CN210598065U - Cuttage formula scaffold frame for building site - Google Patents

Cuttage formula scaffold frame for building site Download PDF

Info

Publication number
CN210598065U
CN210598065U CN201920589741.6U CN201920589741U CN210598065U CN 210598065 U CN210598065 U CN 210598065U CN 201920589741 U CN201920589741 U CN 201920589741U CN 210598065 U CN210598065 U CN 210598065U
Authority
CN
China
Prior art keywords
fixing
circular
hole
rod
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920589741.6U
Other languages
Chinese (zh)
Inventor
冼玉荣
王永明
姚艺林
张正
吴坚民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenzhen Construction Group Co.,Ltd.
Original Assignee
China Construction Shenye Construction And Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Shenye Construction And Development Co ltd filed Critical China Construction Shenye Construction And Development Co ltd
Priority to CN201920589741.6U priority Critical patent/CN210598065U/en
Application granted granted Critical
Publication of CN210598065U publication Critical patent/CN210598065U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a cuttage formula scaffold frame for building site, including the pole setting, the bar through-hole has been seted up to pole setting surface both sides, and pole setting surface one side has seted up the circular through-hole of a plurality of, and the pole setting is equipped with the dead lever in circular through-hole department, dead lever one side top fixedly connected with stationary bar, the outside top of stationary bar is rotated and is connected with first stationary dog, circular through-hole has been seted up to first stationary dog one side, and the outside bottom of stationary bar is rotated and is connected with the second stationary dog, circular through-hole has been seted up to second stationary dog one side. Compared with the prior art, the utility model discloses an open and establish circular through-hole in the pole setting, can be when putting up the scaffold frame, the position of putting up is selected freely, has reduced the time of putting up and demolising the scaffold frame, has improved efficiency, simultaneously, through setting up first stationary dog and second stationary dog, when the fixed horizontal pole of dead lever, let first stationary dog and second stationary dog fix again on one side, improved the reliability of device.

Description

Cuttage formula scaffold frame for building site
Technical Field
The utility model relates to a building technical field especially relates to a cuttage formula scaffold frame for building site.
Background
In daily life, a lot of scaffolds on a building site can be seen frequently, the scaffolds enable building workers to build a city of the city with a large amount of force, but in recent years, accidents of the scaffolds are not few, most of the scaffolds are not firm enough, the scaffolds collapse, in addition, the scaffolds are generally connected one by one when built, a lot of manpower and material resources are wasted when the scaffolds are built and dismantled, and therefore the cuttage type scaffold for the building site is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and having current scaffold device firm inadequately among the prior art, current scaffold is convenient shortcoming inadequately when buildding and demolising, and the cuttage formula scaffold frame for building site who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a cuttage scaffold for construction sites comprises a vertical rod, wherein strip-shaped through holes are formed in two sides of the surface of the vertical rod, a plurality of circular through holes are formed in one side of the surface of the vertical rod, a fixing rod is arranged at the position of the circular through hole of the vertical rod, a fixing rod is fixedly connected to the top end of one side of the fixing rod, a first fixing claw is rotatably connected to the top end of the outer portion of the fixing rod, a circular through hole is formed in one side of the first fixing claw, a second fixing claw is rotatably connected to the bottom end of the outer portion of the fixing rod, a circular through hole is formed in one side of the second fixing claw, a rotating rod is rotatably connected to the position of the circular through hole of the second fixing claw, threads are carved on the outer portion of one end of the rotating rod, the first fixing claw and the second fixing claw are matched, a cross rod is arranged at the position of, the outside cover of horizontal pole is equipped with first fixation clamp and second fixation clamp.
Furthermore, a rotating rod is arranged inside the first fixing clamp, a torsion spring is arranged inside the rotating rod, and elastic cloth is sleeved outside the rotating rod.
Furthermore, a bar-shaped opening is formed in one side of the first fixing clamp, a lock cylinder is arranged at the bar-shaped opening of the first fixing clamp, and the lock cylinder is fixedly connected with the elastic cloth.
Furthermore, a lock catch is fixedly connected to one side of the second fixing clamp, and the lock catch is matched with the lock cylinder.
Further, first fixation clamp one side top and bottom all are equipped with bent shape kelly, circular through-hole has all been seted up at one side both ends that the second fixation clamp is close to first fixation clamp.
Further, the second fixing clamp is provided with a spring at the circular through hole, one end of the spring is fixedly connected with a fixing plate, and one end of the fixing plate is fixedly connected with a round-head rod.
The utility model has the advantages that:
1. through the arrangement of the fixing rods, the fixing positions of the cross rods can be selected according to the heights of floors by enabling the cross rods to slide in the strip-shaped through holes of the vertical rods, and meanwhile, the fixing rods are inserted into the circular through holes of the vertical rods, so that the scaffold is convenient to disassemble and build;
2. through setting up first stationary dog and second stationary dog, when the dead lever blocks the horizontal pole, pass through threaded connection with first stationary dog and second stationary dog and fix, let the scaffold under the effect of dead lever and two stationary dogs fixed, improved the reliability.
Compared with the prior art, the utility model discloses an open and establish circular through-hole in the pole setting, can be when putting up the scaffold frame, the position of putting up is selected freely, has reduced the time of putting up and demolising the scaffold frame, has improved efficiency, simultaneously, through setting up first stationary dog and second stationary dog, when the fixed horizontal pole of dead lever, let first stationary dog and second stationary dog fix again on one side, improved the reliability of device.
Drawings
Fig. 1 is a schematic front view of a cutting scaffold for a construction site according to the present invention;
fig. 2 is a schematic top view of the cutting scaffold for construction site according to the present invention;
fig. 3 is a schematic structural view of a vertical rod of a cuttage scaffold for a construction site according to the present invention;
fig. 4 is a schematic structural diagram of a vertical rod of a cuttage scaffold for a construction site according to the present invention;
fig. 5 is a schematic structural view of a first fixing clip of the cutting scaffold for construction sites according to the present invention;
fig. 6 is the utility model provides a round head pole schematic structure of cuttage formula scaffold frame for building site.
In the figure: 1 pole setting, 2 horizontal poles, 3 first stationary dog, 4 rotary rods, 5 fixed rods, 6 second stationary dog, 7 dead levers, 8 first fixation clamps, 9 second fixation clamps, 10 elasticity cloth, 11 rotating rods, 12 lock cores, 13 button head poles, 14 fixed plates, 15 bent shape kellies, 16 springs, 17 hasps.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-6, a cuttage scaffold for construction sites comprises a vertical rod 1, wherein strip-shaped through holes are formed in two sides of the surface of the vertical rod 1, a plurality of circular through holes are formed in one side of the surface of the vertical rod 1, a fixing rod 7 is arranged at the position of the circular through hole of the vertical rod 1, a fixing rod 5 is fixedly connected to the top end of one side of the fixing rod 7, a first fixing claw 3 is rotatably connected to the top end of the outer portion of the fixing rod 5, a circular through hole is formed in one side of the fixing rod 3, a second fixing claw 6 is rotatably connected to the bottom end of the outer portion of the fixing rod 5, a circular through hole is formed in one side of the second fixing claw 6, a rotating rod 4 is rotatably connected to the position of the circular through hole of the second fixing claw 6, threads are carved on the outer portion of one end of the rotating rod 4, the first fixing claw 3 is matched with the second fixing, outside cover of horizontal pole is equipped with first fixation clamp 8 and second fixation clamp 9, the inside rotation stick 11 that is equipped with of first fixation clamp 8, and the inside torque spring that is equipped with of rotation stick 11, the outside cover of rotation stick 11 is equipped with elasticity cloth 10, 8 one side of first fixation clamp is equipped with the bar opening, and first fixation clamp 9 is equipped with lock core 12 at the bar opening part, and lock core 12 and elasticity cloth 10 fixed connection, 9 one side fixedly connected with hasp 17 of second fixation clamp, and hasp 17 and 12 looks adaptations of lock core, 8 one side top of first fixation clamp and bottom all are equipped with bent shape kelly 15, circular through-hole has all been seted up at one side both ends that second fixation clamp 9 is close to first fixation clamp 8, second fixation clamp 9 is equipped with spring 16 in circular through-hole department, 16 one end fixedly connected with fixed plate 14 of spring, 14 one end fixedly connected with button head pole 13 of fixed plate.
The working principle is as follows: firstly, the fixing rod 7 is drawn out, the cross rod 2 is inserted into the strip-shaped through hole of the vertical rod 1, when the position of the fixing cross rod 2 is determined, the fixing rod 7 is inserted into the circular through hole in the vertical rod 1, the cross rod 2 cannot fall down, meanwhile, the first fixing claw 3 and the second fixing claw 6 are folded and fixed, the rotating rod 4 is rotated, the rotating rod 4 is screwed with the first fixing claw 3, in addition, the first fixing clamp 8 and the second fixing clamp 9 are buckled on the cross rod 2, the curved clamping rods 15 at two ends of one side of the first fixing clamp 8 are matched with the round head rods 13 at two ends of one side of the second fixing clamp 9 and are mutually clamped, the spring cloth 10 is pulled out together with the lock cylinder 12, the spring cloth 10 is wound around the cross rod 2 for half circle, the lock cylinder 12 is buckled with the lock buckle 17, the work is finished.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A cuttage scaffold for construction sites comprises a vertical rod (1) and is characterized in that strip-shaped through holes are formed in two sides of the surface of the vertical rod (1), a plurality of circular through holes are formed in one side of the surface of the vertical rod (1), a fixing rod (7) is arranged in the circular through hole of the vertical rod (1), a fixing rod (5) is fixedly connected to the top end of one side of the fixing rod (7), a first fixing claw (3) is rotatably connected to the top end of the outer portion of the fixing rod (5), a circular through hole is formed in one side of the first fixing claw (3), a second fixing claw (6) is rotatably connected to the bottom end of the outer portion of the fixing rod (5), a circular through hole is formed in one side of the second fixing claw (6), a rotary rod (4) is rotatably connected to the position of the circular through hole of the second fixing claw (6), threads are, first stationary dog (3) and second stationary dog (6) looks adaptation, pole setting (1) are equipped with horizontal pole (2) in bar through-hole department, just the diameter of horizontal pole (2) equals the width of bar through-hole, the material of pole setting (1) and horizontal pole (2) is stainless steel, the outside cover of horizontal pole is equipped with first fixation clamp (8) and second fixation clamp (9).
2. A cutting scaffold for construction site according to claim 1, wherein a rotating rod (11) is arranged inside the first fixing clip (8), a torsion spring is arranged inside the rotating rod (11), and an elastic cloth (10) is sleeved outside the rotating rod (11).
3. A cutting scaffold for construction site according to claim 1, wherein one side of the first fixing clip (8) is provided with a strip-shaped opening, and the first fixing clip (8) is provided with a lock core (12) at the strip-shaped opening, and the lock core (12) is fixedly connected with the elastic cloth (10).
4. A cutting scaffold for construction site according to claim 1, characterized in that a lock catch (17) is fixedly connected to one side of the second fixing clip (9), and the lock catch (17) is adapted to the lock core (12).
5. A cutting scaffold for construction site as claimed in claim 1, wherein said first fixing clip (8) has curved clamping bars (15) at top and bottom ends, and said second fixing clip (9) has circular through holes at two ends near the first fixing clip (8).
6. A cutting scaffold for construction site according to claim 1, characterized in that the second fixing clip (9) is provided with a spring (16) at the circular through hole, one end of the spring (16) is fixedly connected with a fixing plate (14), and one end of the fixing plate (14) is fixedly connected with a round head rod (13).
CN201920589741.6U 2019-04-28 2019-04-28 Cuttage formula scaffold frame for building site Active CN210598065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920589741.6U CN210598065U (en) 2019-04-28 2019-04-28 Cuttage formula scaffold frame for building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920589741.6U CN210598065U (en) 2019-04-28 2019-04-28 Cuttage formula scaffold frame for building site

Publications (1)

Publication Number Publication Date
CN210598065U true CN210598065U (en) 2020-05-22

Family

ID=70713108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920589741.6U Active CN210598065U (en) 2019-04-28 2019-04-28 Cuttage formula scaffold frame for building site

Country Status (1)

Country Link
CN (1) CN210598065U (en)

Similar Documents

Publication Publication Date Title
CN210598065U (en) Cuttage formula scaffold frame for building site
CN205558265U (en) A banded column is detained for concrete column formwork support
CN207633783U (en) A kind of building safety protection fixing device
CN203654880U (en) Safety fence
CN201495760U (en) Double-hook butting scaffold
CN215165707U (en) Municipal works bank protection protector
CN211228574U (en) A template for construction of protective fence basis
CN211115144U (en) Rail guard for construction
CN206941011U (en) A kind of anodizing hanging device
CN214575579U (en) Aluminum alloy scaffold's external device of safety net
CN215167951U (en) Anti-falling scaffold
CN202323485U (en) Movable clothes hanger
CN218347387U (en) Side platform with height-adjustable guardrail
CN212243965U (en) Special tool for binding construction steel bars
CN213806524U (en) Protective net frame for scaffold
CN212279336U (en) Raise pigs with convenient location fence
CN215168277U (en) Adjustable safety flat net for construction site
CN217028204U (en) Scalable elevartor shaft does not have crab-bolt regularization facade protector
CN217043597U (en) Construction elevator well protective structure is built to building room
CN204715726U (en) A kind of anti-ponding steel springboard with draw bail
CN210370163U (en) Fast assembly type building enclosure
CN210594610U (en) Backpack type isolation gate barbed wire paying-off device
CN216058722U (en) Fence for animal husbandry industry
CN212200077U (en) Hanging basket for bridge building
CN212787025U (en) Multifunctional training device for dogs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 "change of name, title or address"

Address after: 1703-1706, 17 / F, block a and B, Jiangsu mansion, 6013 Yitian Road, Fuxin community, Lianhua street, Futian District, Shenzhen City, Guangdong Province

Patentee after: China Shenzhen Construction Group Co.,Ltd.

Address before: Room 3815, 3816, 3818, Changping Commercial Building, Shihua Road, Fubao Street Bonded Zone, Futian District, Shenzhen City, Guangdong Province

Patentee before: CHINA CONSTRUCTION SHENYE CONSTRUCTION AND DEVELOPMENT Co.,Ltd.

CP03 "change of name, title or address"