CN210597643U - Liftable top drilling and bar planting device - Google Patents
Liftable top drilling and bar planting device Download PDFInfo
- Publication number
- CN210597643U CN210597643U CN201921066051.9U CN201921066051U CN210597643U CN 210597643 U CN210597643 U CN 210597643U CN 201921066051 U CN201921066051 U CN 201921066051U CN 210597643 U CN210597643 U CN 210597643U
- Authority
- CN
- China
- Prior art keywords
- rod
- main
- installation
- drill bit
- planting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a liftable top drilling and bar planting device relates to building, daily life field technical field, when the bar planting adopts the main part pre-buried for solving current drilling, easy off normal, leak thick liquid, follow-up template demolish inconveniently, adopt carry out top drilling after bed hedgehopping such as cat ladder, when planting the bar downwards, the problem that potential safety hazard, inconvenient operation etc. take place easily in the operation on the bed hedgehopping article such as cat ladder is stood to the people. The drill bit mounting structure is characterized in that a main working support rod is installed on one side of the main support mounting rod, a working rod and a main working rod are installed between the main support mounting rod and the main working support rod, rotating hinges are installed at two ends of the working rod, the main working rod and the main support mounting rod are rotatably connected through second rotating hinges, and a drill bit mounting fixing block is installed on one side of the upper end of the main support mounting rod.
Description
Technical Field
The utility model relates to a technical architecture, daily life technical field specifically are a liftable top drilling and bar planting device.
Background
The building is a general name of buildings and structures, and is an artificial environment created by using the grasped material technical means and applying certain scientific laws, wind and water concepts and aesthetic rules in order to meet the needs of social life of people, and holes are needed to be punched at the top of the building in the later period of the building construction for planting bars, so that the later processing and installation are convenient.
However, most of the existing engineering roof beam plates are embedded with ribs downwards and the top of the engineering roof beam plates is drilled with ribs downwards and upwards and then embedded with ribs downwards by adopting a main body structure or adopting a step ladder and other padding heights; when the main body is embedded, deviation and slurry leakage are easy to occur, and follow-up templates are inconvenient to remove, when the top drilling and downward bar planting are carried out after the padding is carried out by adopting a crawling ladder and the like, potential safety hazards, inconvenient operation and the like easily occur when people stand on padding articles such as the crawling ladder and the like for operation; therefore, the existing requirements are not met, and a liftable top drilling and bar planting device is provided for the requirements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a liftable top drilling and bar planting device to when solving the current drilling bar planting that proposes in the above-mentioned background art and adopting the main part pre-buried, easy off normal, leak thick liquid, follow-up template demolish inconveniently, adopt carry out top drilling after bed hedgehopping such as cat ladder, when planting the bar downwards, the people stands and takes place the problem of potential safety hazard, inconvenient operation etc. easily on the bed hedgehopping article such as cat ladder.
In order to achieve the above object, the utility model provides a following technical scheme: a liftable top drilling and bar planting device comprises a main support mounting rod and a bar planting device mounting rod, a main working support rod is arranged at one side of the main support mounting rod, a working rod and a main working rod are arranged between the main support mounting rod and the main working support rod, the main working rod is positioned below the working rod, both ends of the working rod are provided with rotating hinges, and the working rod is respectively connected with the main supporting installation rod and the main working supporting rod in a rotating way through a rotating hinge, the main working rod is rotatably connected with the main support mounting rod through a second rotating hinge, the other end of the main working rod extends to the other side of the main working support rod, and the main working rod is rotatably connected with the main working support rod through a rotating bearing, a drill bit mounting fixing block is mounted on one side of the upper end of the main support mounting rod, and the drill bit mounting fixing block is connected with the main support mounting rod through a screw.
Preferably, a pulling handle is installed above one end of the main working rod, and the pulling handle is connected with the main working rod through a screw.
Preferably, the inside of bar planting device installation pole is provided with the bar planting standing groove, the lower extreme of bar planting device installation pole is provided with the installation fixed plate, the inside of installation fixed plate is provided with connect the via hole, and connect the via hole and be provided with two.
Preferably, drill bit installation fixed block includes closely fixed cushion, electric drill handle standing groove, fixed block, fixed rope, fixed plate and damping spring.
Preferably, damping spring is installed to the bottom of drill bit installation fixed block, and damping spring is provided with four, and four damping spring distribute in proper order, the fixed plate is installed to damping spring's top, the fixed block is all installed, two to the both sides of fixed plate upper end be provided with electric drill handle standing groove between the fixed block.
Preferably, inseparable fixed cushion is all installed to the inside both sides of drill bit installation fixed block, and inseparable fixed cushion pastes with drill bit installation fixed block and is connected, fixed rope is installed to the outside one side of drill bit installation fixed block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an install main tributary and prop installation pole and main work bracing piece, can drive main tributary through pulling main work pole and prop the installation pole and stretch out and draw back, can accomplish through the flexible of main tributary and prop the installation pole and punch, the overall device simple structure, performance is perfect, has solved the current pseudo proposition that hidden danger, inconvenient operation take place easily in the operation of drilling bar planting operating personnel station on bed hedgehopping article such as cat ladder.
2. The utility model discloses a flexible of main tributary strut work pole directly drills, can carry out follow-up bar planting through changing bar planting device installation pole, and the condition that the off normal hourglass thick liquid can not appear in the position that can more audio-visual observation drilling or bar planting when using, has solved current drilling bar planting and has adopted the main part when pre-buried, easy off normal, leak thick liquid, follow-up template demolish inconvenient problem.
3. The utility model discloses an install a plurality of rotation hinges, the holistic flexible performance of guarantee that can be better, the stability of structure is more perfect, through the inside at drill bit installation fixed block be provided with electric drill hand (hold) standing groove and closely fixed cushion, can be better fix the drill bit, the shock that the damping spring of bottom installation can be fine reduce the vibrations that the drill bit during operation produced.
Drawings
Fig. 1 is a front view of a liftable top drilling and bar planting device of the present invention;
FIG. 2 is a schematic structural view of a liftable top drilling and bar planting device of the present invention;
FIG. 3 is a schematic structural view of the mounting rod of the bar planting device of the present invention;
fig. 4 is the internal structure schematic diagram of the drill bit mounting fixing block of the present invention.
In the figure: 1. a main support mounting bar; 2. a main working support bar; 3. a working lever; 4. rotating the hinge; 5. a main working lever; 6. a second rotating hinge; 7. a rotating bearing; 8. a drill bit is provided with a fixed block; 9. pulling the handle; 10. installing a rod by the bar planting device; 11. placing grooves for planting bars; 12. mounting a fixed plate; 13. a connecting through hole; 14. tightly fixing the soft cushion; 15. an electric drill handle placing groove; 16. a fixed block; 17. fixing a rope; 18. a fixing plate; 19. a shock absorbing spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: a liftable top drilling and bar planting device comprises a main support mounting rod 1 and a bar planting device mounting rod 10, a main working support rod 2 is mounted on one side of the main support mounting rod 1, a working rod 3 and a main working rod 5 are mounted between the main support mounting rod 1 and the main working support rod 2, the main working rod 5 is positioned below the working rod 3, rotating hinges 4 are mounted at two ends of the working rod 3, the working rod 3 is respectively rotatably connected with the main support mounting rod 1 and the main working support rod 2 through the rotating hinges 4, the integral use supporting performance can be better guaranteed, the main working rod 5 is rotatably connected with the main support mounting rod 1 through a second rotating hinge 6, the other end of the main working rod 5 extends to the other side of the main working support rod 2, the main working rod 5 is rotatably connected with the main working support rod 2 through a rotating bearing 7, a drill bit mounting fixing block 8 is mounted on one side of the upper end of the main support mounting rod 1, and drill bit installation fixed block 8 passes through bolted connection with main tributary props installation pole 1, and the installation is dismantled convenient and fast more, and holistic practicality is higher.
Further, pulling handle 9 is installed to the top of 5 one ends of main work pole, and pulling handle 9 passes through bolted connection with main work pole 5, and the installation is dismantled convenient and fast more.
Further, the inside of bar planting device installation pole 10 is provided with bar planting standing groove 11, and the lower extreme of bar planting device installation pole 10 is provided with installation fixed plate 12, and the inside of installation fixed plate 12 is provided with connect the via hole 13, and connect the via hole 13 and be provided with two, can be better fix and install.
Further, the drill mounting and fixing block 8 includes a tightly fixing soft pad 14, an electric drill handle placing groove 15, a fixing block 16, a fixing rope 17, a fixing plate 18 and a damping spring 19.
Further, damping spring 19 is installed to the bottom of drill bit installation fixed block 8, and damping spring 19 is provided with four, and four damping spring 19 distribute in proper order, and fixed plate 18 is installed to damping spring 19's top, and fixed block 16 is all installed to the both sides of fixed plate 18 upper end, is provided with electric drill handle standing groove 15 between two fixed blocks 16, and the installation of carrying out the drill bit that can be better is fixed, and the working property of drill bit is more stable.
Further, inseparable fixed cushion 14 is all installed to the inside both sides of drill bit installation fixed block 8, and inseparable fixed cushion 14 pastes with drill bit installation fixed block 8 and is connected, and fixed rope 17 is installed to 8 outside one sides of drill bit installation fixed block, and fixed performance is more perfect, and overall structure's practicality is higher.
The working principle is as follows: when the drill bit is used, the lower end of the drill bit is placed inside the drill bit mounting fixing block 8, the drill bit handle is clamped inside the electric drill handle placing groove 15, the tightly fixed cushion 14 has certain contractibility and can be used for fixing the drill bit to a certain extent, the drill bit can be secondarily fixed through the fixing rope 17 and can be used after the fixing is completed, when the drilling is carried out, the socket with a switch can be adopted to be connected with a prefabricated liftable electric drill device, the socket switch is closed, the electric drill switch is opened, the handle 9 is pulled by hand power, the rotating hinge 4, the second rotating hinge 6 and the rotating bearing 7 start to rotate simultaneously, the main support mounting rod 1 moves upwards to the position needing drilling at the top, the socket switch is opened to drill, the drilling is stopped when the drilling is carried out to the required depth, the handle 9 is pulled by loosening, when the bar planting is required, the main support mounting rod 1 is replaced by the bar planting device mounting rod, the bar will be planted the clearance in advance, set up the bar planting glue on the reinforcing bar, will not glue bar planting glue and put into bar planting standing groove 11 inside one end, hand power pulling handle 9, bar planting device installation pole 10 upward movement, implant downtheholely can.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921066051.9U CN210597643U (en) | 2019-07-09 | 2019-07-09 | Liftable top drilling and bar planting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921066051.9U CN210597643U (en) | 2019-07-09 | 2019-07-09 | Liftable top drilling and bar planting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN210597643U true CN210597643U (en) | 2020-05-22 |
Family
ID=70690877
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921066051.9U Expired - Fee Related CN210597643U (en) | 2019-07-09 | 2019-07-09 | Liftable top drilling and bar planting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN210597643U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111827150A (en) * | 2020-09-04 | 2020-10-27 | 保利长大工程有限公司 | The reinforcement method of adding new arch ring under the main arch ring of the old stone arch bridge |
-
2019
- 2019-07-09 CN CN201921066051.9U patent/CN210597643U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111827150A (en) * | 2020-09-04 | 2020-10-27 | 保利长大工程有限公司 | The reinforcement method of adding new arch ring under the main arch ring of the old stone arch bridge |
| CN111827150B (en) * | 2020-09-04 | 2021-05-14 | 保利长大工程有限公司 | Reinforcing method for additionally arranging new arch ring under main arch ring of old stone arch bridge |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206393834U (en) | A kind of construction prefabricated drilling equipment of cement wall | |
| CN218759696U (en) | Portable drilling device for geotechnical engineering investigation | |
| CN210597643U (en) | Liftable top drilling and bar planting device | |
| CN217556944U (en) | A excavation supporting device for building engineering construction | |
| CN205847173U (en) | A kind of photovoltaic bracket | |
| CN214272065U (en) | Foundation pit support intelligent supporting device | |
| CN202659150U (en) | Spiral base-expanding integral drill | |
| CN210827520U (en) | Hydraulic engineering foundation ditch drainage support | |
| CN210636773U (en) | Civil engineering wall brick builds auxiliary device | |
| CN215671124U (en) | Construction is with heavy object pressure-bearing base that has bradyseism structure | |
| CN106968248B (en) | A pile driver for civil engineering | |
| CN213837625U (en) | Civil engineering construction is with construction support | |
| CN215569093U (en) | Surveying and mapping device for informatization management of natural resources | |
| CN210370008U (en) | Crossbeam strutting arrangement for construction | |
| CN212614540U (en) | A drilling machine for ore mining | |
| CN213478217U (en) | Drilling device for geological exploration | |
| CN213597557U (en) | Safe civil engineering construction support frame | |
| CN216553041U (en) | A novel creeping formwork support body for floor structure department uses | |
| CN217406146U (en) | Assembled facade support | |
| CN108687372A (en) | A kind of building template detection drilling equipment | |
| CN221647074U (en) | Wind power generation isolation net installation equipment | |
| CN206637196U (en) | A kind of device for work high above the ground | |
| CN220815513U (en) | A construction ladder | |
| CN221920811U (en) | High stability rig support | |
| CN215291851U (en) | Water conservancy construction safety arrangement |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200522 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |