CN210596954U - Leveling device for highway construction - Google Patents
Leveling device for highway construction Download PDFInfo
- Publication number
- CN210596954U CN210596954U CN201921132993.2U CN201921132993U CN210596954U CN 210596954 U CN210596954 U CN 210596954U CN 201921132993 U CN201921132993 U CN 201921132993U CN 210596954 U CN210596954 U CN 210596954U
- Authority
- CN
- China
- Prior art keywords
- plate
- fixedly connected
- box
- type levelling
- vibrator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a leveling device for highway construction, the mounting panel comprises a mounting panel, two telescopic cylinder of bottom fixedly connected with of mounting panel, two telescopic cylinder's the common fixedly connected with U type levelling plate of output, the interior bottom fixedly connected with wedge, first box and the second box in proper order of U type levelling plate, first box runs through jointly with the bottom of U type levelling plate and is equipped with a plurality of first small openings, the second box runs through jointly with the bottom of U type levelling plate and is equipped with a plurality of second small openings, the bottom of U type levelling plate is equipped with logical groove, be equipped with the fixed plate in the U type levelling plate, the bottom fixedly connected with vibrator of fixed plate. The utility model discloses it is rational in infrastructure, when handling to grout surfacing, can collect unnecessary grout, also can carry out the automation to the depressed part and fill, improved to grout surperficial level and smooth efficiency and level effectual, construction cycle is short, saves staff's physical power.
Description
Technical Field
The utility model relates to a technical field is used in the highway construction, especially relates to a be used for leveling device for highway construction.
Background
At present, village communication is realized in rural areas, namely cement roads are paved between two villages, so that people can go out more conveniently, and convenience is brought to people.
When a cement road is paved, firstly, a formwork is built on the roadbed, then cement paste is poured into the formwork and leveled, the formwork can be detached when the cement paste is completely solidified, and the pavement of the cement road is completed; currently, most of the poured cement paste is leveled by manually holding a straight wood board, and then workers fill the cement paste surface with obvious depressions, so that the paved cement pavement is guaranteed to be relatively level; however, the leveling and filling of the cement paste surface are manually operated, so that the construction efficiency is greatly reduced, the period is long, and the workload of workers is increased, so that the leveling device for highway construction is designed to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the leveling device for highway construction that proposes, when it is handled to grout surfacing, can collect unnecessary grout, also can carry out automatic filling to the depressed part, improved level and smooth efficiency and level effectual to grout surface, construction cycle is short, saves staff's physical power.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a leveling device for highway construction comprises a mounting plate, wherein the bottom of the mounting plate is fixedly connected with two telescopic cylinders, the output ends of the two telescopic cylinders are fixedly connected with a U-shaped leveling plate together, the inner bottom of the U-shaped leveling plate is fixedly connected with a wedge block, a first box body and a second box body in sequence, a plurality of first leakage holes are arranged at the bottom of the first box body and the U-shaped leveling plate in a penetrating way, a plurality of second leakage holes are arranged at the bottom of the second box body and the U-shaped leveling plate in a penetrating way, the bottom of the U-shaped leveling plate is provided with a through groove, a fixed plate is arranged in the U-shaped leveling plate, the bottom of the fixed plate is fixedly connected with a vibrator, the vibrating plate is fixedly connected with the output end of the vibrator and penetrates through the through groove, the bottom of the mounting plate is provided with a walking mechanism, and the upper end of the mounting plate is provided with a power supply electrically connected with the vibrator.
Preferably, the upper end of the U-shaped leveling plate is fixedly connected with two connecting plates, and the two connecting plates are respectively connected with the output ends of the telescopic cylinders on the same side.
Preferably, a plurality of third leak holes are formed in the bottom of the U-shaped flat plate between the wedge-shaped block and the first box body in a penetrating mode.
Preferably, the fixing plate is located between the first casing and the second casing.
Preferably, the walking mechanism comprises four supporting legs fixed at the bottom of the mounting plate, and four walking wheels are fixedly connected to the bottoms of the supporting legs.
Preferably, the mounting plate is fixedly connected with a push handle.
Compared with the prior art, the utility model, its beneficial effect does:
1. the utility model can collect the redundant cement slurry through the groove body formed by the wedge block, the U-shaped leveling plate and the first box body, so that the resource is not wasted; the cement paste in the first box body leaks out through the first through hole by means of the self gravity, the concave part can be automatically filled, and the filled cement paste can be vibrated through the vibrator and the vibrating plate, so that the filling effect is better; grout in the second box falls the concave department that exists after vibrations through the second small opening, carries out automatic filling to it, then carries out the flattening to the grout after filling through U type leveling plate, and the flattening is effectual, has improved work efficiency, has saved staff's physical power.
To sum up, the utility model discloses rational in infrastructure, when handling grout surfacing, can collect unnecessary grout, also can carry out automatic filling to the depressed part, improved to grout surperficial level and smooth efficiency and level and smooth effectual, construction cycle is short, saves staff's physical power.
Drawings
Fig. 1 is a schematic structural view of a leveling device for road construction according to the present invention;
fig. 2 is a side view of a partial structure in a leveling device for road construction according to the present invention.
In the figure: the device comprises a mounting plate 1, a telescopic cylinder 2, a 3U-shaped flattening plate, a 4 wedge-shaped block, a 5 first box, a 6 second box, a 7 through groove, an 8 fixing plate, a 9 vibrator, a 10 vibrating plate, a 11 first leak hole, a 12 second leak hole, a 13 third leak hole, a 14 power supply, 15 supporting legs, 16 walking wheels, 17 pushing handles and 18 connecting plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, the leveling device for highway construction comprises a mounting plate 1, wherein the bottom of the mounting plate 1 is fixedly connected with two telescopic cylinders 2, the output ends of the two telescopic cylinders 2 are fixedly connected with a U-shaped leveling plate 3 together, and the U-shaped leveling plate 3 is a steel plate with the thickness of 4 mm; two connecting plates 18 are fixedly connected to the upper end of the U-shaped leveling plate 3, the two connecting plates 18 are respectively connected with the output ends of the telescopic cylinders 2 on the same side, and the output ends of the telescopic cylinders 2 are connected with the middle points of the connecting plates 18 through welding.
The wedge-shaped block 4, the first box body 5 and the second box body 6 are fixedly connected to the inner bottom of the U-shaped leveling plate 3 in sequence, the inner widths of the wedge-shaped block 4, the first box body 5 and the second box body 6 are the same as the inner width of the U-shaped leveling plate 3, and the first box body 5 and the second box body 6 are filled with cement paste, so that the concave position of the cement paste surface can be filled conveniently; the bottom of the U-shaped leveling plate 3 between the wedge block 4 and the first box 5 is provided with a plurality of third leak holes 13 in a penetrating mode, when the U-shaped leveling plate 3 moves on a cement paste surface, redundant cement paste can move to the wedge block 4, the wedge block 4 can fall between the wedge block 4 and the first box 5, when a concave position is met, the cement paste can leak through the third leak holes 13, and more cement paste cannot be accumulated.
The first box body 5 and the bottom of the U-shaped leveling plate 3 are provided with a plurality of first leakage holes 11 in a penetrating mode, and when a concave part appears after the U-shaped leveling plate 3 is leveled, cement paste can flow to the concave part through the first leakage holes 11 by means of self gravity to fill the concave part; the second box 6 and the bottom of the U-shaped flat plate 3 are provided with a plurality of second leak holes 12 in a penetrating mode, and cement paste is exposed out of the second leak holes 12 to fill the concave parts after being vibrated by the vibrator 9 and the vibrating plate 10.
A through groove 7 is formed in the bottom of the U-shaped leveling plate 3, a fixing plate 8 is arranged in the U-shaped leveling plate 3, the fixing plate 8 is located between the first box body 5 and the second box body 6, the fixing plate 8 is connected with the U-shaped leveling plate 3 through welding to provide a mounting point for a vibrator 9, and the vibration of the vibrator 9 is beneficial to outflow of cement paste in the first box body 5 and the second box body 6; the bottom fixedly connected with vibrator 9 of fixed plate 8, the output fixedly connected with of vibrator 9 runs through logical groove 7's vibration board 10, can expose the cement filling department to first small opening 11 through vibrator 9 and vibration board 10 and shake, makes it fill the effect better.
The bottom of the mounting plate 1 is provided with a travelling mechanism, the travelling mechanism comprises four supporting legs 15 fixed at the bottom of the mounting plate 1, travelling wheels 16 are fixedly connected at the bottoms of the four supporting legs 15, and the four supporting legs 15 are distributed in a rectangular shape and welded at the bottom of the mounting plate 1; the upper end of the mounting plate 1 is provided with a power supply 14 electrically connected with the vibrator 9, and the power supply 14 can provide power resources for the vibrator 9; the mounting plate 1 is fixedly connected with a push handle 17, and the mounting plate 1 is convenient to push through the push handle 17.
The utility model discloses in, when the grout of laying on the road bed carries out level, at first staff to the output downstream of controlling two telescopic cylinder 2 for U type levelling plate 3 offsets with the grout face, then packs into an amount of grout respectively in to first box 5 and the second box 6, starts vibrator 9 afterwards.
The worker slowly pushes the mounting plate 1 through the push handle 17, the mounting plate 1 is slowly moved through the travelling wheels 16, and the cement paste surface can be leveled through the U-shaped leveling plate 3; the excess cement paste can slide between the first box body 5 and the wedge-shaped block 4 through the wedge-shaped block 4, so that the excess cement paste can be collected, and resources cannot be wasted; when meeting the concave position, the cement paste in the first box body 5 can leak out through the first leakage hole 11 and fall on the concave position, so that the concave position is filled, then the vibrator 9 drives the vibrating plate 10 to vibrate, and the filled cement paste is vibrated, so that the filling effect is better.
If the vibrated cement paste surface still has a concave part, cement paste in the second box body 6 falls on the concave part through the second leak holes 12 and fills the concave part, and then the cement paste filled for the second time can be leveled through the bottom of the U-shaped leveling plate 3, so that the leveling and filling effects on the cement paste road surface are good, and the construction efficiency is improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a leveling device for highway construction, includes mounting panel (1), its characterized in that, the bottom fixedly connected with two telescopic cylinder (2) of mounting panel (1), two the common fixedly connected with U type levelling plate (3) of output of telescopic cylinder (2), the interior bottom fixedly connected with wedge (4), first box (5) and second box (6) in proper order of U type levelling plate (3), the bottom of first box (5) and U type levelling plate (3) is run through jointly and is equipped with a plurality of first small openings (11), the bottom of second box (6) and U type levelling plate (3) is run through jointly and is equipped with a plurality of second small openings (12), the bottom of U type levelling plate (3) is equipped with logical groove (7), be equipped with fixed plate (8) in U type levelling plate (3), the bottom fixedly connected with vibrator (9) of fixed plate (8), the vibrating plate (10) penetrating through the through groove (7) is fixedly connected to the output end of the vibrator (9), a walking mechanism is arranged at the bottom of the mounting plate (1), and a power supply (14) electrically connected with the vibrator (9) is arranged at the upper end of the mounting plate (1).
2. The flattening device for highway construction according to claim 1, characterized in that two connecting plates (18) are fixedly connected to the upper end of said U-shaped flattening plate (3), and said two connecting plates (18) are respectively connected to the output ends of the telescopic cylinders (2) on the same side.
3. Levelling device for road construction according to claim 1 characterized in that the bottom of the U-shaped levelling plate (3) between the wedge-shaped block (4) and the first box (5) is perforated with a plurality of third holes (13).
4. Levelling device for road construction according to claim 1 characterized in that the fixing plate (8) is located between the first box (5) and the second box (6).
5. The flattening device for road construction according to claim 1, characterized in that the walking mechanism comprises four supporting legs (15) fixed at the bottom of the mounting plate (1), and walking wheels (16) are fixedly connected to the bottoms of the four supporting legs (15).
6. Levelling device for road construction according to claim 1, characterized in that a push handle (17) is fixedly connected to the mounting plate (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921132993.2U CN210596954U (en) | 2019-07-18 | 2019-07-18 | Leveling device for highway construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921132993.2U CN210596954U (en) | 2019-07-18 | 2019-07-18 | Leveling device for highway construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210596954U true CN210596954U (en) | 2020-05-22 |
Family
ID=70691042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921132993.2U Active CN210596954U (en) | 2019-07-18 | 2019-07-18 | Leveling device for highway construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210596954U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113944086A (en) * | 2021-11-05 | 2022-01-18 | 中泸有限公司 | A device for construction of town road structural layer |
-
2019
- 2019-07-18 CN CN201921132993.2U patent/CN210596954U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113944086A (en) * | 2021-11-05 | 2022-01-18 | 中泸有限公司 | A device for construction of town road structural layer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210596954U (en) | Leveling device for highway construction | |
CN110424226A (en) | Kerbstone precast assembly side form and its construction technology | |
CN105804101B (en) | Reduce off-loading supporting and retaining system system and construction method and the application of retaining structure stress | |
CN210657852U (en) | Prefabricated road deck and temporary road structure | |
CN210439477U (en) | Post-cast strip interception structure | |
CN203755690U (en) | Vibrating device used for plate type structure concrete | |
CN206545159U (en) | A kind of road deck concrete construction formwork | |
CN211547217U (en) | Auxiliary device is used in road construction | |
CN114775401A (en) | Cable-stayed bridge steel-concrete combined section and ultra-large area grouting construction method thereof | |
CN210152240U (en) | Template for preventing slurry leakage of splicing seams of laminated slab | |
CN209443346U (en) | Road engineering road stone tamping equipment | |
CN202577121U (en) | Template for sub-base layer and base layer of cement stabilized macadam | |
WO2021012759A1 (en) | Long-span pre-stressed structure floor slab and high-precision building floor topping one-time forming construction method | |
CN205577261U (en) | Civil engineering constructs pillar | |
CN105715042B (en) | Tool-type building drop panel assembly and its construction method | |
CN210561528U (en) | Pile sheet formula road bed connecting elements that leakproofness is good | |
CN206883871U (en) | One kind is used for cored slab primary concreting bed die | |
CN218861246U (en) | Sitting slurry assembly type panel structure and pavement structure | |
CN217922940U (en) | Road surface leveling equipment for highway engineering | |
CN113059685A (en) | Precast beam construction system and construction method | |
CN216766233U (en) | Node suitable for regional concrete placement is watered after assembled PEC post | |
CN213774467U (en) | Beam slab post-cast strip template mechanism | |
CN210262938U (en) | Multipurpose fixing device for concrete precast slab of water conservancy | |
CN208633134U (en) | A kind of construction formwork based on electric welding net isolated gate basis | |
CN214573133U (en) | Highway is vibrating device for road bed engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |