CN210619078U - Wall hanging prevention system for steel plate bin - Google Patents

Wall hanging prevention system for steel plate bin Download PDF

Info

Publication number
CN210619078U
CN210619078U CN201921649624.0U CN201921649624U CN210619078U CN 210619078 U CN210619078 U CN 210619078U CN 201921649624 U CN201921649624 U CN 201921649624U CN 210619078 U CN210619078 U CN 210619078U
Authority
CN
China
Prior art keywords
pressurepipe
gas
wall
steel sheet
blowing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921649624.0U
Other languages
Chinese (zh)
Inventor
岳兆平
王兴旺
暴卫东
袁金付
张卫仓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anyang Flyer Steel Silo Engineering Co ltd
Original Assignee
Anyang Flyer Steel Silo Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anyang Flyer Steel Silo Engineering Co ltd filed Critical Anyang Flyer Steel Silo Engineering Co ltd
Priority to CN201921649624.0U priority Critical patent/CN210619078U/en
Application granted granted Critical
Publication of CN210619078U publication Critical patent/CN210619078U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Storage Of Harvested Produce (AREA)

Abstract

The utility model provides a steel sheet storehouse prevents wall hanging system, prevent wall hanging system constitute by one set or many sets of high-pressure gas blowing device, high-pressure gas blowing device including fixed establish the high-pressurepipe in the circle shape of steel sheet storehouse periphery, high-pressurepipe passes through tube coupling high pressurized air source, is provided with the pneumatic valve on the pipeline, steel sheet storehouse inner wall circumferencial direction on the fixed a plurality of gas filled plates that are provided with, gas filled plate is through connecting pipe and the high-pressurepipe intercommunication that passes the bulkhead, sealed between connecting pipe and the bulkhead, gas filled plate on the inner face have a plurality of gas pockets, the inner face indicates the face near the storehouse center, gas pocket and high-pressurepipe. This system blows out high-pressure air through aerifing the board, can effectually prevent that the material from the wall built-up and becoming great cubic after weing.

Description

Wall hanging prevention system for steel plate bin
Technical Field
The utility model relates to a steel sheet storehouse, in particular to system for preventing material caking, wall built-up in the steel sheet storehouse belongs to steel sheet storage water technical field.
Background
The steel plate bin is widely applied to the storage of various materials due to the characteristics of economy, flexible design, convenient construction and the like, can be designed and manufactured according to space and material characteristics, and is found in the design, manufacture and subsequent service practice of the steel plate bin for many years that when the steel plate bin is used for storing powder which is easy to absorb water (such as fly ash and cement), the material is easy to attach to the inner wall of the steel plate bin after being wetted, the weight of the material is gradually increased along with the increase of the adhesion amount, when the adhesion force is lower than the gravity borne by the material, the material is adhered into blocks or falls off, but the blocks formed at the moment are larger, the material can cause unsmooth discharging or even blockage when passing through a discharging port at the bottom, and because the lower part of the discharging port is also provided with equipment for conveying the material, the lower part of the material has very limited activity space, so that the unsmooth discharging or the blockage is very difficult to process, the normal operation of the next process is affected in many cases, so in the design and manufacture of the steel plate silo for the materials, a technical scheme capable of preventing the materials from caking and affecting the discharging is needed.
Disclosure of Invention
An object of the utility model is to overcome the above-mentioned problem that exists when present steel sheet storehouse is used for the powder to store, provide a steel sheet storehouse and prevent hanging wall system.
In order to realize the purpose of the utility model, the following technical proposal is adopted: the utility model provides a steel sheet storehouse prevents wall hanging system, prevent wall hanging system constitute by one set or many sets of high-pressure gas blowing device, high-pressure gas blowing device including fixed establish the high-pressurepipe in the circle shape of steel sheet storehouse periphery, high-pressurepipe passes through tube coupling high pressurized air source, is provided with the pneumatic valve on the pipeline, steel sheet storehouse inner wall circumferencial direction on the fixed a plurality of gas filled plates that are provided with, gas filled plate is through connecting pipe and the high-pressurepipe intercommunication that passes the bulkhead, sealed between connecting pipe and the bulkhead, gas filled plate on the inner face have a plurality of gas pockets, the inner face indicates the face near the storehouse center, gas pocket and high-pressurepipe.
Further, the method comprises the following steps of; the high-pressure air source is an air pump.
Further, the method comprises the following steps of; the high-pressure blowing device is provided with 2-4 sets of blowing devices, and each set of blowing device is arranged at different heights.
Further, the method comprises the following steps of; the inflatable plate is in a hollow box shape, the bottom of the box is an inclined plane which inclines downwards from outside to inside, and a gap is formed between the inner end of the inclined plane and the inner surface of the inflatable plate.
The utility model discloses an actively beneficial technological effect lies in: this system blows out through aerifing the board with highly-compressed air, can effectually prevent that the material from catching the wall and becoming great cubic after weing to prevented that the smooth condition of blockking up even of this type of material ejection of compact from taking place, the effectual material of having guaranteed is normally carried, guarantees the normal operating of whole production technology system, the cost that prevents that wall system design and manufacture increases is very little in the influence and the loss that the putty caused, but the application of this type of steel plate storehouse is better in the storage of dry powder material.
Drawings
Fig. 1 is a schematic front view of the present invention.
Fig. 2 is a schematic top view of the present invention.
Figure 3 is a schematic view of an inflatable panel.
Detailed Description
In order to explain the utility model more fully, the utility model provides an implementation example. These examples are merely illustrative of the present invention and do not limit the scope of the present invention.
The invention is explained in further detail with reference to the drawings, in which the reference symbols are: 1: a wall of the silo; 2: an air pump; 3: a pipeline; 4: a high-pressure air pipe; 5: an inflatable plate; 6: a connecting pipe; 51: an inner face; 52: air holes; 53: a box bottom; 54: a gap.
As shown in the attached drawing, the steel plate bin wall hanging prevention system is composed of one or more sets of high-pressure air blowing devices, the high-pressure blowing device comprises a ring-shaped high-pressure air pipe 4 fixedly arranged on the periphery of the steel plate bin, the high-pressure air pipe is connected with a high-pressure air source through a pipeline 3, the high-pressure air source is an air pump 2, an air valve is arranged on the pipeline, a plurality of inflatable plates are fixedly arranged on the inner wall of the steel plate bin in the circumferential direction, 5 is an inflatable plate, the inflatable plate is in a hollow box shape, the box bottom 53 is an inclined plane which is inclined downwards from outside to inside, a gap 54 is arranged between the inner end of the inclined plane and the inner surface of the inflatable plate, the inflatable plate is communicated with the high-pressure air pipe through a connecting pipe 6 which penetrates through the bin wall, the connecting pipe and the bin wall are sealed, the inner surface of the inflatable plate is provided with a plurality of air holes, 52 is an air hole, the inner surface is a surface close to the center of the bin, 51 is the inner surface, and the air holes are communicated with the high-pressure air pipe 4. The high-pressure blowing device is provided with 2-4 sets of blowing devices, and each set of blowing device is arranged at different heights. In the figure of the embodiment, 2 sets of high-pressure air blowing devices are arranged.
When the system is used, the air pump is started, the air valve is opened after the pressure reaches, high-pressure air can be flushed out from the inflatable plate, and hanging materials on the inner wall of the bin are blown off, so that the large blocks are not prone to being developed to agglomerate, the blanking is influenced, and the influence on normal production is avoided.
After the embodiments of the present invention have been described in detail, those skilled in the art can clearly understand that various changes and modifications can be made without departing from the scope and spirit of the above claims, and any simple modification, equivalent change and modification made to the above embodiments according to the technical spirit of the present invention all fall within the scope of the technical solution of the present invention, and the present invention is not limited to the embodiments of the examples given in the specification.

Claims (4)

1. The utility model provides a steel sheet storehouse prevents wall built-up system which characterized in that: prevent hanging wall system constitute by one set or more sets of high-pressure gas blowing device, high-pressure gas blowing device including fixed establish the high-pressurepipe in the circle shape of steel sheet storehouse periphery, high-pressurepipe passes through pipe connection high pressurized air source, is provided with the pneumatic valve on the pipeline, steel sheet storehouse inner wall circumferencial direction on the fixed a plurality of gas plates that are provided with, the gas plate is through passing connecting pipe and the high-pressurepipe intercommunication of bulkhead, sealed between connecting pipe and the bulkhead, the gas plate on the inner face have a plurality of gas pockets, the inner face indicates the face that is close to the storehouse center, gas pocket and high-pressurepipe UNICOM.
2. The steel silo anti-wall-hanging system of claim 1, wherein: the high-pressure air source is an air pump.
3. The steel silo anti-wall-hanging system of claim 1, wherein: the high-pressure blowing device is provided with 2-4 sets of blowing devices, and each set of blowing device is arranged at different heights.
4. The steel silo anti-wall-hanging system of claim 1, wherein: the inflatable plate is in a hollow box shape, the bottom of the box is an inclined plane which inclines downwards from outside to inside, and a gap is formed between the inner end of the inclined plane and the inner surface of the inflatable plate.
CN201921649624.0U 2019-09-30 2019-09-30 Wall hanging prevention system for steel plate bin Expired - Fee Related CN210619078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921649624.0U CN210619078U (en) 2019-09-30 2019-09-30 Wall hanging prevention system for steel plate bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921649624.0U CN210619078U (en) 2019-09-30 2019-09-30 Wall hanging prevention system for steel plate bin

Publications (1)

Publication Number Publication Date
CN210619078U true CN210619078U (en) 2020-05-26

Family

ID=70755622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921649624.0U Expired - Fee Related CN210619078U (en) 2019-09-30 2019-09-30 Wall hanging prevention system for steel plate bin

Country Status (1)

Country Link
CN (1) CN210619078U (en)

Similar Documents

Publication Publication Date Title
CN209177581U (en) Full packages ultra-dense phase is energy-efficient to control the defeated grey the powder system of stifled abrasionproof pilot-operated type
CN210619078U (en) Wall hanging prevention system for steel plate bin
CN102167200B (en) Limestone powder warehouse
CN204096646U (en) Spring loader
CN203158827U (en) Fluidization device at bottom of injection tank
CN205187365U (en) Stone coal malleation air conveying system
CN203946604U (en) Powder Pipe in Dense Phase Pneumatic storage delivery system in a kind of coating production process
CN208761344U (en) A kind of Novel anti-blockage feed bin
CN208394354U (en) A kind of material conveying gasification installation
CN211568921U (en) Storehouse jar
CN201990116U (en) Limestone powder chamber
CN210418472U (en) Gas circulation loading device
CN204264743U (en) The particle material tank of bulk powder goods tanker
CN210695036U (en) Grain ventilating device for vertical silo
CN219858662U (en) A doffer for powder class storehouse body
CN2892763Y (en) Screw air seal machinery for unloading grain of pneumatic grain handling machine
CN103640818B (en) A kind of aluminium oxide bin system and conveying storage means thereof
CN214827281U (en) Blanking air escape device
CN219308382U (en) Comprehensive device of blanking equipment in limestone-gypsum flue gas desulfurization process
CN203158570U (en) Large-scale fly ash storage tank and fly ash storage system
CN214942939U (en) Novel steel plate bin foundation structure
CN213009828U (en) Ore bin pressure reducing device
CN220995169U (en) Rotary vulcanizing device of blowing tank
CN209814798U (en) Flat plate foundation type multi-point multi-decompression cabin porous discharging device
CN202575351U (en) Feeder with radioactive-type air grid plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200526

Termination date: 20200930

CF01 Termination of patent right due to non-payment of annual fee