (11), its characterized in that: the treatment device is characterized in that a treatment side wall (10) is fixedly connected to the left side of a treatment bottom plate (11), a water stop plug (9) is arranged at the bottom of the treatment side wall (10), a third filter screen (15) is fixedly connected to the right side of the treatment bottom plate (11), the top of the third filter screen (15) is fixedly connected with a walking plate (14), a rotating motor (13) is installed at the top of the walking plate (14), rotating fan blades (16) are movably connected to the left side and the right side of the rotating motor (13), a second filter screen (12) is arranged inside the rotating fan blades (16), a support rod (4) is fixedly connected to the left side of the walking plate (14), a fixed column (18) is fixedly connected to the top of the support rod (4), a fixed buckle (2) is movably connected to the top of the fixed column (18), the left side and the right side of the fixed buckle (2) are, and movable rod (1) bottom and loose axle (6) swing joint, loose axle (6) bottom and activity card (8) fixed connection, and activity card (8) inside is provided with first filter screen (7), activity card (8) right side swing joint has axis of rotation (3), and activity card (8) left side is provided with water inlet (5).
2. The on-site sewage treatment device for building construction management according to claim 1, wherein: the fixing buckle (2) is of a semi-ring structure, the angle of the fixing buckle (2) is larger than 180 degrees, the radius of the fixing buckle (2) is larger than that of the fixing column (18), and the fixing buckle (2) and the fixing column (18) form a fixing structure.
3. The on-site sewage treatment device for building construction management according to claim 1, wherein: the movable card (8) is of a U-shaped structure, the length of the movable card (8) is the same as the left side of the walking plate (14), and the height of the top of the movable card (8) is larger than that of the walking plate (14).
4. The on-site sewage treatment device for building construction management according to claim 1, wherein: the right side of the treatment bottom plate (11) is a smooth inclined plane, and the top of the right side of the treatment bottom plate (11) is flush with the bottom of the third filter screen (15).
5. The on-site sewage treatment device for building construction management according to claim 1, wherein: the rotating fan blades (16) are of an L-shaped structure, the length of each rotating fan blade (16) is smaller than the distance from the center of the rotating motor (13) to the processing bottom plate (11) in the vertical direction, the number of the rotating fan blades (16) is four, and every two of the rotating fan blades (16) are perpendicular.
CN201820044366.2U 2018-01-11 2018-01-11 Construction management is with on-spot sewage treatment plant Expired - Fee Related CN210620410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820044366.2U CN210620410U (en) 2018-01-11 2018-01-11 Construction management is with on-spot sewage treatment plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820044366.2U CN210620410U (en) 2018-01-11 2018-01-11 Construction management is with on-spot sewage treatment plant

Publications (1)

Publication Number Publication Date
CN210620410U true CN210620410U (en) 2020-05-26

Family

ID=70760309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820044366.2U Expired - Fee Related CN210620410U (en) 2018-01-11 2018-01-11 Construction management is with on-spot sewage treatment plant

Country Status (1)

Country Link
CN (1) CN210620410U (en)

Similar Documents

Publication Publication Date Title
CN207032368U (en) One kind building rainwater-collecting primarily efficient filter slag-draining device
CN205461286U (en) Hydrodynamic force rotation type shaft screen scarfing cinder device
CN210562554U (en) Sewage pipeline blocks sediment scrubbing device
CN103452185B (en) Turbine rain perforated strainer
CN209188196U (en) A kind of municipal public use solid-liquid Automatic-separation garbage recovery processing pond
CN210620410U (en) Construction management is with on-spot sewage treatment plant
CN112551615B (en) River course treatment intake pool and integrated sewage treatment system
CN206000766U (en) A kind of dredge pump with crushing function
CN208212711U (en) A kind of dedicated settling system of building waste
CN206503113U (en) A kind of steam trap connection for hydraulic engineering
CN205796654U (en) A kind of aperture plate device intercepting second pond moss and scum silica frost
CN213085492U (en) Grid machine
CN209585731U (en) A kind of artificial swimming pool automatic dust absorption system
CN211753308U (en) Dustproof equipment for building engineering
CN210767170U (en) Prefabricated pump station of hand-free basket and sewage treatment system
CN110130470B (en) Hand-free basket prefabricated pump station and sewage treatment system
CN209475861U (en) A kind of mine high-effective dust-removing machine
CN207205977U (en) A kind of gear or ring gear machining oil groove iron chips cleaning device
CN213446499U (en) Integrated sewage pretreatment equipment
CN211447128U (en) Building water supply and drainage anti-clogging device
CN110180256A (en) A kind of coal water sedimentation pond of automatic collection coal slime and its working method
CN218501647U (en) Dust collector for civil engineering construction site management
CN205204855U (en) Wastewater purification pool removing dross device
CN215586619U (en) Waste recovery device of environmental protection for construction
CN205687585U (en) A kind of autocoupling type installs basket grid device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200526

Termination date: 20210111